CN106327087A - Test task assignment method - Google Patents

Test task assignment method Download PDF

Info

Publication number
CN106327087A
CN106327087A CN201610735483.9A CN201610735483A CN106327087A CN 106327087 A CN106327087 A CN 106327087A CN 201610735483 A CN201610735483 A CN 201610735483A CN 106327087 A CN106327087 A CN 106327087A
Authority
CN
China
Prior art keywords
test
project
information
experiment
test assignment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610735483.9A
Other languages
Chinese (zh)
Inventor
肖孝余
黄兴艺
高洪军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Loncin Motor Co Ltd
Loncin General Dynamics Co Ltd
Original Assignee
Loncin General Dynamics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Loncin General Dynamics Co Ltd filed Critical Loncin General Dynamics Co Ltd
Priority to CN201610735483.9A priority Critical patent/CN106327087A/en
Publication of CN106327087A publication Critical patent/CN106327087A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a test task assignment method comprising the steps that a. the experiment objective is determined and an experiment plan is formulated according to the experiment objective; b. sample information, test personnel information and equipment information are acquired; c whether samples are stored, test personnel meet the conditions and equipment is available is automatically judged according to the preset conditions; and d. an experiment test item group is constructed, item test time is determined and assignment is automatically performed according to the judged result. According to the test task assignment method, the experiment test item group is automatically constructed, item test time is determined and assignment is automatically performed by acquiring the sample information, the test personnel information and the equipment information so that unified management of the experiment data can be realized, the task assignment efficiency can be enhanced, the overall quality of the experiment can be enhanced, repeated tests can be reduced and the experiment research cost of enterprises can be greatly reduced.

