CN106300299B - A kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device - Google Patents

A kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device Download PDF

Info

Publication number
CN106300299B
CN106300299B CN201610850245.2A CN201610850245A CN106300299B CN 106300299 B CN106300299 B CN 106300299B CN 201610850245 A CN201610850245 A CN 201610850245A CN 106300299 B CN106300299 B CN 106300299B
Authority
CN
China
Prior art keywords
alternating
breaker
bus connection
connection switch
valve group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610850245.2A
Other languages
Chinese (zh)
Other versions
CN106300299A (en
Inventor
于海
李跃鹏
马为民
陈大鹏
胡欢
曾丽丽
王柏恒
周林霞
蒲莹
尹健
常亚威
刘威鹏
赵冠华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuji Group Co Ltd
XJ Electric Co Ltd
State Grid Economic and Technological Research Institute
Original Assignee
State Grid Corp of China SGCC
Xuji Group Co Ltd
XJ Electric Co Ltd
State Grid Economic and Technological Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuji Group Co Ltd, XJ Electric Co Ltd, State Grid Economic and Technological Research Institute filed Critical State Grid Corp of China SGCC
Priority to CN201610850245.2A priority Critical patent/CN106300299B/en
Publication of CN106300299A publication Critical patent/CN106300299A/en
Application granted granted Critical
Publication of CN106300299B publication Critical patent/CN106300299B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/268Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured for dc systems

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention belongs in extra-high voltage direct-current engineering alternating-current field technical field, in particular to a kind of last breaker judgment method of alternating-current field being related to bus connection switch and device.The present invention finds last breaker by establishing the alternating-current field equivalent model for being related to bus connection switch and last breaker graph theory solving model, when the bus connection switch of alternating-current field, disconnecting switch, the quantity of circuit and valve group, when on-position changes, it is not necessary to modify the control relay protective scheme programs of original complexity, without system and device power failure more new procedures, only online modification is needed simply to configure parameter, system can be by acquiring the current division state for exchanging field circuit breaker in real time, quickly, intelligence, all incoming lines are accurately calculated to the last breaker between each converter valve.

