CN106324435B - A kind of controller switching equipment running environment monitoring method - Google Patents

A kind of controller switching equipment running environment monitoring method Download PDF

Info

Publication number
CN106324435B
CN106324435B CN201610783123.6A CN201610783123A CN106324435B CN 106324435 B CN106324435 B CN 106324435B CN 201610783123 A CN201610783123 A CN 201610783123A CN 106324435 B CN106324435 B CN 106324435B
Authority
CN
China
Prior art keywords
interference
switch
radiation signal
interference sources
microprocessor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610783123.6A
Other languages
Chinese (zh)
Other versions
CN106324435A (en
Inventor
王健
李继攀
成红星
王明同
李培
张逢雪
王治国
韩岩
张国营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Heze Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201610783123.6A priority Critical patent/CN106324435B/en
Publication of CN106324435A publication Critical patent/CN106324435A/en
Application granted granted Critical
Publication of CN106324435B publication Critical patent/CN106324435B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

A kind of controller switching equipment running environment monitoring method, it is realized using controller switching equipment running environment monitoring device, device includes radiation transmitter, radiation receiver, microprocessor, induced current measuring unit, vibrating sensor and temperature and humidity measurement sensor, it include wherein control processor using radiation transmitter, power splitter, 5 interference sources and its switch of parallel connection, each interference source is correspondingly connected with a transmitting antenna, control processor, power splitter, 5 interference sources and its switch and transmitting antenna of parallel connection are sequentially connected, radiation receiver includes sequentially connected receiving antenna, converting unit, amplify filter unit and actinometry unit, microprocessor is separately connected actinometry unit, induced current measuring unit, vibrating sensor and temperature and humidity measurement sensor, Suresh Kumar, and the environmental parameter of power distribution network can be measured, Effectively judge distribution network exception.

