CN106284988A - Oblique circular cylinder template and construction method thereof - Google Patents

Oblique circular cylinder template and construction method thereof Download PDF

Info

Publication number
CN106284988A
CN106284988A CN201610858412.8A CN201610858412A CN106284988A CN 106284988 A CN106284988 A CN 106284988A CN 201610858412 A CN201610858412 A CN 201610858412A CN 106284988 A CN106284988 A CN 106284988A
Authority
CN
China
Prior art keywords
bridging
many
vertical
bar
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610858412.8A
Other languages
Chinese (zh)
Inventor
温应宜
温骏荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Rong Jian Group Co Ltd
Original Assignee
Fujian Rong Jian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Rong Jian Group Co Ltd filed Critical Fujian Rong Jian Group Co Ltd
Priority to CN201610858412.8A priority Critical patent/CN106284988A/en
Publication of CN106284988A publication Critical patent/CN106284988A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/021Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for circular columns

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of oblique circular cylinder template and construction method thereof, including column-form, many hounds, many vertical rods, bridging, cable wind ropes;The upper end of many described hounds is intervally fixed on the inner side of column-form, the lower end of many hounds fixes on the ground, the upper end of cable wind rope is fixed on the outside of column-form, each outer end points of bridging is separately fixed in the middle part of many hounds, is separately fixed at the middle part of bridging in the middle part of many vertical rods with end points;Described many hounds, many vertical rods, bridgings etc. constitute a bracing frame.The many hound intervals due to the present invention are fixed on the inner side of column-form, cable wind rope is fixed on the outside of column-form, bridging is fixed in the middle part of many hounds, many vertical rods are fixed on the middle part of bridging, making hound, many vertical rods, bridging, the firm support systems of cable wind rope one fixed cylinder template of composition, its structural stability is preferable.