Description

A kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device
Technical field
The invention belongs to extra-high voltage direct-current transmission engineering technical fields, in particular to a kind of exchange being related to bus connection switch The last breaker judgment method in field and device.
Background technology
Last breaker is in extra-high voltage direct-current transmission engineering alternating-current field for separating exchange line attachment and converter valve Crucial breaker between unit (valve group) only needs one breaker of disjunction, all circuits that will be separated with a certain valve group, The valve group is by dead electricity.Last breaker is a kind of important salvo in DC engineering, for passing through disjunction in special circumstances Corresponding valve group is latched rapidly by last breaker, to ensure the safe and reliable operation of system.
The deterministic process of the last breaker of high voltage DC engineering is more complicated, includes 10 3/2 exchange branch strings with one Regular alternating current field for, amount to 30 breakers, then accordingly interval switch combination up to 230=1073741824 kinds.With It is mostly based on conventional logic judging method toward the last breaker judgement of domestic and international DC engineering, any one place's function modification all may be used It can lead to scene modification application program, cumbersome, time-consuming there are security risks again.In March, 2016 is published in《Electric system is automatic Change》's《The last breaker adaptive judgement strategy of extra-high voltage direct-current engineering based on graph theory》Propose it is a kind of based on graph theory most Breaker computational methods afterwards realize the judgement of the last breaker in regular alternating current field.But some of latest domestic planning at present DC engineering has accessed segmentation mother on the ac bus of Inverter Station and has opened to meet the requirement of multiple power mode of movement It closes, by disjunction bus connection switch and outlet disconnecting switch, dc power is delivered directly to different asynchronous power grids.Bus connection switch It is equivalent to and has been divided into several parts, the real topology of alternating-current field to occur with different capacity mode of movement alternating-current field Variation so that the judgement of the last breaker of entire alternating-current field becomes more complicated so that last breaker in the prior art is sentenced Disconnected method, which cannot achieve, judges the last breaker of alternating-current field including bus connection switch.
Invention content
The present invention provides a kind of last breaker judgment method of alternating-current field being related to bus connection switch and devices, for solving The disposable Solve problems of the last breaker of alternating-current field under multiple power mode of movement.
A kind of last breaker judgment method of the alternating-current field being related to bus connection switch, includes the following steps:
1) alternating-current field is abstracted as the Connected undigraph in graph theory, wherein by every exchange of N number of bus connection switch of access Busbar is abstracted as the node of corresponding N+1 figure, will be connected to the node that the device abstract between two breakers is figure, Breaker and bus connection switch are abstracted as to the side of figure, meanwhile, virtual connection side is added between valve group and access point, establishes exchange The graph theory solving model of field;
2) on off operating mode of each breaker or bus connection switch is acquired, if breaker or bus connection switch are closed form State, then its corresponding sides is connection, if breaker or bus connection switch are off-state, corresponding side is non-interconnected 's;
3) in the graph theory solving model of search alternating-current field each line attachment or each tie-in line Rendezvous Point to valve group it Between cut edge, to obtain the last breaker of valve group.
Further, the equipment being connected in step 1) between two breakers includes:Access valve group, circuit, exchange filter Wave device and isolation switch.
Further, the flow of searching valve group cut edge is in step 3):
First, the adjacency matrix between each valve group and its interdependent node is established according to the graph theory solving model of alternating-current field, Specifically generation method is:If having side connection between two nodes, and the breaker that represents of the side or bus connection switch is are closed State, then the element corresponded in adjacency matrix is 1, is otherwise 0;
Secondly, the adjacency matrix to correspond to valve group in the graph theory solving model of alternating-current field, starting point, terminal are input, are utilized Depth Priority Algorithm finds the cut edge of corresponding valve group, and the breaker corresponding to cut edge or bus connection switch searched out is valve The last breaker of group.
The judgment method of cut edge is in the Depth Priority Algorithm search Connected undigraph:
A) beginning and end is specified, that is, searches for each line attachment or each tie-in line Rendezvous Point to a certain specified valve group Between all paths;
B) the item number of record path and the traversal number of each edge;
C) it is cut edge that all traversal numbers, which are equal to the side of number of passes, in path.
A kind of last breaker judgment means of the alternating-current field being related to bus connection switch, including following module:
1) it is used to alternating-current field being abstracted as the Connected undigraph module in graph theory, wherein by N number of bus connection switch of access Every ac bus is abstracted as the node of corresponding N+1 figure, and will be connected to the device abstract between two breakers is figure Breaker and bus connection switch are abstracted as the side of figure by one node, meanwhile, virtual connection is added between valve group and access point The graph theory solving model of alternating-current field is established on side;