Description

Test assignment allocating method
Technical field
The present invention relates to the communications field, particularly relate to a kind of test assignment allocating method.
Background technology
Any product is required for doing substantial amounts of experiment during research and development, and can produce a large amount of in experimentation Data, but do not have special technological means to come process and the data of management misconduct for a long time, and by the management of science Method carries out assigned tasks, and this brings huge challenge to management.Prior art lacks the management of effective experimental data The support of system, the work relevant to experiment also rests on manual work state, data statistics difficulty, makes manager be difficult in real time Know and currently doing which experiment, the state that experiment is carried out how, and which experimental project who take part in, and experimental duties are such as What concrete assignment, it is impossible to realize the multistage project management of test center, project process module solidification management, it is impossible to equipment will be tested Tester with in test process use adjuvant information organically associate, and can not the maintenance criterion testing time, refer to Lead and when working out plan, understand that the workload of every day is the most saturated, it is impossible to the test of exact p-value center special concern every sub-project is real Existing standard time, personnel account for the standard time, it is impossible to tester can be carried out multinomial test experiments simultaneously, and tester marks every day The quasi-working time connects with order ticket every day and is managed.
Experiment has the strongest professional mostly, according to the difference of product, the difference of specialty, the regulatory requirement of experimental data Having the biggest difference with application, the professional and multiformity being required for testing carries out the management of differentiation.Experimental data is existing Structural data, also has unstructured data, and along with the difference of collecting device, and the form of unstructured data is also thousand poor Ten thousand are not, and managing these data is a difficult problem, and the data that experimentation produces include initial data, the pretreatment number that equipment gathers Being all very important data according to, analysis report etc., because not having the support of experimental data management system, these data often dissipate It is placed on experimenter's personal computer, it is easy to losing, its main cause is that data are not left concentratedly and manage, and makes administrative man Member, designer and experimenter cannot inquire about experimental data, laboratory report, also make to reuse former Experiment Result and become very Difficulty, is more unfavorable for the assignment of experiment test task, causes experimentation inefficiency, poor effect, have impact on overall real The progress tested and result, therefore, need a kind of new technological means badly, to solve the problems referred to above.
Summary of the invention
In view of this, the present invention provides a kind of test assignment allocating method, to solve the problems referred to above.
A kind of test assignment allocating method that the present invention provides, including
A. determine object of experiment, formulate planning of experiment according to object of experiment,
B. exemplar information, tester's information and facility information are gathered,
C. whether condition and equipment whether are met according to pre-conditioned automatic decision exemplar whether warehouse-in, tester It is available,
D. build experiment test project team according to judged result, identify project the testing time, and automatically carry out sending work.
Further, described tester's information includes identity information, finger print information and information of arranging an order according to class and grade, by tester's Fingerprint attendance situation and the workload of experiment, dynamic assignment experiment test task;Described facility information include device identifying information, Whether equipment accounts for inspection information and plant maintenance information.
Further, being identified project the test deadline by test assignment simulation resolving, the simulation of described test assignment resolves Resolving including order and resolve with inverted order, described order resolves and includes being divided into test assignment several sub-projects, and statistics can be also The sub-project of row test, determines the initial time of test assignment, and standard testing time and every day according to every sub-project permit The full test duration permitted, obtains the deadline of test assignment;Described inverted order resolve include being divided into test assignment some Sub-project, statistics can the sub-project of concurrent testing, determine the deadline of test assignment, during according to the test of every sub-project Between and every day allow full test duration, counter push away obtain test assignment initial time.
Further, according to the urgency level of the project plan or promptly insert one-state, change test assignment priority, if test Exceed the project plan task time and finally complete the time, then automatic alarm.
Further, add up free time short testing equipment according to facility information prioritizing selection history, will survey simultaneously Examination personnel sort by priority, and selects test man according to test assignment according to priority order, if exemplar is put in storage, then sends Work, if exemplar is not put in storage, then stops to carry out sending work, and sends warning.
Further, also include equipment is carried out spot check, automatically obtain spot check planning chart according to an overhaul period, and by mobile Terminal carries out spot-checking plan prompting to spot check personnel, to the spot check item that can quantify time according to the threshold value automatic decision pre-set Equipment is the most qualified;Use artificial judgment the most qualified the most energetic spot check item time, if equipment any spot check item does not conforms to Lattice, then trigger maintenance flow and freezed by equipment, until its conformance with standard.
Further, according to sending work to generate test order ticket, tester passes through to test described in mobile scanning terminal order ticket, Send test assignment start information, by mobile terminal records test result after end to be tested.
Further, if test result is defective, work is sent in automatic triggering again, and carries out experiment test the most repeatedly, note Record and upload test initial data and all previous test data of experiment.
Further, according to the performance of test sub-project, automatically generate test report, analyzed by described test report The service efficiency of every equipment, the work efficiency of each tester and project overall progress complete efficiency.
Further, tester being carried out rights management, the tester being controlled different function by rights management is checked Relative test assignment.
Beneficial effects of the present invention: the test assignment allocating method in the present invention, by gathering exemplar information, tester Information and facility information, automatically build experiment test project team, identify project the testing time, and automatically carry out sending work, to experiment Task is assigned and is carried out standardized management, establishes digital experiment datumization management platform, it is ensured that the safety of experimental data, Verity, integrity, concordance and trackability, it is achieved that the unified management of experimental data, the task of improve is sent work efficiency rate, is carried The high total quality of experiment, decreases and repeats test, greatly reduce the experiment development cost of enterprise, it is achieved that restrictive row Produce, simultaneously by experimental data and the accumulation of experiment experience, make experimental data be converted into knowledge and the core competitiveness of enterprise, It is easy to lifting and the improvement of experimentation.