Description

A kind of controller switching equipment running environment monitoring method
Technical field
The present invention relates to electric power environmentals to monitor field, and in particular to a kind of controller switching equipment running environment monitoring method.
Background technique
The progress of science and technology and economic rapid development, society rapidly increases power demand, however as power distribution network The continuous development of cable process, distribution network line structure become increasingly complex, and branched line is various, for power distribution network power supply performance Reliable and stable requirement it is higher and higher, while requirement of the user for power quality and service is also being continuously improved.
Currently, the mostly sudden and violent leakage of power distribution network in some rugged environments, is often struck by lightning, high wind, sleet, high temperature etc. from The influence of right factor, and these factors can have an impact power distribution network performance.Therefore, the monitoring of power distribution network local environment is become It obtains particularly important.Currently, mostly using temperature, humidity, the parameter of illumination to survey the major way of the environmental monitoring of distribution network Amount, to judge whether environment is abnormal, to judge whether have an impact to distribution network, but this mode it is single, Line quality can not be evaluated and tested effectively.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of Suresh Kumars, and can measure power distribution network Environmental parameter, effectively judge the controller switching equipment running environment monitoring method of distribution network exception.
System is monitored the present invention provides a kind of controller switching equipment running environment, including radiation transmitter is radiation receiver, micro- Processor, induced current measuring unit, vibrating sensor and temperature and humidity measurement sensor, wherein radiation transmitter includes at control 5 interference sources and its switch of device, power splitter, parallel connection are managed, each interference source is correspondingly connected with a transmitting antenna, control processing Device, power splitter, 5 interference sources of parallel connection and its switch and transmitting antenna are sequentially connected, and radiation receiver includes successively connecting Receiving antenna, converting unit, amplification filter unit and actinometry unit, the microprocessor connect is separately connected actinometry list Member, induced current measuring unit, vibrating sensor and temperature and humidity measurement sensor;
Control processor is used to control 5 interference sources of the power splitter by different power distributions to parallel connection, and divides Not Kong Zhi the switches of 5 interference sources successively open in cycle T or open in combination at regular intervals, pass through Transmitting antenna transmitting interference radiation signal;
Receiving antenna receives the power distribution network radiation signal from the interference source interference radiation signal emitted and superposition, through turning It changes after unit, amplification filter unit and actinometry cell processing and radiation signal is sent to microprocessor;
Microprocessor is being different from 5 interference for controlling vibrating sensor and temperature and humidity measurement sensor in cycle T The time that the switch in source is opened carries out the measurement of vibration values and temperature and humidity value simultaneously, and controls induced current measuring unit in week In phase T, in the time for the time opening corresponding with the switch of 5 interference sources is identical to that the switch for being different from 5 interference sources is opened The measurement of induced electricity flow valuve is carried out respectively;
Radiation signal after microprocessor is also used to handle, the meeting of performing fighting of the interior switch different from 5 interference sources of cycle T The switch correspondence that 5 interference sources are identical in vibration values, temperature and humidity value and induced electricity flow valuve and the cycle T that time measures is beaten The induced electricity flow valuve for the time measurement opened is compared with corresponding threshold range.
Preferably, the cycle T is the period in fixed period or variation.
Preferably, the combined form opening is by by two or three in the switch of 5 interference sources while beating It opens.
Preferably, the corresponding threshold range is the threshold range of setting
Preferably, the corresponding threshold range is that actual test obtains when being worked normally by power distribution network.
Preferably, the frequency of the radiation interference signals of 5 interference sources transmitting is identical.
Preferably, the frequency of the radiation interference signals of 5 interference sources transmitting is different.
The present invention also provides a kind of controller switching equipment running environment monitoring methods, in turn include the following steps:
