CN106284299B - H-type concrete-pile and diaphram wall for building piping lane side wall - Google Patents

H-type concrete-pile and diaphram wall for building piping lane side wall Download PDF

Info

Publication number
CN106284299B
CN106284299B CN201610834832.2A CN201610834832A CN106284299B CN 106284299 B CN106284299 B CN 106284299B CN 201610834832 A CN201610834832 A CN 201610834832A CN 106284299 B CN106284299 B CN 106284299B
Authority
CN
China
Prior art keywords
pile
wing
edge
pile body
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610834832.2A
Other languages
Chinese (zh)
Other versions
CN106284299A (en
Inventor
俞晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610834832.2A priority Critical patent/CN106284299B/en
Publication of CN106284299A publication Critical patent/CN106284299A/en
Application granted granted Critical
Publication of CN106284299B publication Critical patent/CN106284299B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/12Locking forms; Edge joints; Pile crossings; Branch pieces
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of H-type concrete-piles for building piping lane side wall, including pile body, the cross section of the pile body is by former and later two spaced edges of a wing and to connect the H-shaped that the web on former and later two edges of a wing constitutes, two edges of a wing and web and form the concave part extended along pile body length direction in the both sides of pile body;It is characterized in that:The middle part of the pile body is coated with the first pile protection hoop of steel along its circumferential direction.It is a kind of H-type concrete-pile that suitable piping lane is built, there are the mechanical properties such as good bending resistance, shearing resistance using diaphram wall made of the stake, convenient for fixing the anchor rib or rod iron of more protrusions on the end face of stake, it carries out pouring into a mould the roof and bottom plate that form piping lane between left and right adjacent two is using the manufactured diaphragm wall of this to facilitate, while ensureing that the connection between diaphragm wall and piping lane roof and bottom plate is firm.The invention further relates to a kind of diaphram walls using aforementioned stake.

