CN106331640A - Real-time tracking and monitoring system for project wiring - Google Patents

Real-time tracking and monitoring system for project wiring Download PDF

Info

Publication number
CN106331640A
CN106331640A CN201610793456.7A CN201610793456A CN106331640A CN 106331640 A CN106331640 A CN 106331640A CN 201610793456 A CN201610793456 A CN 201610793456A CN 106331640 A CN106331640 A CN 106331640A
Authority
CN
China
Prior art keywords
wiring
project
picture
plugs
actual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610793456.7A
Other languages
Chinese (zh)
Inventor
吴君晔
甘露
李祥
蔡泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong David Project Management Ltd By Share Ltd
Original Assignee
Guangdong David Project Management Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong David Project Management Ltd By Share Ltd filed Critical Guangdong David Project Management Ltd By Share Ltd
Priority to CN201610793456.7A priority Critical patent/CN106331640A/en
Publication of CN106331640A publication Critical patent/CN106331640A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • H04N7/183Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a single remote source
    • H04N7/185Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a single remote source from a mobile camera, e.g. for remote control
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/66Testing of connections, e.g. of plugs or non-disconnectable joints
    • G01R31/68Testing of releasable connections, e.g. of terminals mounted on a printed circuit board

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Image Analysis (AREA)

Abstract

The present invention relates to a real-time tracking and monitoring system for project wiring. The system comprises a project wiring standard template picture generated according to a project construction design; an imaging system of a project construction site used for collecting an actual wiring picture of a monitored object; a construction site processing system used for processing the received actual wiring picture so as to obtain a monitored construction site wiring picture and sending the monitored construction site wiring picture to a remote monitoring terminal; and the remote monitoring terminal used for comparing the monitored construction site wiring picture with the project wiring standard template picture so as to determine whether the monitored construction site wiring meets project demands. The real-time tracking and monitoring system for project wiring can monitor the project construction site remotely, the monitoring processing is simple, convenient and direct, the manpower resources are saved, the construction site wiring condition can be fed back in time, and the result accuracy is high.

