CN106327084A - Aluminum section product order completion time calculation system and method - Google Patents

Aluminum section product order completion time calculation system and method Download PDF

Info

Publication number
CN106327084A
CN106327084A CN201610730180.8A CN201610730180A CN106327084A CN 106327084 A CN106327084 A CN 106327084A CN 201610730180 A CN201610730180 A CN 201610730180A CN 106327084 A CN106327084 A CN 106327084A
Authority
CN
China
Prior art keywords
duration
aluminium profile
profile product
business
heat insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610730180.8A
Other languages
Chinese (zh)
Inventor
曹湛斌
刘建辉
曹泳强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jianmei Aluminum Profile Factory Group Co Ltd
Guangdong Jianmei Aluminum Profile Factory Co Ltd
Original Assignee
Guangdong Jianmei Aluminum Profile Factory Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jianmei Aluminum Profile Factory Group Co Ltd filed Critical Guangdong Jianmei Aluminum Profile Factory Group Co Ltd
Priority to CN201610730180.8A priority Critical patent/CN106327084A/en
Publication of CN106327084A publication Critical patent/CN106327084A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • General Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Data Mining & Analysis (AREA)
  • Extrusion Of Metal (AREA)

Abstract

The invention discloses an aluminum section product order completion time calculation system and method. The method comprises the steps that the preset data of various types of aluminum section products are stored; the types of the aluminum section products in an aluminum section product order are received; and processing phases required for producing the aluminum section products are received or the processing phases required for the aluminum section products are automatically identified, sub-procedures required for completing the order are determined according to the processing phases required for producing the aluminum section products, time duration required for each sub-procedure is calculated according to the types of the aluminum section products and the preset data of the aluminum section products, and time of completing the aluminum section product order is calculated according to the time duration required for each sub-procedure. Various influence factors in the production process are comprehensively considered and scientifically designed, and different product specifications, the equipment production capacity, production technologies of different products, risk time and the existing production task quantity of each procedure and other factors are considered so that time of completing the aluminum section product order can be relatively accurately calculated.