Accompanying drawing explanation
The invention will be further described with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the principle schematic of the present invention.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings: Fig. 1 is the principle schematic of the present invention.
As it is shown in figure 1, the test assignment allocating method in the present embodiment, including
A. determine object of experiment, formulate planning of experiment according to object of experiment,
B. exemplar information, tester's information and facility information are gathered,
C. whether condition and equipment whether are met according to pre-conditioned automatic decision exemplar whether warehouse-in, tester It is available,
D. build experiment test project team according to judged result, identify project the testing time, and automatically carry out sending work.
In the present embodiment, experimental project planning management and manufacturing process management have been carried out effective to closing, worked out item Energy clear wash rice equipment service condition, personal information during mesh plan, system is according to the project plan, facility information, personal information, exemplar letter The list that assigns a task that breath, adjuvant information are punctual, each tester carries out ruly experiment test task according to job order, It is finally completed the experimentation of entirety.Rational task can be assigned in the rational time by the method in the application, sensible Substantial amounts of test experiments sums up that the standard time determine in amendment, to improve experiment flow, formation test database, knowledge base, system automatic Write laboratory report.
In the present embodiment, tester's information includes identity information, finger print information and information of arranging an order according to class and grade, and passes through tester Fingerprint attendance situation and the workload of experiment, dynamic assignment experiment test task;Described facility information includes that equipment identification is believed Whether breath, equipment account for inspection information and plant maintenance information.All employees can be unified to compile by the identity information of tester Employee processed encodes, and by system typing employee coding, employee's title, department, educational background, enters factory's date, identity card, home address etc. Information, gathers employee's fingerprint by attendance record terminal equipment, stores attendance record terminal, and management personnel can be unified according to test job amount Arrange one section of date situation on duty (day shift or night shift) of employee;Employee gathers employee automatically by fingerprint attendance machine before going to work every day Every day reality of work situation, attendance recorder is direct-connected with test center's Management System Data storehouse, during a fingerprint of employee every dozen, automatically writes Enter in test center's Management System Data storehouse.By above method, add up employee's actual work attendance situation every day, under project task When reaching offer, personnel tie up bundle and provide foundation.By equipment is encoded accordingly, formulate facility information, enter factory's inspection including equipment Testing, paste bar code, bar code content comprises the information such as equipment serial number, model, purchase date, producer, and whether equipment accounts for inspection, if Standby maintenance information includes whether to exceed defects liability period, verify information such as whether passing through, by above-mentioned all information unification at test and management Registration warehouse-in in system.
In the present embodiment, identified project the test deadline by test assignment simulation resolving, described test assignment mould Quasi-solution is calculated and is included that order resolves and inverted order resolving, and described order resolves and includes being divided into test assignment several sub-projects, system Meter can the sub-project of concurrent testing, determine the initial time of test assignment, according to standard testing time of every sub-project and The full test duration that every day allows, obtains the deadline of test assignment;Described inverted order resolves and includes dividing test assignment For several sub-projects, statistics can the sub-project of concurrent testing, determine the deadline of test assignment, according to every sub-project The full test duration that testing time and every day allow, the anti-initial time pushing away acquisition test assignment.For example, it is assumed that totally 7 Test sub-project, sub-project 2, sub-project 3 can concurrent testing, other sub-project can only serial test, test job time every day It is 7 hours, total test 14 hours, need could survey for 2 days.Sequentially solution process includes: such as Start Date is in June, 2016 The morning on the 1st, 8:00 started, and sub-project 1 tests becomes 11 points (testing 3 hours), and sub-project 2, sub-project 3 are parallel, can simultaneously from 11 beginnings, the maximum beginning testDate that testing time is sub-project 4, Ruo Dangkai arrangement sub-project 4 then can be little more than 7 Time, need to start for second day;8:00 started sub-project 4 and tested the morning on June 2nd, second day, end time 11 point;Sub-project 5 time started 11 points, end time 12 point;Sub-project 6 time started 13:00 (nooning 1 hour), 16:00 terminates;Subitem Mesh 7 time started 16:00, end time 17:00;Resolving of seizing back confiscated property includes: June 2 2016 last day completes son before leaving offices Project 7 is tested, and sub-project of retrodicting 6, sub-project 5, sub-project 4, sub-project 3, sub-project 1 start over the time.
In the present embodiment, add up free time short testing equipment according to facility information prioritizing selection history, with Time tester is sorted by priority, according to test assignment according to priority order select test man, if exemplar is put in storage, then enter Row sends work, if exemplar is not put in storage, then stops to carry out sending work, and sends warning, and such as task delegation 1, trust 2 respectively need survey for 3 hours The examination time, resolve principle by project task priority, it is assumed that first resolving order ticket 1:
Committal charge 1 resolves principle: 1. available devices A B C, it is judged that whether She BeiA B C can use, if available, then take and sets (equipment component working time every day is 7 hours to the accumulative idle how many equipment of standby history, only arranges test day shift;Equipment component Work 24 hours, night shift can be arranged to test), device A B the C free time be all 7 hours, appoint and take a device A and meet test request; 2. can use tester A B C D E F, it is judged that work attendance on the same day information of personnel, wherein personnel E F asks for leave, meet require only Having tester A B C D, taking A B C D each personnel free time is 7 hours, according to priority takes personnel A B test;3. judge Whether exemplar puts in storage, meeting condition if having put in storage, not putting in storage, and this order ticket is invalid, it is impossible to system automatic job distribution, and system sends report Alert, prompting related personnel process, and prompting can cause the plan of extension.
Equipment, personnel, exemplar all meet condition, committal charge 1 automatic job distribution, tester A B respectively account for 3 hours, device A Consume 3 hours.