Description

A kind of engineering project plugs wiring real-time tracking monitoring system
Technical field
The present invention relates to engineering project tracing and monitoring technical field, particularly relate to a kind of engineering project and plug wiring in real time Tracking monitoring system.
Background technology
In some engineering projects such as communication, building, generally it is required for configuring and plugs routing interface grafting pair accordingly The circuit answered.Various circuit sockets and wiring accuracy are the keys effectively run in the guarantee building later stage.In prior art, manifold Cross artificial being monitored to scene to judge.On the one hand this processing mode, needs supervisor to run just and can complete monitoring process, Need the human resources expended bigger.Additionally, the mode of artificial management is discontinuity due to the time at the scene, it is impossible in real time The process of policer operation, the when of often pinpointing the problems, all engineering all has been carried out a period of time, to the feelings such as deviation occur Condition is difficult to correct in time.
Therefore, not enough for prior art, it is provided that a kind of engineering project plugs wiring real-time tracking monitoring system to overcome Prior art deficiency is the most necessary.
Summary of the invention
A kind of engineering project is provided to plug wiring in real time in place of it is an object of the invention to avoid the deficiencies in the prior art Tracking monitoring system, this engineering project plug wiring real-time tracking monitoring system can the real-time remote monitoring project implementation ground insert If whether wiring meets engine request, and have and judge feature directly and accurately.
The above-mentioned purpose of the present invention is realized by following technological means.
A kind of engineering project is provided to plug wiring real-time tracking monitoring system, including:
Plugging line standard template picture according to the project that project construction design drawing generates, project plugs line standard template Picture has grafting point, trace arrangements characteristic information, and project plugs line standard template picture and is stored in memorizer;
The imaging system on project implementation ground, is arranged at project implementation ground, is plugged cloth in order to gather by the actual of management object Line chart sheet, and the actual wiring picture that plugs gathered is sent to implementing ground processing system;
Implement ground processing system, to received actual plug wiring picture carry out process obtain monitoring implement plug cloth Line chart sheet, and monitoring is plugged with implementing wiring picture transmission to remote monitoring terminal;
Remote monitoring terminal, plugs monitoring wiring picture and plugs line standard template picture with project and compare with implementing Right, it may be judged whether to meet engine request, if meeting engine request, sending to project implementation ground processing system and meeting instruction, as Fruit does not meets engine request and then sends do not meet instruction to project implementation example ground processing system.
Preferably, project plugs the grafting point of line standard template picture, trace arrangements characteristic information especially by as follows Mode obtains:
First, selection project plugs the certain point of line standard template picture and sets up coordinate system as original coordinates initial point, With original coordinates initial point as reference, select M point as reference point the coordinate that records each reference point;
Then, select original grafting characteristic point, record the coordinate of each original grafting characteristic point;
Subsequently, primitive character wiring, the coordinate position of record primitive character wiring are selected.
Preferably, the imaging system on project implementation ground shoots in mode at equal intervals and is plugged wiring diagram by the actual of management object Sheet.
Preferably, the imaging system on project implementation ground shoots in unequal interval mode and is plugged wiring by the actual of management object Picture.
Preferably, enforcement ground processing system carries out process with obtaining monitoring enforcement to the actual wiring picture that plugs received Plug wiring picture, specifically:
First, implement ground processing system and reject the actual wiring picture that plugs that shooting is fuzzy, retain actual plugging Wiring picture;
Then, to actual plug wiring picture carry out splicing obtain monitoring implement plug wiring picture.
Preferably, described ground processing system of implementing carries out splicing specifically include the actual wiring picture that plugs:
First determine whether every position feature plugging wiring picture actual, will be actual clearly according to position feature Plugging wiring picture split, during split, adjacent two actual laps plugged between wiring picture carry out redundancy Removal processes, and obtains monitoring and plugs wiring picture on the spot.
Preferably, monitoring is plugged wiring picture and plugs line standard template picture with project by remote monitoring terminal with implementing Compare and judge whether to meet engine request, specifically:
First monitoring is plugged wiring picture with implementing and project plugs line standard template picture and carries out location matches;
Plug with implementing to find out on wiring picture in monitoring the most respectively and plug the spy of line standard template picture with project Levy point, fact characteristic point that characteristic curve is corresponding, actual characteristic line, and calculate fact characteristic point, the coordinate data of actual characteristic line;
The coordinate data of fact characteristic point, actual characteristic line is entered with primitive character point, the coordinate data of primitive character line Row compares, it may be judged whether in range of error, if in range of error, judges that current project implementation ground grafting wiring is closed Lattice, if beyond range of error, judge that current project implementation ground grafting wiring is defective, are given and feed back to project implementation ground Processing system.
The engineering project of the present invention plugs wiring real-time tracking monitoring system, including:
Plugging line standard template picture according to the project that project construction design drawing generates, project plugs line standard template Picture has grafting point, trace arrangements characteristic information, and project plugs line standard template picture and is stored in memorizer;
The imaging system on project implementation ground, is arranged at project implementation ground, is plugged cloth in order to gather by the actual of management object Line chart sheet, and the actual wiring picture that plugs gathered is sent to implementing ground processing system;
Implement ground processing system, to received actual plug wiring picture carry out process obtain monitoring implement plug cloth Line chart sheet, and monitoring is plugged with implementing wiring picture transmission to remote monitoring terminal;
Remote monitoring terminal, plugs monitoring wiring picture and plugs line standard template picture with project and compare with implementing Right, it may be judged whether to meet engine request, if meeting engine request, sending to project implementation ground processing system and meeting instruction, as Fruit does not meets engine request and then sends do not meet instruction to project implementation example ground processing system.
