CN106286174A - Carbon dioxide accumulation of energy quick-acting connector - Google Patents

Carbon dioxide accumulation of energy quick-acting connector Download PDF

Info

Publication number
CN106286174A
CN106286174A CN201510291888.3A CN201510291888A CN106286174A CN 106286174 A CN106286174 A CN 106286174A CN 201510291888 A CN201510291888 A CN 201510291888A CN 106286174 A CN106286174 A CN 106286174A
Authority
CN
China
Prior art keywords
bolt
topping
pressure release
liquid storage
storage pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510291888.3A
Other languages
Chinese (zh)
Inventor
张长禄
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Chang Hong Precision Equipment Co Ltd
Original Assignee
Zhengzhou Chang Hong Precision Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Chang Hong Precision Equipment Co Ltd filed Critical Zhengzhou Chang Hong Precision Equipment Co Ltd
Priority to CN201510291888.3A priority Critical patent/CN106286174A/en
Publication of CN106286174A publication Critical patent/CN106286174A/en
Pending legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of carbon dioxide accumulation of energy quick access device, relate to spalling and precrack technical field.Described carbon dioxide accumulation of energy quick access device is formed separate unit by pressure release bolt, liquid storage pipe, safety heater, topping up bolt, and while multiple separate units are connected in series, circuit part is connected in parallel.Described device is intended to after accumulation of energy separate unit completes accumulation of energy, and quick access device can realize multiple safety heater parallel connection energising, and quickly, efficiently, reliably.Liquid storage pipe is embedded with through hole to two ends, inside has wire, one end to be connected with pressure release bolt electric installation, and the other end is connected with topping up bolt electric installation;Topping up bolt is internal to be connected with safety heater;Pressure release bolt is accessible with topping up bolt electric installation to be connected, it is achieved multiple separate units are connected, circuit in parallel.Described device can be used for mining activities auxiliary cracking, and safety in utilization is higher.

Description

Carbon dioxide accumulation of energy quick-acting connector
Technical field
The present invention relates to convert expansion work technical field, particularly to carbon dioxide accumulation of energy spalling part by liquid gas.
Background technology
Explosive uses with a long history, from beginning to use so far, has been deep into every field, had produced huge benefit, but also with very Big hazardness, not only can produce volume of smoke, produce a lot of rubbish, causes serious environmental pollution, and have impact on the stable of society, can give People's productive life brings potential safety hazard.
Summary of the invention
Feature of present invention solves carbon dioxide technically as medium, and the spalling function when the conversion energy release of liquid gaseity, due to list Individual accumulator finite energy, multitube connects the weak point that can make up in energy release, mining activities plays certain auxiliary cracking function, uses Safety, convenient, pollution-free and secondary disaster.
Apparatus of the present invention use the series connection of multiple liquid storage pipe separate unit, circuit realiration parallel technology scheme between unit and unit: each storage Liquid pipe separate unit two ends are respectively topping up bolt and pressure release bolt, and wherein topping up bolt two ends are screw thread, and one end is connected with liquid storage pipe, spiral shell beyond the other end Stricture of vagina form tethers with pressure release and connects, and is equipped with female connector inside topping up bolt, and one end is connected with safety heater, the other end then with tube wall built-in electrical insulation line Connecting, pressure release bolt is built-in with male connector, can threaded with topping up bolt, simultaneously in screwing operations, and connector male and topping up bolt in pressure release bolt Intraconnector female contacts, and circuit can turn on.
Use technique scheme, can achieve the effect that: accumulation of energy separate unit can realize the series connection of the multiple Storage Unit of two or more even Connecing, between each unit, circuit realiration is connected in parallel, and during a spalling, not only connects efficient, reliable, saves a large amount of set-up time;And Achieve a spalling area big, more than volume cube, economic benefits.Described energy storage equipment is that in changing according to carbon dioxide tri-state, liquid is subject to Thermal transition is the pressure that gaseous state produces, and breaks through accumulation of energy sheet and releases energy, gaseous state impulsive force make to tear less than the object of expansive force, and whole process is The state change of carbon dioxide, does not poison novel substance and produces, and liquid turns atmospheric pressure impact and has certain limit, and security performance is high, and nonhazardous is made an uproar Sound is little, guaranteed to personal safety;Using this device can be in block clearing of hardening, the aspect such as exploitation of stone be more effective.And produce, transport, The each side advantages such as use are relatively big, carbon dioxide itself have fire extinguishing function, utilize this effect can play the advantages such as elimination naked light, prevention burning. This product all has special steel material manufacture, impact flexibility and fatigue strength to have passed through strict calculating and substantial amounts of test, even if accumulation of energy spalling was lost efficacy, also Personnel will not be caused danger.
Accompanying drawing explanation
Accompanying drawing is the detailed configuration of apparatus of the present invention structure.
Fig. 1 liquid storage pipe connects pressure release stud portion circuit diagram;It is made up of insulated conductor 2, annular insulating mat A 5 and conducting loop-shaped circle A 6.
Fig. 2 pressure release bolt circuit diagram;By spring probe 7, probe external insulation sleeve A 8, connecting bolt 10, bottom insulation pad A 11 forms, and becomes " L-type " Arrangement,.
Fig. 3 topping up bolt circuit diagram;Main by bottom insulation pad B 20, insulation sleeve C 21, connector C 22, probe external insulation sleeve B17, spring probe 7, insulation sleeve A 12, female sleeve 13, insulation sleeve B14, become " Y type " arrangement.
Fig. 4 liquid storage pipe connects topping up stud portion circuit diagram;By conducting loop-shaped circle B 18, annular insulating mat B 19, insulated conductor 2.
Fig. 5 liquid storage pipe, pressure release bolt, topping up bolt, liquid storage pipe circuit connection diagram;Pressure release bolt, liquid storage pipe, topping up bolt are sequentially connected with, constitute separate single Unit.
Wherein: 1, liquid storage pipe, 2, insulated conductor, 3, insulation copper packing;, 4, accumulation of energy sheet, 5, annular insulating mat A, 6, conducting loop-shaped Circle A, 7, spring probe, 8, probe external insulation sleeve A, 9, topping up bolt, 10, connecting bolt, 11, bottom insulation pad A, 12, insulation sleeve A, 13, female sleeve, 14, insulation sleeve B, 15, close mouth plug, 16, pressure release bolt, 17, probe external insulation sleeve B, 18, conducting loop-shaped circle B, 19, annular insulating mat B, 20, bottom insulation pad B, 21, insulation sleeve C, 22, connector C, 23, safety heater.
Detailed description of the invention
The present invention combines accompanying drawing and further illustrates;
Separate unit connection scheme: the single Storage Unit of carbon dioxide accumulation of energy quick-acting connector is an independent entirety, by topping up bolt, liquid storage pipe, pressure release Several parts compositions such as bolt, safety heater, parallel conductance circuit;Liquid storage pipe two ends are threaded by topping up bolt and pressure release bolt respectively, formed and store liquid The cavity volume of state carbon dioxide, inside is placed with safety heater and makes it be sealed in liquid storage pipe end, and safety heater wire is connected by connector one end Connecing, the other end is drawn, and is connected and is formed single circuit with the insulated conductor on tube wall, constitute a complete independent Storage Unit.
Above-mentioned carbon dioxide accumulation of energy quick-acting connector liquid storage pipe one end, shown in Fig. 1, liquid storage pipe connects pressure release stud portion circuit diagram;External diameter position has logical Hole so that covered wire is put into, can contact with two ends conducting loop-shaped pad.
The above-mentioned carbon dioxide accumulation of energy quick-acting connector liquid storage pipe other end, Fig. 4 liquid storage pipe connects topping up stud portion circuit diagram;Two ends have cannelure, Placing annular insulating mat, felt pad is built-in with annular to shop packing ring.
Fig. 4 liquid storage pipe connects topping up stud portion circuit diagram;It is equipped with wire inside topping up bolt, becomes " Y type " arrangement, one end and topping up bolt Interior connector connects, and can realize attachment security heater;The other end is connected with topping up bolt plug-in unit, can realize being connected with pressure release bolt plug-in unit;Residue One joint, by via, is connected with spring probe, and has insulation sleeve to protect outside spring probe, completely cuts off with topping up bolt, it is to avoid short circuit.
Fig. 2 pressure release bolt circuit diagram;It is equipped with wire inside pressure release bolt, becomes " L-type " arrangement, one end to be connected with pressure release bolt plug-in unit, Can realize being connected with topping up bolt plug-in unit;Another joint, by via, is connected with spring probe, and has insulation sleeve to protect outside spring probe, Completely cut off with topping up bolt, it is to avoid short circuit.
Fig. 5 liquid storage pipe, pressure release bolt, topping up bolt, liquid storage pipe circuit connection diagram;When topping up bolt is threaded connection with liquid storage pipe, internal By connector, directly connect with safety heater wire, additionally by external springs probe, the conducting loop-shaped circle contact placed in liquid storage pipe end, Can follow and be threaded into continuous compression spring, make the spring probe contact ring shaped conductive circle on topping up bolt all the time, it is ensured that the normal ON of circuit.
It is threaded connection with liquid storage pipe at pressure release bolt, Fig. 5 liquid storage pipe, pressure release bolt, topping up bolt, liquid storage pipe circuit connection diagram;By outside Spring probe, the conducting loop-shaped circle placed in liquid storage pipe end contact, can follow and be threaded into continuous compression spring, make all the time on topping up bolt Spring probe contact ring shaped conductive circle, it is ensured that the normal ON of circuit.
Carbon dioxide accumulation of energy quick-acting connector can be connected in series two or more multiple accumulation of energy separate unit, and circuit part realizes being connected in parallel Mode, each separate unit all can disposably be energized, and realizes loop conducting simultaneously.Apparatus of the present invention include: liquid storage pipe 1, are connected with liquid storage pipe Pressure release bolt 9, the topping up bolt 16 being connected with pressure release bolt, and the liquid storage pipe being connected with topping up bolt, realize by that analogy multiple unit connect.Single Individual unit two ends are topping up bolt and pressure release bolt respectively, and connected mode is threaded, it is achieved pretightning force, prevent loosening phenomenon and occur;The most independent It is to realize compressibility with the spring probe 7 of the conductive ring 6 at liquid storage pipe two ends with topping up bolt, pressure release bolt two ends to be connected that circuit connects, and makes circuit all the time The parallel connection being in screwing operations and conducting state.The while of finally realizing liquid storage pipe series connection between multiple separate unit, circuit in parallel successful connection.
It is above the core concept of the application, specifically the present invention is illustrated in conjunction with accompanying drawing, embodiment is carried out clearly by elaboration, intactly Describe, and a part of embodiment as the present invention represents, and not all represent.Based on the embodiment on the basis of the embodiment of the present invention, not through wound New lower other embodiments obtained of property work premise, belong to scope, and those skilled in the art can be in spiritual basis of the present invention Carrying out similar popularization, therefore the present invention is not limited by the description of open specific embodiment.
The used principle of accumulation of energy quick-acting connector: be connected in series between accumulation of energy pipe separate unit, circuit part realizes safety conducting simultaneously in parallel.According to The attribute of carbon dioxide own, during critical state, carbon dioxide is in gas-liquid mixture phase, can be converted into all gas state by heating.Critical shape Below state, there is certain pressure, the carbon dioxide being is liquid, cryogenic high pressure pump extract out in liquid storage tank, directly suppresses in entrance liquid storage pipe, It is gaseous state by the rapid thermal conversion of safety heater, produces pressure according to the repulsion between dividing, break through accumulation of energy sheet, stress object is torn; Being chained together by liquid storage pipe unit by connecing tandem arrangement soon, accumulation of energy simultaneously, it is convenient that circuit connects, and uses efficiently, large area spalling.
Advantage: described accumulation of energy quick-acting connector, is that the change of a kind of carbon dioxide state produces, and nonhazardous side effect, environmentally safe, to people Body safety is guaranteed, block clearing, and tear material aspect replaces artificial, and can be connected in series by multitube, implements working area relatively big, substantially increases Service efficiency, and the size and Orientation of power can be controlled, simply material is torn, there is no bigger shock wave, and the most easily grasp Making, management and use cost are cheap, and are different from explosive, detonator etc., are not belonging to special trade operation category.

Claims (8)

1. a carbon dioxide accumulation of energy quick-acting connector, it is characterised in that: include liquid storage pipe 1, pressure release bolt 9, topping up bolt 16, safety heater 23 and Several parts of circuit conductive quick access device, it is achieved liquid storage pipe 1, pressure release bolt 9, topping up bolt 16, liquid storage pipe 1 circulating series connect, meanwhile, electricity Road parallel connection is connected or compensates on-state.Wherein pressure release bolt 9 is attached with liquid storage pipe 1, by threaded pre-tightening power by screw thread with topping up bolt 16 Making pressure release bolt 9 connect liquid storage pipe 1 one end, the other end connects the other end by same way, and liquid storage pipe 1 is formed a cavity closed, storage Deposit liquid carbon dioxide;Being equipped with through hole in described liquid pipe 1 cavity wall, there are felt pad 5 and conducting loop-shaped circle A6 in two ends, by covered wire 2, spring top Pin 7, conducting loop-shaped circle A6, conducting loop-shaped circle B18;Liquid storage pipe 1, pressure release bolt 9, topping up bolt 16 3 partial circuit are connected, it is achieved circuit Conducting;It is provided with in topping up bolt 16 and safety heater 23, connects the connector C22 of conduction, simultaneously with topping up bolt 16 outer wall power spring probe 7 Compensation device is connected, it is achieved inside and outside circuit turn-on;Identical, pressure release bolt 9 is internal equipped with spring probe 7 and other end of center connecting bolt 10 devices connect, screw thread realize connecting of liquid storage pipe 1 and being connected in parallel of circuit with topping up bolt 16.
The most according to claim 1, carbon dioxide accumulation of energy quick-acting connector, is characterized in that: on topping up bolt 16, spring probe 7 conducts electricity with liquid storage pipe 1 end When annular ring B18 can realize threaded, it is in connection status all the time.
Carbon dioxide accumulation of energy quick-acting connector the most according to claim 1, it is characterised in that: the spring probe 7 on pressure release bolt 9 and liquid storage pipe 1 end When portion conducting loop-shaped circle A6 also can realize threaded, it is in connection status all the time.
Pressure release bolt 9 the most according to claim 3, internal bore, it is installed with covered wire 2, one end connects spring probe 7, and the other end connects Latch 10.
Topping up bolt 16 the most according to claim 2, internal bore, it is installed with covered wire 2, one end connects spring probe 7, one end female wiring Set 13, also one end is connected with connector C22.
Carbon dioxide accumulation of energy quick-acting connector the most according to claim 1, it is characterised in that: topping up bolt 16 is connected with pressure release bolt 9 internal and external threads, In screwing operations, connecting bolt in topping up bolt 16 10 realizes male and female grafting with the female sleeve 13 in pressure release bolt 9 so that topping up bolt 16 with Pressure release bolt 9 circuit connects.
Carbon dioxide accumulation of energy quick-acting connector the most according to claim 1, when realizing external circuit and connecting, multiple safety heaters 23 are energized simultaneously.
Carbon dioxide accumulation of energy quick-acting connector the most according to claim 1, circuit part is to be connected liquid storage pipe 1 two ends with insulation by insulated conductor 2 The ring shaped conductive circle 7 of packing ring 5, topping up bolt 16, connecting bolt 10, insulated conductor 2, insulation spacer 11, spring probe 7, and pressure release bolt 9, Internal wiring terminal 13, insulated conductor 2, insulation spacer 20, be conductively connected connecting plug 22;Three main body topping up bolts 16, liquid storage pipe 1, pressure release bolts 9 Can be when threaded screwing, external circuit is by liquid storage pipe 1 two ends annular conductive film, respectively with the spring of device on topping up bolt 16 and pressure release bolt 9 Probe 7 connects, it is achieved conducting function.
CN201510291888.3A 2015-06-02 2015-06-02 Carbon dioxide accumulation of energy quick-acting connector Pending CN106286174A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510291888.3A CN106286174A (en) 2015-06-02 2015-06-02 Carbon dioxide accumulation of energy quick-acting connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510291888.3A CN106286174A (en) 2015-06-02 2015-06-02 Carbon dioxide accumulation of energy quick-acting connector

Publications (1)

Publication Number Publication Date
CN106286174A true CN106286174A (en) 2017-01-04

Family

ID=57656285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510291888.3A Pending CN106286174A (en) 2015-06-02 2015-06-02 Carbon dioxide accumulation of energy quick-acting connector

Country Status (1)

Country Link
CN (1) CN106286174A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3221014A1 (en) * 1982-06-04 1983-12-08 Christian Dipl.-Ing. 8900 Augsburg Strobel Ecologically friendly ocean mining
CN1042754A (en) * 1988-11-18 1990-06-06 中央地区黑色冶金企业建筑和结构维修局 Actuating unit
CN2818447Y (en) * 2005-06-10 2006-09-20 宁波翔羚机械有限公司 External long-piping mechanical liquid loading valve
JP2008215272A (en) * 2007-03-06 2008-09-18 Shin Kagaku Kaihatsu Kenkyusho:Kk Power generation system
CA2575168C (en) * 2004-08-10 2010-11-16 Schlumberger Canada Limited Method for exploitation of gas hydrates
CN203685187U (en) * 2013-10-17 2014-07-02 湖南汉寿中煤科技有限公司 Oriented CO2 air cannon device
CN205370875U (en) * 2015-06-02 2016-07-06 河南昌弘精密设备有限公司 Carbon dioxide energy storage connects ware soon

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3221014A1 (en) * 1982-06-04 1983-12-08 Christian Dipl.-Ing. 8900 Augsburg Strobel Ecologically friendly ocean mining
CN1042754A (en) * 1988-11-18 1990-06-06 中央地区黑色冶金企业建筑和结构维修局 Actuating unit
CA2575168C (en) * 2004-08-10 2010-11-16 Schlumberger Canada Limited Method for exploitation of gas hydrates
CN2818447Y (en) * 2005-06-10 2006-09-20 宁波翔羚机械有限公司 External long-piping mechanical liquid loading valve
JP2008215272A (en) * 2007-03-06 2008-09-18 Shin Kagaku Kaihatsu Kenkyusho:Kk Power generation system
CN203685187U (en) * 2013-10-17 2014-07-02 湖南汉寿中煤科技有限公司 Oriented CO2 air cannon device
CN205370875U (en) * 2015-06-02 2016-07-06 河南昌弘精密设备有限公司 Carbon dioxide energy storage connects ware soon

Similar Documents

Publication Publication Date Title
CN105422074B (en) Electric initiating liquid medicine dynamic fracturing equipment
CO5290317A1 (en) METHOD OF DISPLAYING AN ELECTRICALLY OPERATED FLUID TRANSDUCTION SYSTEM IN A WELL
RU2013149850A (en) SYSTEMS FOR CONNECTING INSULATED CONDUCTORS
CN205605214U (en) Carbon dioxide sends and splits ware
CN102760516B (en) Application and preparation method of copper-aluminum transitional composite connecting bar and multistage composite connecting bar
CN104389574A (en) Gaseous phase fracturing device
CN108134319A (en) A kind of security power power distribution cabinet with warning function
CN210660049U (en) Secondary crack-making perforating gun for volume fracturing of vertical well of tight reservoir
CN106351659A (en) Carbon dioxide cracking device
CN203081491U (en) Circuit closing connection structure for carbon dioxide splitting device
CN205370875U (en) Carbon dioxide energy storage connects ware soon
CN106286174A (en) Carbon dioxide accumulation of energy quick-acting connector
CN204011803U (en) A kind of cable end grounding wire device
CN201311901Y (en) Novel jumper of high-voltage fuse wire
CN105680261B (en) A kind of carbon dioxide fracturing device connector
CN105486183B (en) A kind of carbon dioxide filling valve and fracturing device
CN207381360U (en) A kind of Novel fuse unit
CN206988512U (en) A kind of electronic execution needling structure QRV Quick Release Valve door
CN205282808U (en) Double -deck high pressure fire prevention socket
CN108860537A (en) A kind of emergeney ejectioning device based on battery
CN204788089U (en) Ignitor of detonating ware of carbon dioxide
CN104729371A (en) High-temperature blast hole thermal insulation sheath, blasting assembly and construction method
CN204884829U (en) Transformer core multiple spot earth fault discharge impact ware
CN102684040A (en) Anti-creeping method and anti-creeping connecting device
CN209401481U (en) Energy-storage capacitor and controllable surge generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104