Committal charge 2 resolves principle: 1. available devices A B C, it is judged that whether She BeiA B C can use, if available, then take and sets (equipment component working time every day is 7 hours to the accumulative idle how many equipment of standby history, only arranges test day shift;Equipment component Work 24 hours, night shift can be arranged to test), device A (idle 4 hours) B (idle 4 hours) C (idle 7 hours), appoint to take and set Standby B meets test request;2. tester A B C D E F can be used, it is judged that work attendance on the same day information of personnel, wherein personnel E F Ask for leave, meet the only tester A (idle 4 hours) that requires B (idle 4 hours) C (idle 7 hours) D (idle 7 little Time), according to priority take personnel C test;3. judge whether exemplar puts in storage, meeting condition if having put in storage, not putting in storage, this order ticket without Effect, it is impossible to system automatic job distribution, system sends warning, and prompting related personnel process, and prompting can cause the plan of extension, it is possible to Will determine that exemplar is placed on the first step and judges.
Equipment, personnel, exemplar all meet condition, committal charge 2 automatic job distribution, and tester C accounts for 3 hours, and equipment B consumes 3 hours.
Other committal charge the like, tester not can exceed that the testing standard time on the same day, and equipment not can exceed that works as It testing time, exemplar must be put in storage as most basic principle, otherwise system alarm prompting need manual intervention process (or overtime work, Or delay), according to the urgency level of the project plan or promptly insert one-state, change test assignment priority, if during test assignment Between exceed the project plan and finally complete the time, then automatic alarm.
In the present embodiment, also include equipment is carried out spot check, automatically obtain spot check planning chart according to an overhaul period, and lead to Cross mobile terminal and spot check personnel are carried out spot-checking plan prompting, to the spot check item that can quantify time according to the threshold value pre-set certainly Move and judge that equipment is the most qualified;Use artificial judgment the most qualified the most energetic spot check item time, if equipment any spot check item Secondary defective, then trigger maintenance flow and equipment is freezed, until its conformance with standard, according to sending work to generate test order ticket, surveying Examination personnel, by testing order ticket described in mobile scanning terminal, send test assignment start information, by moving after end to be tested Dynamic terminal record test result, if test result is defective, work is sent in automatic triggering again, and the most repeatedly tests survey Examination, records and uploads test initial data and all previous test data of experiment.According to the performance of test sub-project, automatically give birth to Become test report, analyze the service efficiency of every equipment, the work efficiency of each tester and item by described test report Mesh overall progress complete efficiency.
In the present embodiment, system calculates verification planning chart automatically according to an overhaul period, is carried by the APP in smart mobile phone Show inspector's verification on same day plan;Spot check item is gathered according to the plan of verifying, temporary freezing equipment, inspector's typing or equipment Secondary, energetic item subsystem automatic decision is the most qualified, it is impossible to the item of quantization time artificial judgment is the most qualified;If verification equipment Any one time is defective, then system trigger maintenance flow, and this equipment is frozen, until conformance with standard could use;If all Qualified, the automatic thawing equipment of system, is that task sends work basic condition.Defective item system triggers quality writ automatically, uses Correlated quality information is filled at family, uploads maintenance daily record.Often test group director checks test plan, the test equipment of current group Situation, personal information situation, assign a task performance;Emergency according to the project plan or promptly insert one-state, more Change test assignment priority, arrange the test assignment time, the most not can exceed that the project plan finally completes the date, otherwise system Automatic alarm, prompting causes other project delay information.Group group leader accepts the task on the same day, the accepted test assignment of history Whether complete, the information such as performance;Standard testing time according to sub-project, test qualification personnel are (in whether work attendance on the same day Class), facility information, whether exemplar put in storage, the most enough information of adjuvant stock, system automatic job distribution, in the present embodiment, according to Test order ticket, can use smart mobile phone to start test by corresponding APP program scanning, and test terminates the record of rear scanning barcode Enter test result, if defective, need gap filling macadam writ information;For test failure sub-project, system automatically triggers and heavily sends Work job order, needs tester the most repeatedly to test;Tester uploads test initial data or automatic with test equipment networking Read test initial data, according to test sub-project test performance, returns the performance of falling the project plan, object of experiment completes Situation;According to object of experiment reporting requirement, system automatic reading part divided data writes test report;Thus can realize analyzing Every equipment service efficiency, the work efficiency of each tester, and project process completes efficiency.
In the present embodiment, tester is carried out rights management, controlled the test person of different function by rights management Member checks that relative test assignment, leader's group can check that all items node data, project process instrumental panel show, project Report.Show can successively launch by abnormal alarm, trace back to original test data.Such as: will be able to own according to function Personnel are divided into project plan group, task assigns group, test group, quality group, equipment group, exemplar management group, disbursement and sattlement group and letter The different groups such as breath management group, project plan group can be worked out plan according to project superclass, submit examination & approval to.Task assigns group can only Check the project plan of this group, arrange the test data of this group.Test group can only check my test assignment, uploads this and surveys Trial record.Quality group is according to test result typing quality writ.Equipment group can only manage authorized equipment registration, spot check, guarantor Support, verify.Exemplar management group can only manage exemplar and receive, puts in storage, leads material, cancelling stocks, all data of return.Disbursement and sattlement group according to Test process management, system calculates clearing form automatically.The authority of each group of information management group process, the intersection authority of one or two people, Different authorities can be set according to employee post's difference, make the personnel in respective post can only check, operate own job bit data, pass through Rights management achieves unified Role Management.
Finally illustrating, above example is only in order to illustrate technical scheme and unrestricted, although with reference to relatively The present invention has been described in detail by good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent, and without deviating from objective and the scope of technical solution of the present invention, it all should be contained at this In the middle of the right of invention.

