CN106337446A - Indoor test device for pulling resistance of pile foundation and test method of indoor test device - Google Patents

Indoor test device for pulling resistance of pile foundation and test method of indoor test device Download PDF

Info

Publication number
CN106337446A
CN106337446A CN201610853864.7A CN201610853864A CN106337446A CN 106337446 A CN106337446 A CN 106337446A CN 201610853864 A CN201610853864 A CN 201610853864A CN 106337446 A CN106337446 A CN 106337446A
Authority
CN
China
Prior art keywords
sensing unit
foundation ditch
foundation
pile
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610853864.7A
Other languages
Chinese (zh)
Other versions
CN106337446B (en
Inventor
李浩然
杜彦良
赵维刚
王景春
高阳
张骞
刘博�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tiedao University
Original Assignee
Shijiazhuang Tiedao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tiedao University filed Critical Shijiazhuang Tiedao University
Priority to CN201610853864.7A priority Critical patent/CN106337446B/en
Publication of CN106337446A publication Critical patent/CN106337446A/en
Application granted granted Critical
Publication of CN106337446B publication Critical patent/CN106337446B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention discloses an indoor test device for testing the pulling resistance of a pile foundation. The indoor test device comprises a test box, a foundation pit and pile foundation system, a stress loading system and a monitoring system used for testing all parameters in the test process. The test box is placed on the ground and filled with test soil. The foundation pit and pile foundation system is arranged in the soil layer of the test box. The stress loading system is connected with the foundation pit and pile foundation system through a steel wire rope. According to the indoor test device for testing the pulling resistance of the pile foundation, monitoring of the stress characteristic and strain change of a pile body in foundation pit excavation and pile foundation bearing processes can be achieved, and the overall structure of the device is simple. The indoor test device can also be used for studying the action relation between the strain of the pile body and the pulling resistance, the influence of the interface characteristic of pile soil on the pulling resistance of the pile foundation, the influence of the pressure of the soil layer on the pulling resistance of the pile foundation, the influence of the pile diameter ratio on the pulling resistance of the pile foundation, and the influence of the moisture content on the pulling resistance of the pile foundation, and a foundation is laid for deep study on the pulling-resisting mechanism and influence factors of uplift piles.