2) it is used to acquire the on off operating mode of each breaker or bus connection switch, if breaker or bus connection switch are to be closed State, then it is connection that its corresponding sides, which is arranged, if breaker or bus connection switch are off-state, its corresponding side is arranged It is non-interconnected module;
3) each line attachment is to the cut edge between valve group in the graph theory solving model for searching for alternating-current field, to obtain The module of the last breaker of valve group.
Further, module 1) in the equipment that is connected between two breakers include:Access valve group, circuit, exchange filter Wave device and isolation switch equipment.
Further, module 3) find valve group cut edge flow be:
First, the adjacency matrix between each valve group and its interdependent node is established according to the graph theory solving model of alternating-current field, Specifically generation method is:If having side connection between two nodes, and the breaker that represents of the side or bus connection switch is are closed State, then the element corresponded in adjacency matrix is 1, is otherwise 0;
Secondly, the adjacency matrix to correspond to valve group in the graph theory solving model of alternating-current field, starting point, terminal are input, are utilized Depth Priority Algorithm finds the cut edge of corresponding valve group, and the breaker corresponding to cut edge or bus connection switch searched out is valve The last breaker of group.
The judgment method of cut edge is in the Depth Priority Algorithm search Connected undigraph:
A) beginning and end is specified, that is, searches for each line attachment or each tie-in line Rendezvous Point to a certain specified valve group Between all paths;
B) the item number of record path and the traversal number of each edge;
C) it is cut edge that all traversal numbers, which are equal to the side of number of passes, in path.
The present invention proposes a kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device, works as alternating-current field When bus connection switch, disconnecting switch, circuit, the quantity of valve group and on-position change, it is not necessary to modify the controls of original complexity Protective program logic only needs online modification simply to configure parameter, system can pass through without control system power failure more new procedures The division state of the current exchange field circuit breaker of acquisition in real time realizes all incoming lines to last open circuit between each change of current valve group Device fast and accurately judges.
Description of the drawings
Fig. 1 is Inverter Station alternating-current field main wiring diagram;
Fig. 2 is the alternating-current field equivalent model for being related to bus connection switch;
Fig. 3 is the last breaker graph theory model for being related to bus connection switch;
Specific implementation mode
The present invention provides a kind of last breaker judgment method of alternating-current field being related to bus connection switch and devices, and every is connect The ac bus of the N number of bus connection switch entered is abstracted as corresponding N+1 node, to be related to the alternating-current field of bus connection switch most Breaker Solve problems are converted to the problem of Connected undigraph solves cut edge afterwards, realize alternating-current field under multiple power mode of movement Last breaker disposably solves.
The present invention will be further described in detail below in conjunction with the accompanying drawings.
A kind of embodiment of the last breaker judgment method of the alternating-current field being related to bus connection switch:
Including the Inverter Station alternating-current field main electrical scheme of bus connection switch is as shown in Figure 1, BX and BY indicates two ac bus, busbar Between be parallel with 9 3/2 exchange branches strings, every exchange string, can be with cut-in valve between each two breaker there are three breaker The other equipments such as group, circuit, alternating current filter, isolation switch.
The exchange outlet of Fig. 1 shares four times, is respectively connected to two asynchronous power grids, and wherein outlet 1 and outlet 2 accesses A power savings Net, outlet 3 and outlet 4 and 4 times spare outlet access B save power grid.Being characterized in that on ac bus for the alternating-current field connects Tetra- segmentation bus connection switches of M1, M2, M3 and M4 are entered, two disconnecting switch have been accessed in two outlets that access A saves power grid. By division bus connection switch and disconnecting switch, dc power " sending A to save entirely ", " sending B to save entirely ", " pole 1 can be operated in control system Send A save, pole 2 send B to save " etc. three kinds of modes, basic implementation be:
1) dc power " sending A to save entirely ":M1, M2 bus connection switch close position, and M3, M4 bus connection switch divide position, 1#, 2# outlet isolation Switch closes position.
2) dc power " sending B to save entirely ":M1, M2, M3, M4 bus connection switch close position, and 1#, 2# outlet disconnecting switch divide position.
3) dc power " pole 1 send A to save, and pole 2 send B to save ":M1, M2 bus connection switch divide position, and M3, M4 bus connection switch close position, 1#, 2# outlets, which are kept apart, closes position.
As it can be seen from the above scheme the topological structure of alternating-current field is different under various power mode of movement, and engineering design It is required that exchange Control protection system can in real time calculate under different capacity mode of movement, the last of entire each valve group of alternating-current field breaks Road device is stablized in addition, engineering design also requires three of the above power mode of movement that can carry out on-line conversion in dc power The arbitrary conversion of power mode of movement is completed under the operating mode of conveying.It is not three due to existing in three kinds of method of operation transfer processes The case where kind standard method of operation, conversion operation will produce different degrees of DC over-voltage.Therefore, the method solved using differentiation Not only efficiency is low, and there are certain risks, it is necessary to further to be improved.With reference to diagram to provided by the present invention Method describes in detail.