Claims (10)

1. a test assignment allocating method, it is characterised in that: include
A. determine object of experiment, formulate planning of experiment according to object of experiment,
B. exemplar information, tester's information and facility information are gathered,
Whether c. put in storage according to pre-conditioned automatic decision exemplar, tester whether meets condition and whether equipment may be used With,
D. build experiment test project team according to judged result, identify project the testing time, and automatically carry out sending work.
Test assignment allocating method the most according to claim 1, it is characterised in that: described tester's information includes identity Information, finger print information and information of arranging an order according to class and grade, by fingerprint attendance situation and the workload of experiment of tester, dynamic assignment is tested Test assignment;Described facility information includes whether device identifying information, equipment account for inspection information and plant maintenance information.
Test assignment allocating method the most according to claim 1, it is characterised in that: determined by test assignment simulation resolving The project testing deadline, the simulation resolving of described test assignment includes that order resolves and resolves with inverted order, and described order resolves and includes Test assignment is divided into several sub-projects, statistics can the sub-project of concurrent testing, determine the initial time of test assignment, root According to standard testing time and the full test duration of permission every day of every sub-project, obtain the deadline of test assignment; Described inverted order resolves and includes being divided into test assignment several sub-projects, statistics can the sub-project of concurrent testing, determine test The deadline of task, according to testing time and the full test duration of permission every day of every sub-project, counter pushing away obtains survey The initial time of trial business.
Test assignment allocating method the most according to claim 3, it is characterised in that: according to the urgency level of the project plan or Urgent one-state of inserting, change test assignment priority, if the test assignment time exceedes the project plan finally completes the time, the most automatically Report to the police.
Test assignment allocating method the most according to claim 4, it is characterised in that: according to facility information prioritizing selection history The testing equipment that accumulative free time is short, sorts by priority tester, according to test assignment according to priority simultaneously Order selects test man, if exemplar is put in storage, then carries out sending work, if exemplar is not put in storage, then stops to carry out sending work, and sends report Alert.
Test assignment allocating method the most according to claim 1, it is characterised in that: also include equipment is carried out spot check, root The strong point overhaul period obtains spot check planning chart automatically, and by mobile terminal, spot check personnel is carried out spot-checking plan prompting, to permissible The spot check item time quantified is the most qualified according to the threshold value automatic decision equipment pre-set;The most energetic spot check item time is used Artificial judgment is the most qualified, if equipment any spot check item time is defective, then triggers maintenance flow and is freezed by equipment, until its symbol Standardization.
Test assignment allocating method the most according to claim 5, it is characterised in that: according to sending work to generate test order ticket, Tester, by testing order ticket described in mobile scanning terminal, sends test assignment start information, passes through after end to be tested Mobile terminal records test result.
Test assignment allocating method the most according to claim 7, it is characterised in that: if test result is defective, automatically Trigger and again send work, and carry out experiment test the most repeatedly, record and upload test initial data and all previous experiment test number According to.
Test assignment allocating method the most according to claim 8, it is characterised in that: according to test sub-project complete feelings Condition, automatically generates test report, analyzes the service efficiency of every equipment, the work of each tester by described test report Efficiency and project overall progress complete efficiency.
Test assignment allocating method the most according to claim 8, it is characterised in that: tester is carried out rights management, The tester being controlled different function by rights management checks relative test assignment.
CN201610735483.9A 2016-08-26 2016-08-26 Test task assignment method Pending CN106327087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610735483.9A CN106327087A (en) 2016-08-26 2016-08-26 Test task assignment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610735483.9A CN106327087A (en) 2016-08-26 2016-08-26 Test task assignment method