(1) control processor control power splitter distributes preset equal-wattage to 5 interference sources of parallel connection, and controls It makes the switch of 5 interference sources successively to open with the time of interval 5s, interference radiation signal is emitted by transmitting antenna;Simultaneously with The switch of 5 interference sources successively opening time identical time controls induced current measuring unit by microprocessor and successively surveys Measure the induced electricity flow valuve at corresponding moment;
(2) receiving antenna receives the power distribution network radiation signal from the interference source interference radiation signal emitted and superposition, Radiation signal is sent to microprocessor, microprocessor after converted unit, amplification filter unit and actinometry cell processing The radiation signal being sequentially received and preset standard radiation signal are compared, if error less than 0.01, enters next Step;
(3) microprocessor successively corresponds to the induced electricity flow valuve at moment to switch opening times and switch is not switched on time correspondence Induced electricity flow valuve seek difference, if the error between difference calibrates success less than 0.01, into next step;
(4) 5 interference sources of the power splitter by different power distributions to parallel connection are controlled by control processor, and The switch for controlling 5 interference sources respectively is successively opened with interval 30s in cycle T or is opened in combination, and transmitting is passed through Antenna transmitting interference radiation signal;
(5) receiving antenna receives the power distribution network radiation signal from the interference source interference radiation signal emitted and superposition, Radiation signal is sent to microprocessor after converted unit, amplification filter unit and actinometry cell processing;
(6) microprocessor control vibrating sensor and temperature and humidity measurement sensor are being different from 5 interference in cycle T The time that the switch in source is opened carries out the measurement of vibration values and temperature and humidity value simultaneously, and controls induced current measuring unit in week In phase T, in the time for the time opening corresponding with the switch of 5 interference sources is identical to that the switch for being different from 5 interference sources is opened The measurement of induced electricity flow valuve is carried out respectively;
(7) by the radiation signal F measured in cycle T, vibration values Z, temperature and humidity value TH, induced electricity flow valuve G and corresponding week Five dimension set of arrays [F Z TH G of phase T composition;T], and it is sent to remote monitoring center in real time, it is stored;
(8) remote control center draws radiation signal F, vibration values Z respectively, and temperature and humidity value TH, induced electricity flow valuve G is at any time The curve graph of variation is simultaneously shown, realizes long-range monitoring;
(9) at the end of each cycle T, radiation signal after being handled by microprocessor, cycle T is interior to be done different from 5 Disturb the vibration values of the time measurement that the switch in source is opened, be identical in temperature and humidity value and induced electricity flow valuve and cycle T 5 it is dry The induced electricity flow valuve for disturbing the corresponding time measurement opened of switch in source is compared with corresponding threshold range, confirms power distribution network ring Whether border is normal.
Preferably, power splitter is wherein controlled for different power distributions to connecting parallel by control processor in step (4) 5 interference sources connect meet P1:P2:P3:P4:P5=1:0.8 particular by the way of different power ratios: 0.5:0.3:0.1, wherein P1, P2, P3, P4, P5 respectively indicate the performance number of 5 corresponding interference sources.
Controller switching equipment running environment monitoring method of the invention, may be implemented:
1) a kind of controller switching equipment running environment monitoring judgment mode is provided, traditional environmental parameter measurement side is different from Formula, so that the accuracy rate of judgement is higher, power distribution network monitors better quality.
2) the quick discovery that can be realized distribution network line fault environment, is timely and effectively handled;
3) different times using induced current measuring unit when receiving interference signal and not receiving interference signal Measured value, come to power distribution network itself performance and power distribution network working environment be monitored simultaneously, in no increase equipment cost On the basis of, one group of data is measured, so that system performance is more superior more.
4) mode of power distribution, so that producing the interference radiation signal of different intensity, flexibility ratio is higher;
5) the packaged data sending method of set of arrays, error rate are low;
6) in the mode of switch on and off, interference source is closed when not working, has saved the energy.
Detailed description of the invention
Fig. 1 is controller switching equipment running environment monitoring system structure diagram
Specific embodiment
The following detailed description of specific implementation of the invention, it is necessary to it is indicated herein to be, implement to be only intended to this hair below Bright further explanation, should not be understood as limiting the scope of the invention, and field person skilled in the art is according to above-mentioned Some nonessential modifications and adaptations that summary of the invention makes the present invention, still fall within protection scope of the present invention.