1, the last breaker solving model of alternating-current field for being related to bus connection switch is established
The alternating-current field equivalent model for being related to bus connection switch is as shown in Figure 2, and bold portion is total to and has 4 exchanges point in model Branch, has been respectively connected to 2 circuits and 2 valve groups.Circuit 1 and circuit 2 are required it can be seen from the path that dotted line in figure indicates Can just reach valve group 1 by breaker A1, M3, A2, B2, C2, disjunction wherein any one, all circuits and valve group 1 will be by Partition, therefore it is last breaker of all circuits to valve group 1 that can simply judge A1, M3, A2, B2, C2 all.Certainly, Branch's string number of alternating-current field, circuit and valve group input number are more in Practical Project, and the division state of breaker is also thousand changes ten thousand Change so that the judgement of last breaker becomes abnormal cumbersome.
Graph theory is the mathematical theory and method of the figure to scheme to study vertex and side composition as research object, is particularly suitable for Solve the relevant engineering problem of network topology.Figure in graph theory can be used for describing certain specific pass between certain things System has this relationship with node on behalf things between indicating corresponding two things with the side of two nodes of connection.In order to facilitate meter Calculation machine operation, generally use corresponding adjacent chained list or adjacency matrix indicate the relationship in figure between each node.If G (V, E) is one A Connected undigraph with n node, V indicate that the set of all nodes, E indicate the set on side between all nodes, then scheme Adjacency matrix be a n*n two-dimensional array, use Edge [n] [n] to indicate that its definition is here:
It needs exist for introducing another concept of graph theory being cut edge, i.e., in Connected undigraph G, e is its a line, such as After fruit removes e, figure G is no longer connected to, then E is known as scheming the cut edge of G.Here the set Ep for defining a cut edge, that is, delete in Ep Any one cut edge, figure G are no longer connected to.
Matched according to the ac bus of alternating-current field, circuit, valve group, breaker (including bus connection switch and outlet disconnecting switch) It sets and topological structure feature, graph theory can be utilized to create the graph theory solving model of last breaker, creation method is:
1) alternating-current field is abstracted as Connected undigraph;
2) breaker (bus connection switch and line disconnecting switch) is abstracted as the side of Connected undigraph;
3) ac bus, valve group, circuit are abstracted as to the node of Connected undigraph;
4) due to the access of bus connection switch, ac bus is no longer single node, N number of for being accessed on every busbar Ac bus need to be abstracted as corresponding N+1 node by bus connection switch.
As shown in figure 3, the last breaker graph theory solving model of alternating-current field as shown in Figure 2 established by the above method.Wherein The breaker that black is closed indicates that the side of connection, the breaker that white disconnects indicate non-interconnected side.Four bus connection switches (M1, M2, M3, M4) two ac bus have been divided into six sections, be abstracted as here 6 nodes, be respectively BX1, BX2, BX3, BY1, BY2 and BY3;In addition, in order to improve graph theory solving model, increases and is virtually connected to side between valve group and access node, Such as S1 and S2, need to remove it in last breaker result of calculation.
It is connected by node between model Zhong Ge branches circuit breakers, while in order to simplify subsequent search arithmetic, it can All incoming lines are collected for a node L, every circuit need not be searched for respectively in this way to the last open circuit between valve group Device, the disposable searching of line of need collect node L to the last breaker of valve group.
Adjoining between each valve group and its interdependent node can be established by the last breaker graph theory solving model in Fig. 3 Matrix.Specifically generation method is:If having side connection between two nodes, and the breaker that represents of the side is closed state, The element then corresponded in adjacency matrix is 1, is otherwise 0.Adjacency matrix between 1 interdependent node of valve group is as follows.
2, last breaker intelligent decision implementation is realized using computer
DC engineering division state change of breaker during putting into operation, running, stop transport is indefinite, needs to believe system Breath acquire, calculate and handle in real time.Therefore, last breaker judgement should cover input coding, intelligent decision, decoding output 3 processes.
A) input coding
All breakers of alternating-current field (comprising bus connection switch, disconnecting switch) are acquired by distributed measure and control device in real time in engineering Division state, and Exchange Station is passed to by fieldbus and controls system host, and be organized into system inside it and can identify Binary system sequence code, depending on number of significant digit is by the actual number of breaker.Organization regulation is:Binary sequence from the right side to A left side indicates that bus connection switch M1, M2, M3, M4, disconnecting switch L1, L2 are virtual disconnected between valve group and node successively from status to high-order Road device S1, S2, then since the alternating-current field upper left corner, from top to bottom, the exchange string breaker being from left to right arranged in order.Two into " 1 " indicates to be closed in sequence processed, and " 0 " indicates disjunction.The corresponding binary sequence of Fig. 3 models is as shown in table 1.
Table 1
Then, system program can according to binary system sequence code, alternating-current field circuit and valve group on-position, exchange point Branch string number generates the corresponding adjacency matrix of each valve group.
B) intelligent decision