This engineering project plugs wiring real-time tracking monitoring system can remotely realize the monitoring to project implementation ground, monitoring Processing procedure is simply, conveniently, directly, it is possible to save human resources, it is possible in time enforcement ground is plugged installation scenarios and carries out instead Feedback, result precision is high.
Detailed description of the invention
The invention will be further described with the following Examples.
Embodiment 1.
A kind of engineering project plugs wiring real-time tracking monitoring system, including:
Plugging line standard template picture according to the project that project construction design drawing generates, project plugs line standard template Picture has grafting point, trace arrangements characteristic information, and project plugs line standard template picture and is stored in memorizer;
The imaging system on project implementation ground, is arranged at project implementation ground, is plugged cloth in order to gather by the actual of management object Line chart sheet, and the actual wiring picture that plugs gathered is sent to implementing ground processing system;
Implement ground processing system, to received actual plug wiring picture carry out process obtain monitoring implement plug cloth Line chart sheet, and monitoring is plugged with implementing wiring picture transmission to remote monitoring terminal;
Remote monitoring terminal, plugs monitoring wiring picture and plugs line standard template picture with project and compare with implementing Right, it may be judged whether to meet engine request, if meeting engine request, sending to project implementation ground processing system and meeting instruction, as Fruit does not meets engine request and then sends do not meet instruction to project implementation example ground processing system.
Wherein, project plugs the grafting point of line standard template picture, trace arrangements characteristic information especially by such as lower section Formula obtains:
First, selection project plugs the certain point of line standard template picture and sets up coordinate system as original coordinates initial point, With original coordinates initial point as reference, select M point as reference point the coordinate that records each reference point;
Then, select original grafting characteristic point, record the coordinate of each original grafting characteristic point;
Subsequently, primitive character wiring, the coordinate position of record primitive character wiring are selected.The coordinate of primitive character wiring Position at least includes the coordinate of two characteristic points in primitive character wiring, two characteristic points connected up by primitive character Coordinate is assured that the position and direction that primitive character connects up.
The imaging system on project implementation ground can shoot in mode at equal intervals and be plugged wiring picture by the actual of management object. The imaging system on project implementation ground can also shoot in unequal interval mode and be plugged wiring picture by the actual of management object.Specifically Shooting interval be adjusted according to the situation of actual management object.
Implement ground processing system to received actual plug wiring picture carry out process obtain monitoring implement plug cloth Line chart sheet, specifically:
First, implement ground processing system and reject the actual wiring picture that plugs that shooting is fuzzy, retain actual plugging Wiring picture;
Then, to actual plug wiring picture carry out splicing obtain monitoring implement plug wiring picture.Splicing Situation be that the images of the different local obtained by different imaging devices in the imaging system for project implementation ground are spelled Connect the overall picture of formation.
Implement ground processing system the actual wiring picture that plugs is carried out splicing and specifically included: first determine whether every clear The clear actual position feature plugging wiring picture, actual will plug wiring picture split, split according to position feature During, adjacent two actual laps plugged between wiring picture carry out redundancy removal process, obtain monitoring on the spot Plug wiring picture.
Monitoring is plugged wiring picture and plugs line standard template picture with project and compare by remote monitoring terminal with implementing To judging whether to meet engine request, specifically:
First monitoring is plugged wiring picture with implementing and project plugs line standard template picture and carries out location matches;Tool Body is to plug wiring picture with implementing plug line standard template picture initial coordinate initial point corresponding to project by finding out monitoring Actual picture zero set up coordinate system.
Plug with implementing to find out on wiring picture in monitoring the most respectively and plug the spy of line standard template picture with project Levy point, fact characteristic point that characteristic curve is corresponding, actual characteristic line, and calculate fact characteristic point, the coordinate data of actual characteristic line.
Again by fact characteristic point, coordinate data and primitive character point, the coordinate data of primitive character line of actual characteristic line Compare, it may be judged whether in range of error, if in range of error, judge current project implementation ground grafting wiring Qualified, if beyond range of error, judge that current project implementation ground grafting wiring is defective, be given and feed back to the project implementation Ground processing system.
This engineering project plugs wiring real-time tracking monitoring system, and the project utilizing original design figure to generate plugs wiring mark Quasi-template picture, plugs wiring picture with obtaining monitoring enforcement by implementing ground imaging system, monitoring is plugged wiring with implementing Picture and project plug the characteristic information of line standard template picture and are analyzed, and sentence according to the error condition of characteristic information Break and draw whether meet project implementation requirement.
Plugging wiring real-time tracking monitoring system by this engineering project, supervisor can remotely check and implement inserting of ground If wiring practical situation, it is not necessary to scene is checked and be can be carried out management, it is possible to effectively reduce running into of supervisor This.
The characteristic information plugging line standard template picture by monitoring plugs wiring picture and project with implementing is carried out Relative analysis draws the conclusion whether meeting engine request, has judgement convenient, result feature accurately.
Additionally, this engineering project plugs wiring real-time tracking monitoring system, it is possible in time the situation on project implementation ground is entered Row monitoring, finds in time the error in engineering, in order to makes the project implementation guidance and avoids continuing to implement under error in time And causing later stage bigger repairing a loss, degree of accuracy is high.
It is last it should be noted that, the present invention is only protected by above example in order to technical scheme to be described The restriction of scope, although being explained in detail the present invention with reference to preferred embodiment, those of ordinary skill in the art should manage Solve, technical scheme can be modified or equivalent, without deviating from technical solution of the present invention essence and Scope.

Claims (7)

1. an engineering project plugs wiring real-time tracking monitoring system, it is characterised in that including:
Plugging line standard template picture according to the project that project construction design drawing generates, project plugs line standard template picture Having grafting point, trace arrangements characteristic information, project plugs line standard template picture and is stored in memorizer;
The imaging system on project implementation ground, is arranged at project implementation ground, is plugged wiring diagram in order to gather by the actual of management object Sheet, and the actual wiring picture that plugs gathered is sent to implementing ground processing system;
Implement ground processing system, to received actual plug wiring picture carry out process obtain monitoring implement plug wiring diagram Sheet, and monitoring is plugged with implementing wiring picture transmission to remote monitoring terminal;
Remote monitoring terminal, plugs monitoring wiring picture and plugs line standard template picture with project and compare with implementing, Judge whether to meet engine request, if meeting engine request, sending to project implementation ground processing system and meeting instruction, if Do not meet engine request then to send do not meet instruction to project implementation example ground processing system.
Engineering project the most according to claim 1 plugs wiring real-time tracking monitoring system, it is characterised in that project plugs The grafting point of line standard template picture, trace arrangements characteristic information obtain especially by following manner:
First, selection project plugs the certain point of line standard template picture and sets up coordinate system as original coordinates initial point, with former Beginning zero is reference, selects M point as reference point the coordinate that records each reference point;
Then, select original grafting characteristic point, record the coordinate of each original grafting characteristic point;
Subsequently, primitive character wiring, the coordinate position of record primitive character wiring are selected.
Engineering project the most according to claim 2 plugs wiring real-time tracking monitoring system, it is characterised in that the project implementation The imaging system on ground shoots in mode at equal intervals and is plugged wiring picture by the actual of management object.
Engineering project the most according to claim 2 plugs wiring real-time tracking monitoring system, it is characterised in that the project implementation The imaging system on ground shoots in unequal interval mode and is plugged wiring picture by the actual of management object.
5. plug wiring real-time tracking monitoring system according to the engineering project described in claim 3 or 4, it is characterised in that
Implement ground processing system to received actual plug wiring picture carry out process obtain monitoring implement plug wiring diagram Sheet, specifically:
First, implement ground processing system and reject the actual wiring picture that plugs that shooting is fuzzy, retain and actual plug wiring Picture;
Then, to actual plug wiring picture carry out splicing obtain monitoring implement plug wiring picture.
Engineering project the most according to claim 5 plugs wiring real-time tracking monitoring system, it is characterised in that
Described ground processing system of implementing carries out splicing specifically include the actual wiring picture that plugs:
First determine whether every position feature plugging wiring picture actual, will actual plug according to position feature Wiring picture split, during split, adjacent two actual laps plugged between wiring picture carry out redundancy removal Process, obtain monitoring and plug wiring picture on the spot.
Engineering project the most according to claim 6 plugs wiring real-time tracking monitoring system, it is characterised in that
Monitoring is plugged wiring picture and project and plugs line standard template picture and compare and sentence by remote monitoring terminal with implementing Break and whether meet engine request, specifically:
First monitoring is plugged wiring picture with implementing and project plugs line standard template picture and carries out location matches;
The most respectively monitoring implement plug wiring picture on find out with project plug line standard template picture characteristic point, Fact characteristic point that characteristic curve is corresponding, actual characteristic line, and calculate fact characteristic point, the coordinate data of actual characteristic line;
The coordinate data of fact characteristic point, actual characteristic line is compared with primitive character point, the coordinate data of primitive character line Relatively, it may be judged whether in range of error, if in range of error, judge that current project implementation ground grafting wiring is qualified, as Beyond range of error, fruit then judges that current project implementation ground grafting wiring is defective, be given and process system with feeding back to the project implementation System.
CN201610793456.7A 2016-08-31 2016-08-31 Real-time tracking and monitoring system for project wiring Pending CN106331640A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610793456.7A CN106331640A (en) 2016-08-31 2016-08-31 Real-time tracking and monitoring system for project wiring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610793456.7A CN106331640A (en) 2016-08-31 2016-08-31 Real-time tracking and monitoring system for project wiring

Publications (1)

Publication Number Publication Date
CN106331640A true CN106331640A (en) 2017-01-11