The present invention provides a kind of controller switching equipment running environment to monitor system, as shown in Figure 1, system includes radiation-emitting Device, radiation receiver, microprocessor, induced current measuring unit, vibrating sensor and temperature and humidity measurement sensor, wherein radiating Transmitter includes that control processor, power splitter, 5 interference sources 1 of parallel connection and its switch, each interference source 1 are correspondingly connected with One transmitting antenna 2, wherein control processor, power splitter, 5 interference sources of parallel connection and its switch and transmitting antenna successively connect It connects, radiation receiver includes sequentially connected receiving antenna, converting unit, amplification filter unit and actinometry unit, micro- place Reason device is separately connected actinometry unit, induced current measuring unit, vibrating sensor and temperature and humidity measurement sensor.
Control processor controls different interference source transmitting interference radiation signals, if distribution network line is normal, spoke Penetrate the interference radiation signal that receiver receives be it is fixed, if problematic, distribution network line itself generate radiation and The radiation superposition that interference source generates can change, then passing through the change of the interference radiated signal strength at measurement radiation receiver Change can predict whether distribution network line has exception.However, only one interference source of measurement generate interference radiation signal and The radiation that distribution network line itself generates is overlapped, and is had little significance for actual measurement, because distribution can be measured directly The radiation that cable road itself generates.In addition, influence of the extraneous factor to radiation is different, therefore the interference radiation of varying strength is set The radiation that signal and distribution network line itself generate is overlapped, and passes through the superimposed radiation value of difference received to different time It measures, so that it may judge whether distribution network line is normal.In addition, while generating radiation signal due to interference source, it can be right Other sensing units also have an impact, therefore in actual measurement, can be by way of time warping, by vibrating sensing Device and temperature and humidity measurement sensor measurement time and actinometry time are staggered, so that vibrating sensor and temperature and humidity The measurement numerical value of measurement sensor is more preferably accurate.Induced current measuring unit common measuring unit when being power equipment monitoring, However the actinometry in the present invention is combined, it can use induced current measuring unit and receiving interference signal and do not receiving dry The measured value of different times when disturbing signal, come to power distribution network itself performance and power distribution network working environment supervise simultaneously It surveys, on the basis of no increase equipment cost, one group of data is measured, so that system performance is more superior more.
In actual monitoring process, control processor is for controlling power splitter for different power distribution to parallel connection 5 interference sources, and respectively control 5 interference sources switch in cycle T at regular intervals successively open or with Combined form is opened, and is emitted interference radiation signal by antenna, is interfered the frequency of radiation signal can be according to the actual needs It is selected, such as can be identical or different, wherein combined form opening is by by two in the switch of 5 interference sources Or three open simultaneously;Receiving antenna receives the power distribution network radiation letter from the interference source interference radiation signal emitted and superposition Number, radiation signal is sent to microprocessor after converted unit, amplification filter unit and actinometry cell processing;Microprocessor For controlling vibrating sensor and temperature and humidity measurement sensor in cycle T, when the switch for being different from 5 interference sources is opened Between carry out the measurement of vibration values and temperature and humidity value simultaneously, wherein cycle T is the period in fixed period or variation, and micro process Device also controls induced current measuring unit in cycle T, in the time for switching opening for being different from 5 interference sources and is identical to 5 The switch of a interference source corresponding time opened carries out the measurement of induced electricity flow valuve respectively;Spoke after microprocessor is also used to handle Signal is penetrated, different from vibration values, temperature and humidity value and the induction of time measurement of having a meeting of performing fighting of the switch of 5 interference sources in cycle T Be identical in current value and cycle T the induced electricity flow valuve of the corresponding time measurement opened of switch of 5 interference sources with it is corresponding Threshold range is compared, and the threshold range that wherein threshold range can be obtained by experience or theoretical calculation is also possible to When being worked normally to power distribution network in actual test, the threshold range obtained by a large amount of measurement data, and in order to rise safely See, threshold range can also be set to 85% of maximum value and minimum value in actual test value be bound range, this threshold value Then issue prompt, more than 100% bound range when then alarm.