Description

Oblique circular cylinder template and construction method thereof
Technical field
The present invention relates to technical field of building construction, particularly relate to a kind of oblique circular cylinder template and construction method thereof.
Background technology
Needing the tilted cylinder of casting concrete in building concrete structure sometimes, tilted cylindrical envelope refers to that cylinder is to building The tilted angle of thing is more than 0 °, and less than the cylinder at 90 ° of angles, its cross section is circular, and with floor at an angle.This allows for really Protect template inclination angle accurate, template the most not spillage tight with floor contact site, concreting and during vibrating template constant Shape, do not cave in, become a highly important problem.Traditional tilted cylindrical envelope template fixing method is made by scaffold upright rod and exists After vertically supporting bottom template, it is supplemented with part skewed horizontal load.This fixing means commonly used is difficult to meet bearing height, lotus Load, the template that span is the biggest, the stability of formwork-support is relatively difficult to ensure card.
This engineering high and big die plate bearing height, load, span are the biggest, main it is ensured that template is propped up during high and big die plate construction Stablizing of support.
Summary of the invention
It is an object of the present invention to provide the oblique circular cylinder template of a kind of good stability.
Further object is that and a kind of oblique circular cylinder template construction method being prone to construction is provided.
For achieving the above object, the technical solution of the present invention is:
The present invention is a kind of oblique circular cylinder template, including column-form, many hounds, many vertical rods, bridging, cable wind ropes;Institute The upper end of the many hounds stated is intervally fixed on the inner side of column-form, and the lower end of many hounds is fixed on ground On, the upper end of cable wind rope is fixed on the outside of column-form, and each outer end points of bridging is separately fixed in many hounds Portion, is separately fixed at the middle part of bridging with end points in the middle part of many vertical rods;Many described hounds, many vertical rods, bridgings Deng one bracing frame of composition.
Described bridging is made up of horizontal cross brace, vertical bridging;Hang down respectively in the two ends of described horizontal cross brace Directly being fixed on vertical bridging, the two ends of vertical bridging are respectively and vertically fixed on horizontal cross brace, constitute multiple size Different rectangular frame structure.
Described column-form includes that cylinder typified form, many flitches erect stupefied, steel band tie;Many described flitches erect Stupefied along cylinder typified form length direction interval arrange and flitch erect stupefied inner side and be fitted on the outer wall of cylinder typified form, steel band The inner band of tie is erected on stupefied outside at flitch.
The top of described hound is connected with U-shaped screw mandrel jacking, and the lower end of pad is oblique is fixed in U-shaped screw mandrel jacking The outer end of U-type groove mouth, is equipped with flitch master stupefied in the U-type groove mouth of U-shaped screw mandrel jacking.
The lower end of described hound acts against on triangle stow-wood by sheeting caps, and triangle stow-wood is fixed on floor, and And, the bottom of hound is connected by short tube bar right angle button of sweeping the floor with the support in laterally tiltedly vertical rod, the lower end of the most oblique vertical rod Squeeze in soil.
The present invention be described in a kind of claim 1 the construction method of oblique circular cylinder template, comprise the following steps:
(1) installing bottom layer bracing frame
Base is arranged, self-indulgent horizontal level sweeps the floor bar, erect bottom vertical rod from corner successively to both sides, and bottom and level are swept the floor bar Snapping is fixed, and should check the perpendicularity of vertical rod before fixing bottom bar, after the installing vertical rod of each direction, and installing second layer level immediately Reinforce bar to fix with vertical rod snapping, after check vertical rod and girt meet the requirements, screw up with a wrench by 45~60N m moments Fastening bolt, extend successively by above-mentioned requirements and set up until first step base layer support frame completes, then carry out second step girt Install, install bridging in time by setting up process subsequently;
