CN106284648A - A kind of space net rack building method with spiral regulation support unit - Google Patents
A kind of space net rack building method with spiral regulation support unit Download PDFInfo
- Publication number
- CN106284648A CN106284648A CN201610639354.XA CN201610639354A CN106284648A CN 106284648 A CN106284648 A CN 106284648A CN 201610639354 A CN201610639354 A CN 201610639354A CN 106284648 A CN106284648 A CN 106284648A
- Authority
- CN
- China
- Prior art keywords
- lifting
- support unit
- regulation support
- spiral regulation
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/19—Three-dimensional framework structures
- E04B1/1903—Connecting nodes specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of space net rack building method with spiral regulation support unit, take following steps: 1) assembled spiral regulation support unit, described spiral regulation support unit includes steel pipe scaffold, jacking and steel plate, jacking and steel plate are bolted the support platform frame that composition is removable, jacking lower end is for having threaded screw rod, screwed in scaffolding steel pipe by screw rod, make scaffold and jacking constitute adjustable flexible connection;Cylindrical support steel pipe is set on described steel plate, in order to support ball node;2) by space grid structure division unit, plan according to actual size and integral space truss structure is divided into some elementary cells;3) splicing ground lifting elements;4) lifting of lifting elements is carried out.During specific works, carrying out building of space net rack according to above-mentioned steps, the altitude mixture control of ball node can be controlled by described spiral regulation support unit.
Description
Technical field
The invention belongs to building engineering field, particularly relate to a kind of space net rack with spiral regulation support unit and build
Method.
Background technology
Space grid structure is a kind of Spacial Frame Structures, has three-dimensional loading characteristic, can bear the effect of all directions, and
And grid structure is generally high order redundant structure, if a bar partial failure, less a degree of statical indeterminacy, internal force can be again
Adjusting, total did not the most lose efficacy, and had higher safety stock.Its rod member crossed in the air had both been stressed member, again
For supporting rod member, mutual when working is for supporting, and collaborative work, therefore its good integrity, good stability, space stiffness is big, can have
Effect bears non-symmetrical load, load and dynamic load, and has preferable anti-seismic performance.Meanwhile, under joint load effect,
Each rod member is primarily subjected to axial pulling force and pressure, can give full play to the intensity of material, saves steel.And grid structure combination
Regular, great deal of nodes and the shape of rod member, equivalently-sized, and rod member and node specification less, it is simple to produce, product quality
Height, on-site consolidation is easy, can improve speed of application.
Grid structure not only achieves the rod member utilizing relatively small dimension to build longspan structure, and structure takes up room
Less, more can effectively utilize space.But there is problems of, space grid structure of the prior art builds complexity, and
Once it is difficult to after installation be adjusted, when structure partial needs to make adaptability fine setting, generally requires and carry out overall weight
New design is built, and is extremely difficult to.
Summary of the invention
In order to solve the problems referred to above, the present invention provides a kind of space net rack side of building with spiral regulation support unit
Method, it is possible to build space net rack quickly and easily, and local adaptation fine setting can be completed.
Adopt the following technical scheme that for this: a kind of space net rack building method with spiral regulation support unit, its
It is characterised by taking following steps:
1) assembled spiral regulation support unit, described spiral regulation support unit includes steel pipe scaffold, jacking and steel plate, jacking
Being bolted, with steel plate, the support platform frame that composition is removable, jacking lower end, for having threaded screw rod, is screwed in by screw rod
In scaffolding steel pipe, scaffold and jacking is made to constitute adjustable flexible connection;Cylindrical is arranged on described steel plate
Support steel pipe, in order to support ball node;
2) by space grid structure division unit, integral space truss structure is divided into some the most single according to actual size planning
Unit;
3) splicing ground lifting elements, first arranges assembled moulding bed, and described moulding bed is made up of, often 4 spiral regulation support units
Connected fixing between individual spiral regulation support unit by rod member;Then on spiral regulation support unit, ball node is lifted, and
Lower boom is lifted respectively between two ball nodes;Complete welding of string ball and rod member;Repeat abovementioned steps, lift two winded up
Ball node and top boom;Fill a vacancy afterwards web member, complete the splicing of ground lifting;
4) lifting of lifting elements is carried out: first first row lifting elements inside lifting;Secondly lifting second row lifting elements;It
Rear lifting the 3rd row's lifting elements, and carry out front two rows and fill a vacancy;The like complete lifting elements and fill a vacancy;Finally carry out rack
Unloading.
Further, in step 4) hoisting process, lifting uses suspender belt colligation node, and 4 lift, and wherein two
Point coordinates chain block to adjust angle;Calculate suspender belt stress according to lifting elements weight, suspender belt angle, dynamic load factor etc., sentence
Break and whether meet demand.
Further, when lifting elements lifts in step 4), draw at lower edge and set two cable wind ropes, prevention unit mistake
Degree swings.
Further, scaffold sets temporary support, in order to support lifting elements.
During lifting, according to space grid structure division unit establishment each unit weight and lifting operating mode table, when load ratio surpasses
The unit crossing 90% uses two-shipper platform to hang;Crane gear carries out Reasonable load distribution, and construction weight must not exceed two cranes and sets
The 75% of standby rated load weight summation, the loading of separate unit crane gear must not exceed the 80% of rated load weight.
During specific works, carrying out building of space net rack according to above-mentioned steps, described spiral regulation support unit can be to ball
The altitude mixture control of node controls.For the location of grid node, owing to being 3 d space coordinate location, under ball node, arrange one
Adjustable bracing frame, spiral is placed on supporting steel pipe, by regulating the absolute altitude of four jackings, by the position of movable supporting frame
Adjust the horizontal level of spiral, strong point when the most both can install as rack, bear construction load, again scalable rack
The coordinate of spiral node.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of spiral of the present invention regulation support unit.
Detailed description of the invention
See accompanying drawing.The present embodiment, as a example by two layers of grid structure, carries out building of space grid structure, especially by with
Lower step: 1) assembled spiral regulation support unit, described spiral regulation support unit includes steel pipe scaffold 1, jacking 2 and steel plate
3, jacking 2 and steel plate 3 are bolted and form removable support platform frame, and jacking 2 lower end is for having threaded screw rod 4, foot
The work layer of hand cradle arranges vertical longitudinal inner thread steel pipe, screws in scaffolding steel pipe by screw rod 4, makes scaffold and jacking
Both constitute adjustable flexible connection;Cylindrical support steel pipe 5 is set on described steel plate, in order to support ball node;Described
Screw rod is provided with rotary handle 41;
2) by space grid structure division unit, integral space truss structure is divided into some the most single according to actual size planning
Unit;
3) splicing ground lifting elements, first arranges assembled moulding bed, and described moulding bed is made up of, often 4 spiral regulation support units
Connected fixing between individual spiral regulation support unit by rod member;Then on spiral regulation support unit, ball node is lifted, and
Lower boom is lifted respectively between two ball nodes;Complete welding of string ball and rod member;Repeat abovementioned steps, lift two winded up
Ball node and top boom;Fill a vacancy afterwards web member, complete the splicing of ground lifting;
4) lifting of lifting elements is carried out: lifting uses suspender belt colligation node, and lift, and wherein 2 cooperations pull calabash at 4
Reed adjusts angle;During lifting, drawing at lower edge and set two cable wind ropes, prevention unit excessively swings;According to lifting elements weight, suspender belt
Angle, dynamic load factor etc. calculate suspender belt stress, it may be judged whether meet demand;First first row lifting elements inside lifting;Its
Secondary lifting second row lifting elements;Lifting the 3rd row's lifting elements afterwards, and carry out front two rows and fill a vacancy;The like complete lifting
Unit is also filled a vacancy;Scaffold sets temporary support, in order to support lifting elements;Finally carry out rack unloading.