Family

ID=57786399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610793456.7A Pending CN106331640A (en) 2016-08-31 2016-08-31 Real-time tracking and monitoring system for project wiring

Country Status (1)

Country Link
CN (1) CN106331640A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103517040A (en) * 2013-09-13 2014-01-15 湖州泰仑电力自动化工程有限公司 Interactive foundation construction site safety management system
CN103780884A (en) * 2014-02-25 2014-05-07 宁夏信友通信监理咨询有限责任公司 Video monitoring engineering project supervision system and method
CN104284165A (en) * 2014-11-04 2015-01-14 贵州黔驰信息股份有限公司 Wireless construction site image monitoring system based on 3G and ZigBEE
CN104754304A (en) * 2015-03-25 2015-07-01 浙江水利水电学院 Safe and visual system applied to construction site and construction method thereof
CN104780223A (en) * 2015-04-30 2015-07-15 广东志高空调有限公司 Whole construction process monitoring system and monitoring method based on cloud computing technology
CN105719200A (en) * 2016-01-19 2016-06-29 上海杰图天下网络科技有限公司 Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology
CN105812740A (en) * 2016-03-28 2016-07-27 成都晨越建设项目管理股份有限公司 Information construction and management device suitable for project supervision

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103517040A (en) * 2013-09-13 2014-01-15 湖州泰仑电力自动化工程有限公司 Interactive foundation construction site safety management system
CN103780884A (en) * 2014-02-25 2014-05-07 宁夏信友通信监理咨询有限责任公司 Video monitoring engineering project supervision system and method
CN104284165A (en) * 2014-11-04 2015-01-14 贵州黔驰信息股份有限公司 Wireless construction site image monitoring system based on 3G and ZigBEE
CN104754304A (en) * 2015-03-25 2015-07-01 浙江水利水电学院 Safe and visual system applied to construction site and construction method thereof
CN104780223A (en) * 2015-04-30 2015-07-15 广东志高空调有限公司 Whole construction process monitoring system and monitoring method based on cloud computing technology
CN105719200A (en) * 2016-01-19 2016-06-29 上海杰图天下网络科技有限公司 Method for carrying out engineering progress supervision by use of three-dimensional panoramic technology by combining BIM technology
CN105812740A (en) * 2016-03-28 2016-07-27 成都晨越建设项目管理股份有限公司 Information construction and management device suitable for project supervision

Similar Documents

Publication Publication Date Title
CN110347152B (en) Virtual wall setting method, system and device
US6882962B2 (en) Maintenance method and maintenance system for industrial machinery
CN109698758B (en) Network resource information checking method and system
JP2018530800A (en) Method for assembling electric switch and assembly assist device for simplifying assembly of such switch
CN106408172A (en) Project management system
CN107330143B (en) Method and device for checking PCBA (printed Circuit Board Assembly) by adopting AR (augmented reality) technology
CN112534664B (en) Apparatus and method for testing the contents of a switchgear after installation according to a plan
CN109343517A (en) Crusing robot pinpoints visiting method
CN109671388A (en) The acquisition methods and device of correction data
CN113038084A (en) State identification method, device and system
JP2023106393A (en) Image determination device, image inspection device, manufacturing system of electric wire with terminal, and image determination method
CN111993420A (en) Fixed binocular vision 3D guide piece feeding system
CN117218743B (en) Intelligent inspection control method and system based on machine vision
CN104898485B (en) Positioning method and device of household appliance and server
CN106331640A (en) Real-time tracking and monitoring system for project wiring
CN117745743A (en) Automatic generation method and device for cutting path of printed circuit board
KR101741997B1 (en) Robot Arm Align Apparatus And Align Method With The Same
CN106375717A (en) Inserting and wiring real-time tracking, monitoring and displaying system for engineering project
CN107584493A (en) A kind of method and system for catching target taught point
CN112000109A (en) Position correction method for power inspection robot, power inspection robot and medium
CN114137388B (en) Circuit board signal trace-searching detection system
CN111064794B (en) Fault detection method, device, equipment and storage medium of terminal equipment
CN114553599A (en) Garden monitoring system and method based on edge calculation
CN114138253A (en) Test feedback method, device, equipment and storage medium of graphical programming code
CN110736911B (en) Flying probe testing method, flying probe testing device, flying probe testing apparatus, and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111

RJ01 Rejection of invention patent application after publication