Description

H-type concrete-pile and diaphram wall for building piping lane side wall
Technical field
The invention belongs to municipal underground engineering technical fields, and in particular to a kind of H-type coagulation for building piping lane side wall Native stake and the diaphram wall for constituting piping lane side wall.
Background technology
China's Municipal public utilities adhere to different unit construction and management separately, since building time is successively different, and Unified planning and comprehensive utilization are not carried out to urban underground space.Underground pipe network construction mostly uses the city planting ductwork of traditional direct-burried Engineering construction mode, various municipal pipelines are mostly directly embedded in soil layer by respective system, and maintenance is inconvenient, is easily damaged, The ability of securing an adequate supply is often subject to interfere.Since the depth of burying of various pipelines differs, it is be easy to cause conflict, urban road is frequent It is destroyed.Road surface is excavated repeatedly causes route denial, traffic jam, road surface patch pile patch.With urban development, buried pipe Line is increasingly complicated, deep-rooted, is formed " underground noodles problem ".Subway work, which also increases because of relocation of services or temporary shift, to be built Being set as this, even initiation resident is discontented.Pipe network facilities increase or repair, the building site of urban construction also can be found everywhere, and such as coal gas changes Natural gas, laying communications optical cable, embedded cable power transmission, water supply network repairing, gas piping repairing etc..Many urban pavements also like Slide fastener is the same constantly to be excavated, fills.It is straight caused by the pipe network accidents that the whole nation is caused by construction every year according to incompletely statistics Economic loss is connect up to 5,000,000,000 yuan, indirect economic loss is up to as many as 40,000,000,000 yuan.
Underground pipe gallery is also known as " common trench ", the various pipeline collection such as electric power, communication, combustion gas, water supply, draining, heating power In one, an intensive tunnel is built in the underground space of urban road.Underground pipe gallery makes space utilization more fill Divide, is compact, economical, also allowing for overhauling, more will not turn off road breaking face because of the old pipe of maintenance, the new pipe of the row of applying.State Council in 2014 General office issues《About the instruction for reinforcing City Buried Pipeline implementation management》(Office of the State Council sends out (2014) No. 27), clearly proposes Urban Underground pipe gallery construction is moved forward steadily, carries out underground pipe gallery pilot project 36 big and medium-sized cities.Different form Underground pipe gallery, form of fracture, to accommodate pipeline type, cost, repair and management different.Beijing, depth at present The cities such as ditch between fields, Hangzhou, Ningbo have been built up or positive construction parts underground pipe gallery.
Existing underground pipe gallery mainly uses two ways:The first is cast-type piping lane, is first waiting for excavation pit Both sides set foundation pit enclosure, then the excavation pit earthwork, and finally the both sides in foundation pit carry out poured in place concrete and form piping lane, Finally backfill soil covers piping lane.Foundation pit enclosure generally connects to be formed using rigid sheet pile or cast-in-situ bored pile, but because of its intensity And water resistance is poor, and lack suitably to the preferably fixed tie point of piping lane bottom plate, roof, it is impossible to as piping lane A part for side wall, entire piping lane main body must all separately (reinforcing bar rolls, template branch for cast in situs in the foundation pit gone along with sb. to guard him Vertical, concrete casting and maintenance etc.), therefore, this cast in situs formula piping lane is there are long construction period, project cost is costly, The shortcomings of being not easy to the application of advanced construction technology.Second is that underground pipe gallery is contained in Integral prefabricated type side, there are volume and again Amount is big, and manufacturing equipment is brought to require the shortcomings of high, lifting is difficult, freight volume is big, and freight is high, and is easy to happen piping lane part Sedimentation and drainage.Also one is use diaphram walls as foundation pit enclosure, this ground being used as foundation pit enclosure Although lower diaphragm wall theoretically during practice of construction, can equally exist the mechanical property of wall as the side wall of piping lane Difference and lack suitably to the preferably fixed tie point of piping lane bottom plate, roof and stress point, therefore inconvenience adjacent two Directly cast forms the top and bottom of piping lane between diaphragm wall, further needs exist for considering diaphragm wall and piping lane top and bottom Between the technical problems such as whether connection firm, so in practice never using will as foundation pit enclosure diaphram wall it is direct Engineering precedent as piping lane side wall.
Invention content
First technical problem to be solved by this invention be for the above-mentioned prior art present situation and one kind is provided can be direct H-type concrete-pile for building piping lane side wall, to be equipped with convenient for the connection structure with the firm connection of other components on pile body There is provided may.There are the mechanical properties such as good bending resistance, shearing resistance using diaphram wall made of the stake, and by being set on pile body The connection structure set can facilitate it is firm between adjacent two diaphragm wall in left and right build bottom plate, thus the stake can be directly used for structure pipe The side wall wall of corridor, to build the piping lane of pile wall interaction.
Technical solution is used by the present invention solves above-mentioned first technical problem:It is a kind of to be used to build piping lane side wall The cross section of H-type concrete-pile, including pile body, the pile body is two edges of a wing being arranged by time interval and connects former and later two wings The H-shaped that the web of edge is constituted, two edges of a wing and web form the concave part extended along pile body length direction in the both sides of pile body;Its It is characterized in that:The middle part of the pile body is coated with the first pile protection hoop of steel along its circumferential direction.The middle part of the pile body refers to being located at Certain part between two ends of pile body, does not mean that the center part at the half of pile body, certainly, from reality From the point of view of requirement of engineering, the first pile protection hoop is typically situated at the half of pile body length to a certain conjunction between a quarter It sets right position.Pile protection hoop, refers to the whole circle circumferentially coated along pile body or a part of steel plate, and pile protection hoop shape can be with pile body circumferential direction Rib exterior feature form fit, may be set to be rectangular or other shapes.H-type concrete-pile has because its cross section is H-type The mechanical properties such as best lateral bending resistance, shearing