Description

A kind of pile foundation resistance to plucking laboratory testing rig and its experimental technique
Technical field
The present invention relates to a kind of laboratory testing rig of pile foundation extraction-resistant behavior test and using method, belong to Geotechnical Engineering Indoor test technical field, is applied particularly to pile foundation performance detection technical field.
Technical background
With the extensive development of China's urban construction, urban underground space utilization rate requires more and more higher, when underground work When journey buried depth is shallower, under the influence of extraneous factor (strong wind, subsoil water), engineering structure will face floating risk.Especially South China most area, rainfall is abundant, and long-term level of ground water is higher, and soil layer geological condition is poor, when hypogee When deadweight and earthing weight sum can not balance buoyancy force of underground water effect, structure floating problem is following.Ask for solving this Topic, presently most used measure is setting uplift pile.Uplift pile is also anti-floating pile, refer to when architectural engineering underground structure part or During the whole water level less than Soil Surrounding, the stake that arranges to resist the buoyancy that in soil, water produces to structure.Therefore, in foundation ditch The protuberance deformation at Foundation Pit bottom caused by buoyancy and the stressing conditions of pile foundation are easily and accurately predicted before excavation, for The design of the support system of the design of uplift pile arrangement of reinforcement, construction and inner support foundation ditch under the conditions of contrary sequence method, all has weight The directive significance wanted.
The test of pile foundation extraction-resistant behavior has laboratory test and field test two ways.Field test is time-consuming longer, manpower, Material resources are relatively costly, and field test safety management requires strictly, therefore, to compare field test, laboratory test becomes one kind more For easily means of testing.
Content of the invention
The technical problem to be solved in the present invention is that a kind of structure of offer is simple, efficiently facilitates, measures accurate uplift pile Can indoor experimental apparatus and experimental technique, it can study a pedosphere region feature, earth pressure, stake footpath ratio, moisture content etc. because The impact to pile foundation extraction-resistant behavior for the element.
In order to solve above-mentioned technical problem, the technical solution adopted in the present invention is: a kind of pile foundation extraction-resistant behavior test Laboratory testing rig, its key technology is: it includes experimental box body, foundation ditch and pile foundation system, stress loading system and use The monitoring system of the parameters during determination test;Described experimental box body is placed on the ground, its solid experiment The soil body, described foundation ditch and pile foundation system are positioned in the soil layer of experimental box body, described stress loading system and foundation ditch and pile foundation system System is connected by steel wire rope;
Described experimental box body main body is frame structure, and the top of described experimental box body side, bottom are respectively perpendicular setting pod apertures, Setting connection valve at described pod apertures, arranges water level displaying tube between lower upper connection valve;
Described foundation ditch and pile foundation system include foundation ditch groove and the simulation stake that sandy soil can be placed in inside, described foundation ditch groove top for cube Shape, its upper opening, side, bottom surface are welded by steel plate;The top of described four side steel plates of foundation ditch groove arranges 4 Connecting hole, connecting hole is used for realizing system for pit and the connection of stress loading system, the bottom surface weld bolt of described foundation ditch groove, institute Stating simulation stake is hollow steel pipe, the nut of simulation stake top end interior welds and bolt matching, and the middle part of described simulation stake sets Put the microchannels for pasting strain sensing unit;
Described stress loading system includes bracing frame, fixed pulley, steel wire rope, stress loading disk and counterweight composition, support frame as described above Including vertical support steel beam, horizontal support girder steel and inclined shore girder steel, described vertical support steel beam is connected with experimental box body, institute State horizontal support girder steel to be welded and fixed with vertical support steel beam, the vertical support steel beam of described inclined shore girder steel one end welding, one End weld horizontal support steel beam, is provided with fixed pulley above described horizontal support girder steel, one end linker pit of described steel wire rope, The other end is connected with stress loading disk by two fixed pulleys, and described stress loading disk is used for placing experiment weights;
Described monitoring system include soil pressure sensing unit, water pressure sensing unit, strain sensing unit, displacement sensing unit, Data wire data acquisition system, described soil pressure sensing unit, water pressure sensing unit, strain sensing unit, displacement sensing Unit is connected with data collecting system respectively, and described soil pressure sensing unit is embedded in simulation stake surrounding soil, described hydraulic pressure Power sensing unit is embedded in the soil body of foundation ditch trench bottom, and described strain sensing unit is pasted miniature in simulation stake middle part In groove, described displacement sensing unit is fixed on four angles on foundation ditch groove top.