During lifting, according to space grid structure division unit establishment each unit weight and lifting operating mode table, when load ratio surpasses
The unit crossing 90% uses two-shipper platform to hang;Crane gear carries out Reasonable load distribution, and construction weight must not exceed two cranes and sets
The 75% of standby rated load weight summation, the loading of separate unit crane gear must not exceed the 80% of rated load weight.
Claims (4)
1. a space net rack building method with spiral regulation support unit, it is characterised in that take following steps:
1) assembled spiral regulation support unit, described spiral regulation support unit includes steel pipe scaffold, jacking and steel plate, jacking
Being bolted, with steel plate, the support platform frame that composition is removable, jacking lower end, for having threaded screw rod, is screwed in by screw rod
In scaffolding steel pipe, scaffold and jacking is made to constitute adjustable flexible connection;Cylindrical is arranged on described steel plate
Support steel pipe, in order to support ball node;
2) by space grid structure division unit, integral space truss structure is divided into some the most single according to actual size planning
Unit;
3) splicing ground lifting elements, first arranges assembled moulding bed, and described moulding bed is made up of, often 4 spiral regulation support units
Connected fixing between individual spiral regulation support unit by rod member;Then on spiral regulation support unit, ball node is lifted, and
Lower boom is lifted respectively between two ball nodes;Complete welding of string ball and rod member;Repeat abovementioned steps, lift two winded up
Ball node and top boom;Fill a vacancy afterwards web member, complete the splicing of ground lifting;
4) lifting of lifting elements is carried out: first first row lifting elements inside lifting;Secondly lifting second row lifting elements;It
Rear lifting the 3rd row's lifting elements, and carry out front two rows and fill a vacancy;The like complete lifting elements and fill a vacancy;Finally carry out rack
Unloading.
2., according to a kind of space net rack building method with spiral regulation support unit described in claim 1, its feature exists
In: in step 4) hoisting process, lifting uses suspender belt colligation node, and 4 lift, and wherein 2 coordinate chain block
Adjust angle;Suspender belt stress is calculated, it may be judged whether meet demand according to lifting elements weight, suspender belt angle, dynamic load factor etc..
3., according to a kind of space net rack building method with spiral regulation support unit described in claim 1, its feature exists
In: when lifting elements lifts in step 4), drawing at lower edge and set two cable wind ropes, prevention unit excessively swings.
4., according to a kind of space net rack building method with spiral regulation support unit described in claim 1, its feature exists
In: on scaffold, set temporary support, in order to support lifting elements.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610639354.XA CN106284648A (en) | 2016-08-08 | 2016-08-08 | A kind of space net rack building method with spiral regulation support unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610639354.XA CN106284648A (en) | 2016-08-08 | 2016-08-08 | A kind of space net rack building method with spiral regulation support unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106284648A true CN106284648A (en) | 2017-01-04 |
Family
ID=57666055
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610639354.XA Pending CN106284648A (en) | 2016-08-08 | 2016-08-08 | A kind of space net rack building method with spiral regulation support unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284648A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060098A (en) * | 2017-04-20 | 2017-08-18 | 陆汉时 | A kind of high-altitude wire frame Steel Structure Installation method based on sliding platform |
CN112324139A (en) * | 2020-09-17 | 2021-02-05 | 上海宝冶冶金工程有限公司 | Disk buckle type assembly jig frame for sliding net rack |
CN117166770A (en) * | 2023-08-10 | 2023-12-05 | 上海二十冶建设有限公司 | Assembling construction method for starting span of latticed shell structure |
CN117738530A (en) * | 2023-12-25 | 2024-03-22 | 陕西工业职业技术学院 | Tunnel-shaped folding net frame configuration method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09137510A (en) * | 1995-11-10 | 1997-05-27 | Pacific Consultants Internatl:Kk | Cross section joining structure of truss member |
CN204059993U (en) * | 2014-07-09 | 2014-12-31 | 中国建筑第八工程局有限公司 | A kind of assembled moulding bed |
CN204238570U (en) * | 2014-11-27 | 2015-04-01 | 江西建工机械施工有限责任公司 | The spiral adjuster of absolute altitude of frame ball node is installed |
CN104831939A (en) * | 2015-05-22 | 2015-08-12 | 常州第一建筑集团有限公司 | Bolt ball welding ball mixed node large span cantilever grid structure construction method |
CN105442701A (en) * | 2015-12-10 | 2016-03-30 | 上海市机械施工集团有限公司 | Space truss structure and construction method thereof |
-
2016
- 2016-08-08 CN CN201610639354.XA patent/CN106284648A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09137510A (en) * | 1995-11-10 | 1997-05-27 | Pacific Consultants Internatl:Kk | Cross section joining structure of truss member |
CN204059993U (en) * | 2014-07-09 | 2014-12-31 | 中国建筑第八工程局有限公司 | A kind of assembled moulding bed |
CN204238570U (en) * | 2014-11-27 | 2015-04-01 | 江西建工机械施工有限责任公司 | The spiral adjuster of absolute altitude of frame ball node is installed |
CN104831939A (en) * | 2015-05-22 | 2015-08-12 | 常州第一建筑集团有限公司 | Bolt ball welding ball mixed node large span cantilever grid structure construction method |
CN105442701A (en) * | 2015-12-10 | 2016-03-30 | 上海市机械施工集团有限公司 | Space truss structure and construction method thereof |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060098A (en) * | 2017-04-20 | 2017-08-18 | 陆汉时 | A kind of high-altitude wire frame Steel Structure Installation method based on sliding platform |
CN112324139A (en) * | 2020-09-17 | 2021-02-05 | 上海宝冶冶金工程有限公司 | Disk buckle type assembly jig frame for sliding net rack |
CN117166770A (en) * | 2023-08-10 | 2023-12-05 | 上海二十冶建设有限公司 | Assembling construction method for starting span of latticed shell structure |
CN117738530A (en) * | 2023-12-25 | 2024-03-22 | 陕西工业职业技术学院 | Tunnel-shaped folding net frame configuration method |
CN117738530B (en) * | 2023-12-25 | 2024-06-11 | 陕西工业职业技术学院 | Tunnel-shaped folding net frame configuration method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102146732B (en) | Extra-large-area hyperboloid welding ball network frame sliding construction method | |
CN106284648A (en) | A kind of space net rack building method with spiral regulation support unit | |
CN103194981A (en) | System and method for bridge steel tower maritime vertical rotation construction | |
CN101892636A (en) | Integral lifting reconstruction method for high-span overweight continuous box girder | |
CN107476581A (en) | A kind of steel construction bilayer cantilevered structure lifts installation method | |
CN105442853B (en) | A kind of long-span deformed Elements of Space Grid Truss and landing Steel Structure Installation construction method | |
CN101633483B (en) | Integral lifting apparatus for steel structure net rack | |
CN110656723B (en) | Rail support for sliding construction of cylindrical arch shell roof | |
CN111218987A (en) | Bearing type net rack construction method | |
CN103132702A (en) | Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method | |
CN211369597U (en) | Construction is with recoverable bearing diagonal structure | |
CN107816209A (en) | The large-scale Roof Truss construction technology of installation is lifted across outer both sides | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
CN207228750U (en) | Become length section triple strain combination emergent repairing tower | |
CN105625701A (en) | Universal supporting combined frame supporting unit and universal supporting combined frame | |
CN206267303U (en) | Cable net structure and jacking membrane structure | |
CN205444935U (en) | Special -shaped steel space frame construction and installation structure of complicated large -span department | |
CN206128683U (en) | Steel bar truss building carrier plate strutting arrangement | |
CN201915632U (en) | Adjustable supporting structure of beam template | |
CN206971394U (en) | The automatic lifting system of Steel Structure Installation | |
CN205617763U (en) | Omnipotent support combined bay support element and omnipotent support combined bay | |
CN206245483U (en) | Superelevation steel construction band support frame core wall structure system | |
CN113356057B (en) | Internal force control method for bridge tower column construction | |
CN110820575A (en) | Temporary buttress for stabilizing and compensating small bridge pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170104 |
|
WD01 | Invention patent application deemed withdrawn after publication |