CN106285697A - Double-shielded TBM closed-loop construction method - Google Patents

Double-shielded TBM closed-loop construction method Download PDF

Info

Publication number
CN106285697A
CN106285697A CN201610748716.9A CN201610748716A CN106285697A CN 106285697 A CN106285697 A CN 106285697A CN 201610748716 A CN201610748716 A CN 201610748716A CN 106285697 A CN106285697 A CN 106285697A
Authority
CN
China
Prior art keywords
agent
closed
colloid
loop
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610748716.9A
Other languages
Chinese (zh)
Other versions
CN106285697B (en
Inventor
赵书杰
陈忠伟
盛连才
胡昌春
李娟�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 3 Co Ltd
Original Assignee
Sinohydro Bureau 3 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 3 Co Ltd filed Critical Sinohydro Bureau 3 Co Ltd
Priority to CN201610748716.9A priority Critical patent/CN106285697B/en
Publication of CN106285697A publication Critical patent/CN106285697A/en
Application granted granted Critical
Publication of CN106285697B publication Critical patent/CN106285697B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/06Aluminous cements
    • C04B28/065Calcium aluminosulfate cements, e.g. cements hydrating into ettringite
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Ceramic Engineering (AREA)
  • Civil Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Environmental & Geological Engineering (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

The invention provides a kind of double-shielded TBM closed-loop construction method, comprise the following steps: one, choose raw material: cement, colloid adjustable solidification agent, Sha Heshui;Two, joining in forced mixer, stirring obtains paste mortar;Three, manual work position is determined;Four, paste mortar is transported to manual work position, then paste mortar is applied in the periphery, front end of assembly, to clog the space between assembly and bean gravel and country rock, after hardening, obtain a complete closed-loop.Colloid adjustable solidification agent is used in closed-loop construction technology by the present invention, and beneficially cream slurry is combined with section of jurisdiction and country rock, adjustable setting time simultaneously, the contraction of Cement paste can be suppressed, ungauged regions after Cement paste calculus, has microdilatancy effect, is prevented effectively from the appearance in crackle or crack., there is not construction blind area in constructing operation simple, intuitive of the present invention, the making effect of closed-loop is ideal, and sealing effect is excellent.