The present invention also provides a kind of controller switching equipment running environment monitoring methods, in turn include the following steps:
(1) control processor control power splitter distributes preset equal-wattage to 5 interference sources of parallel connection, and controls It makes the switch of 5 interference sources successively to open with the time of interval 5s, interference radiation signal is emitted by transmitting antenna;Simultaneously with The switch of 5 interference sources successively opening time identical time controls induced current measuring unit by microprocessor and successively surveys Measure the induced electricity flow valuve at corresponding moment;
(2) receiving antenna receives the power distribution network radiation signal from the interference source interference radiation signal emitted and superposition, Radiation signal is sent to microprocessor, microprocessor after converted unit, amplification filter unit and actinometry cell processing The radiation signal being sequentially received and preset standard radiation signal are compared, if error less than 0.01, enters next Step;
(3) microprocessor successively corresponds to the induced electricity flow valuve at moment to switch opening times and switch is not switched on time correspondence Induced electricity flow valuve seek difference, if the error between difference calibrates success less than 0.01, into next step;
(4) 5 interference sources of the power splitter by different power distributions to parallel connection are controlled by control processor, and The switch for controlling 5 interference sources respectively is successively opened with interval 30s in cycle T or is opened in combination, and transmitting is passed through Antenna transmitting interference radiation signal;
(5) receiving antenna receives the power distribution network radiation signal from the interference source interference radiation signal emitted and superposition, Radiation signal is sent to microprocessor after converted unit, amplification filter unit and actinometry cell processing;
(6) microprocessor control vibrating sensor and temperature and humidity measurement sensor are being different from 5 interference in cycle T The time that the switch in source is opened carries out the measurement of vibration values and temperature and humidity value simultaneously, and controls induced current measuring unit in week In phase T, in the time for the time opening corresponding with the switch of 5 interference sources is identical to that the switch for being different from 5 interference sources is opened The measurement of induced electricity flow valuve is carried out respectively;
(7) by the radiation signal F measured in cycle T, vibration values Z, temperature and humidity value TH, induced electricity flow valuve G and corresponding week Five dimension set of arrays [F Z TH G of phase T composition;T], and it is sent to remote monitoring center in real time, it is stored;
(8) remote control center draws radiation signal F, vibration values Z respectively, and temperature and humidity value TH, induced electricity flow valuve G is at any time The curve graph of variation is simultaneously shown, realizes long-range monitoring;
(9) at the end of each cycle T, radiation signal after being handled by microprocessor, cycle T is interior to be done different from 5 Disturb the switch in source perform fighting have a meeting the vibration values of time measurement, be identical to 5 in temperature and humidity value and induced electricity flow valuve and cycle T The induced electricity flow valuve of the corresponding time measurement opened of the switch of a interference source is compared with corresponding threshold range, confirms distribution Whether net environment is normal.
5 of power splitter by different power distributions to parallel connection are wherein controlled by control processor in step (4) Interference source meets P1:P2:P3:P4:P5=1:0.8:0.5:0.3 particular by the way of different power ratios: 0.1, wherein P1, P2, P3, P4, P5 respectively indicate the performance number of 5 corresponding interference sources.
It should be noted that each device of the invention, step, parameter are made in the case where rational expectation, It is any extreme or the case where do not meet technical solution of the present invention, all should it is reasonable it is expected in removal.
Although for illustrative purposes, it has been described that exemplary embodiments of the present invention, those skilled in the art Member it will be understood that, can be in form and details in the case where the scope and spirit for not departing from invention disclosed in appended claims On the change that carry out various modifications, add and replace etc., and all these changes all should belong to appended claims of the present invention Protection scope, and each step in the claimed each department of product and method, can in any combination Form is combined.Therefore, to disclosed in this invention the description of embodiment be not intended to limit the scope of the invention, But for describing the present invention.Correspondingly, the scope of the present invention is not limited by embodiment of above, but by claim or Its equivalent is defined.