(2) top supporting frame is installed
1. require unwrapping wire location, first to eject the steel tube poles position line, sheeting caps, base riding position according to vertical rod site plan Want accurately, when setting up, can use the method set up with logical layer by row, and bar should be reinforced with taking in length and breadth with setting bar level of sweeping the floor;Vertical rod Bottom sheeting caps length no less than 2 across, width >=200mm, thickness 50mm;Girt is firm with vertical rod snapping, sweeps the floor in length and breadth Bar overhead height is not more than 200mm;
2. during site operation falsework, the spacing between bar and top horizontal pull bar of sweeping the floor, determined meeting stencil design Girt stride requirements under the conditions of, should be distributed equally and determine concrete step pitch;Each step vertically and horizontally should respectively set one water Horizontal drawing bar;
3. support body outer periphery and internal vertical, horizontal every 4 across, the end to top the most vertical bridging, vertical bridging are set Width be 4 across;At vertical bridging top, intersection point plane arranges continuous horizontal bridging, and the layer that arranges of bar of sweeping the floor arranges level and cuts Cutter supports, and horizontal cross brace to support body baseplane distance and horizontal cross tie distance are less than 6m, and bridging width is 3~5m;Perpendicular Being 45 °~60 ° to the inclination angle of bridging brace Yu ground, horizontal cross brace angle vertical or horizontal with support is 45 °~60 °;Cut The spreading of cutter support brace uses overlap joint, and the lap of splice is not less than 1m, and employing is fixed not less than 2 rotary buckles, end fastener The edge of cover plate to rod end distance not less than 100mm;Bridging use rotary buckle be fixed on intersecting therewith girt or In vertical rod, the distance of rotary buckle centrage to host node is not more than 150mm;
4. girt spreading use to clasp connect, girt clasp is answered interlaced arrangement, two are bordered on the river mutually The joint of horizontal drawing bar should not be located at synchronization with across interior, and asynchronous or difference is across two adjacent joints distance that staggers in the horizontal direction More than 500mm, the distance of each connector center to nearly host node is not preferably greater than the 1/3 of span;
5. in vertical rod clasp is answered interlaced arrangement: the joint of two adjacent vertical rods should not be arranged in synchronization, in synchronizing every Two of a piece vertical rod are separated by the distance preferably less than 500mm that joint staggers in short transverse;Each connector center is to host node Distance is not preferably greater than the 1/3 of step pitch;
(3) column-form is installed
On post, first eject axis, the position line and horizontal elevation control line, adjust the adjustable top of design of coupler scaffold by designed elevation The absolute altitude of torr, is adjusted to predetermined height, then lays flitch on the supporting plate of adjustable jack;After column-form is installed, then Flitch is installed and erects stupefied, steel band tie is finally installed;
(4) capital beam form is installed: according to the absolute altitude on post, draws bottom elevation, constructs according to beam form, controls the U-shaped jacking of vertical rod Absolute altitude, it is stupefied to place flitch master on U-shaped jacking, then repaves along beam span direction that to put square steel tube at the bottom of beam time stupefied, lay at the bottom of beam, Beam side panel, colligation beam steel, reinforcement side template;
Process to privileged sites: the outside of oblique circular cylinder is designed with binder, the about every 3m of vertical spacing together, take to reserve by this binder Joint bar, carries out secondary construction after oblique circular cylinder has been constructed again;During construction oblique circular cylinder, the typified form of oblique circular cylinder is holed, The straight muscle of reserved binder, in order to oblique circular cylinder mould form removal.