Description

A kind of calculating system and method for aluminium profile product order deadline
Technical field
The present invention relates to aluminium section bar production technical field, particularly relate to the calculating of a kind of aluminium profile product order deadline System and method.
Background technology
Along with aluminum profile industry competition, aluminium section bar kind becomes increasingly complex, and the delivery cycle also requires that increasingly Short.Applicant, by using questionnaire survey, client to visit, complain the modes such as collection, carries out customer demand finish message and analysis, The delivery rate on time knowing order is to affect the key index of CSAT.Delivery just-in-time, win is not only prestige, also Win market, how to better control over date of delivery, it is ensured that deliver goods on schedule, the major issue that always aluminum processing enterprise is concerned about, The problem that presently, there are is as follows:
1, along with the development of aluminium profile market, client to the demand of product to personalized, diversified development, date of delivery Require progressively to shorten, according to traditional order management mode, it is difficult to well meet the urgent needs that order is delivered goods on schedule by client;
2, cycle length, the situation such as bad delivery that enterprise order delivery is existed by client is complained more, order in 2013 The rate of delivering goods on schedule is 93%, and customer order complains accounting to reach 27% date of delivery;
3, employee compensation is to reckon by the piece, and order completes poor consciousness on schedule.
The reason causing problem above has:
1, order calculation at date of delivery is rough, lacks and considers influence factors various in production process and science Design;
2, upper and lower inter process lacks communication and smooth and easy linking, causes planning to be difficult to ensure that each inter process in the process of implementation Harmonious;
3, each workshop is often with yield as First Principles, does not sets up order completion rate performance appraisal mechanism and examination number According to collection mechanism.
Summary of the invention
In order to solve the problem of order deadline calculation poor accuracy in prior art, the invention provides one The calculating system and method for aluminium profile product order deadline.
The invention provides the computational methods of a kind of aluminium profile product order deadline, including:
Step 1, stores the preset data of all types of aluminium profile products;
Step 2, receives the type of aluminium profile product in aluminium profile product order by interactive interface;Connect by interactive interface Midwifery produce needed for described aluminium profile product processing stage or automatically identify needed for described aluminium profile product processing stage, herein The reason stage is one of following four situation: only include compression stage;Including compression stage and surface treatment stage;Including extruding rank Section and heat insulation processing stage;Including compression stage, surface treatment stage and heat insulation processing stage;
Step 3, according to produce needed for aluminium profile product processing stage determine that order completes required sub-operation, according to institute The preset data of the type and aluminium profile product of stating aluminium profile product calculates the duration needed for every sub-operation, according to each sub-work Duration calculation needed for sequence has gone out the time of described aluminium profile product order.
The method also has the following characteristics that
Described in described step 3 according to produce needed for aluminium profile product processing stage determine that order completes required sub-work Sequence includes:
Produce that described aluminium profile product comprised processing stage when only including compression stage, order completes required sub-work Sequence includes: mould production process, extrusion process;
Produce that described aluminium profile product comprised processing stage when including compression stage and surface treatment stage, order is complete Sub-operation needed for one-tenth includes: mould production process, extrusion process, intermediate bin treatment process, surface treatment procedure;
Produce that described aluminium profile product comprised processing stage include compression stage and heat insulation processing stage time, order is complete Sub-operation needed for one-tenth includes: mould production process, extrusion process, intermediate bin treatment process, heat insulation treatment process;
Produce that described aluminium profile product comprised processing stage include compression stage, surface treatment stage and heat insulation process During the stage, order completes required sub-operation and includes: mould production process, extrusion process, intermediate bin treatment process, surface process Operation, intermediate bin treatment process, heat insulation treatment process.
The method also has the following characteristics that
The preset data of aluminium profile product described in described step 1 include all kinds of aluminium profile product mould produce duration, Extruder tonnage that all kinds of aluminium profile products are corresponding, the mould die trial corresponding to extruder of different tonnage section and nitridation duration, Risk duration in timeliness and risk duration, intermediate bin treatment process duration, surface treatment procedure, heat insulation process in extrusion process Risk duration in operation;
Type according to described aluminium profile product and the preset data every height of calculating of aluminium profile product in described step 3 Duration needed for operation includes:
When calculating the duration of mould production process, determine that its mould produces duration according to the type of described aluminium profile product;
When calculating the duration of extrusion process, determine that the duration of extrusion process includes mould die trial and nitridation duration, extruding life Produce timeliness and risk duration in duration and extrusion process;Wherein, when calculating the duration of mould die trial and nitridation, according to described aluminium profiles The type of material product determines the extruder tonnage that described aluminium profile product is corresponding, determines this tonnage section belonging to extruder tonnage, Determine mould die trial and nitridation duration that the extruder of this tonnage section is corresponding;When calculating extruding production duration, determine according to described The type of aluminium profile product determines the extruder tonnage that described aluminium profile product is corresponding, determines this tonnage belonging to extruder tonnage Section, inquires about the data in production system and knows the extruder daily output in single amount with this tonnage section on the same day of this tonnage section, Calculate the described business in single amount with the described daily output, when the arithmetic point part of the value of this business is less than 0.5, by the integer part of this business Value as extruding produce duration, the arithmetic point of the value of this business be partially larger than or equal to 0.5 time, by the value of the integer part of this business With 1 and as extruding produce duration;When calculating timeliness and risk duration in extrusion process, obtain from described memory module and squeeze Timeliness and risk duration in pressure operation;
When calculating intermediate bin treatment process duration, from described memory module, obtain intermediate bin treatment process duration;
During the duration of gauging surface treatment process, determine the duration of surface treatment procedure include surface process for producing duration, Risk duration;Wherein, during gauging surface process for producing duration, the data in inquiry production system know that surface processing equipment is being worked as It at single amount and the daily output of surface processing equipment, calculate described in single amount with the business of the described daily output, the value of this business little When several parts are less than 0.5, as extruding, the value of the integer part of this business being produced duration, the arithmetic point part of the value of this business is big In or during equal to 0.5, using the value of the integer part of this business and 1 and as surface process for producing duration;During calculation risk duration, The risk duration in surface treatment procedure is obtained from described memory module;