The present invention proposes that determination strategy is in the last breaker graph theory solving models of Fig. 3, to collect node with incoming line L is starting point, using a certain valve group node as terminal, the set of search starting point to cut edge between terminal, and every cut edge generation in set One last breaker of table, the set are set of all line attachments of alternating-current field to the last breaker of a certain valve group.Set In the number of cut edge can be one, multiple or zero, delete collection and in any one cut edge, i.e., it is any one in disjunction set A breaker is no longer connected between origin-to-destination, and all circuits will be separated with valve group.
Searching for Connected undigraph specifies the cut edge between 2 points that can use Depth Priority Algorithm, its algorithm idea It is that the node that any one in figure is not accessed is selected to start to search for as starting point first, if the node being searched is full Foot is never accessed, then is to have accessed the vertex ticks, while being continued search for using the node as starting point, repeatedly, directly It is accessed to node all in figure.Depth-first search is one of the algorithm traversed to figure, during traversal Different fallback conditions and decision logic can be set, different engineering problems is solved.The depth-first search of invention setting is sentenced Disconnected strategy is:
1) beginning and end, i.e. searching of line is specified to collect node to all paths between a certain specified valve group;
2) the item number of record path and the traversal number (being less than or equal to number of passes) of each edge;
3) it is all cut edge that all traversal numbers, which are equal to the side of number of passes, in path.
The input quantity of the strategy is corresponding valve group adjacency matrix, starting point, terminal in graph theory model, is exported the result is that starting point Number, and the cut edge set by judging output are traversed to all paths, number of passes, each side between terminal.Fig. 3 models The result of calculation of middle valve group 1 is as shown in table 2.The path that communicating site has circuit to valve group 1 shares 2, wherein only breaker C2, B2, A2, M3, A1 traversal number be equal to 2, the traversal number on other sides is respectively less than 2, thus judge C2, B2, A2, M3, A1 is last breaker of all circuits to valve group 1.S1 be with valve group 1 abut it is virtual be connected to side, need it from cut edge Collection and middle removal.In addition, beginning and end need not be included in set.
Table 2
C) decoding output
Judge through system, last breaker result of calculation need to be converted into the binary sequence code that device can identify, valve 1 corresponding binary system output code sequence of group is as shown in table 3, wherein " 1 " indicates that the breaker that this represents is last breaker, " 0 " is not.The output result can be sent to stream valve protection system host, pole control system host by controlling bus.In special feelings Once there is critical system fault generation under condition, that is, judge that a breaker is i.e. by disjunction in the last one breaker, system is immediately Send out emergency outage interlocking signal (ESOF), emergency outage valve group.Simultaneity factor can be sent ESOF signals by interior communication To station, corresponding operation is also taken to station.
Table 3
A kind of embodiment of the last breaker judgment means of the alternating-current field being related to bus connection switch:
A kind of last breaker judgment means of the alternating-current field being related to bus connection switch, including following module:
1) it is used to alternating-current field being abstracted as the Connected undigraph module in graph theory, wherein by N number of bus connection switch of access Every ac bus is abstracted as the node of corresponding N+1 figure, and will be connected to the device abstract between two breakers is figure one Breaker and bus connection switch are abstracted as the side of figure by a node, meanwhile, virtual connection side is added between valve group and access point, Establish the graph theory solving model of alternating-current field;
2) it is used to acquire the module of the on off operating mode on each side:If the breaker or mother that represent side representative are opened It is closed state to close, then it represents that the side is connection, if representing breaker or the bus connection switch on the side as off-state, Indicate that the side is non-interconnected;
3) it is used to search in alternating-current field graph theory model that each line attachment is to the cut edge between valve group, to obtain valve group The module of last breaker.
Device of the present invention is actually based on a kind of computer solution of the method for the invention, is A kind of software component, module described in device are corresponded with steps flow chart in method.Due to the introduction to the above method Sufficiently clear is complete, therefore is repeated no more to the embodiment of apparatus of the present invention
The present invention is directed to can not solve the DC engineering alternating-current field of multiple power mode of movement most using regular logical design The problem of breaker judges afterwards provides a kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device, when When alternating-current field bus connection switch, disconnecting switch, circuit, the quantity of valve group and on-position change, it is not necessary to modify original complexity Control protective program logic, without control system have a power failure more new procedures, only need online modification simply to configure parameter, system is Can by acquiring the division state of current exchange field circuit breaker in real time, realize all incoming lines between each change of current valve group most Breaker fast and accurately judges afterwards.This method is not only suitable for ± 500kV, ± 800kV and other special voltages that will be built The regular alternating current field topological structure of grade DC engineering is also applied for complicated disjunction alternating-current field topological structure.