resistance, therefore the performance requirement of the bending resistance of piping lane side wall, shearing resistance can be met.It is mixed in H-type The first pile protection hoop of the steel is arranged in the middle part of solidifying soil pile body, so that it may to weld various connectors on the first pile protection hoop, or The various designs for meeting requirement of engineering are carried out to the first pile protection hoop in advance, the various components for connection are preset, so as in stake Convenient, firm back plate connections are obtained with it, with bottom plate that is firm, easily connecting, build piping lane, it is not necessary to find and managing The connection position of corridor bottom plate connection and the self structure for removing to destroy pile body and diaphram wall, efficiently solve diaphram wall structure Its side wall of piping lane be difficult to connect or connect illusive problem with bottom plate, meanwhile, piping lane bottom plate is built by the first pile protection hoop It on pile body, is equivalent to and has squeezed into a pile foundation in advance to bottom plate and piping lane, to fundamentally avoid piping lane sedimentation And the security risks such as piping lane local collapse, deformation, dislocation, cracking and infiltration occurred, what is more important also can avoid internal It floats because of the buoyancy of underground water for the piping lane and piping lane bottom plate of cavity.Pipe can be used as using diaphragm wall made of the stake Foundation pit enclosure when corridor is constructed is used, and the wall for the piping lane that also serves as uses, without the additional wall for building piping lane both sides.Cause This, the side wall wall of structure piping lane is can be directly used for using the H-type concrete-pile with the first pile protection hoop in the middle part of the pile body, to Build the piping lane of pile wall interaction.
It is further improved, is located in the edge of a wing of the front at the first pile protection hoop and is equipped with one or more first built-in pipe, the One pile protection hoop is equipped with the first hole appeared for the opening of the first built-in pipe.The setting of first built-in pipe is convenient on the pile body edge of a wing The duct plugged for rod iron is formed, the rod iron as connector can be easily inserted in built-in pipe, can to the bottom plate of piping lane By plugging, the rod iron being fixed in built-in pipe is stable, firm builds on pile body.Because the first built-in pipe is fixed on first On cuff, pile protection hoop is previously placed in as inserts in mold, and when pouring pile body, the presence of built-in pipe makes pile body corresponding position It is formed through the duct of pile body end face, without directly additionally drilling on pile body, is conducive to mass production;In addition, built-in pipe The contact area of duct and rod iron is larger, but also rod iron can be more fixed firmly on pile body.If do not had on the first pile protection hoop First built-in pipe is set, and in order to obtain the connector on pile body, the anchor ribs such as rod iron must be directly welded at the pile protection hoop of steel, be Ensure bonding strength, the pile protection hoop of steel must be very thick, this increases cost with regard to consumptive material;If dowel is directly threaded through pile body side On wall, the structure of pile body itself can be destroyed, influences piping lane quality and safety;It is above to lack after this structure with built-in pipe It falls into and can avoid.First pile protection hoop is equipped with the first hole appeared for the first built-in pipe so that the duct of built-in pipe can be with The pile body external world is connected and is unlikely to be coated by pile protection hoop to close, and is easily inserted in built-in pipe convenient for connectors such as rod irons.
It further improves, is also preset with described in one or more in the edge of a wing at the rear portion at the first pile protection hoop First built-in pipe, the first built-in pipe in the edge of a wing of front and the edge of a wing at rear portion correspond.It in this way can be before and after concave part Two edges of a wing are respectively formed on perforation, are located at through being inserted by concave part after the first built-in pipe across the front edge of a wing conducive to rod iron In built-in pipe in the subsequent rear portion edge of a wing of concave part, when wall is made using the stake, the concrete perfusion in concave part can also make Rod iron becomes one structure with diaphragm wall, further enhances the fastness that rod iron is combined with pile body, so that piping lane bottom plate Build more stablize it is firm.
Similarly, the top of above-mentioned pile body is coated with the second pile protection hoop of steel along its circumferential direction.The top of pile body is along its circumferential direction Be coated with the second pile protection hoop of a circle or a part of steel, because pile protection hoop is steel, can on pile protection hoop the steely stick of fixed class one The component of sample, rod iron can be used welding or other means fixed with pile protection hoop, exposed rod iron be convenient at the top of concrete-pile it Between build framework of steel reinforcement structure inside piping lane roof, to construct the roof of piping lane;After the completion of pouring simultaneously, diaphragm wall and top It is also linked together by exposed rod iron between wall, connectivity is more firm between wall and the roof of piping lane;It is made of the stake Foundation pit enclosure of diaphragm wall when can be used as piping lane construction be used, the wall of the piping lane that also serves as uses, without additionally building The wall of tubing corridor both sides.
Similarly, it is located in the edge of a wing of the front at the second pile protection hoop and is equipped with one or more second built-in pipe, second Pile protection hoop is equipped with the second hole appeared for the opening of the second built-in pipe.
One or more described second built-in pipe is equipped in the edge of a wing at the rear portion at the second pile protection hoop, front The second built-in pipe in the edge of a wing at the edge of a wing and rear portion corresponds.
As an improvement, being fixed at left and right sides of the edge of a wing of front between at the top of above-mentioned first pile protection hoop and the pile body Steel plate, steel plate are arranged along the length direction of pile body.Diaphragm wall is being built using concrete-pile and when piping lane, two adjacent piles it Between can have a gap, and then moisture can be penetrated by gap in piping lane, can be by will be adjacent using diaphragm wall made of the stake Fixed steel plate welds together with seal clearance on the edge of a wing of two pile body fronts, achievees the effect that abundant waterproof, sealing, weldering The steel plate being connected together also further increases the fixing combined between stake and stake, continuity, certainly, if adjacent two steel plate Between larger can also be filled out in gap in gap set auxiliary welding steel, respectively at left and right sides of gap two blocks of steel plates weld.
As optimal case, steel is fixed at left and right sides of the edge of a wing of the front between the first pile protection hoop and the second pile protection hoop Plate, steel plate are arranged along the length direction of pile body.