When calculating the duration of heat insulation treatment process, determine that the duration of heat insulation treatment process includes that heat insulation stricture of vagina produces duration, wind Danger duration;Wherein, when calculating heat insulation stricture of vagina production duration, the data in inquiry production system know that heat insulation stricture of vagina produced equipment on the same day The daily output of the equipment that produces in single amount and heat insulation stricture of vagina, calculate described in single amount with the business of the described daily output, the value of this business little When several parts are less than 0.5, as extruding, the value of the integer part of this business being produced duration, the arithmetic point part of the value of this business is big In or during equal to 0.5, using the value of the integer part of this business and 1 and produce duration as heat insulation stricture of vagina;During calculation risk duration, from Described memory module obtains the risk duration in heat insulation treatment process.
The method also has the following characteristics that
Described method also includes step 4, is received the manufacturing schedule information of aluminium profile product by interactive interface;According to described The manufacturing schedule information of aluminium profile product is corresponding with the duration of the sub-operation of described aluminium profile product to be compared, it is judged that described aluminium section bar When the manufacturing schedule of product lags behind the progress corresponding to duration of described sub-operation, send alarm prompt;And according to backwardness Degree sends the alarm prompt of different stage.
Present invention also offers the calculating system of a kind of aluminium profile product order deadline, including memory module, input Module, control module;
Described memory module, for storing the preset data of all types of aluminium profile products;
Described input module, for receiving the type of aluminium profile product by interactive interface;It is additionally operable to pass through interactive interface Receive aluminium profile product comprised processing stage;Wherein, aluminium profile product comprised processing stage include four kinds of situations: only Including compression stage;Including compression stage and surface treatment stage;Including compression stage and heat insulation processing stage;Including extruding rank Section, surface treatment stage and heat insulation processing stage;
Described control module, the described aluminium profile product for obtaining according to described input module comprised processing stage Determine that order completes required sub-operation, the type of the described aluminium profile product obtained according to described input module and described in deposit The preset data of the aluminium profile product in storage module calculates the duration needed for every sub-operation, according to the duration needed for each sub-operation Calculate the time of described aluminium profile product order.
This system also has the following characteristics that
Described control module, for making to determine using the following method that order completes required sub-operation:
When described aluminium profile product only includes compression stage processing stage of being comprised, order completes required sub-operation bag Include: mould production process, extrusion process;
When described aluminium profile product includes compression stage and surface treatment stage processing stage of being comprised, order completes institute The sub-operation needed includes: mould production process, extrusion process, intermediate bin treatment process, surface treatment procedure;
Described aluminium profile product include the processing stage of being comprised compression stage and heat insulation processing stage time, order completes institute The sub-operation needed includes: mould production process, extrusion process, intermediate bin treatment process, heat insulation treatment process;
Described aluminium profile product include the processing stage of being comprised compression stage, surface treatment stage and heat insulation processing stage Time, order completes required sub-operation and includes: mould production process, extrusion process, intermediate bin treatment process, surface science and engineering Sequence, intermediate bin treatment process, heat insulation treatment process.
This system also has the following characteristics that
The preset data of aluminium profile product includes that the mould of all kinds of aluminium profile product produces duration, all kinds of aluminium profile product pair In the extruder tonnage answered, the mould die trial corresponding to extruder of different tonnage section and nitridation duration, extrusion process timeliness and When the risk duration in risk duration, intermediate bin treatment process duration, surface treatment procedure, the risk in heat insulation treatment process Long;
Described control module is for making the class of described aluminium profile product obtained using the following method according to described input module Duration needed for every sub-operation of preset data calculating of aluminium profile product in type and described memory module:
When calculating the duration of mould production process, determine that its mould produces duration according to the type of described aluminium profile product;
When calculating the duration of extrusion process, determine that the duration of extrusion process includes mould die trial and nitridation duration, extruding life Produce timeliness and risk duration in duration and extrusion process;Wherein, when calculating the duration of mould die trial and nitridation, according to described aluminium profiles The type of material product determines the extruder tonnage that described aluminium profile product is corresponding, determines this tonnage section belonging to extruder tonnage, Determine mould die trial and nitridation duration that the extruder of this tonnage section is corresponding;When calculating extruding production duration, determine according to described The type of aluminium profile product determines the extruder tonnage that described aluminium profile product is corresponding, determines this tonnage belonging to extruder tonnage Section, inquires about the data in production system and knows the extruder daily output in single amount with this tonnage section on the same day of this tonnage section, Calculate the described business in single amount with the described daily output, when the arithmetic point part of the value of this business is less than 0.5, by the integer part of this business Value as extruding produce duration, the arithmetic point of the value of this business be partially larger than or equal to 0.5 time, by the value of the integer part of this business With 1 and as extruding produce duration;When calculating timeliness and risk duration in extrusion process, obtain from described memory module and squeeze Timeliness and risk duration in pressure operation;
When calculating intermediate bin treatment process duration, from described memory module, obtain intermediate bin treatment process duration;
During the duration of gauging surface treatment process, determine the duration of surface treatment procedure include surface process for producing duration, Risk duration;Wherein, during gauging surface process for producing duration, the data in inquiry production system know that surface processing equipment is being worked as It at single amount and the daily output of surface processing equipment, calculate described in single amount with the business of the described daily output, the value of this business little When several parts are less than 0.5, as extruding, the value of the integer part of this business being produced duration, the arithmetic point part of the value of this business is big In or during equal to 0.5, using the value of the integer part of this business and 1 and as surface process for producing duration;During calculation risk duration, The risk duration in surface treatment procedure is obtained from described memory module;