Preferably, described experimental box body includes rigid frame, safety glass, water level displaying tube, connection valve, cushion pad Piece and geotextile, described rigid frame is welded by certain thickness cylindrical steel, assumes sphere of movements for the elephants shape cloth on bottom surface Put, assume " day " word row arrangement four sides;The contact position of described rigid frame and safety glass arranges buffering spacer, institute State the upper and lower that pod apertures are located at the safety glass of side, described safety glass with connect valve, connect valve and water level Between display tube, sealing ring is set, and using resin glue reality sealing.In connection valve internal setting geotextile.
Preferably, the surface of described simulation stake could be arranged to smooth surface or thread surface.
Preferably, the concrete structure of described stress loading system is: described vertical support steel beam sets four altogether, every support The bottom of girder steel is welded with the cylindrical steel of the rigid frame corner of experimental box body respectively, and top is welded with horizontal support girder steel Connect, vertical support steel beam is used for supporting the stress load on top;Described horizontal support girder steel sets the six roots of sensation altogether, assumes " mesh " font and divides Cloth feature, wherein two horizontal support girder steels are parallel with stress loading direction, four horizontal support girder steels and stress loading direction Tangent, horizontal support girder steel is welded and fixed with vertical support steel beam;Vertical support steel beam is welded in described inclined shore girder steel one end, Other end weld horizontal support steel beam;The center of gravity of second tangential horizontal support girder steel be located at foundation ditch groove central upper, the 4th The center of gravity of root tangential horizontal support girder steel is located at the central upper of stress loading disk, in second tangential horizontal support girder steel and the Fixed pulley is laid in the centre position of four horizontal support girder steels respectively, is fixed using Type of Welding between fixed pulley and girder steel.
The experimental technique of the laboratory testing rig of above-described pile foundation extraction-resistant behavior test, it comprises the steps:
(1) according to known formation information, soil is weighed, pave inside experimental box body 1, be compacted, choose a kind of simulation stake, Strain sensing unit is pasted on the surface of simulation stake, using screw bolt and nut, foundation ditch groove is connected with simulation both stakes, in specified height The embedded foundation ditch groove of degree, simulation stake, soil pressure sensing unit, water pressure sensing unit, in the upper end fixed displacement sensing of foundation ditch groove Soil pressure sensing unit, water pressure sensing unit, strain sensing unit, displacement sensing unit are connected by unit using data wire To data collecting system, gather soil pressure sensing unit, water pressure sensing unit, strain sensing unit, displacement sensing unit letter Breath, after test requirements document condition to be achieved, prepares to start to test;
(2) the progressively experiment soil body in excavation pit groove, the reduction of upper load will cause foundation ditch groove and the deformation of simulation stake And displacement, using strain sensing unit, displacement sensing unit Deformation Monitoring and displacement information;
(3) after the completion of the experiment soil excavation in foundation ditch groove, start to place counterweight in stress loading disk, now, pulling force passes through fixed Pulley and steel wire rope, conduct to foundation ditch groove;It is stepped up the quality of counterweight, the weight of record weights and loading procedure, foundation ditch groove To produce in the presence of pulling force with simulation stake and shift up, will eventually be pulled out;
(4) collection, the soil pressure sensing unit arranging in this experimentation, water pressure sensing unit, strain sensing unit, position Move sensing unit, load counterbalance mass information, draw the foundation ditch groove in excavation of foundation pit and external force loading procedure and the change simulating stake Shape and displacement characteristic;Arrange foundation ditch and bear external force load and uplift displacement relationship characteristic, show that the stress-displacement of uplift pile is bent Line;
(5) after the completion of testing, remove loading counterweight, unload stress loading system, and foundation ditch and pile foundation system are moved from soil layer Go out, then the soil body in experimental box body 1 inside is cleaned out, in case next time, experiment used;
(6) repeat the above steps 1~5, the simulation stake changing different roughness is it is possible to draw another kind of surface roughness resistance to plucking The stress-displacement curve of stake, the stress-displacement curve of contrast different surface roughness uplift pile is it is possible to analysis draws pile body The impact to extraction-resistant behavior for the roughness.
Have the beneficial effects that using produced by technique scheme: the present invention can realize excavation of foundation pit and hold with pile foundation Pile body stress characteristic during load, strain variation monitoring, equipment overall structure is fairly simple.In process of the test, the present invention can With parameter attributes such as monitoring test soil pressure, water pressure, foundation ditch floating displacement, uplift load size, pile body displacements;The present invention can For the interactively of research pile strain and withdrawal resistance, the impact of stake Soil Interface Characteristics on Pile plinth extraction-resistant behavior, soil layer The impact to pile foundation extraction-resistant behavior for the pressure, stake footpath compare the impact of pile foundation extraction-resistant behavior, moisture content to pile foundation resistance to plucking The impact of energy, Study on Anti-Tensile Mechanism and influence factor for furtheing investigate uplift pile provide basis.
Brief description