Publications (1)

Publication Number Publication Date
CN106327087A true CN106327087A (en) 2017-01-11

Family

ID=57791806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610735483.9A Pending CN106327087A (en) 2016-08-26 2016-08-26 Test task assignment method

Country Status (1)

Country Link
CN (1) CN106327087A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107145442A (en) * 2017-04-27 2017-09-08 广东艾檬电子科技有限公司 A kind of method and device for testing application
CN107220806A (en) * 2017-05-23 2017-09-29 合肥昊思云科科技有限公司 One kind automation workman's job placement management system
CN107220804A (en) * 2017-05-23 2017-09-29 合肥昊思云科科技有限公司 A kind of intelligent work management method based on big data
CN108536592A (en) * 2018-03-29 2018-09-14 京北方信息技术股份有限公司 A kind of test assignment allocating method, device and server
CN109214770A (en) * 2018-07-24 2019-01-15 武汉空心科技有限公司 Development approach, platform and system based on design original text metering
CN111213164A (en) * 2017-08-16 2020-05-29 Nmetric有限责任公司 System and method for ensuring and maintaining equipment availability for tasks
CN111461552A (en) * 2020-04-02 2020-07-28 中电工业互联网有限公司 Test automatic scheduling method and system based on multi-variety and small-batch orders
CN111539598A (en) * 2020-04-03 2020-08-14 联宝(合肥)电子科技有限公司 Test task allocation method, device and storage medium
CN111882220A (en) * 2020-07-29 2020-11-03 珠海格力电器股份有限公司 Data detection method and device
CN112055069A (en) * 2020-08-31 2020-12-08 深圳供电局有限公司 Electric power automation equipment testing method and system
CN112396242A (en) * 2020-11-27 2021-02-23 南京博森科技有限公司 Self-learning intelligent laboratory operation platform and control method thereof
CN113566812A (en) * 2021-07-19 2021-10-29 中数通信息有限公司 Mobile terminal outfield test management system platform
CN113592459A (en) * 2021-08-09 2021-11-02 吉斯凯(苏州)制药有限公司 Experimental plan informatization management method suitable for new drug development
CN113837611A (en) * 2021-09-24 2021-12-24 苏州迈艾木软件科技有限公司 Automatic worker dispatching recommendation method and system
CN113869883A (en) * 2021-10-30 2021-12-31 哈尔滨工业大学 Experimental project operation management method based on template instance strategy
CN116187715A (en) * 2023-04-19 2023-05-30 巴斯夫一体化基地(广东)有限公司 Method and device for scheduling execution of test tasks
CN116449032A (en) * 2023-04-19 2023-07-18 巴斯夫一体化基地(广东)有限公司 Method and system for laboratory processing of product samples on a production line