When calculating the duration of heat insulation treatment process, determine that the duration of heat insulation treatment process includes that heat insulation stricture of vagina produces duration, wind Danger duration;Wherein, when calculating heat insulation stricture of vagina production duration, the data in inquiry production system know that heat insulation stricture of vagina produced equipment on the same day The daily output of the equipment that produces in single amount and heat insulation stricture of vagina, calculate described in single amount with the business of the described daily output, the value of this business little When several parts are less than 0.5, as extruding, the value of the integer part of this business being produced duration, the arithmetic point part of the value of this business is big In or during equal to 0.5, using the value of the integer part of this business and 1 and produce duration as heat insulation stricture of vagina;During calculation risk duration, from Described memory module obtains the risk duration in heat insulation treatment process.
This system also has the following characteristics that
Described system also includes alarm prompt module;
Described input module is additionally operable to be received the manufacturing schedule information of aluminium profile product by interactive interface;
Described control module is additionally operable to the manufacturing schedule information according to described aluminium profile product and described aluminium profile product The duration correspondence of sub-operation compares, it is judged that the manufacturing schedule of described aluminium profile product lags behind corresponding to the duration of described sub-operation Progress time, send alarm prompt;And the alarm prompt of different stage is sent according to the degree fallen behind.
Influence factors various in production process have been carried out considering and scientific design by the present invention, it is contemplated that different product The factors such as specification, equipment capacity, different product production technology, risk time, each operation existing production task amount, can be relatively For calculating the deadline of aluminium profile product order accurately.
Accompanying drawing explanation
The accompanying drawing of the part constituting the present invention is used for providing a further understanding of the present invention, and the present invention's is schematic real Execute example and illustrate for explaining the present invention, being not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the computational methods of aluminium profile product order deadline in embodiment;
Fig. 2 is the structure chart of the calculating system of aluminium profile product order deadline in embodiment.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under not making creative work premise, broadly falls into the scope of protection of the invention.Need Illustrating, in the case of not conflicting, the embodiment in the application and the feature in embodiment can mutual combination in any.
Fig. 1 is the flow chart of the computational methods of aluminium profile product order deadline in embodiment;With reference to Fig. 1, aluminium section bar The computational methods of product order deadline include:
Step 101, stores the preset data of all types of aluminium profile products;
Step 102, receives the type of aluminium profile product in aluminium profile product order by interactive interface;Pass through interactive interface Receive produce needed for aluminium profile product processing stage or automatically identify needed for this aluminium profile product processing stage, this processes rank Section is one of following four situation: only include compression stage;Including compression stage and surface treatment stage;Including compression stage and The processing stage of heat insulation;Including compression stage, surface treatment stage and heat insulation processing stage;
Step 103, according to aluminium profile product comprised processing stage determine that order completes required sub-operation, according to aluminum The type of product forms and the preset data of aluminium profile product calculate the duration needed for every sub-operation, obtain phase in each operation The existing production task amount of equipment should be produced, according to the duration calculation needed for each sub-operation gone out aluminium profile product order time Between.
Wherein,
In step 103 according to produce needed for aluminium profile product processing stage determine that order completes required sub-operation bag Include:
Produce that above-mentioned aluminium profile product comprised processing stage when only including compression stage, order completes required sub-work Sequence includes: mould production process, extrusion process;
Produce that above-mentioned aluminium profile product comprised processing stage when including compression stage and surface treatment stage, order is complete Sub-operation needed for one-tenth includes: mould production process, extrusion process, intermediate bin treatment process, surface treatment procedure;
Produce that above-mentioned aluminium profile product comprised processing stage include compression stage and heat insulation processing stage time, order is complete Sub-operation needed for one-tenth includes: mould production process, extrusion process, intermediate bin treatment process, heat insulation treatment process;
Produce that above-mentioned aluminium profile product comprised processing stage include compression stage, surface treatment stage and heat insulation process During the stage, order completes required sub-operation and includes: mould production process, extrusion process, intermediate bin treatment process, surface process Operation, intermediate bin treatment process, heat insulation treatment process.
Wherein, in step 1, the preset data of aluminium profile product includes that the mould of all kinds of aluminium profile product produces duration, all kinds of Extruder tonnage, the mould die trial corresponding to extruder of different tonnage section and nitridation duration, the extruding that aluminium profile product is corresponding Risk duration in timeliness and risk duration, intermediate bin treatment process duration, surface treatment procedure, heat insulation treatment process in operation In risk duration;
Needed in step 3, the preset data of type according to aluminium profile product and aluminium profile product calculates every sub-operation Duration include:
When calculating the duration of mould production process, determine that its mould produces duration according to the type of aluminium profile product.
When calculating the duration of extrusion process, determine that the duration of extrusion process includes mould die trial and nitridation duration, extruding life Produce timeliness and risk duration in duration and extrusion process;Wherein, when calculating the duration of mould die trial and nitridation, produce according to aluminium section bar The type of product determines the extruder tonnage that aluminium profile product is corresponding, determines this tonnage section belonging to extruder tonnage, determines this ton The mould die trial corresponding to extruder of position section and nitridation duration;When calculating extruding production duration, determine according to aluminium profile product Type determines the extruder tonnage that aluminium profile product is corresponding, determines this tonnage section belonging to extruder tonnage, inquires about production system In data know the extruder of this tonnage section the same day at single amount and the daily output of this tonnage section, calculate in single amount and daily output The business of amount, when the arithmetic point part of the value of this business is less than 0.5, produces duration using the value of the integer part of this business as extruding, this The arithmetic point of the value of business is partially larger than or during equal to 0.5, using the value of the integer part of this business and 1 and during as extruding production Long;When calculating timeliness and risk duration in extrusion process, from memory module, obtain timeliness and risk duration in extrusion process;Its In, extruder includes following tonnage section: 600T-1650T, 1800T-2300T, 3000T-3600T, 9000T;Use different tonnage It is different that the extruder of section produces duration spent during the product of same type, and the duration that the extruder of tonnage Duan Yue great expends is more Short.
When calculating intermediate bin treatment process duration, from memory module, obtain intermediate bin treatment process duration.
During the duration of gauging surface treatment process, determine the duration of surface treatment procedure include surface process for producing duration, Risk duration;Wherein, during gauging surface process for producing duration, the data in inquiry production system know that surface processing equipment is being worked as It the daily output in single amount with surface processing equipment, calculates in single amount and the business of the daily output, the arithmetic point part of the value of this business During less than 0.5, as extruding, the value of the integer part of this business being produced duration, the arithmetic point of the value of this business is partially larger than or is equal to When 0.5, using the value of the integer part of this business and 1 and as surface process for producing duration;During calculation risk duration, from storage mould Block obtains the risk duration in surface treatment procedure.
When calculating the duration of heat insulation treatment process, determine that the duration of heat insulation treatment process includes that heat insulation stricture of vagina produces duration, wind Danger duration;Wherein, when calculating heat insulation stricture of vagina production duration, the data in inquiry production system know that heat insulation stricture of vagina produced equipment on the same day The daily output of the equipment that produces in single amount and heat insulation stricture of vagina, calculate in single amount and the business of the daily output, the arithmetic point part of the value of this business During less than 0.5, as extruding, the value of the integer part of this business being produced duration, the arithmetic point of the value of this business is partially larger than or is equal to When 0.5, using the value of the integer part of this business and 1 and produce duration as heat insulation stricture of vagina;During calculation risk duration, from memory module Risk duration in the heat insulation treatment process of middle acquisition.
This method also includes order progress following function, when order progress falls behind, sends alarm.Concrete, we Method also includes step 4, is received the manufacturing schedule information of aluminium profile product by interactive interface;Production according to aluminium profile product is entered Degree information is corresponding with the duration of the sub-operation of aluminium profile product to be compared, it is judged that the manufacturing schedule of aluminium profile product lags behind sub-operation The progress corresponding to duration time, send alarm prompt;And the alarm prompt of different stage is sent according to the degree fallen behind.
Fig. 2 is the structure chart of the calculating system of aluminium profile product order deadline, this calculating system include memory module, Input module, control module.
Memory module is for storing the preset data of all types of aluminium profile products;
Input module for receiving the type of aluminium profile product by interactive interface;It is additionally operable to receive aluminum by interactive interface Product forms comprised processing stage;Wherein, aluminium profile product comprised processing stage include four kinds of situations: only include crowded The pressure stage;Including compression stage and surface treatment stage;Including compression stage and heat insulation processing stage;Including compression stage, table The processing stage of face and the processing stage of heat insulation;
Control module, for according to input module obtain aluminium profile product comprised processing stage determine that order completes Required sub-operation, the aluminium profile product in the type of the aluminium profile product obtained according to input module and memory module pre- If data calculate the duration needed for every sub-operation, go out aluminium profile product order according to the duration calculation needed for each sub-operation Time.
Wherein,
Control module is for making to determine using the following method that order completes required sub-operation:
When aluminium profile product only includes compression stage processing stage of being comprised, order completes required sub-operation and includes: Mould production process, extrusion process;
When aluminium profile product includes compression stage and surface treatment stage processing stage of being comprised, order completes required Sub-operation includes: mould production process, extrusion process, intermediate bin treatment process, surface treatment procedure;
Aluminium profile product include the processing stage of being comprised compression stage and heat insulation processing stage time, order completes required Sub-operation includes: mould production process, extrusion process, intermediate bin treatment process, heat insulation treatment process;
Aluminium profile product include the processing stage of being comprised compression stage, surface treatment stage and heat insulation processing stage time, Order completes required sub-operation and includes: mould production process, extrusion process, intermediate bin treatment process, surface treatment procedure, in Between storehouse treatment process, heat insulation treatment process.
Aluminium profile product in the type of the aluminium profile product that control module obtains according to input module and memory module Preset data calculate the calculating each operation institute described in the executive mode of duration needed for every sub-operation and said method The mode of the duration needed is identical, and here is omitted.
Native system also includes alarm prompt module.
Input module is additionally operable to be received the manufacturing schedule information of aluminium profile product by interactive interface;
Control module is for the duration pair of the manufacturing schedule information according to aluminium profile product with the sub-operation of aluminium profile product Should compare, it is judged that when the manufacturing schedule of aluminium profile product lags behind the progress corresponding to the duration of sub-operation, send alarm prompt; And the alarm prompt of different stage is sent according to the degree fallen behind.
Influence factors various in production process have been carried out considering and scientific design by the present invention, it is contemplated that different product The factors such as specification, equipment capacity, different product production technology, risk time, each operation existing production task amount, can be relatively For calculating the deadline of aluminium profile product order accurately.
Descriptions above can combine enforcement individually or in every way, and these variant all exist Within protection scope of the present invention.
It should be noted that in this article, term " includes ", " comprising " or its any other variant are intended to non-row Comprising of his property, so that include that the article of a series of key element or equipment not only include those key elements, but also include not There are other key elements being expressly recited, or also include the key element intrinsic for this article or equipment.There is no more limit In the case of system, statement " including ... " key element limited, it is not excluded that in the article including described key element or equipment There is also other identical element.
Above example is only in order to illustrate technical scheme and unrestricted, reference only to preferred embodiment to this Bright it is described in detail.It will be understood by those within the art that, technical scheme can be modified Or equivalent, without deviating from the spirit and scope of technical solution of the present invention, all should contain the claim model in the present invention In the middle of enclosing.

Claims (8)

1. the computational methods of an aluminium profile product order deadline, it is characterised in that including:
Step 1, stores the preset data of all types of aluminium profile products;
Step 2, receives the type of aluminium profile product in aluminium profile product order by interactive interface;Received raw by interactive interface Needed for producing described aluminium profile product processing stage or automatically identify needed for described aluminium profile product processing stage, this processes rank Section is one of following four situation: only include compression stage;Including compression stage and surface treatment stage;Including compression stage and The processing stage of heat insulation;Including compression stage, surface treatment stage and heat insulation processing stage;
Step 3, according to produce needed for aluminium profile product processing stage determine that order completes required sub-operation, according to described aluminum The type of product forms and the preset data of aluminium profile product calculate the duration needed for every sub-operation, according to each sub-operation institute The duration calculation needed has gone out the time of described aluminium profile product order.
2. the method for claim 1, it is characterised in that
Described in described step 3 according to produce needed for aluminium profile product processing stage determine that order completes required sub-operation bag Include:
Produce that described aluminium profile product comprised processing stage when only including compression stage, order completes required sub-operation bag Include: mould production process, extrusion process;
Produce that described aluminium profile product comprised processing stage when including compression stage and surface treatment stage, order completes institute The sub-operation needed includes: mould production process, extrusion process, intermediate bin treatment process, surface treatment procedure;
Produce that described aluminium profile product comprised processing stage include compression stage and heat insulation processing stage time, order completes institute The sub-operation needed includes: mould production process, extrusion process, intermediate bin treatment process, heat insulation treatment process;
Produce that described aluminium profile product comprised processing stage include compression stage, surface treatment stage and heat insulation processing stage Time, order completes required sub-operation and includes: mould production process, extrusion process, intermediate bin treatment process, surface science and engineering Sequence, intermediate bin treatment process, heat insulation treatment process.
3. method as claimed in claim 2, it is characterised in that
The preset data of aluminium profile product described in described step 1 includes that the mould of all kinds of aluminium profile product produces duration, all kinds of Extruder tonnage, the mould die trial corresponding to extruder of different tonnage section and nitridation duration, the extruding that aluminium profile product is corresponding Risk duration in timeliness and risk duration, intermediate bin treatment process duration, surface treatment procedure, heat insulation treatment process in operation In risk duration;
Type according to described aluminium profile product and every sub-operation of preset data calculating of aluminium profile product in described step 3 Required duration includes:
When calculating the duration of mould production process, determine that its mould produces duration according to the type of described aluminium profile product;
When calculating the duration of extrusion process, determine when the duration of extrusion process includes mould die trial and nitridation duration, extruding production Timeliness and risk duration in length and extrusion process;Wherein, when calculating the duration of mould die trial and nitridation, produce according to described aluminium section bar The type of product determines the extruder tonnage that described aluminium profile product is corresponding, determines this tonnage section belonging to extruder tonnage, determines Mould die trial that the extruder of this tonnage section is corresponding and nitridation duration;When calculating extruding production duration, determine according to described aluminium profiles The type of material product determines the extruder tonnage that described aluminium profile product is corresponding, determines this tonnage section belonging to extruder tonnage, Data in inquiry production system know the extruder daily output in single amount with this tonnage section on the same day of this tonnage section, calculate The described business in single amount with the described daily output, when the arithmetic point part of the value of this business is less than 0.5, by the value of the integer part of this business Duration is produced, when the arithmetic point of the value of this business is partially larger than or is equal to 0.5, by the value and 1 of the integer part of this business as extruding And as extruding produce duration;When calculating timeliness and risk duration in extrusion process, from described memory module, obtain extruding Timeliness and risk duration in operation;
When calculating intermediate bin treatment process duration, from described memory module, obtain intermediate bin treatment process duration;
During the duration of gauging surface treatment process, determine that the duration of surface treatment procedure includes surface process for producing duration, risk Duration;Wherein, during gauging surface process for producing duration, the data in inquiry production system know that surface processing equipment was on the same day At the daily output of single amount with surface processing equipment, calculate the described business in single amount with the described daily output, the arithmetic point of the value of this business Part less than 0.5 time, using the value of the integer part of this business as extruding produce duration, the arithmetic point of the value of this business be partially larger than or During equal to 0.5, using the value of the integer part of this business and 1 and as surface process for producing duration;During calculation risk duration, from institute State and memory module obtains the risk duration in surface treatment procedure;
When calculating the duration of heat insulation treatment process, determine that the duration of heat insulation treatment process includes when heat insulation stricture of vagina produces duration, risk Long;Wherein, calculate heat insulation stricture of vagina produce duration time, inquiry production system in data know heat insulation stricture of vagina produce equipment the same day Single amount and the daily output of heat insulation stricture of vagina production equipment, calculate the described business in single amount with the described daily output, the arithmetic point of the value of this business Part less than 0.5 time, using the value of the integer part of this business as extruding produce duration, the arithmetic point of the value of this business be partially larger than or During equal to 0.5, using the value of the integer part of this business and 1 and produce duration as heat insulation stricture of vagina;During calculation risk duration, from described Memory module obtains the risk duration in heat insulation treatment process.
4. the method for claim 1, it is characterised in that
Described method also includes step 4, is received the manufacturing schedule information of aluminium profile product by interactive interface;According to described aluminium profiles The manufacturing schedule information of material product is corresponding with the duration of the sub-operation of described aluminium profile product to be compared, it is judged that described aluminium profile product Manufacturing schedule when lagging behind the progress corresponding to duration of described sub-operation, send alarm prompt;And according to the degree fallen behind Send the alarm prompt of different stage.
5. the calculating system of an aluminium profile product order deadline, it is characterised in that include memory module, input module, Control module;
Described memory module, for storing the preset data of all types of aluminium profile products;
Described input module, for receiving the type of aluminium profile product by interactive interface;It is additionally operable to be received by interactive interface Aluminium profile product comprised processing stage;Wherein, aluminium profile product comprised processing stage include four kinds of situations: only include Compression stage;Including compression stage and surface treatment stage;Including compression stage and heat insulation processing stage;Including compression stage, Surface treatment stage and heat insulation processing stage;
Described control module, the described aluminium profile product for obtaining according to described input module comprised processing stage determine Order completes required sub-operation, the type of the described aluminium profile product obtained according to described input module and described storage mould The preset data of the aluminium profile product in block calculates the duration needed for every sub-operation, according to the duration calculation needed for each sub-operation Go out the time of described aluminium profile product order.
6. system as claimed in claim 5, it is characterised in that
Described control module, for making to determine using the following method that order completes required sub-operation:
When described aluminium profile product only includes compression stage processing stage of being comprised, order completes required sub-operation and includes: Mould production process, extrusion process;
When described aluminium profile product includes compression stage and surface treatment stage processing stage of being comprised, order completes required Sub-operation includes: mould production process, extrusion process, intermediate bin treatment process, surface treatment procedure;
Described aluminium profile product include the processing stage of being comprised compression stage and heat insulation processing stage time, order completes required Sub-operation includes: mould production process, extrusion process, intermediate bin treatment process, heat insulation treatment process;
Described aluminium profile product include the processing stage of being comprised compression stage, surface treatment stage and heat insulation processing stage time, Order completes required sub-operation and includes: mould production process, extrusion process, intermediate bin treatment process, surface treatment procedure, in Between storehouse treatment process, heat insulation treatment process.
7. system as claimed in claim 6, it is characterised in that
The preset data of aluminium profile product includes that the mould production duration of all kinds of aluminium profile product, all kinds of aluminium profile product are corresponding Timeliness and risk in extruder tonnage, the mould die trial corresponding to extruder of different tonnage section and nitridation duration, extrusion process Risk duration in duration, intermediate bin treatment process duration, surface treatment procedure, the risk duration in heat insulation treatment process;
Described control module for make the type of described aluminium profile product that obtains according to described input module using the following method with And the preset data of the aluminium profile product in described memory module calculates the duration needed for every sub-operation:
When calculating the duration of mould production process, determine that its mould produces duration according to the type of described aluminium profile product;
When calculating the duration of extrusion process, determine when the duration of extrusion process includes mould die trial and nitridation duration, extruding production Timeliness and risk duration in length and extrusion process;Wherein, when calculating the duration of mould die trial and nitridation, produce according to described aluminium section bar The type of product determines the extruder tonnage that described aluminium profile product is corresponding, determines this tonnage section belonging to extruder tonnage, determines Mould die trial that the extruder of this tonnage section is corresponding and nitridation duration;When calculating extruding production duration, determine according to described aluminium profiles The type of material product determines the extruder tonnage that described aluminium profile product is corresponding, determines this tonnage section belonging to extruder tonnage, Data in inquiry production system know the extruder daily output in single amount with this tonnage section on the same day of this tonnage section, calculate The described business in single amount with the described daily output, when the arithmetic point part of the value of this business is less than 0.5, by the value of the integer part of this business Duration is produced, when the arithmetic point of the value of this business is partially larger than or is equal to 0.5, by the value and 1 of the integer part of this business as extruding And as extruding produce duration;When calculating timeliness and risk duration in extrusion process, from described memory module, obtain extruding Timeliness and risk duration in operation;
When calculating intermediate bin treatment process duration, from described memory module, obtain intermediate bin treatment process duration;
During the duration of gauging surface treatment process, determine that the duration of surface treatment procedure includes surface process for producing duration, risk Duration;Wherein, during gauging surface process for producing duration, the data in inquiry production system know that surface processing equipment was on the same day At the daily output of single amount with surface processing equipment, calculate the described business in single amount with the described daily output, the arithmetic point of the value of this business Part less than 0.5 time, using the value of the integer part of this business as extruding produce duration, the arithmetic point of the value of this business be partially larger than or During equal to 0.5, using the value of the integer part of this business and 1 and as surface process for producing duration;During calculation risk duration, from institute State and memory module obtains the risk duration in surface treatment procedure;
When calculating the duration of heat insulation treatment process, determine that the duration of heat insulation treatment process includes when heat insulation stricture of vagina produces duration, risk Long;Wherein, calculate heat insulation stricture of vagina produce duration time, inquiry production system in data know heat insulation stricture of vagina produce equipment the same day Single amount and the daily output of heat insulation stricture of vagina production equipment, calculate the described business in single amount with the described daily output, the arithmetic point of the value of this business Part less than 0.5 time, using the value of the integer part of this business as extruding produce duration, the arithmetic point of the value of this business be partially larger than or During equal to 0.5, using the value of the integer part of this business and 1 and produce duration as heat insulation stricture of vagina;During calculation risk duration, from described Memory module obtains the risk duration in heat insulation treatment process.
8. system as claimed in claim 5, it is characterised in that
Described system also includes alarm prompt module;
Described input module is additionally operable to be received the manufacturing schedule information of aluminium profile product by interactive interface;
Described control module is additionally operable to the sub-work of the manufacturing schedule information according to described aluminium profile product and described aluminium profile product The duration correspondence of sequence compares, it is judged that the manufacturing schedule of described aluminium profile product lags behind entering corresponding to the duration of described sub-operation When spending, send alarm prompt;And the alarm prompt of different stage is sent according to the degree fallen behind.
CN201610730180.8A 2016-08-26 2016-08-26 Aluminum section product order completion time calculation system and method Pending CN106327084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610730180.8A CN106327084A (en) 2016-08-26 2016-08-26 Aluminum section product order completion time calculation system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610730180.8A CN106327084A (en) 2016-08-26 2016-08-26 Aluminum section product order completion time calculation system and method