Fig. 1 is a kind of pile foundation resistance to plucking laboratory testing rig schematic diagram;
Fig. 2 is the schematic diagram arranging buffering spacer between safety glass and rigid frame;
Fig. 3 is a kind of foundation ditch and pile foundation system structure diagram;
Fig. 4 is the schematic view of the mounting position of strain sensing unit;
Fig. 5 is to pull out load-deformation curve in uplift pile in certain process of the test;
Fig. 6 is to pull out load-deformation curve in uplift pile under different moisture content state;
Wherein, experimental box body 1;Rigid frame 1-1;Safety glass 1-2;Water level displaying tube 1-3;Connection valve 1-4;Sealing ring 1- 5, buffering spacer 1-6;Foundation ditch and pile foundation system 2;By foundation ditch groove 2-1;Simulation stake 2-2;Bolt 2-3;Nut 2-4;Stress loading System 3;It is by supporting steel frame 3-1;Fixed pulley 3-2;Steel wire rope 3-3;Stress loading disk 3-4;Counterweight 3-5;Monitoring system 4;Soil Pressure sensitive unit 4-1;Water pressure sensing unit 4-2;Strain sensing unit 4-3;Displacement sensing unit 4-4.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is further detailed.
Referring to accompanying drawing 1- accompanying drawing 4, the present embodiment include experimental box body 1, foundation ditch and pile foundation system 2, stress loading system 3 and 4 four parts of monitoring system.Experimental box body 1 is placed on ground, the solid experiment soil body.Foundation ditch and pile foundation system 2 and stress Loading system 3 is passed through load transfer device and is connected, and foundation ditch and pile foundation system 2 are positioned in the soil layer of experimental box body 1.
Part I is experimental box body 1, and it is by rigid frame 1-1, safety glass 1-2, water level displaying tube 1-3, communicating valve Door 1-4, sealing ring 1-5 composition, buffering spacer 1-6, geotextile 1-7 composition.Rigid frame 1-1 is by certain thickness cylindrical steel Sealing of tube forms, and assumes sphere of movements for the elephants shape arrangement on bottom surface, assumes " day " word row arrangement four sides, can be experimental box body The safety glass cavity of bottom surface and side provides protection.Safety glass 1-2 thickness is more than 15mm, and has enough rigidity.Bottom Bondd with resin glue between the safety glass (one piece) in face and the safety glass (four pieces) of four sides, to realize experimental box body Seal, water white transparency material selected by safety glass, to be easy to observe the internal soil body and water level information.Rigid frame 1-1 and steel Change the contact position arrangement buffering spacer 1-6 of glass 1-2, to realize the good contact of the two, and provide guarantor for safety glass 1-2 Shield.Pod apertures are set in the top of side safety glass, lower vertical, setting connection valve 1-4, lower upper connection at pod apertures Water level displaying tube 1-3 is set between valve 1-4, safety glass 1-2 with connect valve 1-4, connect valve 1-4 and water level displaying tube Between 1-3, sealing ring 1-5 is set, and using resin glue reality sealing.Inside connection valve 1-4, geotextile 1-7 is set, with Prevent sandy soil from entering, block water level displaying tube 1-3.
Part II foundation ditch and pile foundation system 2, by foundation ditch groove 2-1, simulation stake 2-2, bolt 2-3, nut 2-4, connecting hole 2-5 forms.Foundation ditch groove 2-1 top assumes cube body characteristicses, upper opening, and side, bottom surface are welded by steel plate, has certain Rigidity.Sandy soil can be placed in the inside of foundation ditch groove 2-1, to imitate the impact excavated to uplift pile of underground engineering.Four sides The top of steel plate arranges 4 connecting hole 2-5, for realizing the connection of system for pit and stress loading system.The bottom surface of foundation ditch groove Weld bolt 2-3, bolt 2-3 arrangement assumes array features, for realizing the connection of foundation ditch groove and simulation stake 2-2.Simulation stake 2-2 For hollow steel pipe, its length can be arranged according to test requirements document.The surface of simulation stake 2-2 could be arranged to smooth surface or spiral shell Stricture of vagina surface, to study the impact to pile body extraction-resistant behavior for the different roughness.In the top interior welds nut 2-4 of simulation stake 2-2, For realizing the connection of foundation ditch groove 2-1 and simulation stake 2-2, in the middle part setting microchannels of simulation stake 2-2, it is used for pasting Strain sensing unit.During test, by the connection connecting realization simulation stake 2-2 and foundation ditch groove 2-1 of bolt 2-3, nut 2-4.
Part III is stress loading system 3.It is by vertical support steel beam 3-1, horizontal support girder steel 3-2 and inclined shore Girder steel 3-3, fixed pulley 3-4, steel wire rope 3-5, stress loading disk 3-6 and counterweight 3-7 composition.Vertically support steel beam 3-1 has four Root, the bottom of every support steel beam is welded with the cylindrical steel of the rigid frame 1-1 corner of experimental box body 1 respectively, top with Horizontal support girder steel 3-2 welds, and vertical support steel beam 3-1 is used for supporting the stress load on top.Horizontal support girder steel 3-2 has The six roots of sensation, assumes " mesh " font distribution characteristicss, and wherein two horizontal support girder steel 3-2 are parallel with stress loading direction, four levels Support steel beam 3-2 is tangent with stress loading direction, and horizontal support girder steel 3-2 is welded and fixed with vertical support steel beam 3-1.Tilt to prop up Support girder steel 3-3 one end weld vertical support steel beam 3-1, one end weld horizontal support steel beam 3-2 it is ensured that stress loading system whole Body stability.The center of gravity of second tangential horizontal support girder steel is located at the central upper of rigid frame 1-1, the 4th tangential level The center of gravity of support steel beam 3-2 is located at the central upper of stress loading disk 3-6.In second tangential horizontal support girder steel 3-2 and Fixed pulley 3-4 is laid in the centre position of four horizontal support girder steel 3-2 respectively, between fixed pulley 3-4 and horizontal support girder steel 3-2 Fixed using Type of Welding.One end of steel wire rope 3-5 connects the foundation ditch groove 2-1 in foundation ditch and pile foundation system 2, by two fixed cunnings Wheel 3-4 is connected with stress loading disk 3-6, and stress loading disk 3-6 is used for placing experiment weights 3-7.When stress loading disk 3-6 top When placing counterweight 3-7, external stress will be delivered in foundation ditch and pile foundation system 2 by steel wire rope 3-5, thus to foundation ditch and pile foundation System 2 produces uplift force.
Part IV is monitoring system 4.It is by soil pressure sensing unit 4-1, water pressure sensing unit 4-2, strain sensing Unit 4-3, displacement sensing unit 4-4, data wire, data collecting system composition.Wherein, soil pressure sensing unit 4-1, water pressure Sensing unit 4-2, strain sensing unit 4-3, displacement sensing unit 4-4 are connected with data collecting system respectively, for measuring examination Parameters during testing.Soil pressure sensing unit 4-1 is embedded in simulation stake 2-2 surrounding soil, is connected by data wire To data collecting system, for the soil pressure change during monitoring test.Water pressure sensing 4-2 unit is embedded in foundation ditch groove 2- In the soil body of 1 bottom, data collecting system is connected to by data wire, bears for the foundation ditch groove 2-1 during monitoring test Water pressure situation.Strain sensing unit 4-3 pastes in the microchannels of simulation stake 2-2 middle part, by data wire even It is connected to data collecting system, for monitoring the simulation stake 2-2 deformation during uplift test.Displacement sensing unit 4-4 is solid It is scheduled on four angles on foundation ditch groove 2-1 top, data collecting system is connected to by data wire, during monitoring uplift test Foundation ditch groove 2-1 uplift displacement.Data collecting system can gather soil pressure in whole process of the test, water pressure, simulation stake The information such as strain, foundation ditch groove displacement.Data collecting system can be surveyed using static stress and deformation tester dh1838(Jiangsu East China Examination technical concern company limited produces), other kinds of product certainly may also be employed, meet use requirement.
Apply the impact to pile foundation extraction-resistant behavior for this device to test Pile Soil interfacial characteristics, its experimental procedure is as follows:
(1) according to known formation information, soil is weighed, pave inside experimental box body 1, be compacted.Choose a kind of simulation stake 2- 2, paste strain sensing unit 4-3 on the surface of simulation stake 2-2, using bolt 2-3 and nut 2-4, by foundation ditch groove 2-1 and simulation Stake both 2-2 are connected.Bury foundation ditch groove 2-1, simulation stake 2-2, soil pressure sensing unit 4-1, water pressure sensing in specified altitude assignment Unit 4-2, in the upper end fixed displacement sensing unit 4-4 of foundation ditch groove 2-1.Using data wire, by soil pressure sensing unit 4-1, Water pressure sensing unit 4-2, strain sensing unit 4-3, displacement sensing unit 4-4 are connected to data collecting system.To experimental box The body 1 injection design water yield, collection soil pressure sensing unit 4-1, water pressure sensing unit 4-2, strain sensing unit 4-3, displacement Sensing unit 4-4 information, prepares to start to test.
(2) experimental box body 1 top lentamente, equably artificial rainmaking, water penetrate into the soil body after, water pressure sensing unit 4-2 will perceive the water pressure change of inside soil body, when experimental box body 1 internal water pressure reaches design load, stops precipitation;Accurate Standby start to test.
(3) the progressively experiment soil body in excavation pit groove 2-1, the water of the reduction of upper load and foundation ditch groove 2-1 bottom surface floats Power acts on, it will cause deformation and the displacement of foundation ditch groove 2-1 and simulation stake 2-2, using strain sensing unit 4-3, displacement sensing Unit 4-4 Deformation Monitoring and displacement information.
(4), after the completion of the experiment soil excavation in foundation ditch groove 2-1, start to place counterweight 3-7 in stress loading disk 3-6, this When, pulling force passes through fixed pulley 3-4 and steel wire rope 3-5, conducts to foundation ditch groove 2-1;It is stepped up the quality of counterweight 3-7, writing-method The weight of code 3-7 and loading procedure, foundation ditch groove 2-1 and simulation stake 2-2 will produce in the presence of pulling force and shift up, the most at last Can be pulled out.
(5) collection, the soil pressure sensing unit 4-1 arranging in this experimentation, water pressure sensing unit 4-2, strain Sensing unit 4-3, displacement sensing unit 4-4, loading counterweight 3-7 quality information, draw in excavation of foundation pit and external force loading procedure Foundation ditch groove 2-1 and the simulation deformation of stake 2-2 and displacement characteristic.Arrange foundation ditch and bear external force load and uplift displacement relation spy Levy, draw the stress-displacement curve of uplift pile, see accompanying drawing 5.
(6), after the completion of testing, remove loading counterweight 3-7, unload stress loading system 3, and by foundation ditch and pile foundation system 2 from Remove in soil layer, then the soil body in experimental box body 1 inside is cleaned out, in case next time, experiment used.
(7) repeat the above steps 1~5, the simulation stake 2-2 changing different roughness is it is possible to show that another kind of surface is thick The stress-displacement curve of rugosity uplift pile.The stress-displacement curve of contrast different surface roughness uplift pile is it is possible to analyze Draw the impact to extraction-resistant behavior for the pile body roughness, see Fig. 6.