Claims (8)

1. a kind of last breaker judgment method of the alternating-current field being related to bus connection switch, it is characterized in that, include the following steps:
1) alternating-current field is abstracted as the Connected undigraph in graph theory, wherein by every ac bus of N number of bus connection switch of access It is abstracted as the node of corresponding N+1 figure, the node that the device abstract between two breakers is figure will be connected to, will broken Road device and bus connection switch are abstracted as the side of figure, meanwhile, virtual connection side is added between valve group and access point, establishes alternating-current field Graph theory solving model;
2) on off operating mode of each breaker or bus connection switch is acquired, if breaker or bus connection switch are closed state, Its corresponding sides is connection, if breaker or bus connection switch are off-state, corresponding side is non-interconnected;
3) in the graph theory solving model of search alternating-current field each line attachment or each tie-in line Rendezvous Point between valve group Cut edge, to obtain the last breaker of valve group.
2. the last breaker judgment method of a kind of alternating-current field being related to bus connection switch according to claim 1, it is characterized in that, The equipment being connected in step 1) between two breakers includes:Access valve group, circuit, alternating current filter and isolation switch.
3. the last breaker judgment method of a kind of alternating-current field being related to bus connection switch according to claim 1, it is characterized in that, The flow of searching valve group cut edge is in step 3):
First, the adjacency matrix between each valve group and its interdependent node is established according to the graph theory solving model of alternating-current field, specifically Generation method is:If having side connection between two nodes, and the breaker that represents of the side or bus connection switch are closed state, The element then corresponded in adjacency matrix is 1, is otherwise 0;
Secondly, the adjacency matrix to correspond to valve group in the graph theory solving model of alternating-current field, starting point, terminal are input, utilize depth First search algorithm finds the cut edge of corresponding valve group, and the breaker corresponding to cut edge or bus connection switch searched out is valve group Last breaker.
4. the last breaker judgment method of a kind of alternating-current field being related to bus connection switch according to claim 3, it is characterized in that, The judgment method of cut edge is in the Depth Priority Algorithm search Connected undigraph:
A) beginning and end is specified, that is, searches for each line attachment or each tie-in line Rendezvous Point between a certain specified valve group All paths;
B) the item number of record path and the traversal number of each edge;
C) it is cut edge that all traversal numbers, which are equal to the side of number of passes, in path.
5. a kind of last breaker judgment means of the alternating-current field being related to bus connection switch, it is characterized in that, including following module:
1) it is used to alternating-current field being abstracted as the Connected undigraph module in graph theory, wherein by every of N number of bus connection switch of access Ac bus is abstracted as the node of corresponding N+1 figure, and will be connected to the device abstract between two breakers is one of figure Breaker and bus connection switch are abstracted as the side of figure by node, meanwhile, virtual connection side is added between valve group and access point, builds The graph theory solving model in grade separation flow field;
2) it is used to acquire the on off operating mode of each breaker or bus connection switch, if breaker or bus connection switch are closed form State, then it is connection that its corresponding sides, which is arranged, if breaker or bus connection switch are off-state, its corresponding side, which is arranged, is Non-interconnected module;
3) each line attachment is to the cut edge between valve group in the graph theory solving model for searching for alternating-current field, to obtain valve group Last breaker module.
6. the last breaker judgment means of a kind of alternating-current field being related to bus connection switch according to claim 5, it is characterized in that, Module 1) in the equipment that is connected between two breakers include:Access valve group, circuit, alternating current filter and isolation switch are set It is standby.
7. the last breaker judgment means of a kind of alternating-current field being related to bus connection switch according to claim 5, it is characterized in that, Module 3) find valve group cut edge flow be:
First, the adjacency matrix between each valve group and its interdependent node is established according to the graph theory solving model of alternating-current field, specifically Generation method is:If having side connection between two nodes, and the breaker that represents of the side or bus connection switch are closed state, The element then corresponded in adjacency matrix is 1, is otherwise 0;
Secondly, the adjacency matrix to correspond to valve group in the graph theory solving model of alternating-current field, starting point, terminal are input, utilize depth First search algorithm finds the cut edge of corresponding valve group, and the breaker corresponding to cut edge or bus connection switch searched out is valve group Last breaker.
8. the last breaker judgment means of a kind of alternating-current field being related to bus connection switch according to claim 7, it is characterized in that, The judgment method of cut edge is in the Depth Priority Algorithm search Connected undigraph:
A) beginning and end is specified, that is, searches for each line attachment or each tie-in line Rendezvous Point between a certain specified valve group All paths;
B) the item number of record path and the traversal number of each edge;
C) it is cut edge that all traversal numbers, which are equal to the side of number of passes, in path.
CN201610850245.2A 2016-09-23 2016-09-23 A kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device Active CN106300299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610850245.2A CN106300299B (en) 2016-09-23 2016-09-23 A kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610850245.2A CN106300299B (en) 2016-09-23 2016-09-23 A kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device