Publications (1)

Publication Number Publication Date
CN106327084A true CN106327084A (en) 2017-01-11

Family

ID=57791136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610730180.8A Pending CN106327084A (en) 2016-08-26 2016-08-26 Aluminum section product order completion time calculation system and method

Country Status (1)

Country Link
CN (1) CN106327084A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109034671A (en) * 2018-09-06 2018-12-18 深圳百胜扬工业电子商务平台发展有限公司 Factory's producing line target product production duration determines method and device
CN109165784A (en) * 2018-08-20 2019-01-08 江苏金迪木业股份有限公司 Timber process time prediction technique based on manufacturing database

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101751013A (en) * 2008-12-04 2010-06-23 和舰科技(苏州)有限公司 Auxiliary distribution system and auxiliary distribution method for semiconductor manufacturing production
CN104778502A (en) * 2015-03-16 2015-07-15 上海市建筑装饰工程集团有限公司 Digitalized monitoring method suitable for building decoration members
CN105243512A (en) * 2015-11-06 2016-01-13 湖南千盟物联信息技术有限公司 Dynamic scheduling method of steelmaking operation plan

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101751013A (en) * 2008-12-04 2010-06-23 和舰科技(苏州)有限公司 Auxiliary distribution system and auxiliary distribution method for semiconductor manufacturing production
CN104778502A (en) * 2015-03-16 2015-07-15 上海市建筑装饰工程集团有限公司 Digitalized monitoring method suitable for building decoration members
CN105243512A (en) * 2015-11-06 2016-01-13 湖南千盟物联信息技术有限公司 Dynamic scheduling method of steelmaking operation plan

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁永宏: "铝型材挤压车间MES***研究与设计", 《机电工程技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109165784A (en) * 2018-08-20 2019-01-08 江苏金迪木业股份有限公司 Timber process time prediction technique based on manufacturing database
CN109034671A (en) * 2018-09-06 2018-12-18 深圳百胜扬工业电子商务平台发展有限公司 Factory's producing line target product production duration determines method and device

Similar Documents

Publication Publication Date Title
Rahmani et al. A robust optimization model for multi-product two-stage capacitated production planning under uncertainty
EP1695282B1 (en) Data processing system and method
CN109784984A (en) A kind of fresh shops's Intelligent Ordering System
CN109492873A (en) The day scheduled production method, apparatus and intelligent terminal of vehicle production line
Korytkowski et al. Exponential smoothing for multi-product lot-sizing with heijunka and varying demand
Pihnastyi et al. Calculation of the parameters of the composite conveyor line with a constant speed of movement of subjects of labour
CN106327084A (en) Aluminum section product order completion time calculation system and method
CN112950262A (en) Sales prediction method, sales prediction apparatus, computer device, and storage medium
Singh et al. Three stage supply chain model with two warehouse, imperfect production, variable demand rate and inflation
CN114626745A (en) Scheduling plan generation method, system, medium and electronic terminal
CN105988439B (en) A kind of production capacity optimization method based on dynamic prediction board load capacity
US20200134649A1 (en) Forecasting demand for groups of items, such as mobile phones
KR102352658B1 (en) A construction information management system and a method for controlling the same
Fleisch et al. The value of information integration in meeting delivery dates
CN109360041A (en) Trade company's methods of exhibiting, device, electronic equipment and storage medium
Shukla et al. A framework for an inventory model for deteriorating items with expiration under trapezoidal-type demand and partial backlogging
TWI438707B (en) Manufacturing cost analysis system
TW200428246A (en) System and method for computing production cost
CN105184586A (en) Method and device for controlling information display
CN106325226A (en) Dispatching system and dispatching method
CN117891224B (en) Production control method, equipment and medium for oral liquid bottle
CN107704983A (en) The integrated scheduling method of electroplating technology
Ruangkanjanases et al. MINIMIZING PROCESS LEAD TIME FOR A SINGLE MACHINE USING THE DEVELOPED OPTIMAL BATCH SIZE EQUATIONS
CN113836721A (en) Method and device for calculating garden throwing amount, storage medium and computer equipment
Peng et al. Raw materials purchasing strategy model for complex products based on time series

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111

RJ01 Rejection of invention patent application after publication