Claims (9)

1. a kind of controller switching equipment running environment monitors system, including radiation transmitter, radiation receiver, microprocessor, induced electricity Flow metering unit, vibrating sensor and temperature and humidity measurement sensor, wherein radiation transmitter include control processor, power splitter, 5 interference sources and its switch, each interference source of parallel connection are correspondingly connected with a transmitting antenna, it is characterised in that:
Control processor, power splitter, 5 interference sources of parallel connection and its switch and transmitting antenna are sequentially connected, and radiation receives Device includes that sequentially connected receiving antenna, converting unit, amplification filter unit and actinometry unit, microprocessor are separately connected Actinometry unit, induced current measuring unit, vibrating sensor and temperature and humidity measurement sensor;
Control processor is used to control 5 interference sources of the power splitter by different power distributions to parallel connection, and controls respectively The switch for making 5 interference sources is successively opened at regular intervals in cycle T or is opened in combination, and transmitting is passed through Antenna transmitting interference radiation signal;
Receiving antenna receives the power distribution network radiation signal from the interference source interference radiation signal emitted and superposition, converted list Radiation signal is sent to microprocessor after member, amplification filter unit and actinometry cell processing;
Microprocessor is being different from 5 interference sources for controlling vibrating sensor and temperature and humidity measurement sensor in cycle T It switchs the time opened while carrying out the measurement of vibration values and temperature and humidity value, and control induced current measuring unit in cycle T It is interior, in the time difference for the time opening corresponding with the switch of 5 interference sources is identical to that the switch for being different from 5 interference sources is opened Carry out the measurement of induced electricity flow valuve;
Microprocessor is also used to treated radiation signal, and the switch opening times measurement of 5 interference sources is different from cycle T Vibration values, be identical to the corresponding time measurement opened of 5 interference sources in temperature and humidity value and induced electricity flow valuve and cycle T Induced electricity flow valuve is compared with corresponding threshold range.
2. the system as claimed in claim 1, it is characterised in that: the cycle T is the period in fixed period or variation.
3. the system as claimed in claim 1, it is characterised in that: the combined form opening is by by 5 interference sources Two or three in switch open simultaneously.
4. the system as claimed in claim 1, it is characterised in that: the corresponding threshold range is the threshold range of setting.
5. the system as claimed in claim 1, it is characterised in that: the corresponding threshold range is worked normally by power distribution network When actual test obtain.
6. the system as claimed in claim 1, it is characterised in that: the frequency of the radiation interference signals of 5 interference sources transmitting is identical.
7. the system as claimed in claim 1, it is characterised in that: the frequency of the radiation interference signals of 5 interference sources transmitting is different.
8. a kind of controller switching equipment running environment monitoring method using the system as described in the claims 1-7 any one, It is characterized in that, in turn including the following steps:
(1) control processor control power splitter distributes preset equal-wattage to 5 interference sources of parallel connection, and controls 5 The switch of a interference source is successively opened with the time of interval 5s, emits interference radiation signal by transmitting antenna;Simultaneously with 5 The switch of interference source successively opening time identical time controls induced current measuring unit by microprocessor and successively measures pair Answer the induced electricity flow valuve at moment;
(2) receiving antenna receives the power distribution network radiation signal from the interference source interference radiation signal emitted and superposition, through turning It changes after unit, amplification filter unit and actinometry cell processing and radiation signal is sent to microprocessor, microprocessor will be according to The secondary radiation signal received and preset standard radiation signal are compared, if error less than 0.01, enters next step;
(3) microprocessor successively corresponds to the induced electricity flow valuve at moment to switch opening times and switch is not switched on time corresponding sense Current value is answered to seek difference, if the error between difference calibrates success less than 0.01, into next step;
(4) 5 interference sources of the power splitter by different power distributions to parallel connection are controlled by control processor, and respectively The switch for controlling 5 interference sources is successively opened with interval 30s in cycle T or is opened in combination, and transmitting antenna is passed through Transmitting interference radiation signal;
(5) receiving antenna receives the power distribution network radiation signal from the interference source interference radiation signal emitted and superposition, through turning It changes after unit, amplification filter unit and actinometry cell processing and radiation signal is sent to microprocessor;
(6) microprocessor control vibrating sensor and temperature and humidity measurement sensor are being different from 5 interference sources in cycle T It switchs the time opened while carrying out the measurement of vibration values and temperature and humidity value, and control induced current measuring unit in cycle T It is interior, in the time difference for the time opening corresponding with the switch of 5 interference sources is identical to that the switch for being different from 5 interference sources is opened Carry out the measurement of induced electricity flow valuve;
(7) by the radiation signal F measured in cycle T, vibration values Z, temperature and humidity value TH, induced electricity flow valuve G and corresponding cycle T group Cheng Wuwei set of arrays [F Z TH G;T], and it is sent to remote monitoring center in real time, it is stored;
(8) remote control center draws radiation signal F, vibration values Z, temperature and humidity value TH respectively, and induced electricity flow valuve G is changed over time Curve graph and shown, realize long-range monitoring;
(9) at the end of each cycle T, by microprocessor will treated radiation signal, be different from 5 interference in cycle T 5 interference are identical in vibration values, temperature and humidity value and induced electricity flow valuve and the cycle T that the time that the switch in source is opened measures The induced electricity flow valuve of the corresponding time measurement opened of the switch in source is compared with corresponding threshold range, confirms power distribution network environment It is whether normal.
9. method according to claim 8, it is characterised in that: wherein control power splitter by control processor in step (4) By 5 interference sources of different power distribution to parallel connection particular by the way of different power ratios, meet P1:P2:P3:P4:P5=1:0.8:0.5:0.3:0.1, wherein P1, P2, P3, P4, P5 respectively indicate the function of 5 corresponding interference sources Rate value.
CN201610783123.6A 2016-08-31 2016-08-31 A kind of controller switching equipment running environment monitoring method Expired - Fee Related CN106324435B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610783123.6A CN106324435B (en) 2016-08-31 2016-08-31 A kind of controller switching equipment running environment monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610783123.6A CN106324435B (en) 2016-08-31 2016-08-31 A kind of controller switching equipment running environment monitoring method