Description

Double-shielded TBM closed-loop construction method
Technical field
The invention belongs to TBM technical field of construction, be specifically related to a kind of double-shielded TBM closed-loop novel construction method.
Background technology
In double-shielded TBM work progress, need after pipe-plate lining carrying out rockfill grouting after wall, and in rockfill grouting Time, in order to quickly play pressure, it is ensured that grouting quality, need to carry out packer grouting, it is necessary to make closed-loop.
Traditional closed-loop way is to utilize dual slurry, waterglass, coagulating agent to carry out, by changing filling pipe, the form that spray is solidifying, Forming an annular concretion between section of jurisdiction outer wall and crag, form closed-loop, this kind of method due to constructing operation not intuitively, exists Blind area, the making effect of closed-loop is the most undesirable, does not often have " effect " of closing.
Summary of the invention
The technical problem to be solved is for above-mentioned the deficiencies in the prior art, it is provided that a kind of double-shielded TBM Closed-loop construction method., there is not construction blind area, the non-convention of making effect of closed-loop in the method constructing operation simple, intuitive Thinking, sealing effect is excellent.
For solving above-mentioned technical problem, the technical solution used in the present invention is: a kind of double-shielded TBM closed-loop construction party Method, it is characterised in that the method comprises the following steps:
Step one, choose following raw material:
A. cement;
B. colloid adjustable solidification agent;Described colloid adjustable solidification agent is by konjak glucomannan, carbonate, rheological agent, dispersant, morning by force Agent and water is the most agitated, distill, pulverize, dried and screened are made, the addition of described colloid adjustable solidification agent is cement quality 3%~5%;
C. sand;The addition of described sand is the 50%~100% of cement quality;
D. water;The addition of described water is cement, colloid adjustable solidification agent and the 30% of sand gross mass~40%;
Step 2, prepare paste mortar: colloid adjustable solidification agent selected in step one, cement, sand and water are added successively In forced mixer, after stirring 1min~2min, obtain paste mortar;
Step 3, determine manual work position: use double-shielded TBM that section of jurisdiction is installed, until the section of jurisdiction installed A length of 45m~60m, then in the end installing section of jurisdiction, section of jurisdiction at the bottom of a piece is installed again, being combined into a front end is spade Tubular assembly, utilize that TBM auxiliary cylinder is counter pushes away this assembly afterwards, make to depart between TBM tail shield and assembly, expose one Bar width is the space of 100mm~150mm, and the space exposed is defined as manual work position;
Step 4, construction: employing carries charging basket and paste mortar described in step 2 is transported to the work of people described in step 3 Industry position, then uses spatula that paste mortar is applied in the periphery, front end of assembly, with clog assembly and bean gravel and Space between country rock, obtains a closed-loop after hardening.
Above-mentioned double-shielded TBM closed-loop construction method, it is characterised in that the preparation of colloid adjustable solidification agent described in step one Method is: first konjak glucomannan, carbonate, rheological agent, dispersant and early strength agent is added water respectively and fully dissolves, Then konjak glucomannan solution, carbonate solution, rheological agent solution, dispersant solution and the morning that will obtain after fully dissolving Strong agent solution is uniformly mixing to obtain mixed serum, then carries out described mixed serum successively distilling, pulverize, be spray-dried and sieving Process, obtain colloid adjustable solidification agent;The form of described colloid adjustable solidification agent is powdery, described konjak glucomannan, carbonate, rheology The weight ratio of agent, dispersant and early strength agent is 40: 25: 10: 15: 10, and in described mixed serum, the mass concentration of solid solute is 25%~35%.
Above-mentioned double-shielded TBM closed-loop construction method, it is characterised in that described carbonate is sodium carbonate, and described morning is strong Agent is FN type concrete early strength agent, and described dispersant is dispersant NNO, and described rheological agent is aluminium magensium silicate class rheological agent.
Above-mentioned double-shielded TBM closed-loop construction method, it is characterised in that water described in step one is domestic water.
Above-mentioned double-shielded TBM closed-loop construction method, it is characterised in that cement described in step one be No. 42.5 fast hard Sulphate aluminium cement.
The present invention compared with prior art has the advantage that
