CN106284327A - The construction method that formed steel construction in cement mixing method and micro-disturbance thereof are pulled out - Google Patents

The construction method that formed steel construction in cement mixing method and micro-disturbance thereof are pulled out Download PDF

Info

Publication number
CN106284327A
CN106284327A CN201610821148.0A CN201610821148A CN106284327A CN 106284327 A CN106284327 A CN 106284327A CN 201610821148 A CN201610821148 A CN 201610821148A CN 106284327 A CN106284327 A CN 106284327A
Authority
CN
China
Prior art keywords
shaped steel
grouting
cement mixing
mixing method
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610821148.0A
Other languages
Chinese (zh)
Inventor
肖晓春
陆善龙
张帆
张滔
付军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN201610821148.0A priority Critical patent/CN106284327A/en
Publication of CN106284327A publication Critical patent/CN106284327A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to the formed steel construction in a kind of cement mixing method and construction method that micro-disturbance is pulled out, the method comprises the steps: to provide shaped steel, fixing on described shaped steel connects Grouting Pipe;Described shaped steel is inserted in cement mixing method so that the top of shaped steel protrudes out described cement mixing method;And to be used complete after, pull out described shaped steel, and utilize described Grouting Pipe to inject grouting serous fluid to described cement mixing method inter-sync, so that described grouting serous fluid fills the space formed after described shaped steel is pulled out.The present invention uses the method carrying out synchronous grouting while pulling out shaped steel, the grouting serous fluid filling section steel utilizing synchronous grouting to inject extract after cement mixing method in space, utilize slip casing by pressure, with pulling out with note, it can be ensured that cement mixing method remains unchanged for a long period of time during pulling out shaped steel and after pulling out shaped steel shape, not fragmentation, do not shrink, the stratum of periphery unshifts, and does not sinks, it is ensured that the safety of periphery structures.

Description

The construction method that formed steel construction in cement mixing method and micro-disturbance thereof are pulled out
Technical field
The present invention relates to the realm of building construction, refer in particular to the formed steel construction in a kind of cement mixing method and micro-disturbance is pulled out Construction method.
Background technology
SMW (Soil Mixing Wall) engineering method construction fender post starts progressively to promote from the nineties, and this engineering method is general Be applicable to the degree of depth less than the foundation ditch of 18 meters, be most commonly used that three spindle-type drilling blenders, stake footpath between 650mm to 1000mm, Internal shaped steel width, between 500mm to 800mm, has construction cost low, and speed is fast, to when requiring without stringent environmental protection The advantages such as the shaped steel wherein inserted can also reclaim.But there is the location construction of strict demand wherein to insert after terminating for environmental conservation The shaped steel entered does not allows to extract, because extracting shaped steel to be likely to result in land subsidence, and then affects surrounding enviroment and adjacent structures Safety.Thus make the relatively costly of construction, also result in the waste of shaped steel.
Summary of the invention
It is an object of the invention to overcome the defect of prior art, it is provided that formed steel construction in a kind of cement mixing method and The construction method that its micro-disturbance is pulled out, solves have the location of strict demand not allow shaped steel to pull out for environmental conservation in prior art Go out and make the higher problem with the waste causing shaped steel of construction cost.
The technical scheme realizing above-mentioned purpose is:
The invention provides the construction method that the formed steel construction micro-disturbance in a kind of cement mixing method is pulled out, including as follows Step:
Thering is provided shaped steel, fixing connection Grouting Pipe on described shaped steel, described Grouting Pipe is formed in the bottom of described shaped steel Grout outlet, and be that described grout outlet is coated with elastic protecting sleeve, the grouting port of described Grouting Pipe is placed in the top of described shaped steel;
Described shaped steel is inserted in cement mixing method so that the top of shaped steel protrudes out described cement mixing method, and Guarantee that described grouting port and described Grouting Pipe are unimpeded;And
After described cement mixing method has used, utilize the top of described shaped steel to be pulled out by described shaped steel, pulling out During described shaped steel, described grouting port and described Grouting Pipe is utilized to inject slip casting slurry to described cement mixing method inter-sync Liquid, the grouting serous fluid of injection is covered in described cement mixing method by described grout outlet and described resilient protection, so that Described grouting serous fluid fills the space formed after described shaped steel is pulled out.
The present invention uses the method carrying out synchronous grouting while pulling out shaped steel, utilizes the slip casting slurry that synchronous grouting injects Liquid filling section steel extract after cement mixing method in space, utilize slip casing by pressure, with pulling out with note, it can be ensured that soil cement stirs Mixing stake to remain unchanged for a long period of time during pulling out shaped steel and after pulling out shaped steel shape, not fragmentation, do not shrink, the stratum of periphery unshifts, Do not sink, it is ensured that the safety of periphery structures.
Further improvement is that of the construction method of the present invention, on described shaped steel during fixing connection Grouting Pipe, by described Grouting Pipe is along the elongated layout of length direction of described shaped steel, and the hoop at interval sets fixture, by described in described Grouting Pipe Fixture is fixed with described shaped steel and is connected it is achieved thereby that described Grouting Pipe is connected with the fixing of described shaped steel.
Further improvement is that of the construction method of the present invention, also includes:
Connect slip casting spool in the bottom of described Grouting Pipe, the bottom of described slip casting spool is the closing knot in cusp-shaped Structure, the periphery wall of described slip casting spool is formed with the groove caved inward at described enclosed construction;
The multiple grout outlets connecting described grouting valve core inner are offered on described groove;
Sheathed elastic protecting sleeve on described slip casting spool, and described resilient protection is placed in described groove, pass through Described elastic protecting sleeve covers described grout outlet.
Further improvement is that of the construction method of the present invention, described shaped steel is I-steel, and described Grouting Pipe is located at institute State the web of I-steel and the angle of one of them flange plate;
Described fixture is angle steel, and in described angle, button sets described angle steel, and is welded with described shaped steel by described angle steel Fixing, by described angle steel, described Grouting Pipe is fixedly connected on described shaped steel.
Further improvement is that of the construction method of the present invention, during pulling out described shaped steel, utilizes described slip casting Mouth and described Grouting Pipe inject grouting serous fluid to described cement mixing method inter-sync, including:
Grouting port in described Grouting Pipe connects grouting pump and grouting serous fluid, opens described grouting pump, by described slip casting Described grouting serous fluid is injected in described Grouting Pipe by pump by described grouting port;
Pulling out described shaped steel, control described shaped steel pulls out speed and the injection rate of described grouting serous fluid, to guarantee simultaneously Described grouting serous fluid tamps the space in described cement mixing method;
Wherein: after described grouting serous fluid enters in described Grouting Pipe along with the grouting pressure of described grouting pump, by described Grouting pressure impacts the elastic protecting sleeve at described grout outlet, makes described elastic protecting sleeve deformation and forms gap, so that institute State grouting serous fluid to inject in described cement mixing method at described gap.
Further improvement is that of the construction method of the present invention, during described shaped steel is inserted cement mixing method, Described Grouting Pipe top is fixed temporarily and described grouting port is arranged upward.
Present invention also offers the formed steel construction in a kind of cement mixing method, including:
Shaped steel, is inserted in cement mixing method, and the top of described shaped steel protrudes out described cement mixing method;
Being fixedly connected on the Grouting Pipe of described shaped steel, described Grouting Pipe is inserted in described cement mixing method with described shaped steel In, described Grouting Pipe is formed at grout outlet, and described grout outlet in the bottom of described shaped steel and is coated with elastic protecting sleeve, described The grouting port of Grouting Pipe is placed in the top of described shaped steel and is positioned at outside described cement mixing method.
Further improvement is that of formed steel construction in cement mixing method of the present invention, the bottom of described Grouting Pipe connects to be had Slip casting spool, the bottom of described slip casting spool is the enclosed construction in cusp-shaped, and the periphery wall of described slip casting spool is near institute State and at enclosed construction, be formed with the groove caved inward, in described groove, offer the multiple institutes connecting described grouting valve core inner State grout outlet, sheathed described elastic protecting sleeve on described slip casting spool, and described resilient protection is placed in described groove and covers Cover described grout outlet.
Further improvement is that of formed steel construction in cement mixing method of the present invention, described Grouting Pipe is along described shaped steel Length direction is arranged, and described Grouting Pipe is spaced hoop and is provided with fixture, and described fixture is fixing with described shaped steel to be connected.
Accompanying drawing explanation
Fig. 1 is the polycrystalline substance schematic diagram of the formed steel construction in cement mixing method of the present invention.
Fig. 2 is the sectional view of slip casting spool in the formed steel construction in cement mixing method of the present invention.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
The invention provides the formed steel construction in a kind of cement mixing method and construction method that micro-disturbance is pulled out, in order to Social resources can be made full use of, it is to avoid waste of material and loss, use the method for pile pulling synchronous grouting to guarantee Soil-cement Stake is completely filled with grouting serous fluid in space after shaped steel is pulled out, it is to avoid the deformation of cement mixing method and to surrounding formations and The adverse effect of structures.Extract the grouting serous fluid of simultaneous implantation respective numbers while shaped steel, the most compacted And filling extracts the space after stake, the soil body in cement mixing method of the grouting serous fluid in space forms a bulk strength, So that stake mesopore reduces, grouting serous fluid to be implanted, after certain time forms intensity, makes the intensity of former cement-soil mixture All being strengthened with integral rigidity, the stability of soil layer is also improved simultaneously.Grouting serous fluid, when just injecting, is still in flowing State, and there is certain pressure, along with the disappearance of pressure, the intensity of grouting serous fluid increases, thus can slow down soil deformation Speed, deformation and adjacent structures to the soil body are effectively controlled, thus ensure that the safety of surrounding buildings.And achieve type The recycling of steel.The construction below in conjunction with the accompanying drawings formed steel construction in cement mixing method of the present invention and micro-disturbance thereof pulled out Method illustrates.
As it is shown in figure 1, the formed steel construction that the invention provides in a kind of cement mixing method, this formed steel construction includes shaped steel 11 and the Grouting Pipe 12 that is fixed on shaped steel 11, shaped steel 11 and Grouting Pipe 12 are inserted in cement mixing method using as SMW work The fender post of method construction, after construction completes, then pulls out to recycle by the shaped steel 11 in cement mixing method, strengthens The recovery utilization rate of material.Shaped steel 11 is inserted in cement mixing method, and the top of shaped steel 11 protrudes out cement mixing method Form revealed section, utilize revealed section to connect crane, after this fender post construction usage completes, shaped steel 11 is pulled out.Grouting Pipe 12 Being fixedly connected on shaped steel 11, Grouting Pipe 12 is inserted in cement mixing method along with shaped steel 11, and Grouting Pipe 12 is at shaped steel 11 Bottom is formed with grout outlet, and is coated with elastic protecting sleeve 134 at grout outlet, and the grouting port of Grouting Pipe 12 is placed in shaped steel 11 Top is also positioned at outside cement mixing method.During pulling out shaped steel 11, Grouting Pipe 12 is utilized to note in cement mixing method Entering grouting serous fluid, the grouting serous fluid of injection is injected in the space after shaped steel 11 is extracted by grout outlet and elastic protecting sleeve 134, The space formed after utilizing grouting serous fluid to be extracted by shaped steel 11 is filled up, for eliminating surrounding enviroment during pulling out shaped steel Impact and the safety of structures, select shaped steel 11 to pull out and inject grouting serous fluid to synchronize to carry out, i.e. utilize crane to lift by crane shaped steel 11 Synchronize to carry out with utilizing Grouting Pipe 12 to inject grouting serous fluid, and the note extracting speed and grouting serous fluid of shaped steel to be controlled 11 Enter amount, it is ensured that shaped steel 11 can be extracted formed space and fill up by the grouting serous fluid of injection timely, it is ensured that Soil-cement The structural stability of stake, improves the stability of soil layer around, reduces ground settlement and produces.
Shown in Fig. 2, connect in the bottom of Grouting Pipe 12 and have slip casting spool 13, the top of slip casting spool 13 and Grouting Pipe 12 connections, the bottom of slip casting spool 13 is the enclosed construction 131 in cusp-shaped, and the periphery wall of slip casting spool 13 is near enclosed construction It is formed with the groove 132 caved inward at 131, in groove 132, begins with the connection multiple grout outlets within slip casting spool 13 133, slip casting spool 13 is arranged with elastic protecting sleeve 134, and in elastic protecting sleeve 134 is placed in groove 132 and cover grout outlet 133.Utilize elastic protecting sleeve 134 to cover grout outlet 133, be used for protecting grout outlet 133, it is to avoid insert at shaped steel 11 and Grouting Pipe 12 When entering in cement mixing method, grout outlet 133 is blocked by the soil cement in stake, and elastic protecting sleeve 134 can effectively be protected out Starch the unimpeded of mouth 133.During shaped steel 11 is pulled out, inject the grouting serous fluid in Grouting Pipe 12, utilize grouting pressure to impact Elastic protecting sleeve 134 at grout outlet 133 so that elastic protecting sleeve 134 deforms formation gap between slip casting spool 13, and then Grouting serous fluid is injected in cement mixing method from gap.
Grouting Pipe 12 is arranged along the length direction of shaped steel 11, Grouting Pipe 12 is spaced hoop and is provided with fixture 14, fixture 14 fixing with shaped steel 11 are connected, thus Grouting Pipe 12 are fixed on shaped steel 11.It is preferred that shaped steel 11 uses I-steel, including There are web 111 and two flange plates, Grouting Pipe 12 is set in the angle of web 111 and flange plate 112.Fixture 14 uses angle Steel, utilizes angle steel to be located on shaped steel 11 by Grouting Pipe 12 hoop, is fixed with web 111 and flange plate 112 the two of angle steel ends Connect.
During shaped steel 11 is inserted in cement mixing method, it is ensured that during insertion, Grouting Pipe 12 and slip casting Spool 13 is unimpeded, it is to avoid it is interior to block Grouting Pipe that the soil cement in cement mixing method enters into Grouting Pipe.Can be by Grouting Pipe 12 tops are temporarily fixed at the periphery of the stake mouth of cement mixing method.When pulling out shaped steel 11, by the slip casting at Grouting Pipe 12 top Mouth connects grouting pump and grouting serous fluid, utilizes grouting pump to be sent to by grouting serous fluid in Grouting Pipe 12, can first open grouting pump, Then crane is being utilized outwards to extract shaped steel 11, it can be ensured that along with extracting of shaped steel 11, what grouting serous fluid synchronized is injected into water In earth mixing pile, when extracted, the injection rate extracting speed and grouting serous fluid of shaped steel 11 is controlled so that the slip casting slurry of injection Liquid can fill up tamp extracting the space that shaped steel formed timely, the grouting serous fluid of injection soil in cement mixing method Body forms a bulk strength, and around the stability of soil layer is improved, thus reduces ground settlement and produce.The slip casting of the present invention Serosity uses cement mortar.Present invention saves engineering material, have the turnover utilizing shaped steel and reuse, reduce cost payout, The most preferably protect environmental demand, it is ensured that the safety of periphery structures.
The construction method pulled out the formed steel construction micro-disturbance in cement mixing method of the present invention below illustrates.
The construction method that formed steel construction micro-disturbance in cement mixing method of the present invention is pulled out, comprises the steps:
Shown in Fig. 1, it is provided that shaped steel 11, fixing connection Grouting Pipe 12 on shaped steel 11, Grouting Pipe 12 is at shaped steel 11 Bottom is formed with grout outlet, and is coated with elastic protecting sleeve 134 for grout outlet, and the grouting port of Grouting Pipe 12 is placed in the top of shaped steel 11 Portion;
Then shaped steel 11 is inserted in cement mixing method together with Grouting Pipe 12, after insertion, makes the top of shaped steel 11 Protrude out cement mixing method, form one section of revealed section, during inserting, it is ensured that grouting port and Grouting Pipe 12 are unimpeded, keep away Exempting from the soil cement in cement mixing method and enter in Grouting Pipe 12, shaped steel 11 is rear and this cement in being inserted into cement mixing method Soil mixing pile forms fender post together, serves the effect of reinforcing;
After fender post construction terminates, after i.e. cement mixing method has used, utilize the revealed section at the top of shaped steel 11 Shaped steel 11 is pulled out, will extract in cement mixing method by shaped steel 11, during pulling out shaped steel 11, utilize grouting port and Grouting Pipe 12 injects grouting serous fluid to the inter-sync of the Soil-cement village, and the grouting serous fluid of injection passes through grout outlet and elastic protecting sleeve Enter in cement mixing pile, so that the space that grouting serous fluid filling section steel 11 is formed after pulling out.
Use simultaneous implantation grouting serous fluid, i.e. in the withdrawal process of shaped steel 11, with pulling out with slip casting, meeting when shaped steel 11 is extracted In cement mixing method, form space, along with extracting the generation in space, utilize grouting serous fluid to be filled up in space timely, space In grouting serous fluid and cement mixing method in the soil body form an entirety, so that the hole in cement mixing method subtracts Few, the grouting serous fluid of injection is after certain time forms intensity, and around the stability of soil layer is improved, and decreases ground settlement Produce, it is ensured that the safety of structures around.
On shaped steel 11 fixing when connecting Grouting Pipe 12, by Grouting Pipe 12 along the elongated setting of length direction of shaped steel 11, And the hoop at interval sets fixture 14 in Grouting Pipe 12, fixture 14 and shaped steel 11 is fixed and is connected it is achieved thereby that Grouting Pipe 12 Fixing with shaped steel 11 is connected.Shaped steel 11 uses I-steel, and Grouting Pipe 12 is located at web 111 and the flange plate 112 of I-steel Angle, fixture 14 uses angle steel, and in the angle of web 111 and flange plate 112, button sets angle steel, by angle steel and shaped steel 11 It is welded and fixed, by angle steel, Grouting Pipe 12 is fixedly connected on shaped steel 11.
Shown in Fig. 2, as a better embodiment of the present invention, connect slip casting spool in the bottom of Grouting Pipe 12 13, the bottom of slip casting spool 13 is the enclosed construction 131 in cusp-shaped, and the periphery wall of slip casting spool 13 is near enclosed construction 131 Place is formed with the groove 132 caved inward;Groove 132 is offered the connection multiple grout outlets 133 within slip casting spool 13, Sheathed elastic protecting sleeve 134 on slip casting spool 13, is placed in elastic protecting sleeve 134 in groove 132, by elastic protecting sleeve 134 Cover grout outlet 133.Grout outlet 133 is protected not blocked by the soil cement in cement mixing method by elastic protecting sleeve 134.Note Slurry spool 13 is connected with Grouting Pipe 12, and the grouting serous fluid injected by the grouting port of Grouting Pipe 12 is flowed into after Grouting Pipe 12 In slip casting spool 13, the bottom of slip casting spool 13 is enclosed construction 131 so that grouting serous fluid is impacted grout outlet by grouting pressure 133, and then the elastic protecting sleeve 134 that grout outlet 133 is covered is hit and deforms so that elastic protecting sleeve 134 and slip casting Form gap between spool 13, and then make grouting serous fluid enter in cement mixing method from gap, pass through elastic protecting sleeve 134 define unidirectional perfusion valve so that grouting serous fluid outwards can only be noted from slip casting spool 13, and can not from grout outlet 133 to Recharge.
As a better embodiment of the present invention, during pulling out shaped steel 11, utilize grouting port and Grouting Pipe to Grouting serous fluid is injected in cement mixing method inter-sync, including: the grouting port in Grouting Pipe connects grouting pump and grouting serous fluid, opens Grouting pump, is injected into grouting serous fluid in Grouting Pipe 12 by grouting port by grouting pump;Utilize crane to pull out shaped steel 11 simultaneously, Control speed and the injection rate of grouting serous fluid that shaped steel 11 is pulled out, to guarantee that grouting serous fluid tamps the sky in cement mixing method Gap, and in time space is filled up.After wherein grouting serous fluid enters in Grouting Pipe 12 along with the grouting pressure of grouting pump, pass through Grouting pressure impact grout outlet 133 at elastic protecting sleeve 134, make elastic protecting sleeve 134 deformation and and slip casting spool 13 between Form gap so that grouting serous fluid is injected in cement mixing method at gap.While extracting shaped steel, simultaneous implantation is corresponding The grouting serous fluid of quantity, prevents cement mixing method aperture contracting disturbed soil from sinking.Normal section steel extracts 1 meter, grouting serous fluid Injection rate is more than or equal to 0.26 cubic metre.
During shaped steel is inserted cement mixing method, Grouting Pipe top is fixed temporarily and grouting port is set upward Put.To protect the unimpeded of Grouting Pipe, it is to avoid enter foreign body from grouting port and block Grouting Pipe.
The construction method of the present invention, the grouting serous fluid of simultaneous implantation respective numbers when extracting shaped steel, at certain pressure Under compacted filling extract shaped steel after the space that stays, the soil body in cement mixing method of the grouting serous fluid in space forms one Entirety so that hole in mixing pile reduces, the grouting serous fluid of injection after certain time forms intensity, soil layer around Stability is improved, thus reduces ground settlement and produce.The method that the present invention takes to pull out shaped steel synchronous grouting, it is ensured that soil cement Space in mixing pile completes filling, utilizes slip casing by pressure, and with pulling out with note, the cement mixing method made is pulling out the process of shaped steel The shape that remains unchanged for a long period of time afterwards, not fragmentation are pulled out in neutralization, do not shrink, and periphery bottom unshifts, and does not sinks, and improve shaped steel simultaneously and repeat profit By rate, save engineering cost.Grouting serous fluid to be implanted, after certain time forms intensity, makes the intensity of former cement mixing method All being strengthened with integral rigidity, the stability of soil layer is also improved simultaneously.Grouting serous fluid, when just injecting, is still in flowing State, and there is certain pressure, along with the disappearance of pressure, the intensity of grouting serous fluid increases, thus can slow down soil deformation Speed, deformation and adjacent structures to the soil body are effectively controlled, thus ensure that the safety of surrounding buildings.
Being described in detail the present invention above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State and bright the present invention is made many variations example.Thus, some details in embodiment should not constitute limitation of the invention, this Invent the scope that defines using appended claims as protection scope of the present invention.

Claims (9)

1. the construction method that the formed steel construction micro-disturbance in a cement mixing method is pulled out, it is characterised in that include walking as follows Rapid:
Thering is provided shaped steel, fixing connection Grouting Pipe on described shaped steel, described Grouting Pipe is formed with pulp in the bottom of described shaped steel Mouthful, and be that described grout outlet is coated with elastic protecting sleeve, the grouting port of described Grouting Pipe is placed in the top of described shaped steel;
Described shaped steel is inserted in cement mixing method so that the top of shaped steel protrudes out described cement mixing method, and guarantees Described grouting port and described Grouting Pipe are unimpeded;And
After described cement mixing method has used, the top of described shaped steel is utilized to be pulled out by described shaped steel, described pulling out During shaped steel, described grouting port and described Grouting Pipe is utilized to inject grouting serous fluid to described cement mixing method inter-sync, The grouting serous fluid injected is covered in described cement mixing method by described grout outlet and described resilient protection, so that described Grouting serous fluid fills the space formed after described shaped steel is pulled out.
2. construction method as claimed in claim 1, it is characterised in that on described shaped steel during fixing connection Grouting Pipe, by institute State the Grouting Pipe elongated layout of length direction along described shaped steel, and the hoop at interval sets fixture, by institute in described Grouting Pipe State fixture to fix with described shaped steel and be connected it is achieved thereby that described Grouting Pipe is connected with the fixing of described shaped steel.
3. construction method as claimed in claim 1 or 2, it is characterised in that also include:
Connect slip casting spool in the bottom of described Grouting Pipe, the bottom of described slip casting spool is the enclosed construction in cusp-shaped, institute The periphery wall stating slip casting spool is formed with the groove caved inward at described enclosed construction;
The multiple grout outlets connecting described grouting valve core inner are offered on described groove;
Sheathed elastic protecting sleeve on described slip casting spool, and described resilient protection is placed in described groove, by described Elastic protecting sleeve covers described grout outlet.
4. construction method as claimed in claim 2, it is characterised in that described shaped steel is I-steel, described Grouting Pipe is located at The web of described I-steel and the angle of one of them flange plate;
Described fixture is angle steel, and in described angle, button sets described angle steel, and is welded and fixed with described shaped steel by described angle steel, By described angle steel, described Grouting Pipe is fixedly connected on described shaped steel.
5. construction method as claimed in claim 1, it is characterised in that during pulling out described shaped steel, utilize described note Slurry mouth and described Grouting Pipe inject grouting serous fluid to described cement mixing method inter-sync, including:
Grouting port in described Grouting Pipe connects grouting pump and grouting serous fluid, opens described grouting pump, will by described grouting pump Described grouting serous fluid is injected in described Grouting Pipe by described grouting port;
Pulling out described shaped steel, control described shaped steel pulls out speed and the injection rate of described grouting serous fluid simultaneously, described to guarantee Grouting serous fluid tamps the space in described cement mixing method;
Wherein: after described grouting serous fluid enters in described Grouting Pipe along with the grouting pressure of described grouting pump, by described slip casting Elastic protecting sleeve at grout outlet described in compression shock, makes described elastic protecting sleeve deformation and forms gap, so that described note Slurry serosity injects in described cement mixing method at described gap.
6. construction method as claimed in claim 1, it is characterised in that described shaped steel is inserted the process of cement mixing method In, described Grouting Pipe top is fixed temporarily and described grouting port is arranged upward.
7. the formed steel construction in a cement mixing method, it is characterised in that including:
Shaped steel, is inserted in cement mixing method, and the top of described shaped steel protrudes out described cement mixing method;
Being fixedly connected on the Grouting Pipe of described shaped steel, described Grouting Pipe is inserted in described cement mixing method with described shaped steel, Described Grouting Pipe is formed at grout outlet, and described grout outlet in the bottom of described shaped steel and is coated with elastic protecting sleeve, described note The grouting port of slurry pipe is placed in the top of described shaped steel and is positioned at outside described cement mixing method.
8. the formed steel construction in cement mixing method as claimed in claim 7, it is characterised in that the bottom of described Grouting Pipe connects Being connected to slip casting spool, the bottom of described slip casting spool is the enclosed construction in cusp-shaped, and the periphery wall of described slip casting spool leans on It is formed with the groove caved inward at nearly described enclosed construction, offers the described grouting valve core inner of connection in described groove many Individual described grout outlet, sheathed described elastic protecting sleeve on described slip casting spool, and described resilient protection are placed in described groove And cover described grout outlet.
9. the formed steel construction in cement mixing method as claimed in claim 7 or 8, it is characterised in that described Grouting Pipe is along institute The length direction stating shaped steel is arranged, and described Grouting Pipe is spaced hoop and is provided with fixture, and described fixture is fixing with described shaped steel even Connect.
CN201610821148.0A 2016-09-13 2016-09-13 The construction method that formed steel construction in cement mixing method and micro-disturbance thereof are pulled out Pending CN106284327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610821148.0A CN106284327A (en) 2016-09-13 2016-09-13 The construction method that formed steel construction in cement mixing method and micro-disturbance thereof are pulled out

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610821148.0A CN106284327A (en) 2016-09-13 2016-09-13 The construction method that formed steel construction in cement mixing method and micro-disturbance thereof are pulled out

Publications (1)

Publication Number Publication Date
CN106284327A true CN106284327A (en) 2017-01-04

Family

ID=57710011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610821148.0A Pending CN106284327A (en) 2016-09-13 2016-09-13 The construction method that formed steel construction in cement mixing method and micro-disturbance thereof are pulled out

Country Status (1)

Country Link
CN (1) CN106284327A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301404A (en) * 2018-01-18 2018-07-20 中国冶集团有限公司 SMW engineering method pile-type steel is pulled out and high-pressure slip-casting method for synchronously constructing
CN108824446A (en) * 2018-07-16 2018-11-16 北京市政建设集团有限责任公司 A method of improving foundation pit SMW fender post waterproof performance
CN110042826A (en) * 2018-09-14 2019-07-23 北京中岩大地科技股份有限公司 A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN110629757A (en) * 2019-10-10 2019-12-31 华东交通大学 Method for removing pile section steel in SMW construction method
CN110777796A (en) * 2019-10-30 2020-02-11 河海大学 Stirring type underwater crack repairing and seepage preventing device and construction method thereof
CN112726573A (en) * 2020-12-23 2021-04-30 温州大学 FRP pipe concrete pile/member and construction method thereof
CN113818440A (en) * 2021-10-13 2021-12-21 上海建工七建集团有限公司 Pile pulling device for reducing soil disturbance and using method
CN115506334A (en) * 2022-11-22 2022-12-23 海南省农垦金城实业有限公司 Pile wall plugging structure of marine engineering gravel stratum SMW construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1150447A (en) * 1997-07-31 1999-02-23 San Soil:Kk Formation method of steel pipe column continuous wall and device therefor
CN2913491Y (en) * 2006-04-28 2007-06-20 上海捷特防水技术有限公司 Slip-casting water stop belt
CN101929343A (en) * 2009-09-21 2010-12-29 中铁隧道集团二处有限公司 Profile steel pulling and grouting method of SMW (Soil Mixing Wall) process
CN201843624U (en) * 2010-11-07 2011-05-25 山东浩珂矿业工程有限公司 Grouting pipe
CN103790160A (en) * 2014-01-17 2014-05-14 上海中锦建设集团股份有限公司 Method for pulling out structural steel and conducting grouting through SMW construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1150447A (en) * 1997-07-31 1999-02-23 San Soil:Kk Formation method of steel pipe column continuous wall and device therefor
CN2913491Y (en) * 2006-04-28 2007-06-20 上海捷特防水技术有限公司 Slip-casting water stop belt
CN101929343A (en) * 2009-09-21 2010-12-29 中铁隧道集团二处有限公司 Profile steel pulling and grouting method of SMW (Soil Mixing Wall) process
CN201843624U (en) * 2010-11-07 2011-05-25 山东浩珂矿业工程有限公司 Grouting pipe
CN103790160A (en) * 2014-01-17 2014-05-14 上海中锦建设集团股份有限公司 Method for pulling out structural steel and conducting grouting through SMW construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301404A (en) * 2018-01-18 2018-07-20 中国冶集团有限公司 SMW engineering method pile-type steel is pulled out and high-pressure slip-casting method for synchronously constructing
CN108301404B (en) * 2018-01-18 2019-12-10 中国一冶集团有限公司 Synchronous construction method for removing pile section steel and high-pressure grouting in SMW (soil mixing wall) method
CN108824446A (en) * 2018-07-16 2018-11-16 北京市政建设集团有限责任公司 A method of improving foundation pit SMW fender post waterproof performance
CN110042826A (en) * 2018-09-14 2019-07-23 北京中岩大地科技股份有限公司 A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN110042826B (en) * 2018-09-14 2023-12-12 北京中岩大地科技股份有限公司 Prefabricated concrete sheet pile for enhancing water interception effect of cement-soil mixing pile
CN110629757A (en) * 2019-10-10 2019-12-31 华东交通大学 Method for removing pile section steel in SMW construction method
CN110777796A (en) * 2019-10-30 2020-02-11 河海大学 Stirring type underwater crack repairing and seepage preventing device and construction method thereof
CN112726573A (en) * 2020-12-23 2021-04-30 温州大学 FRP pipe concrete pile/member and construction method thereof
CN113818440A (en) * 2021-10-13 2021-12-21 上海建工七建集团有限公司 Pile pulling device for reducing soil disturbance and using method
CN115506334A (en) * 2022-11-22 2022-12-23 海南省农垦金城实业有限公司 Pile wall plugging structure of marine engineering gravel stratum SMW construction method
CN115506334B (en) * 2022-11-22 2023-02-03 海南省农垦金城实业有限公司 Pile wall plugging structure of marine engineering gravel stratum SMW construction method

Similar Documents

Publication Publication Date Title
CN106284327A (en) The construction method that formed steel construction in cement mixing method and micro-disturbance thereof are pulled out
WO2020062940A1 (en) Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor
CN206722878U (en) A kind of mining light-duty filling counterfort
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN108086328A (en) A kind of dynamic sealing, assembled building enclosure and its construction method from recharge
CN206090653U (en) Anchor rod static pressure pile slip casting structure
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN106703044B (en) One kind stream modeling shape rinse fill soft stratum slope combination supporting method
CN203200746U (en) High-pressure jet grouting hollow reinforced tubular pile
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN108951649B (en) Foundation pit supporting structure
CN105297757A (en) Construction method for quicksand layer pile foundation
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN208235525U (en) A kind of multiple grouting device controlling soil deformation
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN105019913A (en) Base rock uplift region shielding tool-changing in-situ reinforcement method
CN102808407A (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN109826635A (en) Reinforce the construction method for the shield reception space periphery soil body that subsurface excavation method applies
CN106638646B (en) A kind of construction method of open caisson secondary bottom sealing structure
CN103343534A (en) Closed precipitation method for foundation pit construction
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
CN110896644B (en) Grouting consolidation method for full-casing drilling guide precast pile
CN208545745U (en) Crushed stone grouting pile with classification enlarged footing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104