After using such scheme, owing to the present invention includes column-form, many hounds, many vertical rods, bridging, guys Rope, many hound intervals are fixed on the inner side of column-form, and cable wind rope is fixed on the outside of column-form, and bridging is fixed on In the middle part of many hounds, many vertical rods are fixed on the middle part of bridging so that hound, many vertical rods, bridging, cable wind rope structures Becoming the firm support system of a fixed cylinder template, its structural stability is preferable.
The present invention is further illustrated with specific embodiment below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the front view of the present invention;
Fig. 2 is the side view of the present invention;
Fig. 3 is the sectional view of column-form of the present invention;
Fig. 4 is hound top junction composition of the present invention;;
Fig. 5 is the first chart at the bottom of of hound of the present invention;
Fig. 6 is hound the second chart at the bottom of of the present invention.
Detailed description of the invention
As shown in Figure 1, Figure 2, Figure 6 shows, the present invention is a kind of oblique circular cylinder template, including column-form 1, many hounds 2, many Root vertical rod 3,4, two cable wind ropes 5 of bridging, bar 6 of sweeping the floor, girt 7.
The upper end of many described hounds 2 is intervally fixed on the inner side of column-form 1, many hounds 2 times End fixes on the ground, and the upper end of two cable wind ropes 5 is separately fixed at the top outside column-form 1 and middle part, bridging 4 Each outer end points is separately fixed in the middle part of many hounds 2, is separately fixed in bridging 2 with end points in the middle part of many vertical rods 3 Portion.Many described hounds 2, many vertical rods 3, bridgings 4 etc. constitute a bracing frame 8.
Described bridging 4 is made up of horizontal cross brace 41, vertical bridging 42 and lateral bridging 43.Described level The two ends of bridging 41 are respectively and vertically fixed on vertical bridging 42, and the two ends of vertical bridging 42 are respectively and vertically fixed at water On flat bridging 41, constituting multiple rectangular frame structure varied in size, lateral bridging 43 is fixed on horizontal cross brace 41 He Vertical bridging 42 outer end.
In the present embodiment, described bridging 4 is according to reinforced setting.In support body outer periphery and internal vertical, horizontal Every 4 across (and no more than 5m), the end to top arrange the most vertical bridging 42, bridging 4 width be 4 across.At vertical bridging 42 top intersection point planes arrange continuous horizontal bridging 41, and the layer that arranges of bar 6 of sweeping the floor arranges horizontal cross brace 41, horizontal cross brace 41 to support body baseplane distance and horizontal cross brace 41 spacing are less than 6m, and bridging 4 width is 3~5m.Vertical bridging 42 Brace is 45 °~60 ° with the inclination angle on ground, and horizontal cross brace 41 vertical with support (or horizontal) is 45 °~60 ° to angle.Bridging 4 The spreading of brace uses overlap joint, and the lap of splice is not less than 1m, and employing is fixed not less than 2 rotary buckles, end fastener cover plate Edge to rod end distance not less than 100mm.Bridging 4 uses rotary buckle to be fixed on intersecting therewith girt 7 or vertical On bar 3, the distance of rotary buckle centrage to host node is not more than 150mm.
As it is shown on figure 3, described column-form 1 includes that cylinder typified form 11, many flitches erect stupefied 12, steel band tie 13.Many described flitches erect stupefied 12 and erect be fitted in inside stupefied 12 along the setting of cylinder typified form 11 length direction interval and flitch On the outer wall of cylinder typified form 11, the inner band of steel band tie 13 is erected on the outside of stupefied 12 at flitch, by cylinder typified form 11 wale firmly.
As shown in Figure 4, the top of described hound 2 is connected with U-shaped screw mandrel jacking 21, and the lower end of pad 22 is oblique affixed In the outer end of the U-type groove mouth of U-shaped screw mandrel jacking 21, in the U-type groove mouth of U-shaped screw mandrel jacking 21, it is equipped with flitch master stupefied 23.
As it is shown in figure 5, be the hound 2 of the present invention structural representation bottom the first, hound 2 lower end is all at sheeting caps On 24, on the skew wall of the triangular groove 101 on sheeting caps 24 ground 10.