Claims (5)

1. a kind of test of pile foundation extraction-resistant behavior laboratory testing rig it is characterised in that: it includes experimental box body (1), foundation ditch With pile foundation system (2), stress loading system (3) and the monitoring system (4) for the parameters during determination test;Described Experimental box body (1) is placed on the ground, its solid experiment soil body, and described foundation ditch and pile foundation system (2) are positioned over experimental box In the soil layer of body (1), described stress loading system (3) is connected by steel wire rope with pile foundation system (2) with foundation ditch;
Described experimental box body (1) main body is frame structure, and the top of described experimental box body (1) side, bottom are respectively perpendicular setting Pod apertures, setting connection valve (1-4) at described pod apertures, between upper and lower connection valve (1-4), water level displaying tube is set (1-3);
Described foundation ditch and pile foundation system (2) include the internal foundation ditch groove (2-1) that can place sandy soil and simulation stake (2-2), described base Pit (2-1) top is cubic shaped, its upper opening, and side, bottom surface are welded by steel plate;Described foundation ditch groove (2-1) The top of four side steel plates arranges 4 and is used for realizing the connecting hole (2-5) of the connection of system for pit and stress loading system, institute State the bottom surface weld bolt (2-3) of foundation ditch groove (2-1), described simulation stake (2-2) is hollow steel pipe, in simulation stake (2-2) top Portion's welding and the supporting nut (2-4) of bolt (2-3), the middle part of described simulation stake (2-2) is provided for pasting strain biography The microchannels of sense unit;
Described stress loading system (3) includes bracing frame (3-1), fixed pulley (3-2), steel wire rope (3-3), stress loading disk (3- 4) and counterweight (3-5), support frame as described above (3-1) includes vertical support steel beam, horizontal support girder steel and inclined shore girder steel, described Vertically support steel beam is connected with experimental box body (1), and described horizontal support girder steel and vertical support steel beam are welded and fixed, described inclination Vertical support steel beam, one end weld horizontal support steel beam are welded in support steel beam one end, and it is fixed to be provided with above described horizontal support girder steel Pulley (3-2), one end linker pit (2-1) of described steel wire rope (3-3), the other end passes through two fixed pulleys (3-2) and answers Power loading disc (3-4) is connected, and described stress loading disk (3-4) is used for placing experiment weights (3-5);
Described monitoring system (4) includes soil pressure sensing unit (4-1), water pressure sensing unit (4-2), strain sensing unit (4-3), displacement sensing unit (4-4), data wire data acquisition system, described soil pressure sensing unit (4-1), water pressure pass Sense unit (4-2), strain sensing unit (4-3), displacement sensing unit (4-4) are connected with data collecting system respectively, described soil Pressure sensitive unit (4-1) is embedded in simulation stake (2-2) surrounding soil, and described water pressure sensing unit (4-2) is embedded in base In the soil body of pit (2-1) bottom, described strain sensing unit (4-3) pastes the miniature ditch in simulation stake (2-2) middle part In groove, described displacement sensing unit (4-4) is fixed on four angles on foundation ditch groove (2-1) top.
2. pile foundation extraction-resistant behavior according to claim 1 test laboratory testing rig it is characterised in that: described experiment Casing (1) includes rigid frame (1-1), safety glass (1-2), water level displaying tube (1-3), connection valve (1-4), buffering spacer (1-6) and geotextile, described rigid frame (1-1) is welded by cylindrical steel, assumes sphere of movements for the elephants shape cloth on its bottom surface Put, assume " day " word row arrangement in its four sides;Described rigid frame (1-1) is buffered with the contact position arrangement of safety glass Pad (1-6), described pod apertures are located at the upper and lower of the safety glass (1-2) of side, described safety glass (1-2) and company Setting sealing ring (1-5) between port valve door (1-4), connection valve (1-4) and water level displaying tube (1-3), in connection valve connection Setting geotextile inside valve (1-4).
3. pile foundation extraction-resistant behavior according to claim 1 test laboratory testing rig it is characterised in that: described simulation The surface of stake (2-2) could be arranged to smooth surface or thread surface.
4. pile foundation extraction-resistant behavior according to claim 2 test laboratory testing rig it is characterised in that: described stress The concrete structure of loading system (3) is: described vertical support steel beam sets four altogether, the bottom of every support steel beam respectively with experiment The cylindrical steel welding of rigid frame (1-1) corner of casing (1), top is welded with horizontal support girder steel, vertical supporting steel Beam is used for supporting the stress load on top;Described horizontal support girder steel sets the six roots of sensation altogether, assumes " mesh " font distribution characteristicss, and wherein two Root horizontal support girder steel is parallel with stress loading direction, four horizontal support girder steels and stress loading direction are tangent, horizontal support Girder steel is welded and fixed with vertical support steel beam;Vertical support steel beam is welded in described inclined shore girder steel one end, and the other end welds water Flat support steel beam;The center of gravity of second tangential horizontal support girder steel is located at the central upper of foundation ditch groove (2-1), the 4th tangential water The center of gravity of flat support steel beam is located at the central upper of stress loading disk (3-4), in second tangential horizontal support girder steel and the 4th Fixed pulley (3-2) is laid in the centre position of root horizontal support girder steel respectively, and fixed pulley (3-2) adopts Type of Welding and girder steel between Fixing.
5. described in claim 1 pile foundation extraction-resistant behavior test laboratory testing rig experimental technique it is characterised in that: its Comprise the steps:
(1) according to known formation information, soil is weighed, pave inside experimental box body 1, be compacted, choose a kind of simulation stake (2- 2), paste strain sensing unit (4-3) on the surface of simulation stake (2-2), using bolt (2-3) and nut (2-4), by foundation ditch groove (2-1) the two is connected with simulation stake (2-2), buries foundation ditch groove (2-1), simulation stake (2-2), soil pressure sensing list in specified altitude assignment First (4-1), water pressure sensing unit (4-2), in upper end fixed displacement sensing unit (4-4) of foundation ditch groove (2-1), using data Line is by soil pressure sensing unit (4-1), water pressure sensing unit (4-2), strain sensing unit (4-3), displacement sensing unit (4- 4) it is connected to data collecting system, collection soil pressure sensing unit (4-1), water pressure sensing unit (4-2), strain sensing unit (4-3), displacement sensing unit (4-4) information, after test requirements document condition to be achieved, prepares to start to test;
(2) the progressively experiment soil body in excavation pit groove (2-1), the water of the reduction of upper load and foundation ditch groove (2-1) bottom surface floats Power acts on, it will cause foundation ditch groove (2-1) and deformation and the displacement of simulating stake (2-2), using strain sensing unit (4-3), position Move sensing unit (4-4) Deformation Monitoring and displacement information;
(3), after the completion of the experiment soil excavation in foundation ditch groove 2-1, start to place counterweight (3-7) in stress loading disk (3-6), this When, pulling force passes through fixed pulley (3-4) and steel wire rope (3-5), conducts to foundation ditch groove (2-1);It is stepped up the matter of counterweight (3-7) Amount, the weight of record weights (3-7) and loading procedure, foundation ditch groove (2-1) and simulation stake (2-2) will produce in the presence of pulling force Shift up, will eventually be pulled out;
(4) collection, the soil pressure sensing unit (4-1) arranging in this experimentation, water pressure sensing unit (4-2), strain Sensing unit (4-3), displacement sensing unit (4-4), loading counterweight (3-7) quality information, show that excavation of foundation pit is loaded with external force During foundation ditch groove (2-1) and simulation stake (2-2) deformation and displacement characteristic;Arrange foundation ditch to bear external force load and above pull out position Move relationship characteristic, draw the stress-displacement curve of uplift pile;
(5), after the completion of testing, remove loading counterweight (3-7), unload stress loading system (3), and by foundation ditch and pile foundation system (2) Remove from soil layer, then the soil body in experimental box body 1 inside is cleaned out, in case next time, experiment used;
(6) repeat the above steps 1~5, the simulation stake (2-2) changing different roughness is it is possible to draw another kind of rough surface The stress-displacement curve of degree uplift pile, the stress-displacement curve of contrast different surface roughness uplift pile is it is possible to analyze Go out the impact to extraction-resistant behavior for the pile body roughness.
CN201610853864.7A 2016-09-27 2016-09-27 A kind of pile foundation resistance to plucking laboratory testing rig and its experimental method Active CN106337446B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610853864.7A CN106337446B (en) 2016-09-27 2016-09-27 A kind of pile foundation resistance to plucking laboratory testing rig and its experimental method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610853864.7A CN106337446B (en) 2016-09-27 2016-09-27 A kind of pile foundation resistance to plucking laboratory testing rig and its experimental method

Publications (2)

Publication Number Publication Date
CN106337446A true CN106337446A (en) 2017-01-18
CN106337446B CN106337446B (en) 2017-08-11

Family

ID=57839478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610853864.7A Active CN106337446B (en) 2016-09-27 2016-09-27 A kind of pile foundation resistance to plucking laboratory testing rig and its experimental method

Country Status (1)

Country Link
CN (1) CN106337446B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108036998A (en) * 2017-12-14 2018-05-15 西安航天化学动力厂 It is a kind of to determine stress/determine strain detection testing device
CN110080317A (en) * 2019-05-24 2019-08-02 福建工程学院 Artesian water stratum bottom of foundation ditch soil layer pile foundation reinforcement pilespacing and the long prediction technique of stake
CN110106929A (en) * 2019-06-03 2019-08-09 天津大学前沿技术研究院 It is a kind of to plug stake to the model test apparatus and test method of neighbouring grouped piles influence
CN111428309A (en) * 2020-05-06 2020-07-17 中国民航大学 Pile foundation uplift resistance-based high-rise structure anti-overturning performance design method with large height-width ratio
CN112227430A (en) * 2020-09-30 2021-01-15 武汉弘泰建筑工程质量检测有限公司 Pile foundation uplift resistance detection device and detection method thereof
CN114045890A (en) * 2021-11-24 2022-02-15 浙江大学 Test device and method for measuring ultimate bearing capacity of composite anchorage of open caisson tubular pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1793046A1 (en) * 2005-10-18 2007-06-06 Jean-Marie Renovation Connection element between a micropile and a driving means, and a testing device with such an element
CN104900130A (en) * 2015-06-10 2015-09-09 浙江大学 Foundation pit pouring demonstrator and foundation pit pouring experiment research method thereof
CN205242462U (en) * 2015-11-20 2016-05-18 浙江科技学院 Research anti -floating pile resists test device that foundation ditch suddenly gushes failure mechanisms
CN205576989U (en) * 2016-05-09 2016-09-14 东华理工大学 Comprehensive laboratory experiment stake model experiment device is pressed, pulled out