Publications (2)

Publication Number Publication Date
CN106324435A CN106324435A (en) 2017-01-11
CN106324435B true CN106324435B (en) 2019-02-19

Family

ID=57788873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610783123.6A Expired - Fee Related CN106324435B (en) 2016-08-31 2016-08-31 A kind of controller switching equipment running environment monitoring method

Country Status (1)

Country Link
CN (1) CN106324435B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003169136A (en) * 2001-12-03 2003-06-13 Kawamura Electric Inc Network environment monitoring device
CN201277889Y (en) * 2008-11-04 2009-07-22 常州帕斯菲克自动化技术有限公司 Temperature on-line monitoring apparatus for high-voltage switch contact
CN103017940A (en) * 2012-12-21 2013-04-03 武汉烽火富华电气有限责任公司 Passive wireless sound surface wave temperature sensor saturation detecting and adjusting method
CN103364641A (en) * 2012-03-31 2013-10-23 浙江省电力公司电力科学研究院 Transient electromagnetic environment testing method for transformer station
CN203259855U (en) * 2013-05-12 2013-10-30 安徽工程大学 TD-LTE network-based environment monitoring system
CN204374738U (en) * 2014-12-11 2015-06-03 北京阳光凯瑞国际科技发展有限公司 Telemanagement intelligent electric power power divider

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003169136A (en) * 2001-12-03 2003-06-13 Kawamura Electric Inc Network environment monitoring device
CN201277889Y (en) * 2008-11-04 2009-07-22 常州帕斯菲克自动化技术有限公司 Temperature on-line monitoring apparatus for high-voltage switch contact
CN103364641A (en) * 2012-03-31 2013-10-23 浙江省电力公司电力科学研究院 Transient electromagnetic environment testing method for transformer station
CN103017940A (en) * 2012-12-21 2013-04-03 武汉烽火富华电气有限责任公司 Passive wireless sound surface wave temperature sensor saturation detecting and adjusting method
CN203259855U (en) * 2013-05-12 2013-10-30 安徽工程大学 TD-LTE network-based environment monitoring system
CN204374738U (en) * 2014-12-11 2015-06-03 北京阳光凯瑞国际科技发展有限公司 Telemanagement intelligent electric power power divider

Also Published As

Publication number Publication date
CN106324435A (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN106026408B (en) Low-voltage platform area physical topology generates online and method of real-time and system
EP2102671B1 (en) Fault prediction in electric transmission networks
CN207636653U (en) A kind of intelligent electric meter with the automatic monitoring function of fault remote
CN102298107A (en) Portable ultrasonic wave and cloud detection apparatus for partial discharge
CN107294562B (en) Low-voltage power carrier module simulation detection device
CN106448099B (en) A kind of ring network cabinet running environment remote supervision system
CN108063498A (en) Test system, the method and device of charge parameter
CN105514984B (en) A kind of non-intrusion type load decomposition device of plug and play
CN108896953A (en) Multi-compartment digital metering test macro based on wireless synchronization
CN105703321B (en) A kind of relay protection constant value remotely verifies adjusting system and setting method
Cataliotti et al. Experimental evaluation of an hybrid communication system architecture for smart grid applications
CN106772208A (en) A kind of integrated reliability testing platform of single three-phase meter
CN203299264U (en) Overvoltage on-line monitor system
CN115792407A (en) Electromagnetic environment early warning system and electromagnetic environment early warning method
CN106058338B (en) A kind of detection maintenance of power battery pack and balanced maintenance facility
CN106324435B (en) A kind of controller switching equipment running environment monitoring method
CN106443240B (en) A kind of electric power environmental monitoring system
CN207396635U (en) Reliability testing equipment for power distribution terminal
CN106603338A (en) Method, device and system for testing response time of intelligent terminal
CN103869114B (en) Manufacturing technology and device for high-voltage high-power adjustable simulative transformer substation
CN206740854U (en) A kind of consumption detection device of electric energy measuring equipment carrier communication module
CN207623501U (en) A kind of terminal batch for electric energy quality monitoring tests system
CN103618287A (en) Lightning protection method and system
CN209387822U (en) A kind of portable beaker characteristic test device
CN104822157B (en) Short distance power communication micro power radio communication Protocol Conformance Test System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190219

Termination date: 20190831