As shown in Fig. 1, Fig. 6, it is the structural representation bottom hound 2 the second of the present invention, described hound 2 times End acts against on triangle stow-wood 25 by sheeting caps 24, and triangle stow-wood 25 is fixed on floor, and, the bottom of hound 2 leads to Crossing short tube 26 bar right angle button 28 of sweeping the floor with the support in laterally tiltedly vertical rod 27 to be connected, the most tiltedly the lower end of vertical rod 27 is squeezed in soil. In the present embodiment, the most tiltedly vertical rod 27 often arranges four, is all provided with steel pipe slide resistant pile, squeezes in soil at every the most tiltedly vertical rod 27 Not less than 500mm, expose not less than 300mm, remaining spacing 1.5m.
Described bar 6 of sweeping the floor is located at vertical rod 3 end far from ground 200mm eminence, along horizontal direction in length and breadth by the journey on horizontal under vertical Sequence sets bar 6 of sweeping the floor.Bar 6 of sweeping the floor should use docking, and adjacent two banjo fixing butt jointings sweeping the floor bar must not be with across interior, and banjo fixing butt jointing edge The distance that horizontal direction staggers is not preferably less than 500mm, and each connector center is not preferably greater than the 1/3 of vertical pole's span away from host node.
Described girt 7 step pitch is less than 1.5m, arranges in length and breadth.Vertical rod 3 top in adjustable supporting backing portion should be along vertical One girt of horizontally set 7.When support system height is in 8~20m, add in the middle of step pitch two girt 7 pushing up most One girt 7.Support system for oblique circular cylinder adds one girt in the middle of the step girt 7 of frame top two respectively 7。
Transverse horizontal pull bar 7 and the hound 2 right angle snapping of described bracing frame 8, longitudinal girt 7 and horizontal water Horizontal drawing bar 7 right angle snapping.
As shown in Figure 1, Figure 2, Figure 6 shows, the present invention is a kind of oblique circular cylinder template construction method, comprises the following steps:
1. set up bracing frame 8
(1) installing bottom layer bracing frame 8
Base is arranged, self-indulgent horizontal level sweeps the floor bar 6, erect bottom vertical rod 3 from corner successively to both sides, sweeps the floor with level in bottom Bar 6 snapping is fixed, and should check the perpendicularity of vertical rod 3, after the installing vertical rod 3 of each direction, install second immediately before fixing bottom bar Layer horizontal reinforcing bar is fixed with vertical rod 3 snapping, after check vertical rod 3 and girt meet the requirements, uses by 45~60N m moments Spanner is tightened fastening bolt, is extended successively by above-mentioned requirements and set up until first step base layer support frame 8 completes, then checks one comprehensively All over base layer support frame 8 mass, it is ensured that carry out second step girt installation after framework prescription again, subsequently by set up process and Time installing bridging 4.
(2) top supporting frame 8 is installed
1. requiring unwrapping wire location, first to eject steel tube poles 3 position line according to vertical rod 3 site plan, sheeting caps 24, base are laid Position is wanted accurately, can use the method set up with logical layer by row when setting up, and should reinforce in length and breadth with setting bar 6 level of sweeping the floor with taking Bar.Bottom vertical rod 3 sheeting caps 24 length no less than 2 across, width >=200mm, thickness 50mm.Girt 7 and vertical rod 3 snapping jail Gu, bar 6 overhead height of sweeping the floor in length and breadth is not more than 200mm.
2. during site operation falsework, the spacing between bar 6 and top horizontal pull bar 7 of sweeping the floor, meeting stencil design Determined by under girt 7 step pitch (1.5m) requirement condition, should be distributed equally and determine concrete step pitch;Each step is vertically and horizontally Should respectively set one girt 7, i.e. often walk, often girt 7 be set across the most two-way.
3. in support body outer periphery and internal vertical, horizontal every 4 across (and no more than 5m), the end arrange to top and vertically cut continuously Cutter support 42, vertical bridging 42 width be 4 across.At vertical bridging 42 top, intersection point plane arranges continuous horizontal bridging 41, The layer that arranges of bar 6 of sweeping the floor arranges horizontal cross brace 41, between horizontal cross brace 41 to support body baseplane distance and horizontal cross brace 41 Away from less than 6m, bridging 4 width is 3~5m.Vertical bridging 42 brace is 45 °~60 ° with the inclination angle on ground, horizontal cross Support 41 vertical with support (or horizontal) is 45 °~60 ° to angle.The spreading of bridging 4 brace uses overlap joint, and the lap of splice is not less than 1m, and use and fix not less than 2 rotary buckles, the edge of end fastener cover plate to rod end distance is not less than 100mm.Bridging 4 use rotary buckle to be fixed in intersecting therewith girt 7 or vertical rod 3, the distance of rotary buckle centrage to host node It is not more than 150mm.
4. girt 7 use to clasp connect, girt 7 clasp is answered interlaced arrangement, two are bordered on the river mutually The joint of horizontal drawing bar 7 should not be located at synchronization with across interior, asynchronous or difference across two adjacent joints in the horizontal direction stagger away from From more than 500mm, the distance of each connector center to nearly host node is not preferably greater than the 1/3 of span.
5. in vertical rod 3 clasp is answered interlaced arrangement: the joint of two adjacent vertical rods 3 should not be arranged in synchronization, with In step, two every a vertical rod 3 are separated by the distance preferably less than 500mm that joint staggers in short transverse;Each connector center is to main The distance of node is not preferably greater than the 1/3 of step pitch.
6. the screw-down torque of fastener should control at 45~60N m, forms clerking during inspection, and supervisor implements other Standing and carry out by random distribution principle, the 10% of contacting piece quantity is inspected by random samples, disqualification rate exceed sampling observation quantity 10% should be complete Face checks, stops to qualified.
7., after falsework has been set up, it is necessary to first self-inspection, the company of reinforming is correlated with after authorities' passed examination, passes through Management, Quality Supervision Station are checked and accepted by rear, can come into operation.
(3) column-form 1 is installed
On post, first eject axis, the position line and horizontal elevation control line, adjust the adjustable top of design of coupler scaffold by designed elevation The absolute altitude of torr, is adjusted to predetermined height, then lays flitch on the supporting plate of adjustable jack.After column-form 1 is installed, then Install 100 × 100/50 × 100 flitches erect stupefied 12(time stupefied), finally installation steel band tie 13.
(4) capital beam form is installed: according to the absolute altitude on post, draws bottom elevation, constructs according to beam form, controls vertical rod 3U type The absolute altitude of jacking, places 100 × 100 flitch masters stupefied 23 on U-shaped jacking, then repaves and put 5 50 × 50 × 3.5 square steel at the bottom of beam Pipe time stupefied (along beam span direction), lays at the bottom of beam, beam side panel, colligation beam steel, reinforcement side template.
(5) process of privileged sites:
The outside of oblique circular cylinder is designed with binder XL1(300 × 600), the about every 3m of vertical spacing together, intend taking reserved inserting by this binder Muscle, carries out secondary construction after oblique circular cylinder has been constructed again.During construction oblique circular cylinder, the typified form of oblique circular cylinder is holed, in advance Stay the straight muscle of binder XL1, in order to oblique circular cylinder mould form removal.
Because the post height of oblique circular cylinder is higher, along the oblique height of oblique circular cylinder, one concrete placings mouth, the mark of oblique circular cylinder are set every 3m The long 3m of quasi-joint, requires when therefore ordering goods that producer opens concrete placings mouth on typified form, and opening size is drafted as 400mm width, 300mm High.
The above, only present pre-ferred embodiments, therefore can not limit, with this, the scope that the present invention implements, i.e. depend on Equivalence change and the modification that scope of the present invention patent and description are made, all should still belong to the model that patent of the present invention contains In enclosing.

Claims (7)

1. an oblique circular cylinder template, it is characterised in that: include column-form, many hounds, many vertical rods, bridging, guys Rope;The upper end of many described hounds is intervally fixed on the inner side of column-form, and the lower end of many hounds is fixed on On ground, the upper end of cable wind rope is fixed on the outside of column-form, and each outer end points of bridging is separately fixed at many diagonal braces In the middle part of bar, in the middle part of many vertical rods, it is separately fixed at the middle part of bridging with end points;Described many hounds, many vertical rods, cut Cutter supports etc. constitute a bracing frame.
Oblique circular cylinder template the most according to claim 1, it is characterised in that: described bridging is by horizontal cross brace, vertical Bridging forms;The two ends of described horizontal cross brace are respectively and vertically fixed on vertical bridging, the two ends of vertical bridging It is respectively and vertically fixed on horizontal cross brace, constitutes multiple rectangular frame structure varied in size.
Oblique circular cylinder template the most according to claim 1, it is characterised in that: described column-form includes cylinder stock mould Plate, many flitches erect stupefied, steel band tie;Many described flitches erect stupefied along the setting of cylinder typified form length direction interval and wood Perpendicular stupefied inner side, side is fitted on the outer wall of cylinder typified form, and the inner band of steel band tie is erected on stupefied outside at flitch.
Oblique circular cylinder template the most according to claim 1, it is characterised in that: the top of described hound is connected with U-shaped silk Masthead torr, the outer end of the oblique U-type groove mouth being fixed in U-shaped screw mandrel jacking in the lower end of pad, at the U-type groove mouth of U-shaped screw mandrel jacking Inside it is equipped with flitch master stupefied.
Oblique circular cylinder template the most according to claim 1, it is characterised in that: sheeting caps top is passed through in the lower end of described hound Leaning against on triangle stow-wood, triangle stow-wood is fixed on floor, and, the bottom of hound is by short tube and the most oblique vertical rod Sweep the floor bar right angle button of support connects, and the most tiltedly the lower end of vertical rod is squeezed in soil.
6. described in a claim 1 the construction method of oblique circular cylinder template, it is characterised in that: comprise the following steps:
(1) installing bottom layer bracing frame
Base is arranged, self-indulgent horizontal level sweeps the floor bar, erect bottom vertical rod from corner successively to both sides, and bottom and level are swept the floor bar Snapping is fixed, and should check the perpendicularity of vertical rod before fixing bottom bar, after the installing vertical rod of each direction, and installing second layer level immediately Reinforce bar to fix with vertical rod snapping, after check vertical rod and girt meet the requirements, screw up with a wrench by 45~60N m moments Fastening bolt, extend successively by above-mentioned requirements and set up until first step base layer support frame completes, then carry out second step girt Install, install bridging in time by setting up process subsequently;
(2) top supporting frame is installed
1. require unwrapping wire location, first to eject the steel tube poles position line, sheeting caps, base riding position according to vertical rod site plan Want accurately, when setting up, can use the method set up with logical layer by row, and bar should be reinforced with taking in length and breadth with setting bar level of sweeping the floor;Vertical rod Bottom sheeting caps length no less than 2 across, width >=200mm, thickness 50mm;Girt is firm with vertical rod snapping, sweeps the floor in length and breadth Bar overhead height is not more than 200mm;
2. during site operation falsework, the spacing between bar and top horizontal pull bar of sweeping the floor, determined meeting stencil design Girt stride requirements under the conditions of, should be distributed equally and determine concrete step pitch;Each step vertically and horizontally should respectively set one water Horizontal drawing bar;
3. support body outer periphery and internal vertical, horizontal every 4 across, the end to top the most vertical bridging, vertical bridging are set Width be 4 across;At vertical bridging top, intersection point plane arranges continuous horizontal bridging, and the layer that arranges of bar of sweeping the floor arranges level and cuts Cutter supports, and horizontal cross brace to support body baseplane distance and horizontal cross tie distance are less than 6m, and bridging width is 3~5m;Perpendicular Being 45 °~60 ° to the inclination angle of bridging brace Yu ground, horizontal cross brace angle vertical or horizontal with support is 45 °~60 °;Cut The spreading of cutter support brace uses overlap joint, and the lap of splice is not less than 1m, and employing is fixed not less than 2 rotary buckles, end fastener The edge of cover plate to rod end distance not less than 100mm;Bridging use rotary buckle be fixed on intersecting therewith girt or In vertical rod, the distance of rotary buckle centrage to host node is not more than 150mm;
4. girt spreading use to clasp connect, girt clasp is answered interlaced arrangement, two are bordered on the river mutually The joint of horizontal drawing bar should not be located at synchronization with across interior, and asynchronous or difference is across two adjacent joints distance that staggers in the horizontal direction More than 500mm, the distance of each connector center to nearly host node is not preferably greater than the 1/3 of span;
5. in vertical rod clasp is answered interlaced arrangement: the joint of two adjacent vertical rods should not be arranged in synchronization, in synchronizing every Two of a piece vertical rod are separated by the distance preferably less than 500mm that joint staggers in short transverse;Each connector center is to host node Distance is not preferably greater than the 1/3 of step pitch;
(3) column-form is installed
On post, first eject axis, the position line and horizontal elevation control line, adjust the adjustable top of design of coupler scaffold by designed elevation The absolute altitude of torr, is adjusted to predetermined height, then lays flitch on the supporting plate of adjustable jack;After column-form is installed, then Flitch is installed and erects stupefied, steel band tie is finally installed;
(4) capital beam form is installed: according to the absolute altitude on post, draws bottom elevation, constructs according to beam form, controls the U-shaped jacking of vertical rod Absolute altitude, it is stupefied to place flitch master on U-shaped jacking, then repaves along beam span direction that to put square steel tube at the bottom of beam time stupefied, lay at the bottom of beam, Beam side panel, colligation beam steel, reinforcement side template.
The construction method of oblique circular cylinder template the most according to claim 6, it is characterised in that: the process to privileged sites: The outside of oblique circular cylinder is designed with binder, and together, this binder takes reserved joint bar to the about every 3m of vertical spacing, treats that oblique circular cylinder has been constructed After carry out secondary construction again;During construction oblique circular cylinder, the typified form of oblique circular cylinder is holed, the straight muscle of reserved binder, in order to tiltedly Cylinder mold form removal.
CN201610858412.8A 2016-09-28 2016-09-28 Oblique circular cylinder template and construction method thereof Pending CN106284988A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610858412.8A CN106284988A (en) 2016-09-28 2016-09-28 Oblique circular cylinder template and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610858412.8A CN106284988A (en) 2016-09-28 2016-09-28 Oblique circular cylinder template and construction method thereof

Publications (1)

Publication Number Publication Date
CN106284988A true CN106284988A (en) 2017-01-04

Family

ID=57715616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610858412.8A Pending CN106284988A (en) 2016-09-28 2016-09-28 Oblique circular cylinder template and construction method thereof

Country Status (1)

Country Link
CN (1) CN106284988A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104482A (en) * 2017-12-29 2018-06-01 珠海十字门中央商务区建设控股有限公司 Batter post installation method
CN108240070A (en) * 2017-12-12 2018-07-03 广东省建筑工程机械施工有限公司 A kind of casting method of tall and big batter post
CN109025292A (en) * 2018-07-26 2018-12-18 北京首钢建设集团有限公司 A kind of large-sized concrete funnel formwork erection method
CN110361524A (en) * 2019-05-22 2019-10-22 中建路桥集团有限公司 Cable-stayed bridge tilts king-post concrete to the test model construction method of template horizontal force action
CN112031406A (en) * 2020-08-31 2020-12-04 上海宝冶集团有限公司 Construction method for 360-degree rotary bending of snowmobile ski-racing track
CN112814373A (en) * 2021-01-26 2021-05-18 中国五冶集团有限公司 Inclined column formwork supporting structure and construction method
CN114421397A (en) * 2022-02-25 2022-04-29 安徽顺开电气有限公司 Electric power energy-saving engineering cable anti-seismic mechanism

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108240070A (en) * 2017-12-12 2018-07-03 广东省建筑工程机械施工有限公司 A kind of casting method of tall and big batter post
CN108240070B (en) * 2017-12-12 2020-04-28 广东省建筑工程机械施工有限公司 Pouring method of tall and big batter post
CN108104482A (en) * 2017-12-29 2018-06-01 珠海十字门中央商务区建设控股有限公司 Batter post installation method
CN109025292A (en) * 2018-07-26 2018-12-18 北京首钢建设集团有限公司 A kind of large-sized concrete funnel formwork erection method
CN110361524A (en) * 2019-05-22 2019-10-22 中建路桥集团有限公司 Cable-stayed bridge tilts king-post concrete to the test model construction method of template horizontal force action
CN112031406A (en) * 2020-08-31 2020-12-04 上海宝冶集团有限公司 Construction method for 360-degree rotary bending of snowmobile ski-racing track
CN112031406B (en) * 2020-08-31 2021-12-31 上海宝冶集团有限公司 Construction method for 360-degree rotary bending of snowmobile ski-racing track
CN112814373A (en) * 2021-01-26 2021-05-18 中国五冶集团有限公司 Inclined column formwork supporting structure and construction method
CN114421397A (en) * 2022-02-25 2022-04-29 安徽顺开电气有限公司 Electric power energy-saving engineering cable anti-seismic mechanism
CN114421397B (en) * 2022-02-25 2024-04-26 安徽顺开电气有限公司 Electric power energy-saving engineering cable anti-seismic mechanism

Similar Documents

Publication Publication Date Title
CN106284988A (en) Oblique circular cylinder template and construction method thereof
CN107090932B (en) Construction method of large-span thin-wall plane arch truss based on stiff ring beam
CN105040970A (en) Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN106049707A (en) Prefabricated wall body, prefabricated house building and construction method
CN205444887U (en) Slope roofing template system
CN113026950B (en) Steel structure advanced and core tube concrete separation construction method
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN110847599A (en) Special-shaped column formwork filling reinforcement device and construction method thereof
CN203383508U (en) One-sided formwork body structure backing onto brick concrete retaining wall
CN207934448U (en) A kind of shear wall inner corner trim single side formwork bracing means
CN110778116B (en) Construction method of complex curved surface giant concrete beam tube structure
CN103883052A (en) Upturned beam and cast-in-place slab overall pouring construction method
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN207878262U (en) A kind of high pier shaft binder concrete construction strutting system
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN212129218U (en) Basement outer wall single face formwork system
CN210140771U (en) Construction work platform hoisting frame of high mound of bridge
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN206319595U (en) Oblique circular cylinder template
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN202596161U (en) Combined formwork device of HR heavy type gantry and reinforced concrete temporary structural column
CN212866842U (en) Frame structure type building scaffold
CN114263343A (en) Formwork erecting method for combined building construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170104