It advanced optimizes, above-mentioned steel plate is the L-shaped angle steel in cross section, and the vertical wall of angle steel is fixed on the wing of pile body front On the side of edge, the horizontal wall of angle steel is fixed on the end face on the edge of a wing of pile body front.The cross section of angle steel is L-shaped, thus its with Concrete-pile contacts in two faces in side and front end face, and it is more firm to be combined with concrete-pile.
Advanced optimize, the side on the above-mentioned edge of a wing be provided along its length lateral protrusions to overlapped stage portion, The middle part of stage portion disconnects that the first pile protection hoop is arranged.Using diaphragm wall made of the stake, adjacent two H-type coagulations Native stake is overlapped by stage portion, and convenient for building, being combined by stage portion limit for adjacent two H-types concrete-pile is firm. In addition the piping lane side wall for using this H-type concrete-pile to build just is completed to build, construction is more by abutting for stage portion It is convenient;Moreover, the stage portion of above structure may insure the intensity of stage portion, ensure the enough power of concrete pile body stitching portion Performance is learned, the safety of piping lane is improved.
Second technical problem to be solved by this invention is to provide a kind of composition piping lane side particularly suitable for piping lane The diaphram wall of wall, the diaphram wall can be in constructions, the convenient bottom between adjacent two diaphragm wall build piping lane Plate, while ensureing that the connection between diaphragm wall and piping lane bottom plate is firm.
First technical solution is used by the present invention solves above-mentioned second technical problem:A kind of diaphram wall, Include the wall being spliced to form by squeezing into more in soil aforementioned H-type concrete-piles successively, in adjacent two pile bodies Two opposite concave parts surround to accommodate the filling space of filler jointly;It is characterized in that:On the first pile protection hoop It is welded with anchor rib, anchor rib exposes outside the front end face of wall.Before between the first pile protection hoop and the top of the pile body Steel plate is fixed at left and right sides of the portion edge of a wing, the steel plate is arranged along the length direction of pile body, on adjacent two H-type concrete-piles Steel plate be welded and fixed.
Exposed anchor rib is convenient for building the reinforcing bar of piping lane base plate interior between in the middle part of the diaphragm wall that concrete-pile is formed Skeleton structure, to construct the bottom plate of piping lane;After the completion of pouring simultaneously, also pass through exposed anchor rib between diaphragm wall and bottom plate It links together, connectivity is more firm between wall and the bottom plate of piping lane;It, can be by will be adjacent as described above to the description of steel plate Fixed steel plate welds together to seal the gap between stake and stake on the edge of a wing of two pile body fronts, reach abundant waterproof, The effect of sealing, and further increase the fixing combined between stake and stake, continuity.
Second technical solution is used by the present invention solves above-mentioned second technical problem:A kind of diaphram wall, Include the wall being spliced to form by squeezing into more in soil aforementioned H-type concrete-piles successively, in adjacent two pile bodies Two opposite concave parts surround to accommodate the filling space of filler jointly;It is characterized in that:At the edge of a wing of front First built-in pipe in be inserted with the first rod iron, the front end of the first rod iron exposes outside the front end face of wall.
Exposed rod iron is convenient for building the steel for constituting piping lane base plate interior between in the middle part of the diaphragm wall that concrete-pile is formed Tendons skeleton structure, to construct the bottom plate of piping lane;After the completion of pouring simultaneously, also pass through exposed rod iron between diaphragm wall and bottom plate It links together, connectivity is more firm between wall and the bottom plate of piping lane;Under the premise of not destroying the structure of pile body itself, increase pipe The safety of corridor, if rod iron is directly welded at the pile protection hoop of steel, to ensure bonding strength, the pile protection hoop of steel must be very thick, This increases cost with regard to consumptive material.If rod iron is directly threaded through on pile body side wall, the structure of pile body itself can be destroyed, piping lane is influenced Quality and safety;Foundation pit enclosure when this diaphragm wall can be used as piping lane construction is used, and the wall for the piping lane that also serves as uses, It without additionally building the wall of piping lane both sides, realizes stake, wall unification, reduces construction cost, simplify working procedure, when construction only More concrete-piles need to be squeezed into side by side successively in foundation pit both sides to be excavated to form the diaphragm wall of piping lane both sides, then only Earth excavation is carried out between the diaphragm wall of both sides, the earthwork of excavation greatly reduces, and greatly reduces the floor space of engineering, also greatly Shorten the construction duration of piping lane, this is particularly important for bustling city incity is constructed;It, can be straight because concrete-pile is in piling It connects and deeper hard layer is driven underground, and the entirety of piping lane is securely incorporated on the diaphragm wall formed by concrete-pile, this phase When in constructing solid pile foundation engineering to piping lane, to effectively avoid piping lane local collapse because geology sedimentation causes, The security risks such as deformation, dislocation, cracking and infiltration and piping lane floating, are more suitable for using piping lane made of this diaphragm wall softer The city of soil property is constructed, and working security is stronger.
It is preferred that the rear end of above-mentioned first rod iron is inserted into the filling space.The concrete perfusion in filling space, may be used also So that rod iron is become one structure with diaphragm wall, further enhances the fastness that rod iron is combined with pile body.
Advanced optimize, be also preset in the edge of a wing at the rear portion at the first pile protection hoop one or more described One built-in pipe;The rear end of first rod iron is inserted into after passing through concave part in the first built-in pipe at the edge of a wing at rear portion.This Sample can be respectively formed perforation in the edge of a wing before and after concave part, be conducive to rod iron after the first built-in pipe across the front edge of a wing through by groove Portion is inserted into the built-in pipe being located in the subsequent rear portion edge of a wing of groove, then is had when wall is made using the stake, is filled in filling space Concrete is noted, can also rod iron be made to become one structure with diaphragm wall, further enhance the fastness that rod iron is combined with pile body, to So that piping lane bottom plate build more stablize it is firm.
It is further improved, the top of above-mentioned pile body is coated with the second pile protection hoop of steel along its circumferential direction, is located at described second The edge of a wing of front at pile protection hoop is equipped with one or more second built-in pipe, and the second rod iron is plugged in second built-in pipe, the The front end of two rod irons exposes outside the front end face of wall.Exposed rod iron is convenient for taking between at the top of the diaphragm wall that concrete-pile is formed The framework of steel reinforcement structure being construed as inside piping lane roof, to construct the roof of piping lane;After the completion of pouring simultaneously, diaphragm wall and top It is also linked together by exposed rod iron between wall, connectivity is more firm between wall and the roof of piping lane;Do not destroying pile body The structure premise of itself, increases the safety of piping lane,
Similarly, the rear end of above-mentioned second rod iron is inserted into the filling space.
Also one or more described second built-in pipe is preset in the edge of a wing at the rear portion at the second pile protection hoop;Institute The rear end for stating the second rod iron is inserted into after concave part in the second built-in pipe in the edge of a wing at rear portion.
It is fixed with steel plate at left and right sides of the edge of a wing of the front on above-mentioned first pile protection hoop top, steel plate is along the length side of pile body To setting, the steel plate on adjacent two H-type concrete-piles is welded and fixed.It, can be by will be adjacent as described above to the description of steel plate Two pile body fronts the edge of a wing on fixed steel plate weld together to seal the gap between stake and stake, reach fully anti- The effect of water, sealing, and further increase the fixing combined between stake and stake, continuity.
Compared with the prior art, the advantages of the present invention are as follows:The middle part of pile body is coated with first of steel along its circumferential direction Cuff, because pile protection hoop be steel, can on pile protection hoop the steely stick of fixed class connecting component, rod iron can be used welding, screw thread connect It connects or other means and to be fixed with pile protection hoop;Because the edge of a wing of pile body is equipped with built-in pipe, the connectors such as rod iron can be conveniently firm Insertion built-in pipe in, so as to obtain convenient, firm back plate connections on pile body, with it is firm, easily connect, build The bottom plate of piping lane.Exposed rod iron is convenient for building the framework of steel reinforcement structure of piping lane base plate interior between in the middle part of concrete-pile, with Construct the bottom plate of piping lane;After the completion of pouring simultaneously, also linked together by exposed rod iron between diaphragm wall and bottom plate, wall Connectivity is more firm between the bottom plate of piping lane;Foundation pit when can be used as piping lane construction using the manufactured diaphragm wall of this encloses Shield is used, and the wall for the piping lane that also serves as uses, without the additional wall for building piping lane both sides.
Description of the drawings
Fig. 1 is the schematic diagram of front three-dimensional structure of H-type concrete-pile embodiment of the present invention;
Fig. 2 is enlarged drawing at the A of Fig. 1;
Fig. 3 is enlarged drawing at the B of Fig. 1;
Fig. 4 is the stereogram exploded view of H-type concrete-pile embodiment of the present invention;
Fig. 5 is the schematic diagram of front three-dimensional structure of diaphram wall embodiment of the present invention;
Fig. 6 is enlarged drawing at the C of Fig. 5;
Fig. 7 is enlarged drawing at the D of Fig. 5;
Fig. 8 is the upward view of diaphram wall embodiment of the present invention;
Fig. 9 is the vertical view of diaphram wall embodiment of the present invention;
Figure 10 is the dimensional structure diagram that diaphram wall embodiment rod iron of the present invention is connect with built-in pipe;
Figure 11 is the dimensional structure diagram of anchoring piece in diaphram wall embodiment of the present invention;
Figure 12 is the dimensional structure diagram that diaphram wall embodiment of the present invention uses on piping lane.
Specific implementation mode
Below in conjunction with attached drawing embodiment, present invention is further described in detail.
As shown in figures 1-4, it is a preferred embodiment of H-type concrete-pile of the present invention.
It is a kind of for building the H-type concrete-pile of piping lane side wall, including pile body 1, the cross section of the pile body 1 is by between front and back Every two edges of a wing 11 of setting and the H-shaped for the composition of web 12 for connecting two edges of a wing 11, two edges of a wing 11 and web 12 are in pile body 1 Both sides form the concave part 13 that extends along pile body length direction.
The improvement of the present invention essentially consists in:At 2/5ths of 1 length of pile body a circle steel is coated with along its circumferential direction The first pile protection hoop 2a, the first pile protection hoop 2a also substantially be in H-type, the first pile protection hoop 2a generally by the way of inserts in production Together with 1 pouring molding of pile body.
More first built-in pipe 3a, the first pile protection hoop 2a institutes are preset in the front edge of a wing 11 that first pile protection hoop 2a is coated Also it is preset with more first built-in pipe 3a in the rear portion edge of a wing 11 of cladding, the in the edge of a wing 11 of front and in the edge of a wing 11 at rear portion One built-in pipe 3a is corresponded.First built-in pipe 3a can be a kind of steel pipe fittings with internal thread or unthreaded hole, the first pile protection It is provided with the first hole 21a revealed for the front and back opening of the first built-in pipe 3a on hoop 2a, is molded in the first pile protection hoop 2a In the state of 1 middle part of pile body, the first built-in pipe 3a is located in the pile body 1, and the front and back opening of the first built-in pipe 3a is via first Hole 21a is revealed to be connected with the pile body external world.
The top of pile body 1 is coated with the second pile protection hoop 2b of a circle steel along its circumferential direction.
More second built-in pipes 3b, the second pile protection hoop 2b are preset in the edge of a wing 11 for the front that second pile protection hoop 2b is coated Also more second built-in pipe 3b are preset in the rear portion edge of a wing 11 corresponding position namely that it is coated, in the edge of a wing 11 of front It is corresponded with the second pre-buried 3b pipes in the edge of a wing 11 at rear portion.Second built-in pipe 3b can be a kind of with internal thread or unthreaded hole Steel pipe fittings, be provided with the second hole 21b revealed for the front and back opening of the second built-in pipe 3b on the second pile protection hoop 2b, Second pile protection hoop 2b is molded in the state of 1 top of the pile body, and the second built-in pipe 3b is located in the pile body 1, and second The front and back opening of built-in pipe 3b is revealed via the second hole 21b to be connected with the pile body external world.
Two corners of the left and right sides on the front edge of a wing 11 of the pile body 1 between the first pile protection hoop 2a and the second pile protection hoop 2b It is fixed with the L-shaped angle bar 5 in cross section, the vertical wall 51 of angle bar 5 is fixed on the side on the 1 front edge of a wing 11 of pile body, angle bar 5 Horizontal wall 52 is fixed on the front end face on the front edge of a wing of pile body 1.Angle bar 5 is strip and is arranged along the length direction of pile body 1.
The side on the edge of a wing 11 be provided along its length lateral protrusions to overlapped stage portion 14, in stage portion 14 Portion disconnects that the first pile protection hoop 2a is arranged, and has spacing d between the top and the top surface of concrete-pile 1 of stage portion 14, should Spacing d is being arranged the second pile protection hoop 2b, namely is not provided with stage portion 14 at the second pile protection hoop of the top of pile body 1; The two pile bodies 1 mutually spliced can be overlapped by the stage portion 14 positioned at 11 side of the respective edge of a wing, be overlapped 141 mutual pairs of the overlap joint side of the stage portion 14 on two edges of a wing 11 is set.The overlap joint side 141 of stage portion 14 is inclined-plane.Certain step Muscle slot inserting structure replacement can also be used in portion 14.
The middle part and top of pile body 1 are along its circumferential pile protection hoop for being coated with a circle steel corresponding respectively, because pile protection hoop is steel System, can on pile protection hoop the steely stick of fixed class component, rod iron can be used welding or other means fixed with pile protection hoop, in pile body The exposed rod iron in portion is convenient for building the framework of steel reinforcement knot of piping lane base plate interior between the middle part for the diaphragm wall that concrete-pile is built Structure, to construct the bottom plate of piping lane, the rod iron to leak outside at the top of pile body is convenient for building the roof of piping lane;After the completion of pouring simultaneously, even Continuous also to be linked together by exposed rod iron between wall and bottom plate, connectivity is more firm between wall and the bottom plate of piping lane;Using Foundation pit enclosure when the manufactured diaphragm wall of this can be used as piping lane construction is used, and the wall for the piping lane that also serves as uses, nothing The wall of piping lane both sides need to additionally be built.
It is a preferred embodiment of diaphram wall of the present invention as shown in Fig. 5~12.
A kind of diaphram wall includes being spelled by squeezing into H-type concrete-pile described in more previous embodiments in soil successively Connect the wall 4 to be formed, two opposite concave parts 13 surround to accommodate filler jointly in adjacent two pile bodies 1 Space 15 is filled, filling is filled with concrete in space 15.
The first rod iron 6a is plugged in the first built-in pipe 3a at the front edge of a wing 11, outside the front end of the first rod iron 6a Expose the front end face 41 of wall 4;The second rod iron 6b, the second rod iron 6b is plugged in the second built-in pipe 3b at the front edge of a wing 11 Front end expose outside the front end face 41 of wall 4.The rear end of first rod iron 6a is inserted into after passing through concave part 13 positioned at the rear portion edge of a wing 11 In the first built-in pipe 3a at place;Second be located at the rear portion edge of a wing 11 is inserted into advance in the rear end of second rod iron 6b after passing through concave part 13 In pipe laying 3b.Being inserted into the rod iron of built-in pipe can be fixed by the internal thread in built-in pipe, certainly also solderable on pile protection hoop It is fixed.
The first pile protection hoop 2a between adjacent two piles body 1 has certain spacing to form one section of first installation gap It is fixed with the first anchoring piece 7a in 8a, the first installation gap 8a, the first anchoring piece 7a is fixed on the first pile protection hoop 2a, the first anchor The front end face 41 of wall 4 is stretched out in the outer end of firmware 7a;The second pile protection hoop 2b between adjacent two piles body 1 has certain spacing It is fixed with the second anchoring piece 7b to be formed in one section of second installation gap 8b, the second installation gap 8b, the second anchoring piece 7b is fixed On the second pile protection hoop 2b, the front end face 41 of wall 4 is stretched out in the outer end of the second anchoring piece 7b.
First anchoring piece 7a includes the first fixed plate 71a, one or more first anchoring rods 72a, and the first anchoring rods 72a is worn And if be fixed on the first fixed plate 71a, the first fixed plate 71a is then weldingly fixed on the first pile protection on adjacent two piles body 1 2a outer end faces are bound round, the first fixed plate 71a installs gap 8a by described first and covers;Second anchoring piece 7b includes the second fixed plate 71b, one or more second anchoring rods 72b, the second anchoring rods 72b wear and are fixed on the second fixed plate 71b, second Fixed plate 71b is then weldingly fixed on the second pile protection hoop 2b outer end faces on adjacent two piles body 1, and the second fixed plate 71b will be described Second installation gap 8b is covered.
First anchoring piece 7a further includes the first backboard 73a, and the first rear portions anchoring rods 72a are fixed on the first backboard 73a, the One backboard 73a is resisted against behind the edge of a wing 11, and the first anchoring rods 72a activities are connected through a screw thread after passing through the first fixed plate 71a The first locking nut 74a on the first anchoring rods 72a and be locked on the first fixed plate 71a;Second anchoring piece 7b further includes Second backboard 73b, the second rear portions anchoring rods 72b are fixed on the second backboard 73b, after the second backboard 73b is resisted against the edge of a wing 11 Face, the second anchoring rods 72b activities are threadedly attached in the second lock on the second anchoring rods 72b after the second fixed plate 71b Tight nut 74b and be locked on the second fixed plate 71b.
Two corners of the left and right sides on the front edge of a wing 11 of the pile body 1 between the first pile protection hoop 2a and the second pile protection hoop 2b It is fixed with the L-shaped angle bar 5 in cross section, the vertical wall 51 of angle bar 5 is fixed on the side on the edge of a wing 11 of 1 front of pile body, angle bar 5 The edge of a wing that is fixed on 1 front of pile body of horizontal wall 52 front end face on, the angle bar 5 between adjacent two pile body 1 weld together with Play sealing, waterproof action.
As shown in figure 12, exposed rod iron 6a, 6b and anchoring rods 72a, 72b be convenient for the diaphragm wall formed in concrete-pile it Between build piping lane bottom plate 17, the framework of steel reinforcement structure inside roof 16, to construct the bottom plate 17 and roof 16 of piping lane;It pours simultaneously After the completion of building, also it is connected to by exposed rod iron 6a, 6b and anchoring rods 72a, 72b between diaphragm wall and bottom plate 17 and roof 16 Together, connectivity is more firm between wall and the bottom plate 17 and roof 16 of piping lane;In the structure premise for not destroying pile body itself, increase The safety of piping lane.
Although the preferred embodiment of the present invention described in detail above, it is to be clearly understood that for this field Technical staff for, the invention may be variously modified and varied.Appoint made by all within the spirits and principles of the present invention What modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (17)

1. the cross section of a kind of H-type concrete-pile for building piping lane side wall, including pile body (1), the pile body (1) is by front and back The H-shaped that spaced two edges of a wing (11) and the web (12) for connecting former and later two edges of a wing (11) are constituted, two edges of a wing (11) The concave part (13) extended along pile body (1) length direction is formed in the both sides of pile body (1) with web (12);It is characterized in that:Institute The middle part for stating pile body (1) is coated with the first pile protection hoop (2a) of steel along its circumferential direction;At the first pile protection hoop (2a) One or more first built-in pipe (3a) is equipped in the edge of a wing (11) of front, the first pile protection hoop (2a), which is equipped with, supplies the first built-in pipe The first hole (21a) that the opening of (3a) appears.
2. H-type concrete-pile according to claim 1, it is characterised in that:After at the first pile protection hoop (2a) It also is provided with one or more first built-in pipe (3a), the edge of a wing of the edge of a wing (11) and rear portion of front in the edge of a wing (11) in portion (11) the first built-in pipe (3a) in corresponds.
3. according to any H-type concrete-pile of claim 1~2, it is characterised in that:The top of the pile body (1) is along it Circumferentially it is coated with the second pile protection hoop (2b) of steel.
4. H-type concrete-pile according to claim 3, it is characterised in that:Before at the second pile protection hoop (2b) One or more second built-in pipe (3b) is equipped in the edge of a wing (11) in portion, the second pile protection hoop (2b), which is equipped with, supplies the second built-in pipe The second hole (21b) that the opening of (3b) appears.
5. H-type concrete-pile according to claim 4, it is characterised in that:After at the second pile protection hoop (2b) It also is provided with one or more second built-in pipe (3b), the edge of a wing of the edge of a wing (11) and rear portion of front in the edge of a wing (11) in portion (11) the second built-in pipe (3b) in corresponds.
6. H-type concrete-pile according to claim 1, it is characterised in that:The first pile protection hoop (2a) and the pile body (1) steel plate (5), length direction of the steel plate (5) along pile body (1) are fixed at left and right sides of the edge of a wing (11) of the front between top Setting.
7. H-type concrete-pile according to claim 3, it is characterised in that:The first pile protection hoop (2a) and described second Steel plate (5), length of the steel plate (5) along pile body (1) are fixed at left and right sides of the edge of a wing (11) of front between pile protection hoop (2b) Direction is arranged.
8. H-type concrete-pile according to claim 6, it is characterised in that:The steel plate (5) is the L-shaped angle in cross section Steel, the vertical wall (51) of angle steel are fixed on the side on the edge of a wing (11) of pile body (1) front, and the horizontal wall (52) of angle steel is fixed on On the end face on the edge of a wing (11) of pile body (1) front.
9. H-type concrete-pile according to claim 1, it is characterised in that:The side of the edge of a wing (11) is square along its length To equipped with lateral protrusions, to overlapped stage portion (14), the middle part of stage portion (14) disconnects so that first pile protection is arranged It binds round (2a).
10. a kind of diaphram wall includes by squeezing into more in soil H-type concrete-piles as described in claim 1 successively The wall (4) being spliced to form, two opposite concave parts (13) are enclosed jointly in the pile body (1) of adjacent two H-type concrete-piles At accommodating the filling space (15) of filler;It is characterized in that:It is welded with anchor rib, anchor on the first pile protection hoop (2a) Gu muscle exposes outside the front end face (41) of wall (4), the front between the first pile protection hoop (2a) and the pile body (1) top Steel plate (5) is fixed at left and right sides of the edge of a wing (11), the steel plate (5) is arranged along the length direction of pile body (1), adjacent two H Steel plate (5) on type concrete-pile is welded and fixed.
11. a kind of diaphram wall includes by squeezing into more in soil H-type concrete-piles as described in claim 1 successively The wall (4) being spliced to form, two opposite concave parts (13) are altogether in the pile body (1) of adjacent two H-type concrete-piles It is same to surround to accommodate the filling space (15) of filler;It is characterized in that:Described first at the edge of a wing (11) of front It is inserted with the first rod iron (6a) in built-in pipe (3a), the front end of the first rod iron (6a) exposes outside the front end face (41) of wall (4).
12. diaphram wall according to claim 11, it is characterised in that:Institute is inserted into the rear end of first rod iron (6a) It states in filling space (15).
13. diaphram wall according to claim 11, it is characterised in that:After at the first pile protection hoop (2a) It also is provided with one or more first built-in pipe (3a) in the edge of a wing (11) in portion;The rear end of first rod iron (6a) passes through recessed Groove portion (13) is inserted into afterwards in the first built-in pipe (3a) in the edge of a wing (11) at rear portion.
14. diaphram wall according to claim 11, it is characterised in that:It is circumferentially wrapped along it at the top of the pile body (1) It is covered with the second pile protection hoop (2b) of steel, the edge of a wing (11) for being located at the front at the second pile protection hoop (2b) is equipped with one or more The second built-in pipe of root (3b), second built-in pipe (3b) is interior to plug the second rod iron (6b), and the front end of the second rod iron (6b) is exposed Go out the front end face (41) of wall (4).
15. diaphram wall according to claim 14, it is characterised in that:Institute is inserted into the rear end of second rod iron (6b) It states in filling space (15).
16. diaphram wall according to claim 14, it is characterised in that:After at the second pile protection hoop (2b) It also is provided with one or more second built-in pipe (3b) in the edge of a wing (11) in portion;The rear end of second rod iron (6b) passes through recessed Groove portion (13) is inserted into afterwards in the second built-in pipe (3b) in the edge of a wing (11) at rear portion.
17. diaphram wall according to claim 11, it is characterised in that:The first pile protection hoop (2a) and the pile body (1) steel plate (5), length side of the steel plate along pile body (1) are fixed at left and right sides of the edge of a wing (11) of the front between top To setting, the steel plate on adjacent two H-type concrete-piles is welded and fixed.
CN201610834832.2A 2016-09-20 2016-09-20 H-type concrete-pile and diaphram wall for building piping lane side wall Active CN106284299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610834832.2A CN106284299B (en) 2016-09-20 2016-09-20 H-type concrete-pile and diaphram wall for building piping lane side wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610834832.2A CN106284299B (en) 2016-09-20 2016-09-20 H-type concrete-pile and diaphram wall for building piping lane side wall

Publications (2)

Publication Number Publication Date
CN106284299A CN106284299A (en) 2017-01-04
CN106284299B true CN106284299B (en) 2018-10-23

Family

ID=57712239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610834832.2A Active CN106284299B (en) 2016-09-20 2016-09-20 H-type concrete-pile and diaphram wall for building piping lane side wall

Country Status (1)

Country Link
CN (1) CN106284299B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106854874B (en) * 2017-01-18 2022-08-09 俞晓东 Underground spliced wall and precast concrete pile for same
CN109826229B (en) * 2019-01-17 2021-02-02 重庆建筑工程职业学院 Concrete pile for constructing side wall of assembled pipe gallery

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR960016755B1 (en) * 1993-12-07 1996-12-20 박정진 Working method and working apparatus of underground structure
CN101560766A (en) * 2009-05-13 2009-10-21 江苏东大鸿基科技有限公司 Grid-like underground continuous wall plate and production method thereof
CN202559363U (en) * 2012-04-09 2012-11-28 东南大学 Foundation pit supporting structure for underground diaphragm wall with steel structure
CN203559411U (en) * 2013-07-31 2014-04-23 谢建富 H-shaped support pile connecting structure
CN206110114U (en) * 2016-09-20 2017-04-19 俞晓东 A H type concrete pile and underground continuous wall for making up piping lane lateral wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR960016755B1 (en) * 1993-12-07 1996-12-20 박정진 Working method and working apparatus of underground structure
CN101560766A (en) * 2009-05-13 2009-10-21 江苏东大鸿基科技有限公司 Grid-like underground continuous wall plate and production method thereof
CN202559363U (en) * 2012-04-09 2012-11-28 东南大学 Foundation pit supporting structure for underground diaphragm wall with steel structure
CN203559411U (en) * 2013-07-31 2014-04-23 谢建富 H-shaped support pile connecting structure
CN206110114U (en) * 2016-09-20 2017-04-19 俞晓东 A H type concrete pile and underground continuous wall for making up piping lane lateral wall

Also Published As

Publication number Publication date
CN106284299A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106049530B (en) City integrated piping lane and construction method
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
CN206189455U (en) Piping lane
CN103343538B (en) Supporting and construction method of steel sheet pile under soft foundation of high flow plastic deep layer
CN208363127U (en) A kind of retaining wall structure of combined type high-speed rail platform
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN105421470A (en) Construction method for assembled type anchor rod and arch framework combined type ecological slope protection
CN105002976A (en) Prefabricated gutter inlet and construction method thereof
CN108797637A (en) Prefabricated board combined cast-in-situ concrete considers the underground pipe gallery construction method of structure and ground
CN205776345U (en) City integrated piping lane
CN106284299B (en) H-type concrete-pile and diaphram wall for building piping lane side wall
CN207512777U (en) Assembled underground pipe gallery
CN108035379A (en) A kind of pipe gallery and its construction method
CN207878505U (en) A kind of prefabricated piping lane of assembly concrete
CN206457842U (en) A kind of underground combination and the precast concrete pile for the underground combination
CN112412472B (en) Pipe-jacking working well wall reverse-acting system in soft soil area and construction method and application thereof
CN104099946A (en) Novel jacking pipe intersegment overhaul well
CN106368211B (en) Rectangular concrete pile for building piping lane side wall
WO2009005244A2 (en) Method for burying hume pipes and support block used in the method
CN206693265U (en) A kind of installation node of piping lane
CN206110114U (en) A H type concrete pile and underground continuous wall for making up piping lane lateral wall
CN107476315A (en) A kind of prefabricated component and its construction method being directed to close to type foundation ditch
CN106480875B (en) For constructing the rectangular concrete pile of piping lane side wall
CN206204928U (en) Constitute the diaphram wall of piping lane side wall
CN106284298B (en) Constitute the diaphram wall of piping lane side wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20230724