Publications (2)

Publication Number Publication Date
CN106300299A CN106300299A (en) 2017-01-04
CN106300299B true CN106300299B (en) 2018-11-06

Family

ID=57715023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610850245.2A Active CN106300299B (en) 2016-09-23 2016-09-23 A kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device

Country Status (1)

Country Link
CN (1) CN106300299B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106990354B (en) * 2017-05-27 2019-03-19 西安科技大学 A kind of trip breaker self-adapted search method based on dijkstra's algorithm
CN109560565B (en) * 2017-09-27 2022-04-19 南京南瑞继保电气有限公司 Overload protection method for converter of flexible direct current transmission bipolar system
CN108666986B (en) * 2018-04-25 2019-08-30 中国南方电网有限责任公司超高压输电公司检修试验中心 A kind of high voltage direct current exchange field device connected trouble method of discrimination based on connected graph
CN108832598B (en) * 2018-05-23 2019-10-29 南京南瑞继保电气有限公司 A kind of method, apparatus and computer storage medium of last breaker protection judgement
CN109950936A (en) * 2019-04-02 2019-06-28 云南电网有限责任公司电力科学研究院 A kind of HVDC transmission system exchange field structure
CN110135109B (en) * 2019-06-03 2022-07-01 西南交通大学 Direct-current system multi-valve-group last circuit breaker identification method based on improved Tarjan algorithm
CN110137911B (en) * 2019-06-03 2021-01-29 西南交通大学 Valve group final circuit breaker identification method based on Dijkstra algorithm
CN113746877B (en) * 2020-05-28 2024-05-03 南京南瑞继保电气有限公司 Method and system for downloading converter valve control unit programs in batches
CN111722582B (en) * 2020-06-18 2021-06-08 常熟理工学院 Switching-on control logic calculation method for marine generator switch and bus switch

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102508059A (en) * 2011-10-18 2012-06-20 北京科东电力控制***有限责任公司 Topology error-preventing checking method based on intelligent identification of state of equipment
CN102522824A (en) * 2011-12-26 2012-06-27 国电南瑞科技股份有限公司 Distributed state estimation calculation method based on centralized control station scheduling main station
CN102545176A (en) * 2012-02-17 2012-07-04 黑龙江省电力有限公司 Current transformer (CT) current orientation method for wide-area differential combinations
CN103605852A (en) * 2013-11-25 2014-02-26 国家电网公司 Parallel topology method for electromechanical transient real-time simulation for large-scale power network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102508059A (en) * 2011-10-18 2012-06-20 北京科东电力控制***有限责任公司 Topology error-preventing checking method based on intelligent identification of state of equipment
CN102522824A (en) * 2011-12-26 2012-06-27 国电南瑞科技股份有限公司 Distributed state estimation calculation method based on centralized control station scheduling main station
CN102545176A (en) * 2012-02-17 2012-07-04 黑龙江省电力有限公司 Current transformer (CT) current orientation method for wide-area differential combinations
CN103605852A (en) * 2013-11-25 2014-02-26 国家电网公司 Parallel topology method for electromechanical transient real-time simulation for large-scale power network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"基于图论的特高压直流工程最后断路器自适应判断策略";于海等;《电力***自动化》;20160310;第40卷(第5期);第121-126页 *

Also Published As

Publication number Publication date
CN106300299A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106300299B (en) A kind of last breaker judgment method of the alternating-current field being related to bus connection switch and device
CN102508059B (en) Topology error-preventing checking method based on intelligent identification of state of equipment
CN103872681A (en) Online real-time loop closing method based on integration of major network and distribution network
CN111428376A (en) CIM (common information model) -based power distribution network feeder contact mode identification method and system
CN107346886B (en) Power distribution network load transfer method and system
CN106786423A (en) Service restoration method after a kind of failure under power distribution network differential protection action
CN106463951A (en) Load restoration in a high or medium voltage substation
CN106655169A (en) Path description-based N-1 security check method of power distribution network
CN112510654B (en) Bus fault diagnosis method, system, readable medium and equipment
CN103236362A (en) PLC-based (programmable logic controller-based) knife switch control method and system
CN111931318A (en) Power supply path analysis method and system based on graph calculation
CN115276244B (en) Self-healing feeder automation control method based on 5G edge nodes
CN105843125B (en) A kind of system and method for substation's series of operations based on status recognition technique
CN109753030A (en) For configuring the method, equipment and computer program of intelligent electronic device
CN104993582B (en) The control method and device of power system
CN106599447B (en) Substation's hierarchical topology analysis method based on electrical separation
CN106485021B (en) Mining high-voltage electric-network automatic short-circuit calculation method based on interconnection switch topology coding
CN109038554B (en) Intelligent power distribution terminal local topology generation method
CN108565858B (en) Reliability evaluation method for hybrid alternating current-direct current power distribution network containing flexible transformer substation
CN115473334A (en) Intelligent substation secondary safety measure checking method based on digital twinning
CN108736480A (en) A kind of multichannel AC looped network type energy router
CN114386222A (en) Power distribution network cooperative fault recovery method and system based on information physical system
CN103944269B (en) 10-kV grid distribution line pre-operating method and system
CN105071382B (en) Off-load method and system based on dispatch automated system
CN106960094B (en) Topological coding-based short circuit current automatic calculation method after operation mode change

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant