CN106285177A - 架空线铁塔的组装方法 - Google Patents

架空线铁塔的组装方法 Download PDF

Info

Publication number
CN106285177A
CN106285177A CN201610658752.6A CN201610658752A CN106285177A CN 106285177 A CN106285177 A CN 106285177A CN 201610658752 A CN201610658752 A CN 201610658752A CN 106285177 A CN106285177 A CN 106285177A
Authority
CN
China
Prior art keywords
tower
assemble method
column foot
head
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610658752.6A
Other languages
English (en)
Inventor
周威葳
曲海波
张颖蕾
刘友坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Power Design Institute Co Ltd
Original Assignee
Shanghai Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Power Design Institute Co Ltd filed Critical Shanghai Electric Power Design Institute Co Ltd
Priority to CN201610658752.6A priority Critical patent/CN106285177A/zh
Publication of CN106285177A publication Critical patent/CN106285177A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)
  • Foundations (AREA)

Abstract

本发明公开了一种架空线铁塔的组装方法,该组装方法依次包括塔材对料、组装塔基、吊装塔头、吊装塔身、与塔基固定及导线拉线作业等步骤。本发明组装方法中,吊车根据组塔进度将已安装完毕的部分塔逐步吊起,作业面始终保持在距地2米以内,克服了传统分解组塔需要进行高空作业的问题,作业人员在地面即可进行安装,材料等设备不需要运至高空,提高了作业安全性,节省作业时间,同时本发明组装方法也不需要整体组装所要求的地形条件。

Description

架空线铁塔的组装方法
技术领域
本发明涉及架空输电线路工程技术领域,具体涉及一种架空线铁塔的组装方法。
背景技术
目前架空线铁塔利用吊车组装时主要采用两种方式进行,一是如图1所示的吊车分解组塔,二是整体组装完成后再吊装。现有技术中两种方法在实际应用中均存在不足之处,第一种方式通常受制于地形条件,随着塔身逐渐向上,需要人工将塔材运至安装位置并进行高空作业;而第二种方式对周边安放塔的地形要求较高,实际中高压线路的铁塔塔身较长,此方法不适用所有场合,局限性大。
专利号为03140535.5的中国发明专利公开了一种大跨越输电铁塔的安装方法,它是在建塔基地的中间先安装一段直立的井架,井架的端部通过四摇臂抱杆安装有吊装机,利用该吊装机搬升一段塔架构件于建塔基地后,再以该塔架构件为依托,将直立的井架连同吊装机一起提升,并在被提升的井架下再接入一段井架并用内套法兰固定连接,再以组合固定后的井架作基础,用吊装机搬升另一部分塔架构件至前一部分塔架构件上部并组装连接,如此循环,完成整体大跨越输电铁塔的安装。这种铁塔安装方法具有稳固性好、占地面积小等优点,但是这种铁塔安装方法要求预先设置安装井架,井架对设置地点的地基强度要求较高,且井架带来的建造成本和时间成本较高。
发明内容
有鉴于现有技术的上述缺陷,本发明提供一种架空线铁塔的组装方法,无需设置井架即可进行分段循环组装。
为实现上述技术目的,达到上述技术效果,本发明是通过以下技术方案实现:
一种架空线铁塔的组装方法,包括如下步骤:
(1)塔材对料:清理布置施工现场,运输铁塔安装所需塔材,进行质量检测并清理物料;
(2)组装塔基:在布置好的施工现场建造塔基;
(3)吊装塔头:塔头包括地线横担、导线横担、绝缘子和吊环,吊环对称设于塔头的顶端作为吊点,组装塔头的各部件并留足临时拉线,临时拉线作为最终立塔完毕后的导线引线;
(4)吊装塔身:吊车抬起塔头一段高度,在塔头因抬起所空出的区域组装塔身,塔身的顶端通过固定件与塔头的底端固定连接;
(5)与塔基固定:吊车抬起塔头和塔身并将其移动至塔基的上方,缓慢放下塔身,将塔身底部与塔基顶部固定连接;
(6)导线拉线作业。
进一步地,所述吊车的作业面始终保持在距地2米以内。
进一步地,所述步骤(3)中,吊环与塔头为一体结构。
进一步地,所述步骤(4)中,塔头的抬升是分步进行地,与塔身的安装进度相配合。
进一步地,所述步骤(5)中,塔身通过焊接或螺栓连接方式与塔基固定连接。
本发明的有益效果:
本发明的组装方法中,吊车根据组塔进度将已安装完毕的部分塔逐步吊起,作业面始终保持在距地2米以内,克服了传统分解组塔需要进行高空作业的问题,作业人员在地面即可进行安装,材料等设备不需要运至高空,提高了作业安全性,节省作业时间,同时本发明组装方法也不需要整体组装所要求的地形条件。
当然,实施本发明的任一产品并不一定需要同时达到以上所述的所有优点。
以下将结合附图对本发明的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本发明的目的、特征和效果。
附图说明
图1为现有技术中所述组装方法的施工流程示意图;
图2为本发明所述组装方法的施工流程示意图;
图3为本发明所述组装方法中步骤(3)至(5)对应的安装状态示意图。
具体实施方式
请参阅图2-图3所示,本实施例提供的一种架空线铁塔的组装方法,包括如下步骤:
(1)塔材对料:清理布置施工现场,运输铁塔安装所需塔材,进行质量检测并清理物料;
(2)组装塔基:在布置好的施工现场建造塔基;
(3)吊装塔头:塔头包括地线横担、导线横担、绝缘子和吊环,吊环对称设于塔头的顶端作为吊点,组装塔头的各部件并留足临时拉线,临时拉线作为最终立塔完毕后的导线引线;
(4)吊装塔身:吊车抬起塔头一段高度,在塔头因抬起所空出的区域组装塔身,塔身的顶端通过固定件与塔头的底端固定连接;
(5)与塔基固定:吊车抬起塔头和塔身并将其移动至塔基的上方,缓慢放下塔身,将塔身底部与塔基顶部固定连接;
(6)导线拉线作业。
步骤(3)中,吊环与塔头为一体结构;步骤(4)中,塔头的抬升是分步进行地,与塔身的安装进度相配合;步骤(5)中,塔身通过焊接或螺栓连接方式与塔基固定连接。
有些塔形的塔材本身较长,会大于2米,这样可以利用铁塔基础开挖的坑深度,加上2米,满足安装条件,这样人员还是在地面上。
本实施例的具体应用为:吊车根据组塔进度将已安装完毕的部分塔逐步吊起,作业面始终保持在距地2米以内,克服了传统分解组塔需要进行高空作业的问题,作业人员在地面即可进行安装,材料等设备不需要运至高空,提高了作业安全性,节省作业时间,同时本发明组装方法也不需要整体组装所要求的地形条件。
在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料过着特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。
以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。

Claims (5)

1.一种架空线铁塔的组装方法,包括如下步骤:
(1)塔材对料:清理布置施工现场,运输铁塔安装所需塔材,进行质量检测并清理物料;
(2)组装塔基:在布置好的施工现场建造塔基;
(3)吊装塔头:塔头包括地线横担、导线横担、绝缘子和吊环,吊环对称设于塔头的顶端作为吊点,组装塔头的各部件并留足临时拉线,临时拉线作为最终立塔完毕后的导线引线;
(4)吊装塔身:吊车抬起塔头一段高度,在塔头因抬起所空出的区域组装塔身,塔身的顶端通过固定件与塔头的底端固定连接;
(5)与塔基固定:吊车抬起塔头和塔身并将其移动至塔基的上方,缓慢放下塔身,将塔身底部与塔基顶部固定连接;
(6)导线拉线作业。
2.根据权利要求1所述的架空线铁塔的组装方法,其特征在于:所述吊车的作业面始终保持在距地2米以内。
3.根据权利要求1所述的架空线铁塔的组装方法,其特征在于:所述步骤(3)中,吊环与塔头为一体结构。
4.根据权利要求1所述的架空线铁塔的组装方法,其特征在于:所述步骤(4)中,塔头的抬升是分步进行地,与塔身的安装进度相配合。
5.根据权利要求1所述的架空线铁塔的组装方法,其特征在于:所述步骤(5)中,塔身通过焊接或螺栓连接方式与塔基固定连接。
CN201610658752.6A 2016-08-12 2016-08-12 架空线铁塔的组装方法 Pending CN106285177A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610658752.6A CN106285177A (zh) 2016-08-12 2016-08-12 架空线铁塔的组装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610658752.6A CN106285177A (zh) 2016-08-12 2016-08-12 架空线铁塔的组装方法

Publications (1)

Publication Number Publication Date
CN106285177A true CN106285177A (zh) 2017-01-04

Family

ID=57668580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610658752.6A Pending CN106285177A (zh) 2016-08-12 2016-08-12 架空线铁塔的组装方法

Country Status (1)

Country Link
CN (1) CN106285177A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612385A (zh) * 2018-06-12 2018-10-02 青岛科华钢结构有限公司 一种钢结构铁塔快速组装设计方法
CN110778201A (zh) * 2019-11-07 2020-02-11 苏州圣典企业管理咨询有限公司 一种高压塔及其安装架设方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458377A (zh) * 2003-05-28 2003-11-26 浙江省电力设计院 一种大跨越输电铁塔的安装方法
CN201756422U (zh) * 2010-07-27 2011-03-09 周杨 两头吊塔式起重机
CN201850813U (zh) * 2010-09-30 2011-06-01 中国电力工程顾问集团中南电力设计院 紧凑型输电线路干字型耐张塔
CN102359303A (zh) * 2011-10-31 2012-02-22 湖北省输变电工程公司 特高压普通线路铁塔组立方法
CN202187601U (zh) * 2011-05-17 2012-04-11 王海兵 高压输电线路单绞磨双抱杆铁塔组立装置
CN102535939A (zh) * 2012-01-19 2012-07-04 湖北省输变电工程公司 拉v塔倒装组立工艺

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458377A (zh) * 2003-05-28 2003-11-26 浙江省电力设计院 一种大跨越输电铁塔的安装方法
CN201756422U (zh) * 2010-07-27 2011-03-09 周杨 两头吊塔式起重机
CN201850813U (zh) * 2010-09-30 2011-06-01 中国电力工程顾问集团中南电力设计院 紧凑型输电线路干字型耐张塔
CN202187601U (zh) * 2011-05-17 2012-04-11 王海兵 高压输电线路单绞磨双抱杆铁塔组立装置
CN102359303A (zh) * 2011-10-31 2012-02-22 湖北省输变电工程公司 特高压普通线路铁塔组立方法
CN102535939A (zh) * 2012-01-19 2012-07-04 湖北省输变电工程公司 拉v塔倒装组立工艺

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612385A (zh) * 2018-06-12 2018-10-02 青岛科华钢结构有限公司 一种钢结构铁塔快速组装设计方法
CN110778201A (zh) * 2019-11-07 2020-02-11 苏州圣典企业管理咨询有限公司 一种高压塔及其安装架设方法
CN110778201B (zh) * 2019-11-07 2021-05-14 苏州圣典企业管理咨询有限公司 一种高压塔的安装架设方法

Similar Documents

Publication Publication Date Title
CN101845849B (zh) 新旧建筑物之间架设的大跨度钢结构连廊及其施工方法
CN204185120U (zh) 移动式设备就位小车
EP2711487B1 (en) Concentrated solar tower assembly and method
CN107399656B (zh) 室外加装电梯及其施工方法
CN104674837A (zh) 风机基础与风机塔筒的连接结构与连接方法
WO2015188694A1 (zh) 一种地下核电站大件吊装运输方法
CN105804400A (zh) 一种曲面网架提升施工方法
CN109138454A (zh) 一种超高层建筑外框带状桁架的安装方法
CN115506650A (zh) 一种顶升落地双摇臂抱杆组装、立塔及拆装工艺
CN106285177A (zh) 架空线铁塔的组装方法
CN101618835B (zh) 一种可升降、可拆卸的吊装平台及其应用方法
CN107419907B (zh) 一种炼钢塔楼钢结构平台的交错安装焊接方法
CN105625732B (zh) 超高悬挑钢结构桁架无支撑施工方法
JP2011162298A (ja) 天井クレーンの設置工法および装置
CN104947953B (zh) 一种10kV输电线路水泥杆更换方法及更换临时杆
CN204474202U (zh) 大吨位钢构件整体吊装工装
CN204126297U (zh) 一种钢桁架屋顶的临时支撑架
CN105858556B (zh) 变电站避雷针更换设备及使用方法
CN105002906B (zh) 一种作为主体结构立柱的捆绑式锚索复合桩结构及其施工方法
CN211849413U (zh) 一种多功能钢管桩桩帽结构
CN107143144A (zh) 圆型立体车库钢结构单元集成安装法
KR101192265B1 (ko) 고강도 콘크리트 장대파일 형성 장치 및 시공 방법
CN104805901A (zh) 一种即插即用的钢结构梁柱连接装置及方法
CN111706149A (zh) 一种新型组立抱杆的施工方法
KR20180029250A (ko) 직류 컨버터 밸브의 조립 방법

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhou Weiwai

Inventor after: Qu Haibo

Inventor after: Zhang Yinglei

Inventor after: Liu Youkun

Inventor before: Zhou Weiwei

Inventor before: Qu Haibo

Inventor before: Zhang Yinglei

Inventor before: Liu Youkun

COR Change of bibliographic data
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104