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1629850A (en) * 2003-12-16 2005-06-22 上海电器科学研究所(集团)有限公司 A control method for laboratory test process management system
CN101127129A (en) * 2006-08-18 2008-02-20 上海宝信软件股份有限公司 Spot-checking plan scheduling control device
WO2008117687A1 (en) * 2007-03-24 2008-10-02 Arix Kabushiki Kaisha Competency action system
CN101599141A (en) * 2009-03-25 2009-12-09 西安计量技术研究院 The system and method that validity control is carried out in report to the Zheng Shu of measurement technology mechanism
CN103164311A (en) * 2011-12-16 2013-06-19 环旭电子股份有限公司 Method for automatically testing communication function of object to be tested
CN104811500A (en) * 2015-05-19 2015-07-29 苏州易信安工业技术有限公司 Equipment control method, device and system
CN104881289A (en) * 2015-06-02 2015-09-02 华北计算技术研究所 GJB5000A-based software development process monitoring method and system
CN104899697A (en) * 2015-06-16 2015-09-09 广州燃石医学检验所有限公司 Laboratory flow quality control management and report automatic system and method
CN105608537A (en) * 2015-12-25 2016-05-25 内蒙古蒙牛乳业(集团)股份有限公司 Management method and system for sample inspection process
CN105868926A (en) * 2016-04-28 2016-08-17 国网福建省电力有限公司 Management platform for achieving task decomposition and automated distribution and performance assessment of power supply station

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1629850A (en) * 2003-12-16 2005-06-22 上海电器科学研究所(集团)有限公司 A control method for laboratory test process management system
CN101127129A (en) * 2006-08-18 2008-02-20 上海宝信软件股份有限公司 Spot-checking plan scheduling control device
WO2008117687A1 (en) * 2007-03-24 2008-10-02 Arix Kabushiki Kaisha Competency action system
CN101599141A (en) * 2009-03-25 2009-12-09 西安计量技术研究院 The system and method that validity control is carried out in report to the Zheng Shu of measurement technology mechanism
CN103164311A (en) * 2011-12-16 2013-06-19 环旭电子股份有限公司 Method for automatically testing communication function of object to be tested
CN104811500A (en) * 2015-05-19 2015-07-29 苏州易信安工业技术有限公司 Equipment control method, device and system
CN104881289A (en) * 2015-06-02 2015-09-02 华北计算技术研究所 GJB5000A-based software development process monitoring method and system
CN104899697A (en) * 2015-06-16 2015-09-09 广州燃石医学检验所有限公司 Laboratory flow quality control management and report automatic system and method
CN105608537A (en) * 2015-12-25 2016-05-25 内蒙古蒙牛乳业(集团)股份有限公司 Management method and system for sample inspection process
CN105868926A (en) * 2016-04-28 2016-08-17 国网福建省电力有限公司 Management platform for achieving task decomposition and automated distribution and performance assessment of power supply station

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107145442A (en) * 2017-04-27 2017-09-08 广东艾檬电子科技有限公司 A kind of method and device for testing application
CN107220806A (en) * 2017-05-23 2017-09-29 合肥昊思云科科技有限公司 One kind automation workman's job placement management system
CN107220804A (en) * 2017-05-23 2017-09-29 合肥昊思云科科技有限公司 A kind of intelligent work management method based on big data
CN111213164A (en) * 2017-08-16 2020-05-29 Nmetric有限责任公司 System and method for ensuring and maintaining equipment availability for tasks
CN108536592A (en) * 2018-03-29 2018-09-14 京北方信息技术股份有限公司 A kind of test assignment allocating method, device and server
CN108536592B (en) * 2018-03-29 2021-09-14 京北方信息技术股份有限公司 Test task assignment method and device and server
CN109214770A (en) * 2018-07-24 2019-01-15 武汉空心科技有限公司 Development approach, platform and system based on design original text metering
CN111461552A (en) * 2020-04-02 2020-07-28 中电工业互联网有限公司 Test automatic scheduling method and system based on multi-variety and small-batch orders
CN111539598A (en) * 2020-04-03 2020-08-14 联宝(合肥)电子科技有限公司 Test task allocation method, device and storage medium
CN111539598B (en) * 2020-04-03 2022-04-15 联宝(合肥)电子科技有限公司 Test task allocation method, device and storage medium
CN111882220A (en) * 2020-07-29 2020-11-03 珠海格力电器股份有限公司 Data detection method and device
CN112055069A (en) * 2020-08-31 2020-12-08 深圳供电局有限公司 Electric power automation equipment testing method and system
CN112055069B (en) * 2020-08-31 2023-12-05 深圳供电局有限公司 Electric power automation equipment testing method and system
CN112396242A (en) * 2020-11-27 2021-02-23 南京博森科技有限公司 Self-learning intelligent laboratory operation platform and control method thereof
CN113566812A (en) * 2021-07-19 2021-10-29 中数通信息有限公司 Mobile terminal outfield test management system platform
CN113592459A (en) * 2021-08-09 2021-11-02 吉斯凯(苏州)制药有限公司 Experimental plan informatization management method suitable for new drug development
CN113592459B (en) * 2021-08-09 2024-04-16 吉斯凯(苏州)制药有限公司 Experimental plan informatization management method suitable for new drug development
CN113837611A (en) * 2021-09-24 2021-12-24 苏州迈艾木软件科技有限公司 Automatic worker dispatching recommendation method and system
CN113869883A (en) * 2021-10-30 2021-12-31 哈尔滨工业大学 Experimental project operation management method based on template instance strategy
CN116187715A (en) * 2023-04-19 2023-05-30 巴斯夫一体化基地(广东)有限公司 Method and device for scheduling execution of test tasks
CN116449032A (en) * 2023-04-19 2023-07-18 巴斯夫一体化基地(广东)有限公司 Method and system for laboratory processing of product samples on a production line
CN116449032B (en) * 2023-04-19 2023-12-12 巴斯夫一体化基地(广东)有限公司 Method and system for laboratory processing of product samples on a production line

Similar Documents

Publication Publication Date Title
CN106327087A (en) Test task assignment method
US10116165B2 (en) Powergrid operation and supervision system
CN107977737B (en) Distribution transformation load prediction method based on mxnet frame deep neural network
CN106447156A (en) Attendance management method and system
CN106296038A (en) Test assignment triggering method
CN105260841B (en) A kind of distribution network failure repairing receipt auditing system
CN113516297A (en) Prediction method and device based on decision tree model and computer equipment
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN109784758B (en) Engineering quality supervision early warning system and method based on BIM model
CN104899143B (en) The software peer review system implementation device of data mining is provided
CN111506618B (en) Abnormal electricity consumption behavior analysis method combined with lightgbm-stacking algorithm
Sheng et al. A hierarchical coloured Petri net model of fleet maintenance with cannibalisation
CN105184438A (en) System for managing human resources based on capacities and method of system
CN109359866A (en) Risk hidden danger monitoring method, device and computer equipment based on leased equipment
CN110570113A (en) Work order processing method and system
CN111488999A (en) Be applied to wind-powered electricity generation field safety production information-based management system
CN106447157A (en) Product testing and supervision method and monitoring system thereof
CN113010806A (en) Dynamic patrol method and device for hydraulic engineering patrol area
CN112184072B (en) Machine room equipment management method and device
CN206505440U (en) Test assignment dispatching system
CN207070219U (en) Projects supervision system based on video monitoring
CN117078209A (en) Method, system and device for managing supervision project and computer storage medium
CN115564398A (en) Intelligent detection laboratory system based on intelligent contract
CN105718602A (en) Cloud system for work safety standardization of rural hydropower station
CN206023811U (en) Drive test supervisory systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111