1, the gum components of colloid adjustable solidification agent of the present invention is by high molecular polymer (konjak glucomannan) and slow setting composition (carbonate, rheological agent, dispersant and early strength agent) compound composition, is made an addition in Cement paste, beneficially Cement paste with Section of jurisdiction and the combination of country rock, simultaneously adjustable setting time (setting time can be controlled between 30min~120min), it is possible to press down The contraction of Cement paste processed, ungauged regions after Cement paste calculus, there is microdilatancy effect.
2, colloid adjustable solidification agent of the present invention with konjak glucomannan (KGM) as main component, use KGM make an addition to cement, In water and sand, it is high and can play that thickening, adhesive aggregation, suspension, fluidity loss be little, bleeding that the Cement paste formed has viscosity Rate is low, meet water be difficult to dispersion, Fast Filling and stick space, setting time is short, improve the early strength of calculus, calculus rate is high, The superperformances such as infiltration coefficient is little.Thus, this colloid adjustable solidification agent is used in the construction technology of closed-loop by the present invention, beneficially cream Slurry is combined with section of jurisdiction and country rock, adjustable setting time simultaneously, it is possible to the contraction of suppression Cement paste, nothing after Cement paste calculus Shrink, have microdilatancy effect, it is possible to be prevented effectively from the appearance in crackle or crack.
3, the closed-loop construction method designed by the present invention is a kind of novel construction method.Traditional handicraft is by TBM master After machine equipment moves forward, at rear mated position, the mode that employingization fills uses dual slurry, water glass by bean gravel pack hole Glass, accelerator make, and have intuitively, there is construction blind area, closed-loop material input greatly, and the bad grade of sealing effect is serious Technological deficiency.The present invention, through bold innovation, devises the closed-loop construction method of a kind of abnormity, constructing operation simple, intuitive, There is not construction blind area, the making effect of closed-loop is ideal, and sealing effect is excellent.
With embodiment, the present invention is described in further detail below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the double-shielded TBM closed-loop of the present invention position relationship schematic diagram in tunnel structure.
Fig. 2 is the position relationship schematic diagram of double-shielded TBM closed-loop of the present invention and assembly.
Description of reference numerals:
1 section of jurisdiction;Section of jurisdiction at the bottom of 1-1;2 bean gravels;
3 country rocks;4 closed-loops.
Detailed description of the invention
Embodiment 1
The present embodiment double-shielded TBM closed-loop construction method comprises the following steps:
Step one, choose following raw material:
A. cement;
B. colloid adjustable solidification agent;Described colloid adjustable solidification agent is by konjak glucomannan, carbonate, rheological agent, dispersant, morning by force Agent and water is the most agitated, distill and pulverizing forms, addition is cement quality the 4% of described colloid adjustable solidification agent;
C. sand;The addition of described sand is equal with cement quality;
D. water;The addition of described water is cement, colloid adjustable solidification agent and the 35% of sand gross mass;
In the present embodiment, the preparation method of described colloid adjustable solidification agent is: first by konjak glucomannan, carbonate, stream Become agent, dispersant and early strength agent to add water respectively and fully dissolve, the konjak glucomannan obtained after then fully dissolving Solution, carbonate solution, rheological agent solution, dispersant solution and early strength agent solution stirring are uniform obtains mixed serum, then by described Mixed serum carries out distilling successively, pulverize, be spray-dried and cross 500 mesh sieves in 100 DEG C processes, and obtains the colloid that form is powdery Adjustable solidification agent;Wherein, the weight ratio of described konjak glucomannan, carbonate, rheological agent, dispersant and early strength agent is 40: 25: 10 : 15: 10, in described mixed serum, the mass concentration of solid solute is 30%;
In the present embodiment, described carbonate is sodium carbonate, and described early strength agent is FN type concrete early strength agent, described dispersant For dispersant NNO, described rheological agent is aluminium magensium silicate class rheological agent;
In the present embodiment, described water is domestic water;
In the present embodiment, described cement is No. 42.5 quick hardening sulphoaluminate cements;
Step 2, prepare paste mortar: colloid adjustable solidification agent selected in step one, cement, sand and water are added successively In forced mixer, after stirring 1min~2min, obtain paste mortar;
Step 3, determine manual work position: use double-shielded TBM that section of jurisdiction 1 is installed, until the section of jurisdiction installed The a length of 50m of 1, then installs section of jurisdiction 1-1 at the bottom of a piece again in the end installing section of jurisdiction 1, and being combined into a front end is spade Tubular assembly, utilize that TBM auxiliary cylinder is counter pushes away this assembly afterwards, make to depart between TBM tail shield and assembly, expose one Bar width is the space of 120mm, and the space exposed is defined as manual work position;
Step 4, construction: employing carries charging basket and paste mortar described in step 2 is transported to the work of people described in step 3 Industry position, then uses spatula that paste mortar is applied in the periphery, front end of assembly, with clog assembly and bean gravel 2 and Space between country rock 3, clogs width about 200mm, clogs thickness about 200mm, obtains a complete closed-loop 4 after hardening.
During Specific construction, according to method repetitive operation described in the present embodiment, the length direction in tunnel every 45m~ 60m makes a closed-loop, till construction is fully completed.
The present embodiment double-shielded TBM closed-loop position relationship in tunnel structure is as it is shown in figure 1, the double shield of the present embodiment The position relationship of TBM closed-loop and assembly is as shown in Figure 2.From Fig. 1 and Fig. 2, tunnel structure includes section of jurisdiction 1, bean gravel 2, country rock 3 and the made closed-loop 4 of the present embodiment, the made closed-loop of the present embodiment 4 designs in specially-shaped annular, is positioned at annular section of jurisdiction 1 and section of jurisdiction, the end 1-1 periphery, front end of spade tubular assembly formed, and clog in assembly and bean gravel 2 and country rock 3 it Between space in;It uses in the Cement paste that colloid adjustable solidification agent component is added on cement, Sha Heshui mixes, and is conducive to closing Ring 4 is combined with section of jurisdiction 1 and country rock 3, simultaneously adjustable setting time (setting time can be controlled between 30min~120min), Can the contraction of Restraining seal ring 4, ungauged regions after closed-loop 4 calculus, have microdilatancy effect.The present embodiment double-shielded TBM closed-loop , there is not construction blind area in constructing operation simple, intuitive, the making effect of closed-loop is ideal, and sealing effect is excellent.
According to tests below examination criteria the present embodiment paste mortar is carried out performance detection: (1) " polymer-modified cement Mortar test code " DL/T5126-2001;(2) " concrete for hydraulic structure testing regulations " SL 352-2006;(3) " concrete is additional Agent " GB8076-2008;(4) " cement normal consistency water consumption, setting time, the stability method of inspection " (GB/T 1346- 2011);(5) " Test method for fluidity of cement mortar " (GB/T 2419-2005).The test result of the present embodiment paste mortar As shown in table 1.
Table 1 embodiment of the present invention 1 paste mortar performance detection data
As shown in Table 1, through the Sampling Intensity detection same period, the present embodiment paste mortar coagulation time can be with site operation Needing to adjust, Best Times is 45min;And it is satisfied by index request for rupture strength, the comprcssive strength of different larval instar, complete Full up foot construction needs.
Embodiment 2
The present embodiment double-shielded TBM closed-loop construction method comprises the following steps:
Step one, choose following raw material:
A. cement;
B. colloid adjustable solidification agent;Described colloid adjustable solidification agent is by konjak glucomannan, carbonate, rheological agent, dispersant, morning by force Agent and water is the most agitated, distill and pulverizing forms, addition is cement quality the 5% of described colloid adjustable solidification agent;
C. sand;The addition of described sand is the 100% of cement quality;
D. water;The addition of described water is cement, colloid adjustable solidification agent and the 30% of sand gross mass;
In the present embodiment, the preparation method of described colloid adjustable solidification agent is: first by konjak glucomannan, carbonate, stream Become agent, dispersant and early strength agent to add water respectively and fully dissolve, the konjak glucomannan obtained after then fully dissolving Solution, carbonate solution, rheological agent solution, dispersant solution and early strength agent solution stirring are uniform obtains mixed serum, then by described Mixed serum carries out distilling successively, pulverize, be spray-dried and cross 500 mesh sieves in 100 DEG C processes, and obtains the colloid that form is powdery Adjustable solidification agent;Wherein, the weight ratio of described konjak glucomannan, carbonate, rheological agent, dispersant and early strength agent is 40: 25: 10 : 15: 10, in described mixed serum, the mass concentration of solid solute is 25%;
In the present embodiment, described carbonate is sodium carbonate, and described early strength agent is FN type concrete early strength agent, described dispersant For dispersant NNO, described rheological agent is aluminium magensium silicate class rheological agent;
In the present embodiment, described water is domestic water;
In the present embodiment, described cement is No. 42.5 quick hardening sulphoaluminate cements;
Step 2, prepare paste mortar: colloid adjustable solidification agent selected in step one, cement, sand and water are added successively In forced mixer, after stirring 1min~2min, obtain paste mortar;
Step 3, determine manual work position: use double-shielded TBM that section of jurisdiction 1 is installed, until the section of jurisdiction installed The a length of 45m of 1, then installs section of jurisdiction 1-1 at the bottom of a piece again in the end installing section of jurisdiction 1, and being combined into a front end is spade Tubular assembly, utilize that TBM auxiliary cylinder is counter pushes away this assembly afterwards, make to depart between TBM tail shield and assembly, expose one Bar width is the space of 120mm, and the space exposed is defined as manual work position;
Step 4, construction: employing carries charging basket and paste mortar described in step 2 is transported to the work of people described in step 3 Industry position, then uses spatula that paste mortar is applied in the periphery, front end of assembly, with clog assembly and bean gravel 2 and Space between country rock 3, clogs width about 200mm, clogs thickness about 100mm, obtains a complete closed-loop 4 after hardening.
During Specific construction, according to method repetitive operation described in the present embodiment, the length direction in tunnel every 45m~ 60m makes a closed-loop, till construction is fully completed.
The present embodiment double-shielded TBM closed-loop position relationship in tunnel structure is as it is shown in figure 1, the double shield of the present embodiment The position relationship of TBM closed-loop and assembly is as shown in Figure 2.From Fig. 1 and Fig. 2, tunnel structure includes section of jurisdiction 1, bean gravel 2, country rock 3 and the made closed-loop 4 of the present embodiment, the made closed-loop of the present embodiment 4 designs in specially-shaped annular, is positioned at annular section of jurisdiction 1 and section of jurisdiction, the end 1-1 periphery, front end of spade tubular assembly formed, and clog in assembly and bean gravel 2 and country rock 3 it Between space in;It uses colloid adjustable solidification agent component to be added in Cement paste, and beneficially closed-loop 4 is tied with section of jurisdiction 1 and country rock 3 Close, adjustable setting time (setting time can be controlled between 30min~120min) simultaneously, can the contraction of Restraining seal ring 4, Ungauged regions after closed-loop 4 calculus, has microdilatancy effect.The present embodiment double-shielded TBM closed-loop constructing operation simple, intuitive, does not deposits In construction blind area, the making effect of closed-loop is ideal, and sealing effect is excellent.
According to tests below examination criteria the present embodiment paste mortar is carried out performance detection: (1) " polymer-modified cement Mortar test code " DL/T5126-2001;(2) " concrete for hydraulic structure testing regulations " SL 352-2006;(3) " concrete is additional Agent " GB8076-2008;(4) " cement normal consistency water consumption, setting time, the stability method of inspection " (GB/T 1346- 2011);(5) " Test method for fluidity of cement mortar " (GB/T 2419-2005).The test result of the present embodiment paste mortar As shown in table 2.
Table 2 embodiment of the present invention 2 paste mortar performance detection data
As shown in Table 2, through the Sampling Intensity detection same period, the present embodiment paste mortar coagulation time can be with site operation Needing to adjust, Best Times is 45min;And it is satisfied by index request for rupture strength, the comprcssive strength of different larval instar, complete Full up foot construction needs.
Embodiment 3
The present embodiment double-shielded TBM closed-loop construction method comprises the following steps:
Step one, choose following raw material:
A. cement;
B. colloid adjustable solidification agent;Described colloid adjustable solidification agent is by konjak glucomannan, carbonate, rheological agent, dispersant, morning by force Agent and water is the most agitated, distill and pulverizing forms, addition is cement quality the 3% of described colloid adjustable solidification agent;
C. sand;The addition of described sand is the 50% of cement quality;
D. water;The addition of described water is cement, colloid adjustable solidification agent and the 40% of sand gross mass;
In the present embodiment, the preparation method of described colloid adjustable solidification agent is: first by konjak glucomannan, carbonate, stream Become agent, dispersant and early strength agent to add water respectively and fully dissolve, the konjak glucomannan obtained after then fully dissolving Solution, carbonate solution, rheological agent solution, dispersant solution and early strength agent solution stirring are uniform obtains mixed serum, then by described Mixed serum carries out distilling successively, pulverize, be spray-dried and cross 500 mesh sieves in 100 DEG C processes, and obtains the colloid that form is powdery Adjustable solidification agent;Wherein, the weight ratio of described konjak glucomannan, carbonate, rheological agent, dispersant and early strength agent is 40: 25: 10 : 15: 10, in described mixed serum, the mass concentration of solid solute is 35%;
In the present embodiment, described carbonate is sodium carbonate, and described early strength agent is FN type concrete early strength agent, described dispersant For dispersant NNO, described rheological agent is aluminium magensium silicate class rheological agent;
In the present embodiment, described water is domestic water;
In the present embodiment, described cement is No. 42.5 quick hardening sulphoaluminate cements;
Step 2, prepare paste mortar: colloid adjustable solidification agent selected in step one, cement, sand and water are added successively In forced mixer, after stirring 1min~2min, obtain paste mortar;
Step 3, determine manual work position: use double-shielded TBM that section of jurisdiction 1 is installed, until the section of jurisdiction installed The a length of 60m of 1, then installs section of jurisdiction 1-1 at the bottom of a piece again in the end installing section of jurisdiction 1, and being combined into a front end is spade Tubular assembly, utilize that TBM auxiliary cylinder is counter pushes away this assembly afterwards, make to depart between TBM tail shield and assembly, expose one Bar width is the space of 120mm, and the space exposed is defined as manual work position;
Step 4, construction: employing carries charging basket and paste mortar described in step 2 is transported to the work of people described in step 3 Industry position, then uses spatula that paste mortar is applied in the periphery, front end of assembly, with clog assembly and bean gravel 2 and Space between country rock 3, clogs width about 200mm, clogs thickness about 300mm, obtains a complete closed-loop 4 after hardening.
During Specific construction, according to method repetitive operation described in the present embodiment, the length direction in tunnel every 45m~ 60m makes a closed-loop, till construction is fully completed.
The present embodiment double-shielded TBM closed-loop position relationship in tunnel structure is as it is shown in figure 1, the double shield of the present embodiment The position relationship of TBM closed-loop and assembly is as shown in Figure 2.From Fig. 1 and Fig. 2, tunnel structure includes section of jurisdiction 1, bean gravel 2, country rock 3 and the made closed-loop 4 of the present embodiment, the made closed-loop of the present embodiment 4 designs in specially-shaped annular, is positioned at annular section of jurisdiction 1 and section of jurisdiction, the end 1-1 periphery, front end of spade tubular assembly formed, and clog in assembly and bean gravel 2 and country rock 3 it Between space in;It uses colloid adjustable solidification agent component to be added in Cement paste, and beneficially closed-loop 4 is tied with section of jurisdiction 1 and country rock 3 Close, adjustable setting time (setting time can be controlled between 30min~120min) simultaneously, can the contraction of Restraining seal ring 4, Ungauged regions after closed-loop 4 calculus, has microdilatancy effect.The present embodiment double-shielded TBM closed-loop constructing operation simple, intuitive, does not deposits In construction blind area, the making effect of closed-loop is ideal, and sealing effect is excellent.
According to tests below examination criteria the present embodiment paste mortar is carried out performance detection: (1) " polymer-modified cement Mortar test code " DL/T5126-2001;(2) " concrete for hydraulic structure testing regulations " SL 352-2006;(3) " concrete is additional Agent " GB8076-2008;(4) " cement normal consistency water consumption, setting time, the stability method of inspection " (GB/T 1346- 2011);(5) " Test method for fluidity of cement mortar " (GB/T 2419-2005).The test result of the present embodiment paste mortar As shown in table 3.
Table 3 embodiment of the present invention 3 paste mortar performance detection data
As shown in Table 3, through the Sampling Intensity detection same period, the present embodiment paste mortar coagulation time can be with site operation Needing to adjust, Best Times is 45min;And it is satisfied by index request for rupture strength, the comprcssive strength of different larval instar, complete Full up foot construction needs.
The above, be only presently preferred embodiments of the present invention, not impose any restrictions the present invention.Every according to invention skill Any simple modification, change and the equivalence change that above example is made by art essence, all still falls within technical solution of the present invention Protection domain in.

Claims (5)

1. a double-shielded TBM closed-loop construction method, it is characterised in that the method comprises the following steps:
Step one, choose following raw material:
A. cement;
B. colloid adjustable solidification agent;Described colloid adjustable solidification agent by konjak glucomannan, carbonate, rheological agent, dispersant, early strength agent and Water is the most agitated, distill, pulverize, dried and screened are made, described colloid adjustable solidification agent addition is cement quality 3%~ 5%;
C. sand;The addition of described sand is the 50%~100% of cement quality;
D. water;The addition of described water is cement, colloid adjustable solidification agent and the 30% of sand gross mass~40%;
Step 2, prepare paste mortar: cement selected in step one, colloid adjustable solidification agent, Sha Heshui are joined by force successively In standard blender, after stirring 1min~2min, obtain paste mortar;
Step 3, determine manual work position: use double-shielded TBM that section of jurisdiction (1) is installed, until the section of jurisdiction installed (1) a length of 45m~60m, then installs section of jurisdiction (1-1) at the bottom of a piece again in the end installing section of jurisdiction (1), is combined into one Front end is the tubular assembly of spade, utilizes that TBM auxiliary cylinder is counter pushes away this assembly afterwards, makes between TBM tail shield and assembly Depart from, expose the space that width is 100mm~150mm, the space exposed is defined as manual work position;
Step 4, construction: employing carries charging basket and paste mortar described in step 2 is transported to manual work portion described in step 3 Position, then uses spatula that paste mortar is applied in the periphery, front end of assembly, to clog assembly and bean gravel (2) and to enclose Space between rock (3), obtains a closed-loop (4) after hardening.
Double-shielded TBM closed-loop construction method the most according to claim 1, it is characterised in that colloid described in step one The preparation method of adjustable solidification agent is: first konjak glucomannan, carbonate, rheological agent, dispersant and early strength agent are added water respectively Fully dissolve, then will fully dissolve after obtain konjak glucomannan solution, carbonate solution, rheological agent solution, Dispersant solution and early strength agent solution stirring uniformly obtain mixed serum, then carry out described mixed serum successively distilling, pulverize, It is spray-dried and process of sieving, obtains colloid adjustable solidification agent;The form of described colloid adjustable solidification agent is powdery, and described konjac mannan gathers The weight ratio of sugar, carbonate, rheological agent, dispersant and early strength agent is 40: 25: 10: 15: 10, and in described mixed serum, solid is molten The mass concentration of matter is 25%~35%.
Double-shielded TBM closed-loop construction method the most according to claim 2, it is characterised in that described carbonate is carbonic acid Sodium, described early strength agent is FN type concrete early strength agent, and described dispersant is dispersant NNO, and described rheological agent is aluminium magensium silicate Class rheological agent.
Double-shielded TBM closed-loop construction method the most according to claim 1 and 2, it is characterised in that water described in step one For domestic water.
Double-shielded TBM closed-loop construction method the most according to claim 1 and 2, it is characterised in that water described in step one Mud is No. 42.5 quick hardening sulphoaluminate cements.
CN201610748716.9A 2016-08-26 2016-08-26 Double-shielded TBM closed-loop construction method Active CN106285697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610748716.9A CN106285697B (en) 2016-08-26 2016-08-26 Double-shielded TBM closed-loop construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610748716.9A CN106285697B (en) 2016-08-26 2016-08-26 Double-shielded TBM closed-loop construction method

Publications (2)

Publication Number Publication Date
CN106285697A true CN106285697A (en) 2017-01-04
CN106285697B CN106285697B (en) 2018-01-19

Family

ID=57676301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610748716.9A Active CN106285697B (en) 2016-08-26 2016-08-26 Double-shielded TBM closed-loop construction method

Country Status (1)

Country Link
CN (1) CN106285697B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441470A (en) * 2018-12-25 2019-03-08 中国电建集团成都勘测设计研究院有限公司 Double-shielded TBM tunnels tunnel surrounding rebound value test method
CN110005432A (en) * 2019-04-18 2019-07-12 西南交通大学 Double-shielded TBM development machine passes through the synchronous grouting construction method of fractured weak zone

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004353372A (en) * 2003-05-30 2004-12-16 Nippon Gijutsu Kensetsu Kk Renewal construction method for old buried pipe
JP2005120349A (en) * 2003-09-16 2005-05-12 Raito Kogyo Co Ltd Material for earth and sand structure, surface protecting construction method for inclined face, lining face, and tunnel lining face using the same, and slope protecting construction method
CN102562146A (en) * 2012-03-07 2012-07-11 深圳市市政工程总公司 Construction gap filling method and device for shield through air pushing section
CN103510964A (en) * 2013-07-31 2014-01-15 中铁隧道集团有限公司 Method for performing backfill grouting on pea gravel by adoption of shield type TBM in construction process
CN105649650A (en) * 2014-12-03 2016-06-08 中铁十八局集团有限公司 Back pea gravel blow filling grouting construction method for single-shield hard rock roadheader after installing TBM pipe piece
CN105804770A (en) * 2016-04-11 2016-07-27 刘文涛 Method for backfilling of tunnel construction through TBM method and equipment for method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004353372A (en) * 2003-05-30 2004-12-16 Nippon Gijutsu Kensetsu Kk Renewal construction method for old buried pipe
JP2005120349A (en) * 2003-09-16 2005-05-12 Raito Kogyo Co Ltd Material for earth and sand structure, surface protecting construction method for inclined face, lining face, and tunnel lining face using the same, and slope protecting construction method
CN102562146A (en) * 2012-03-07 2012-07-11 深圳市市政工程总公司 Construction gap filling method and device for shield through air pushing section
CN103510964A (en) * 2013-07-31 2014-01-15 中铁隧道集团有限公司 Method for performing backfill grouting on pea gravel by adoption of shield type TBM in construction process
CN105649650A (en) * 2014-12-03 2016-06-08 中铁十八局集团有限公司 Back pea gravel blow filling grouting construction method for single-shield hard rock roadheader after installing TBM pipe piece
CN105804770A (en) * 2016-04-11 2016-07-27 刘文涛 Method for backfilling of tunnel construction through TBM method and equipment for method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
任成国: "长沙—株洲—湘潭城际铁路湘江隧道开滨盾构区间", 《隧道建设》 *
周庆武: "斜井TBM工法分段注浆材料的选择", 《煤炭工程》 *
王庆: "达坂隧洞双护盾TBM衬砌与围岩容固施工工法", 《山西建筑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441470A (en) * 2018-12-25 2019-03-08 中国电建集团成都勘测设计研究院有限公司 Double-shielded TBM tunnels tunnel surrounding rebound value test method
CN110005432A (en) * 2019-04-18 2019-07-12 西南交通大学 Double-shielded TBM development machine passes through the synchronous grouting construction method of fractured weak zone

Also Published As

Publication number Publication date
CN106285697B (en) 2018-01-19

Similar Documents

Publication Publication Date Title
CN104628349B (en) A kind of ardealite base upper flow regime grouting material
CN109721310B (en) Cement mortar prepared by replacing natural sand with engineering muck, and preparation method and application thereof
WO2013005609A1 (en) Thickening agent composition for imparting anti-washout property to concrete under water
CN101386518A (en) High-early-strength magnesium phosphate concrete and preparation method thereof
CN104891853A (en) Composite anti-mud agent based on polycarboxylate-type pumping agent, anti-mud pumping agent and preparation method of anti-mud pumping agent
CN103664121B (en) Hole-sealing grouting material and preparation method thereof and application
CN108793857A (en) A kind of shield-tunneling construction synchronous grouting dry-mixed mortar and preparation method thereof
CN108409222A (en) A kind of hydraulic engineering concrete special and preparation method thereof
CN106285697B (en) Double-shielded TBM closed-loop construction method
CN106673541B (en) Mylonite crushed zone shield-tunneling construction protrusion-dispelling gushes injecting paste material and preparation method thereof
CN108424047A (en) A kind of red mud base rapid hardening injecting paste material administered suitable for sandy soil stratum grouting and reinforcing
CN103113060A (en) Cement paste and preparation method thereof
CN103922659B (en) Anti-under water dispersion mortar for large area cavity grouting and preparation method thereof
CN110028273A (en) A kind of grouting material and preparation method thereof reinforced for road
CN102320785B (en) Shrinkage-free grouting reinforcing material and preparation process thereof
WO2022116526A1 (en) Expansion grout for prestressed pipeline grouting and preparation method therefor
CN110372309B (en) Titanium gypsum-based material for goaf filling and preparation method thereof
CN108129110A (en) A kind of high-speed railway large cross-section tunnel prestressed cable anchorage paste materials
CN107056189A (en) A kind of high osmosis cement grouting mortar and preparation method thereof
CN103787610A (en) Pervious concrete additive and preparation method thereof
CN110357501A (en) A kind of concrete waste material concrete and preparation method thereof
CN103922658A (en) Underwater anti-dispersion cement paste and preparation method thereof
CN109748556A (en) Anti- isolation loaded concrete of one kind and preparation method thereof
Di Giulio et al. A preliminary study of the parameters influencing the perfomance of two-component backfill grout
JP4044887B2 (en) Bolt fixing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant