CN106284815B - Furred ceiling clean board construction technique - Google Patents

Furred ceiling clean board construction technique Download PDF

Info

Publication number
CN106284815B
CN106284815B CN201610664856.8A CN201610664856A CN106284815B CN 106284815 B CN106284815 B CN 106284815B CN 201610664856 A CN201610664856 A CN 201610664856A CN 106284815 B CN106284815 B CN 106284815B
Authority
CN
China
Prior art keywords
clean board
sunpender
main joist
adjustment part
joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610664856.8A
Other languages
Chinese (zh)
Other versions
CN106284815A (en
Inventor
吴晶
袁有志
杨智英
阮洁
刘梦星
谷芳
赵语心
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Hangyun Construction Engineering Co ltd
Original Assignee
China Aerospace Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aerospace Construction Group Co Ltd filed Critical China Aerospace Construction Group Co Ltd
Priority to CN201610664856.8A priority Critical patent/CN106284815B/en
Publication of CN106284815A publication Critical patent/CN106284815A/en
Application granted granted Critical
Publication of CN106284815B publication Critical patent/CN106284815B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The present invention provides a kind of furred ceiling clean board construction techniques, belong to construction manufacture processing technique field, and the construction technology is as follows:First determine the hoisting point position on floor;Then, go out the installation site of main joist in the bottomside mark of floor according to hoisting point position;Secondly, sunpender is installed at corresponding hoisting point position, sunpender is vertically arranged;Then, main joist and light steel paired joist are installed, wherein one end of the separate floor of main joist and sunpender connects, and the side of the separate sunpender of light steel paired joist and main joist connects;Then, clean board is installed.When carrying out the installation of clean board, the installation flatness of clean board is good, and after installation is complete, whole sound construction can ensure that the sound insulation, heat preservation, heat-insulated and sound absorption effect of aviation workshop reach requirement in use securely and reliably.

Description

Furred ceiling clean board construction technique
Technical field
The present invention relates to construction to manufacture processing technique field, is applied in particular to a kind of installation of furred ceiling clean board Work technique.
Background technology
It is well known that the requirement of aerospace engineering high-quality precision and sophisticated technology strictly reaches ultimate attainment, space flight workshop processing installation equipment is same Sample is very accurate, this also requires must there is the clean room for meeting equipment purity requirements in space flight processing workshop.In recent years Come, for clean board using being more extensive in space flight workshop, clean room construction technology is horizontal directly to determine that space flight is set in workshop The cleanliness factor of standby environment.During the installation process, it due to the particular surroundings of space flight workshop, is needed in many rooms of space flight workshop Carry out installation of ceiling.Furred ceiling refers to the top finishing of house living environment.Briefly, refer to just the finishing of ceiling, be room One of pith of interior trim.Furred ceiling has heat preservation, heat-insulated, sound insulation, the effect of sound absorption, and electrical, air conditioner, communication With fire prevention, the hidden layer of the alarm engineerings such as line equipment.
Furred ceiling finishing material is to discriminate between the Main Basiss of furred ceiling title, mainly has:Light steel keel gypsum board furred ceiling, plasterboard Furred ceiling, mineral wool board ceiling, clamping plate furred ceiling, special-shaped strip aluminum-pinch furred ceiling, rectangular plating paint aluminum-pinch furred ceiling, stained glass furred ceiling, Aluminum honeycomb perforated sound-absorbing plate furred ceiling, the compound furred ceiling in full room etc., occupy considerable status, to room in entire indoor decoration Decoration appropriate is made in top surface, can not only beautify indoor environment, moreover it is possible to build colourful interior space artistic image.
Inventor has found that traditional ceiling construction at least has the disadvantage that under study for action:
It is not directed to the construction technology that aviation workshop carries out furred ceiling clean board.
Invention content
The purpose of the present invention is to provide a kind of furred ceiling clean board construction techniques, do not have needle in traditional technology to improve The problem of construction technology of furred ceiling clean board is carried out to aviation workshop.
What the embodiment of the present invention was realized in:
Based on above-mentioned purpose, the present invention provides a kind of furred ceiling clean board construction techniques comprising:
Step S100, the hoisting point position on floor is determined;
Step S200, go out the installation site of main joist in the bottomside mark of the floor according to the hoisting point position;
Sunpender is installed step S300, at the corresponding hoisting point position, the sunpender is vertically arranged;
Step S400, main joist and light steel paired joist are installed, wherein the main joist is with the sunpender far from described One end of floor connects, and the light steel paired joist is connect with the side far from the sunpender of the main joist;
Step S500, clean board is installed.
In preferred embodiments of the present invention, the step S100 includes, using ink fountain on the surrounding metope in house bullet Go out horizontal standard line, the horizontal standard line is straight, circle, deviation is handed over to must not exceed positive and negative 3mm.
In preferred embodiments of the present invention, in the step S200, according to the hoisting point position and the main joist Installation site pop up the position control line of the main joist in the bottom surface of floor.
In preferred embodiments of the present invention, the step S300 includes that one end of the sunpender is screwed onto the building On plate, the other end of the sunpender is bolted with level adjuster, and the main joist is installed on the level adjuster.
In preferred embodiments of the present invention, in the step S300, the level adjuster includes the first adjustment part, connects Fitting and second adjustment part, wherein:
The first adjustment part is slidably connected with the connector, the sliding side of the first adjustment part and the connector To the length direction for being parallel to the first adjustment part;The second adjustment part is slidably connected with the connector, and described second The glide direction of adjustment part and the connector is parallel to the length direction of the first adjustment part;The axis of the first adjustment part Line passes through the center of gravity of the connector, and the axis of the second adjustment part passes through the center of gravity of the connector, and described first adjusts The axis collinear of the axis of one integral piece and the second adjustment part;The end set of the second adjustment part has interconnecting piece, for Main joist is fixedly connected.
In preferred embodiments of the present invention, the step S400 includes the side of the main joist and the sunpender One end far from the floor is spirally connected, and the light steel paired joist is clamped with the main joist.
In preferred embodiments of the present invention, in the step S500, the clean board is from the side of floor towards its phase To the other side install, the plate face edge of each clean board is equipped with corner brace, the corresponding institute of adjacent clean board It states and is spaced setting between corner brace, by gap of the bolt across the corresponding corner brace and be screwed onto the light steel paired joist On, the end far from the light steel paired joist of the bolt has position limiting structure, for limiting the corner brace downwards from described It falls off on bolt.
In preferred embodiments of the present invention, there is gap between the adjacent clean board, sealing is installed in the gap Part.
In preferred embodiments of the present invention, the sealing element includes sealing strip and weather-resistant glue, the sealing strip and phase Adjacent clean board connection, the weather-resistant glue are connect with the adjacent clean board, the sealing strip be located at the corner brace and Between the weather-resistant glue.
In preferred embodiments of the present invention, in the step S500, the side of the clean board is equipped with galvanized steel plain sheet Frame, the galvanized steel plain sheet frame are provided with the mounting groove of indent, are connected by the dark hanging beam of middle word aluminium between two neighboring clean board It connects, the middle dark hanging beam of word aluminium is located in the corresponding mounting groove of the two neighboring clean board;The corner brace with it is described Galvanized steel plain sheet frame is spirally connected.
The advantageous effect of the embodiment of the present invention is:
In conclusion an embodiment of the present invention provides a kind of furred ceiling clean board construction technique, the technological operation is simple Reliably, meanwhile, when carrying out the installation of clean board, the installation flatness of clean board is good, after installation is complete, whole structure jail Gu in use securely and reliably, can ensure that the sound insulation of aviation workshop, heat preservation, heat-insulated and sound absorption effect reach use It is required that specific as follows:
Furred ceiling clean board construction technique provided in this embodiment, first on the floor in house by the structure in house and Size determines the position of suspension centre, is ready for the installation of follow-up sunpender and main joist, ensures all parts phase in hoisting process To the accuracy of position, construction quality and construction efficiency are improved;Then, the installation position of main joist is determined according to hoisting point position It sets, stress is better after ensureing main joist installation, ensures safety;After main joist location determination, distinguish at corresponding suspension centre Sunpender is installed, for fixing main joist, sunpender is vertically arranged, i.e., sunpender is vertically arranged with floor, and stress is more stablized;Sunpender position It is equipped with suspension centre determination, also there is a suspension centre determination in main joist position, and the position of sunpender and main joist is accurate and reliable, and sunpender hangs main joist After dress, main joist stress more balances;Main joist installs the secondary dragon of light steel after installation is complete, in the side of the separate sunpender of main joist Bone, light steel paired joist is after installation is complete, and light steel paired joist is connect with main joist, and the installation position selection of light steel paired joist is wide, It can be adjusted on demand, be convenient for the installation of clean board, it is easier for installation quick.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structural schematic diagram after the furred ceiling clean board installation of the embodiment of the present invention;
Fig. 2 is the partial enlarged view in Fig. 1;
Fig. 3 is the structure chart of the level adjuster of the embodiment of the present invention;
Fig. 4 is the structure chart of the connector of the embodiment of the present invention;
Fig. 5 is the connection diagram of the sunpender and connector of the embodiment of the present invention;
Fig. 6 is the connection diagram of the adjustment part and connector of the embodiment of the present invention;
Fig. 7 is the structure chart of the main joist of the embodiment of the present invention;
Fig. 8 is the structure chart of the light steel paired joist of the embodiment of the present invention;
Fig. 9 is the structure chart of the corner brace of the embodiment of the present invention.
In figure:
Level adjuster 10, connector 100, top plate 110, bottom plate 120, left plate 130, right plate 140, front side board 150,
Sunpender 210, the first nut 220, elastic washer 230,
Adjustment part 300, screw rod 310, the second nut 320, locking spring 330, limiting section 340.
Main joist 400, groove sidewall 410, mounting hole 420, tenon portion 430, fixed part 440,
Light steel paired joist 500, connecting plate 510, side plate 520, card adapter plate 530,
Sealing element 600, sealing strip 610, weather-resistant glue 620,
Corner brace 800, the first plate 810, the second plate 820, third plate 830,
Clean board 900, galvanized steel plain sheet frame 910, the dark hanging beam of middle word aluminium 920.
Specific implementation mode
It is well known that the requirement of aerospace engineering high-quality precision and sophisticated technology strictly reaches ultimate attainment, space flight workshop processing installation equipment is same Sample is very accurate, this also requires must there is the clean room for meeting equipment purity requirements in space flight processing workshop.In recent years Come, for clean board using being more extensive in space flight workshop, clean room construction technology is horizontal directly to determine that space flight is set in workshop The cleanliness factor of standby environment.During the installation process, it due to the particular surroundings of space flight workshop, is needed in many rooms of space flight workshop Carry out installation of ceiling.Currently, not being directed to the construction technology that aviation workshop carries out furred ceiling clean board, lead to the environment of aviation workshop Difference cannot satisfy the use demand, and reduce the quality of life of worker, reduce construction efficiency.
In consideration of it, designer of the present invention devises a kind of furred ceiling clean board construction technique, installed in aviation workshop Furred ceiling clean board, clean board are quickly and expediently installed, and construction efficiency is high, and after installation is complete, the flatness of clean board entirety is high, peace Packing quality is high, can ensure there is preferable sound insulation, heat-insulated and heat preservation in workshop, using comfortable.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, below the detailed description of the embodiment of the present invention to providing in the accompanying drawings be not intended to limit it is claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiments of the present invention, this field is common The every other embodiment that technical staff is obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
In the description of the present invention, it should be noted that term "upper", "lower", "vertical", "horizontal", "inner", "outside" etc. The orientation or positional relationship of instruction be based on the orientation or positional relationship shown in the drawings or the invention product use when it is usual The orientation or positional relationship put, is merely for convenience of description of the present invention and simplification of the description, and does not indicate or imply the indicated Device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as to the present invention's Limitation.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, it is not understood to indicate or imply opposite Importance.
In addition, the terms such as term "horizontal", " vertical " are not offered as requiring component abswolute level or pendency, but can be slightly Low dip.It is not to indicate that the structure has been had to if "horizontal" refers to only that its direction is more horizontal with respect to for "vertical" It is complete horizontal, but can be slightly tilted.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, can also be electrical connection;It can be directly connected, it can also be indirect by intermediary It is connected, can is the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
Embodiment
Please refer to Fig.1-Fig. 2, Fig. 1 show furred ceiling clean board 900 installation is complete after structure chart.It present embodiments provides A kind of 900 construction technique of furred ceiling clean board, installation of the construction technology for the furred ceiling clean board 900 in aviation workshop, Reach the requirement of aviation workshop.The construction technology includes the following steps:
Step S100 determines the hoisting point position on floor.When carrying out the floor furred ceiling in workshop, first checks and confirm roofing Waterproof has been constructed completion, and acceptance(check), and horizontal layout dividing wall and plastering construction are completed.According to design requirement and room Between span, on-site actual situations, determine the quantity of suspension centre and built-in fitting, calculate required main joist 400.Hoisting point position is true After fixed, basic preparation is carried out for the construction of follow-up furred ceiling.Hoisting point position timing really is being carried out, the knot according to not chummery is needed The size of structure and floor is designed, and after being primarily determined on drawing, then carries out practical examination at the scene, according to The concrete condition of live workshop is adjusted and changes, and ensures the reasonability of hoisting point position.May be used the bottom surface of floor into Line flag ensures that hoisting point position is high-visible.
Step S200 goes out the installation site of main joist 400 according to the hoisting point position in the bottomside mark of the floor.? In actual mechanical process, according to horizontal control lines, the ceiling absolute altitude of design requirement is measured, and water is popped up in the surrounding metope in house Flat normal line, it is desirable that horizontal standard line wants straight, circle, deviation is handed over to must not exceed ± 3mm.According to the determining suspension centre of design and main dragon 400 position control line of main joist is popped up on the bottom surface of floor in 400 position of bone.Main joist 400 and sunpender are first determined when unwrapping wire 210 positions simultaneously determine therefrom that furred ceiling adds the arrangement and method for construction of load-carrying members.When carrying out the label of horizontal standard line, ink fountain is utilized It is marked on metope, mark mode is simple and reliable, and the line of ink marker is not easy to be erased, and label duration is long.Due to needing The label for carrying out horizontal standard line on multiple circumferential surfaces of wall respectively needs the water for the sustained height for ensureing to be located on different metopes The end of flat normal line is intersected, and since there are errors in actual mechanical process, therefore, it is necessary to ensure adjacent horizontal standard line For difference in height in ± 3mm, the installation site of the main joist 400 obtained in this way is more accurate, installation quality higher.
Step S300, installs sunpender 210 at corresponding hoisting point position, and sunpender 210 is vertically arranged.Sunpender 210 is used for will Main joist 400 is mounted on floor, and the quantity of sunpender 210 is arranged on demand, and corresponding with the position of suspension centre, into sunpender 210 Installation when, set sunpender 210 to cylindrical bar, and the peripheral surface of sunpender 210 is provided with external screw thread, sunpender 210 and floor It is fixedly connected by the way of being spirally connected, nut is installed on floor or is directly threaded hole on floor, will hung Bar 210 is installed in threaded hole or nut.The mode being spirally connected is simple and reliable.Further, floor is made of Elements of Space Grid Truss, because Sunpender 210 is passed through Elements of Space Grid Truss, then in the stretching of sunpender 210 by this in order to improve the connectivity robustness of sunpender 210 and floor Nut is arranged at the top of Elements of Space Grid Truss, structure is more secured.In actual processing, end and the main dragon of the separate floor of sunpender 210 Bone 400 connects, and is preferably arranged to, is connected by the way of being spirally connected.In order to save processing cost, distinguish at the both ends of sunpender 210 External screw thread is set, need not external screw thread be set in the entire peripheral surface of sunpender 210.Referring to Fig. 3, further, sunpender 210 with After main joist 400 is installed, need the levelness for adjusting main joist 400, in the preferred embodiment of the present embodiment, sunpender 210 with it is main Level adjuster 10 is installed, level adjuster 10 includes connector 100 between keel 400.
Fig. 3 and Fig. 4 are please referred to, connector 100 plays the role of connection and transmits power.The planform of connector 100 is pressed It needs to be arranged, is preferably arranged to regular shape, it is easy to process, and stress balance, it is more safe and reliable during use.Specifically, Connector 100 is set as the cube shape with cavity comprising top plate 110, bottom plate 120, left plate 130, right plate 140 and Front side board 150, top plate 110, bottom plate 120, left plate 130 and right plate 140, which are sequentially connected end to end, surrounds the knot with cavity Structure, cavity include be oppositely arranged two openings, and front side board 150 is located at an opening, and front side board 150 respectively with top plate 110, Bottom plate 120, left plate 130 and right plate 140 connect.The gravity of entire connector 100 is light, transports and easy for installation, simultaneously The material for saving processing, saves cost.Connector 100 is made of stainless steel or alloy material, and structural strength is high, makes It is good with stress in the process, it is hardly damaged.When actual processing, top plate 110, bottom plate 120, front side board 150, left plate 130 and the right side Side plate 140 is processed as rectangular slab, simple in structure, convenient processing and manufacture, meanwhile, the symmetry of rectangular slab is good, when installation more It is convenient and efficient.Welding manner processing may be used in top plate 110, bottom plate 120, front side board 150, left plate 130 and right plate 140 Connector 100 is obtained, overall structure is solid and reliable.In another alternative of the present embodiment, connector 100 is using integrated molding It is processed into, processing is more convenient, saves manufacturing cost.
In actual use, top plate 110 is located above, and bottom plate 120 is located at lower section, left plate 130, right plate 140 And front side board 150 is respectively arranged with through-hole, for bolt between top plate 110 and bottom plate 120 on top plate 110 and bottom plate 120 It passes through.The position of through-hole on top plate 110 and the position of the through-hole on bottom plate 120 are all arranged close to front side board 150, ensure through-hole Axis pass through connector 100 center of gravity.
Fig. 3 and Fig. 5 are please referred to, sunpender 210 is slidably connected with connector 100, cunning of the sunpender 210 relative to connector 100 The dynamic length direction for being oriented parallel to sunpender 210.It is preferably arranged to, sunpender 210 is inserted into the through-hole of top plate 110, and sunpender 210 one end is stretched between top plate 110 and bottom plate 120, and two the first nuts 220 are screwed onto respectively on sunpender 210, two first Nut 220 is located at the both sides of the plate face of top plate 110.Sunpender 210 is arranged perpendicular to top plate 110, and sunpender 210 is mounted on top plate After 110, it is more uniformly stressed.Meanwhile the first graduation mark is provided on sunpender 210, the measurement direction of the first graduation mark is parallel In the length direction of sunpender 210, the distance of adjustment is calculated when being conveniently adjusted, adjustment is more rationally reliable.Elastic washer 230 is arranged There are two, each elastic washer 230 is set on sunpender 210, elastic washer 230 be located at the first nut 220 and top plate 110 it Between, there are two the settings of the first nut 220, and the tool of top plate 110 is there are two plate face, therefore, each first nut 220 and top plate 110 The connection structure of elastic washer 230 there are one settings between one plate face, the first nut 220 and top plate 110 is more solid and reliable, Convenient for tightening for the first nut 220, and the first nut 220 is not easy to loosen.
In actual mechanical process, sunpender can be carried out by adjusting positioned at the first nut 220 of the lower section of top plate 110 210 length adjustment, meanwhile, corresponding adjustment is located at the position of the first nut 220 of 110 top of top plate, first be located above The position of nut 220 is adjusted accordingly according to the position of the second nut 320, ensure adjusted two sunpenders 210 relative to After the length of top plate 110, sunpender 210 can be securely attached to together, be not easy to shake with top plate 110.Therefore, it is possible to realize In the scheme of length adjustment, one the first nut 220 of setting is also possible on sunpender 210, and first nut 220 is located at The lower section of top plate 110.The end of the separate top plate 110 of sunpender 210 is connected by the concrete layer of expansion bolt and floor.
Fig. 3 and Fig. 6 are please referred to, adjustment part 300 is slidably connected with connector 100, the cunning of adjustment part 300 and connector 100 Dynamic direction is parallel with the length direction of adjustment part 300, is preferably arranged to, adjustment part 300 including screw rod 310, locking spring 330 with And second nut 320, screw rod 310 pass through the through-hole on bottom plate 120, screw rod 310 to be provided on bottom plate 120, screw rod 310 Second graduation mark, the measurement direction of the second graduation mark are parallel to the length direction of screw rod 310, are carried out by operation adjustment part 300 When the adjustment of length, convenient for accurately being adjusted by the size on screw rod 310, adjustment is more convenient.Screw rod 310 it is separate The end set of top plate 110 has limiting section 340, limiting section 340 to outwardly protrude the outer of screw rod 310 along the radial direction of screw rod 310 Circumferential surface, the second nut 320 is bolted in screw rod 310, and the second nut 320 is located at the two of the plate face of bottom plate 120 with limiting section 340 Side.When actually adjusting, the second nut 320 bears the gravity of bottom, and clean board 900 is sling.By adjusting the second nut 320, change length of the screw rod 310 relative to bottom plate 120, and then have adjusted the length of entire level adjuster 10, realizes day The adjustment of card height.In actual mechanical process, in order to ensure the connectivity robustness between screw rod 310 and bottom plate 120, in spiral shell A locking spring 330 is arranged on bar 310, locking spring 330 locks bullet between limiting section 340 and the bottom surface of bottom plate 120 The elastic force of itself of spring 330 acts on bottom plate 120 and limiting section 340, realizes locking function.Meanwhile locking spring 330 will not shadow Ring the adjustment of the second nut 320.It being preferably arranged to, annular projection is annular in shape around the central axes of screw rod 310, further, ring Shape protrusion is set as circular, and for locking spring 330 between limiting section 340 and bottom plate 120, locking spring 330 and ring-type are convex It plays that cooperation is even closer, and one end of locking spring 330 is located on the end face of limiting section 340, is convenient for locking spring 330 by its elastic force It is applied on limiting section 340 and bottom plate 120.At the same time it can also which annular is arranged in the end face of the close bottom plate 120 of limiting section 340 Groove, locking spring 330 is located in annular groove, easier for installation.
By the way that level adjuster 10 is arranged between sunpender 210 and main joist 400, adjustment is more convenient, and passes through level Graduation mark on adjuster 10 can be fast and accurately adjusted, easy to adjust reliable.
Step S400, sunpender 210 and level adjuster 10 are after installation is complete, and level adjuster 10 is for installing main joist 400, main joist 400 is spirally connected with level adjuster 10, i.e., by main joist 400 be mounted on the second screw rod limiting section and bottom plate it Between, limiting section limits main joist 400 and is detached from the second screw rod downwards, quick and easy for installation.Main joist 400 is after installation is complete, in master Light steel paired joist 500 is installed in side of the keel 400 far from sunpender 210, and light steel paired joist 500 is clamped with main joist 400.It please refers to Fig. 7, main joist 400 are long groove body, and the section of long groove body is isosceles trapezoid, and two groove sidewalls 410 of long groove body are respectively equipped with peace Fill hole 420, and 420 symmetry arrangement of mounting hole in two groove sidewalls 410;The edge of two groove sidewalls 410 is respectively equipped with interval The tenon portion 430 of arrangement, and the tenon portion 430 in two groove sidewalls 410 corresponds arrangement;Tenon portion 430 is provided at least One fixed part 440 for being used for clamping light steel paired joist 500, fixed part 440 extends along the length direction of long groove body, and fixed part 440 have setting gap with the edge of groove sidewall 410.Referring to Fig. 8, light steel paired joist 500 includes 510, two phases of connecting plate Side plate 520 to setting and including two card adapter plates 530, two side plates 520 are respectively arranged in connecting plate 510, two side plates 520 length direction is parallel to the length direction of connecting plate 510, and two side plates 520 are set along the width direction interval of connecting plate 510 It sets;The side of the separate connecting plate 510 of each side plate 520 is provided with card adapter plate 530, and card adapter plate 530 is along perpendicular to side plate 520 Board direction stretches into the straight slot that connecting plate 510 and two side plates 520 surround, two card adapter plates 530 respectively with positioned at same slot Adjacent two fixed parts 440 clamping on side wall 410.Clamping structure is simple and reliable, easy to operate.
Step S500 installs clean board 900.After skeleton is put up, the installation steps of crucial clean board 900 are carried out.? Before the installation for carrying out clean board 900, the flatness of clean board 900 is first checked, plate installs by side, and when installation ensures plate The distance between block and plate, clean board 900 is set as rectangular-shaped plate, easy to process, and when installation coordinates even closer.Please Refering to Fig. 9, clean board 900 is connect by corner brace 800 with light steel paired joist 500, and corner brace 800 includes sequentially connected first plate 810, the second plate 820 and third plate 830, the first plate 810, the second plate 820 and third plate 830 are all rectangular slab, easy to process, First plate 810 and second vertical, third plate 830 is parallel with the second plate 820, and entire corner brace 800 is in zigzag, the first plate 810 with it is clean Net plate 900 is spirally connected by screw.Corresponding two corner braces 800 are one group on two adjacent clean boards 900, two corner braces 800 Between have gap, when installation, connect with light steel paired joist 500 by bolt, one end of bolt is with position limiting structure, by bolt One end of separate position limiting structure initially pass through gap, then run through light steel paired joist 500, across the end of light steel paired joist 500 Portion is spirally connected nut, that is, completes the fixation of corner brace 800, since clean board 900 and corner brace 800 are fixed, and then completes clean board 900 fixation.After corner brace 800 is fixed, due to position limiting structure, corner brace 800 will not fall off from bolt, safe and reliable.Angle Code 800 is fixedly connected with clean board 900 by screw, and connection type is simple and reliable.
Referring to Fig. 2, adjacent clean board 900 is connect by corner brace 800 with light steel paired joist 500, it is adjacent clean in order to ensure The fastness of net plate 900, the installation galvanized steel plain sheet frame 910 in the side of clean board 900, galvanized steel plain sheet frame 910 is provided with interior Recessed mounting groove is connected by the dark hanging beam 920 of middle word aluminium between two neighboring clean board 900, and the middle dark hanging beam 920 of word aluminium is located at phase In the corresponding mounting groove of adjacent two clean boards 900;Corner brace 800 is spirally connected with galvanized steel plain sheet frame 910.The dark hanging beam of word aluminium in 920 connections, the middle dark hanging beam 920 of word aluminium have positioning action, both ensure that the flatness of plate face, and not exposed part, see Reward property higher.There is gap between adjacent clean board 900, sealing element 600 is installed, sound insulation, good heat-insulation effect are whole in gap Structure it is compacter, 900 plate face of clean board is more smooth.
Further, 600 sealing strip 610 of sealing element and weather-resistant glue 620, sealing strip 610 are connect with adjacent acoustic board, Weather-resistant glue 620 is connect with two adjacent acoustic boards, and sealing strip 610 is between corner brace 800 and weather-resistant glue 620.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (7)

1. a kind of furred ceiling clean board construction technique, which is characterized in that the construction technology includes the following steps:
Step S100, the hoisting point position on floor is determined;
Step S200, go out the installation site of main joist in the bottomside mark of the floor according to the hoisting point position;
Sunpender is installed step S300, at the corresponding hoisting point position, the sunpender is vertically arranged;
Step S400, main joist and light steel paired joist are installed, wherein the main joist is with the sunpender far from the floor One end connection, the side of the separate sunpender of the light steel paired joist and the main joist is connect;The one of the main joist Side and one end far from the floor of the sunpender are spirally connected, and the light steel paired joist is clamped with the main joist;
Step S500, clean board is installed, the clean board is installed from the side of floor towards its opposite other side, each The plate face edge of the clean board is equipped with corner brace, setting is spaced between the corresponding corner brace of adjacent clean board, by spiral shell Gap of the bolt across the corresponding corner brace and be screwed onto on the light steel paired joist, the bolt far from the light steel The end of false keel has position limiting structure, falls off from the bolt downwards for limiting the corner brace;The adjacent clean board Between there is gap, sealing element is installed in the gap.
2. furred ceiling clean board construction technique according to claim 1, which is characterized in that the step S100 includes, Horizontal standard line is popped up on the surrounding metope in house using ink fountain, the horizontal standard line is straight, circle, deviation is handed over to must not exceed ±3mm。
3. furred ceiling clean board construction technique according to claim 1, which is characterized in that in the step S200, root According to the installation site of the hoisting point position and the main joist position control line of the main joist is popped up in the bottom surface of floor.
4. furred ceiling clean board construction technique according to claim 1, which is characterized in that the step S300 includes, One end of the sunpender is screwed onto on the floor, the other end of the sunpender is bolted with level adjuster, the main joist It is installed on the level adjuster.
5. furred ceiling clean board construction technique according to claim 4, which is characterized in that in the step S300, institute It includes the first adjustment part, connector and second adjustment part to state level adjuster, wherein:
The first adjustment part is slidably connected with the connector, and the glide direction of the first adjustment part and the connector is flat Row is in the length direction of the first adjustment part;The second adjustment part is slidably connected with the connector, the second adjustment The glide direction of part and the connector is parallel to the length direction of the first adjustment part;The axis of the first adjustment part is worn The center of gravity of the connector is crossed, the axis of the second adjustment part passes through the center of gravity of the connector, and the first adjustment part Axis and the second adjustment part axis collinear;The end set of the second adjustment part has interconnecting piece, is used for and main dragon Bone fixation connects.
6. furred ceiling clean board construction technique according to claim 1, which is characterized in that the sealing element includes sealing Item and weather-resistant glue, the sealing strip are connect with the adjacent clean board, and the weather-resistant glue connects with the adjacent clean board It connects, the sealing strip is between the corner brace and the weather-resistant glue.
7. furred ceiling clean board construction technique according to claim 1, which is characterized in that in the step S500, institute The side for stating clean board is equipped with galvanized steel plain sheet frame, and the galvanized steel plain sheet frame is provided with the mounting groove of indent, two neighboring It is connected by the dark hanging beam of middle word aluminium between clean board, the middle dark hanging beam of word aluminium is located at the corresponding of the two neighboring clean board In the mounting groove;The corner brace is spirally connected with the galvanized steel plain sheet frame.
CN201610664856.8A 2016-08-12 2016-08-12 Furred ceiling clean board construction technique Active CN106284815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610664856.8A CN106284815B (en) 2016-08-12 2016-08-12 Furred ceiling clean board construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610664856.8A CN106284815B (en) 2016-08-12 2016-08-12 Furred ceiling clean board construction technique

Publications (2)

Publication Number Publication Date
CN106284815A CN106284815A (en) 2017-01-04
CN106284815B true CN106284815B (en) 2018-11-06

Family

ID=57670147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610664856.8A Active CN106284815B (en) 2016-08-12 2016-08-12 Furred ceiling clean board construction technique

Country Status (1)

Country Link
CN (1) CN106284815B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938913A (en) * 2017-11-30 2018-04-20 孙田田 A kind of short side bar-plate combination steel construction and combined method
CN109653541A (en) * 2019-01-11 2019-04-19 广州阳诚建筑装饰工程有限公司 A kind of container house and container house production method
CN111441526A (en) * 2019-01-17 2020-07-24 柏诚工程股份有限公司 Method for installing upper fixed node of clean ceiling of electronic factory building
CN110067328A (en) * 2019-05-29 2019-07-30 深圳市中装建设集团股份有限公司 A kind of micro-structure lightgage steel joist with a scale
CN110965694B (en) * 2019-12-05 2021-02-23 北京当代创新建设工程有限责任公司 Ceiling mounting structure
CN113513117B (en) * 2021-04-26 2022-07-15 北京建院装饰工程设计有限公司 Soft membrane ceiling modeling basic unit structure of many monomer combinations
CN115217258B (en) * 2022-07-29 2023-09-05 康利达装饰股份有限公司 Construction method of assembled metal plate suspended ceiling

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005180139A (en) * 2003-12-24 2005-07-07 Toyo Tire & Rubber Co Ltd Suspending device of ceiling panel
CN1959024A (en) * 2006-09-06 2007-05-09 张慕贞 Track type moveable light steel keel
CN202644804U (en) * 2012-06-20 2013-01-02 深圳市奇信建设集团股份有限公司 Ceiling keel structure
CN103397731A (en) * 2013-08-08 2013-11-20 无锡汉佳半导体科技有限公司 Hoisting assembly for operating room ceilings
CN203821677U (en) * 2013-12-05 2014-09-10 北新集团建材股份有限公司 Composite ceiling system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005180139A (en) * 2003-12-24 2005-07-07 Toyo Tire & Rubber Co Ltd Suspending device of ceiling panel
CN1959024A (en) * 2006-09-06 2007-05-09 张慕贞 Track type moveable light steel keel
CN202644804U (en) * 2012-06-20 2013-01-02 深圳市奇信建设集团股份有限公司 Ceiling keel structure
CN103397731A (en) * 2013-08-08 2013-11-20 无锡汉佳半导体科技有限公司 Hoisting assembly for operating room ceilings
CN203821677U (en) * 2013-12-05 2014-09-10 北新集团建材股份有限公司 Composite ceiling system

Also Published As

Publication number Publication date
CN106284815A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106284815B (en) Furred ceiling clean board construction technique
CN101787761B (en) Special aluminum square tube ceiling and construction method thereof
CN107605090B (en) Combined type suspended ceiling suspension arrangement and installation method under a kind of tall and big curved surface steel structure
CN105178495B (en) A kind of suspended ceiling keel system and its construction method
CN106223498A (en) Integrated prefabricated heat-insulation wall plate manufacture method and structure, wallboard connecting component
CN205444780U (en) General system of hanging futilely of wall of interchangeable surface course material
CN105484414B (en) A kind of aluminum honeycomb panel of adjustable-angle hangs binding structure
CN204225337U (en) Fall a grade smallpox crack resistence new structure
CN205857509U (en) Acoustic board mounting structure
CN205857761U (en) Level adjuster
CN208168112U (en) A kind of curved section bars combination furred ceiling
CN110886425A (en) Rapid leveling type ceiling mounting structure and method for striding building beam
CN207919955U (en) A kind of overlay film aluminium sheet metope mounting structure
CN216920972U (en) Connection structure of furred ceiling board and wallboard of whole bathroom
CN205557922U (en) Steel base member inboard is spouted and is built wall body
CN209053322U (en) A kind of light gauge steel structure being easily installed
CN209053320U (en) A kind of refrigerating and heating type indoor suspended ceiling
CN210049471U (en) Novel suspended ceiling plate and mounting structure thereof
CN109537793B (en) Suspended ceiling structure convenient to install and level and installation method thereof
CN107795064B (en) Assembled wood-like structure and molded body
CN105089158A (en) Suspended ceiling and hot water radiant plate connecting structure and construction method thereof
CN103276872A (en) Double-layer point-connection glass curtain wall connecting component and connecting structure thereof
CN209907771U (en) Stack-level awning installation system
CN110469033B (en) Multifunctional light steel keel connecting clamping piece
CN103343589A (en) Connecting structure for glass plate and wire rope of cable mesh point-supported glass curtain wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240514

Address after: 100074 No.7 Dongli, South Yungang District, Fengtai District, Beijing

Patentee after: Beijing Hangyun Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 100071 No. 83 South Fourth Ring Road, Beijing, Fengtai District

Patentee before: China Aerospace Construction Group Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right