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1793046A1 (en) * 2005-10-18 2007-06-06 Jean-Marie Renovation Connection element between a micropile and a driving means, and a testing device with such an element
CN104900130A (en) * 2015-06-10 2015-09-09 浙江大学 Foundation pit pouring demonstrator and foundation pit pouring experiment research method thereof
CN205242462U (en) * 2015-11-20 2016-05-18 浙江科技学院 Research anti -floating pile resists test device that foundation ditch suddenly gushes failure mechanisms
CN205576989U (en) * 2016-05-09 2016-09-14 东华理工大学 Comprehensive laboratory experiment stake model experiment device is pressed, pulled out

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108036998A (en) * 2017-12-14 2018-05-15 西安航天化学动力厂 It is a kind of to determine stress/determine strain detection testing device
CN110080317A (en) * 2019-05-24 2019-08-02 福建工程学院 Artesian water stratum bottom of foundation ditch soil layer pile foundation reinforcement pilespacing and the long prediction technique of stake
CN110080317B (en) * 2019-05-24 2024-03-15 福建工程学院 Method for predicting pile distance and pile length of pile foundation reinforcement of bottom soil layer of foundation pit of confined water stratum
CN110106929A (en) * 2019-06-03 2019-08-09 天津大学前沿技术研究院 It is a kind of to plug stake to the model test apparatus and test method of neighbouring grouped piles influence
CN111428309A (en) * 2020-05-06 2020-07-17 中国民航大学 Pile foundation uplift resistance-based high-rise structure anti-overturning performance design method with large height-width ratio
CN111428309B (en) * 2020-05-06 2024-04-30 中国民航大学 Pile foundation pulling-resistant high-rise structure anti-overturning performance design method
CN112227430A (en) * 2020-09-30 2021-01-15 武汉弘泰建筑工程质量检测有限公司 Pile foundation uplift resistance detection device and detection method thereof
CN114045890A (en) * 2021-11-24 2022-02-15 浙江大学 Test device and method for measuring ultimate bearing capacity of composite anchorage of open caisson tubular pile

Also Published As

Publication number Publication date
CN106337446B (en) 2017-08-11

Similar Documents

Publication Publication Date Title
CN106337446B (en) A kind of pile foundation resistance to plucking laboratory testing rig and its experimental method
CN101832993B (en) Semi-module test box for dynamic compaction reinforced foundation model test
CN104374648A (en) Test device and test method for testing kinetic shear characteristics between pipe piles and grouting soil bodies
CN202610847U (en) Measuring device of pile soil negative friction
CN108797660A (en) The experimental rig and test method of Collapsible Loess District Long-short Pile Group model
CN204590104U (en) A kind of bath scaled model experimental device of simulating self-balance testing pile method
CN103398902A (en) Test apparatus for flexible loading and instantaneously unloading of high geostress, and test method
CN109930635A (en) The model system and test method of single-pile foundation in a kind of silt soil strata
CN110805076A (en) Test device and method for simulating reinforcement of passive area of foundation pit
CN102966125A (en) Transmission and transformation project foundation load test system
Wood et al. Design of large diameter monopiles in chalk atWestermost Rough offshore wind farm
CN211571804U (en) Test device for simulating reinforcement of passive zone of foundation pit
CN111855426A (en) Vertical resistance to compression static load test device of engineering stake
CN212294771U (en) Be used for pile foundation resistance to plucking laboratory test device
CN110344453A (en) Pressure type anchor rod bearer properties model test apparatus and method under horizontal loads
CN110130422A (en) A kind of construction method of unit for single-pile vertical anti-pulling static test equipment
CN111551356B (en) Enlarged head anchor rod group anchor test device and test method thereof
CN205080013U (en) Coarse -grained soil seepage flow direct shear test device
CN110528602A (en) Earth lateral pressure experiment simulator under diaphram wall difference level of ground water operating condition
CN106400857A (en) Model device and method used for field measuring of blockage degree of opening pile interior soil plug
CN105862944A (en) Full-scale testing apparatus for spread foundations
CN103105308A (en) Method of fault-striding buried pipeline in-situ test
CN109853641A (en) A kind of test method of offshore wind farm sand compaction pile
CN103835319A (en) Site observability real pile testing method for concrete expanded disc semi-face pile in stressed state
CN212275467U (en) Vertical resistance to compression static load test device of engineering stake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant