CN106253218A - Control load intelligent breaker - Google Patents
Control load intelligent breaker Download PDFInfo
- Publication number
- CN106253218A CN106253218A CN201610695396.5A CN201610695396A CN106253218A CN 106253218 A CN106253218 A CN 106253218A CN 201610695396 A CN201610695396 A CN 201610695396A CN 106253218 A CN106253218 A CN 106253218A
- Authority
- CN
- China
- Prior art keywords
- processing unit
- central processing
- module
- housing
- phase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012545 processing Methods 0.000 claims abstract description 52
- 230000005611 electricity Effects 0.000 claims abstract description 20
- 238000012544 monitoring process Methods 0.000 claims abstract description 11
- 238000012360 testing method Methods 0.000 claims description 19
- 238000004891 communication Methods 0.000 claims description 15
- 230000009471 action Effects 0.000 claims description 7
- 238000005516 engineering process Methods 0.000 claims description 5
- 230000001681 protective effect Effects 0.000 claims description 3
- 238000001514 detection method Methods 0.000 abstract description 7
- 230000004222 uncontrolled growth Effects 0.000 abstract description 4
- 230000006870 function Effects 0.000 description 11
- 238000000034 method Methods 0.000 description 4
- 238000005070 sampling Methods 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 3
- 240000002853 Nelumbo nucifera Species 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 2
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 244000131316 Panax pseudoginseng Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/42—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to product of voltage and current
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/08—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to excess current
- H02H3/10—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to excess current additionally responsive to some other abnormal electrical conditions
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/26—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to difference between voltages or between currents; responsive to phase angle between voltages or between currents
- H02H3/32—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to difference between voltages or between currents; responsive to phase angle between voltages or between currents involving comparison of the voltage or current values at corresponding points in different conductors of a single system, e.g. of currents in go and return conductors
-
- H02J13/0006—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/40—Display of information, e.g. of data or controls
Landscapes
- Breakers (AREA)
- Emergency Protection Circuit Devices (AREA)
Abstract
The invention discloses a kind of control load intelligent breaker; including housing, input terminal and outlet terminal; connect between any two phase lines in housing and have power module; power module connects central processing unit; on three-phase line in housing, correspondence is serially connected with chopper normally-closed contact; chopper normally-closed contact is connected with circuit breaker tripping coil and leakage protection module in turn, and central processing unit is connected with leakage protection module, is additionally provided with overload trip protection device in housing;Central processing unit is also associated with three phase current sample coil, and central processing unit is also associated with power consumption monitoring module, display module and pc client;Power user is regardless of whether connect with zero line, central processing unit can utilize the voltage of 380v normally to work, make user cannot walk around the detection of central processing unit, so that customer charge is the most all in monitoring, avoid electricity consumption of breaking a contract, the containment Liao Tai district uncontrolled growth of load, reduces line losses indices, improves platform district quality of voltage effectively.
Description
Technical field
The present invention relates to a kind of electrical equipment technical field, particularly relate to a kind of control load intelligent breaker.
Background technology
Current limliting RCCB is used for controlling and protecting low-voltage network, and current limliting RCCB of the prior art is main
Be the 220v civil power using low-pressure side as working power, above-mentioned intelligent breaker is primarily present following shortcoming, and user can be around
Crossing central processing unit controlling organization and carry out electricity consumption, make detection equipment inoperative, user mainly realizes by the following means
:
1. zero line is around more type: zero line, after ammeter is drawn, through current limliting RCCB but is not directly registered one's residence, now
Current limliting RCCB only introduces and has allotted three live wires.
2. zero line deletion form: zero line is after ammeter is drawn, although have zero line to allot, but allot zero line and do not leak electricity toward current limliting
Wiring on chopper, or ammeter do not allots zero line, and now current limliting RCCB only has three live wires to enter, the zero of exit
Line performs practically no function, and the voltage entering customer charge terminal is 380V.
Both the above mode is all not provide zero line to current limliting RCCB, and this cheating makes control and monitor console district bear
Lotus becomes uncontrollable, and transformator heavy duty, overloading happen occasionally, and serious overload is easily burnt transformator and cable occurs, with
Time jeopardize high-tension line safe operation and low-voltage electricity transmission line, cause line loss remain high, quality of voltage is low, badly influences residence
The normal electricity consumption of people lighting consumer, not only cause unpredictable loss to electric company, and very disruptive is for electricity consumption order
Sequence.
Summary of the invention
The technical problem to be solved be to provide a kind of can limited load, anticreep, auxiliary expense control control bear
Lotus intelligent breaker.
For solving above-mentioned technical problem, the technical scheme is that control load intelligent breaker, including housing, institute
Stating housing tip and be provided with four input terminals connecting three-phase four-wire circuit, the corresponding described input terminal in described housing bottom sets
There are four outlet terminals, the electrical connection corresponding with described outlet terminal of described input terminal, it is positioned at any two of described housing
Connecting between phase line and have power module, the connection of the electric power output of described power module has central processing unit, in described housing
On three-phase line, correspondence is serially connected with the chopper normally-closed contact of gearing respectively, and described chopper normally-closed contact connects has chopper to take off
Fastening wire circle, described circuit breaker tripping coil connects leakage protection module, described central processing unit and described leakage protection module
Connect, in described housing, be additionally provided with the overload trip protection device being connected with described leakage protection module;Also set in described housing
There is the arrearage tripping operation modular device being connected with described leakage protection module;Described housing is outer is correspondingly provided with three phases with three-phase line
Current sampling coil, described phase current sample coil is connected to described central processing unit, institute by phase current signal modular converter
The outfan stating central processing unit is also associated with power consumption monitoring module and display module, and described display module is flush-mounted in described shell
The surface of body, described central processing unit is connected to pc client by going back communication module.
As preferred technical scheme, the zero-sequence current that described overload trip protection device is provided with in being included in described housing
Sample coil, described zero-sequence current sample coil is connected to described leakage protection module.
As preferred technical scheme, described three-phase four-wire circuit includes phase line A, phase line B and phase line C and zero line N,
It is connected between described central processing unit with described zero line N and has zero line leakage tests branch road.
As preferred technical scheme, described zero line leakage tests branch road includes the safety electricity being connected on described zero line N
The outfan of resistance R, described safe Resistance R connects leakage tests button K, and the wire of described leakage tests button K outfan is even
Being connected in any one phase line, described leakage tests button K both sides are parallel with button actions and control circuit, described button actions control
Connection processed is to described central processing unit, and described leakage tests button K is flush-mounted on described housing.
As preferred technical scheme, described power consumption monitoring module includes mis module of marketing, described marketing mis module
Outfan connect have intelligent electric meter, described intelligent electric meter to be installed in described housing.
As preferred technical scheme, described pc client includes processor, hard disk, internal memory and system bus.
As preferred technical scheme, described communication module be set to based on wired communication interface or based on GPRS, EDGE,
The wireless communication interface of WLAN, Wi-Fi, 3G, 4G technology.
Owing to have employed technique scheme, controlling load intelligent breaker, including housing, described housing tip is provided with even
Connecing four input terminals of three-phase four-wire circuit, the corresponding described input terminal in described housing bottom is provided with four outlet terminals,
The electrical connection corresponding with described outlet terminal of described input terminal, connects between any two phase lines in described housing and has electricity
Source module, the connection of the electric power output of described power module has central processing unit, the most right on the three-phase line in described housing
Should be serially connected with the chopper normally-closed contact of gearing, described chopper normally-closed contact connects circuit breaker tripping coil, described open circuit
Device tripping coil connects has leakage protection module, described central processing unit to be connected with described leakage protection module, in described housing
It is additionally provided with the overload trip protection device being connected with described leakage protection module;Described housing is outer and three-phase line is correspondingly provided with three
Individual phase current sample coil, described phase current sample coil is connected to described central authorities by phase current signal modular converter and processes
Device, the outfan of described central processing unit is also associated with power consumption monitoring module and display module, and described display module is flush-mounted in
The surface of described housing, described central processing unit is connected to pc client by going back communication module;The invention has the beneficial effects as follows:
After above-mentioned technological means, power user is regardless of whether connect and use zero line, and central processing unit can utilize the voltage of 380V to enter
The normal work of row so that user cannot walk around the detection of central processing unit, so that customer charge is the most all in monitoring, it is to avoid
Promise breaking electricity consumption, the containment Liao Tai district uncontrolled growth of load, reduces line losses indices, improves platform district quality of voltage effectively,
In addition, also add power consumption control function, i.e. take control function, utilize tripping mechanism and marketing system and the meter of chopper
Scale coordinates, and can realize arrearage trip remotely function, can be effectively prevented from the risk of big power family owing electricity charges.
Accompanying drawing explanation
The following drawings is only intended to, in schematically illustrating the present invention and explaining, not delimit the scope of the invention.Wherein:
Fig. 1 is the easy structure schematic diagram of the embodiment of the present invention;
Fig. 2 is the structured flowchart of the embodiment of the present invention;
Fig. 3 is the circuit theory diagrams of the embodiment of the present invention;
In figure: 1-housing;2-input terminal;3-outlet terminal;4-central processing unit;5-chopper normally-closed contact.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, the present invention is expanded on further.In the following detailed description, only by explanation
Mode describes some one exemplary embodiment of the present invention.Undoubtedly, those of ordinary skill in the art will be consequently realised that,
In the case of without departing from the spirit and scope of the present invention, by various different modes, described embodiment can be repaiied
Just.Therefore, accompanying drawing and description are inherently the most illustrative rather than are used for limiting scope of the claims.
As shown in Figure 1, Figure 2 and Figure 3, controlling load intelligent breaker, including housing 1, described housing 1 top is provided with connection
Four input terminals 2 of three-phase four-wire circuit, the corresponding described input terminal 2 in described housing 1 bottom is provided with four outlet terminals
3, described input terminal 2 and described outlet terminal 3 electrically connects by guiding one_to_one corresponding, formed the phase line in described housing 1 and
Zero line.
Connecting between any two phase lines in described housing 1 and have power module, the electric power of described power module is defeated
The connection gone out has central processing unit 4, and the present embodiment utilizes and the most biphase in three-phase firewire does power supply, will described central processing unit
Power supply powered by original 220v and change 380v into and power, make power user regardless of whether connect with zero line, described central processing unit
Can normally work so that user cannot walk around the detection of described central processing unit, so that customer charge is the most all at prison
In control, it is to avoid the phenomenon of promise breaking electricity consumption.
On three-phase line in described housing 1, correspondence is serially connected with the chopper normally-closed contact 5 of gearing, described chopper respectively
Normally-closed contact 5 connects circuit breaker tripping coil, and described circuit breaker tripping coil connects leakage protection module, described centre
Reason device is connected with described leakage protection module, is additionally provided with, in described housing 1, the overload trip being connected with described leakage protection module
Protection device, the zero-sequence current sample coil that described overload trip protection device is provided with in being included in described housing 1, described zero sequence
Current sampling coil is connected to described leakage protection module.The outfan of described central processing unit is also associated with display module, institute
Stating display module and be flush-mounted in the surface of described housing 1, each sample coil is it can also be provided that current transformer.In described housing also
It is provided with the arrearage tripping operation modular device being connected with described leakage protection module.
Described housing 1 is outer and three-phase line is correspondingly provided with three phase current sample coil, and described phase current sample coil is led to
Crossing phase current signal modular converter and be connected to described central processing unit, described phase current signal modular converter is by the electric current letter of sensing
Number be changed into the digital signal that described central processing unit is capable of identify that, described three-phase four-wire circuit include phase line A, phase line B and
Phase line C and zero line N, be connected between described central processing unit with described zero line N and have zero line leakage tests branch road, and described zero line leaks electricity
Test branch road includes that the outfan connection of the safe Resistance R, described safe Resistance R that are connected on described zero line N has leakage tests
Button K, the wire of described leakage tests button K outfan is connected in any one phase line, described leakage tests button K both sides
Being parallel with button actions and control circuit, described button actions controls circuit and is connected to described central processing unit, described leakage tests
Button K is flush-mounted on described housing 1.
The outfan of described central processing unit is also associated with power consumption monitoring module, and described central processing unit is by also communication
Module is connected to pc client.Described power consumption monitoring module includes mis module of marketing, the outfan of described marketing mis module
Connecting has intelligent electric meter, described intelligent electric meter to be installed in described housing 1.Described arrearage tripping operation modular device is located at described intelligence
In ammeter, for the technical scheme known to those of ordinary skill in described technical field, no longer describe in detail at this.Described PC visitor
Family end include processor, hard disk, internal memory and system bus, described communication module be set to based on wired communication interface or based on
The wireless communication interface of GPRS, EDGE, WLAN, Wi-Fi, 3G, 4G technology.
Described central processing unit powers on, and power supply is taken from civil power 380v and powered, and described central processing unit initializes, described display
Module display limits power initial value, starts the parameters such as wheel aobvious each phase voltage, electric current, active power afterwards.
Operationally, circulation shows A, B, C three-phase voltage, size of current and current system to described display module respectively
Power.Information content passes through LED group of four figures pipe video data in turn.4 LED data pipe from left to right first expression classes
Not, A represents A phase;B represents B phase;C represents C phase;P represents power, second and third, four, for current data measured, system is surveyed
Current unit be ampere (A), power unit is kilowatt (kW).
When powering on, the LED numeral method of described display module first self-inspection four is the most correct, system loads numeral
0~9 display times of each digital 500 milliseconds, after numeral has loaded, described display module reads the current power set
Value, show value i.e. represents the current-limited power such as 10kW of current setting, after power exceedes this setting value, equipment delay adjustments time
Between (in delay time still overload power utilization), be then cut off power supply, after this video data shows 1 second, system enters normal work
Make state.
When normally working, LED group of four figures pipe takes turns aobvious electric current and power respectively, and data are from A phase, B phase, C phase and power P
Show respectively, as A:10.1 represents that A phase current current system measured value is that (these data are due to systematic error, general and real for 10.1A
Actual value has the error amount of 5%);B15.6 represents that B phase current current system measured value is 15.6A;C12.4 represents that C phase current is current
Measured value is 12.4A;P8.20 represents that current power power is 8.20kW.
The operation principle of the present embodiment is:
The current sampling of phase line is carried out by three phase current sample coil, and by described phase current signal modular converter
It is sent to described central processing unit, by described central processing unit computing output and carried out numerical value by described display module and show.
Customer parameter utilizes software editing good through pc client, is issued to described central authorities by communication serial ports or wireless network
In processor (customer parameter includes rated power, overload power, permission overload time etc.), when customer charge is normal, from institute
The customer parameter stating the signal storage interior with described central processing unit that the sampling of phase current sample coil comes is made comparisons, if detection ginseng
Number is less than the rated power of customer parameter, then equipment runs well;If it exceeds the rated power of customer parameter, but it is less than
Overload power, the most described central processing unit starts timing, when load exceedes rated power but is not above the permission overload set
Time i.e. recovers normal, then overload time next time is from zero meter;When based model for load duration exceedes rated power and exceedes the permission of setting
After the load time, the most described central processing unit sends trip command, by described leakage protection module and described circuit breaker tripping line
Circle carries out safety trip.
When customer charge directly exceedes overload power, and the most described central processing unit directly sends trip command.Described central authorities
Processor sends trip command and connects described zero line leakage tests branch road by described leakage protection module, makes zero-sequence current sample
Coil midstream crosses out-of-balance current, so that described leakage protection module judges that system exists electric leakage and sends trip command, and control
Make described circuit breaker tripping coil to connect, make tripping mechanism tripping operation thus disconnect user's power supply.
The described central processing unit of the present embodiment passes through three described phase current sample coil detection load, judges user
Power load size, when user power utilization load exceedes assumed load value and during not less than maximum, and described central processing unit starts
Timing, when based model for load duration is constant, timing time reaches setting value and trips, when customer charge exceedes maximum, by described
Central processing unit directly sends trip command, controls customer charge with this.
The present embodiment mainly realizes following functions:
One, short-circuit protection.When there is overload, are short-circuited in protected circuit or subscriber equipment, phase current sample coil
In flow through larger current, drive circuit breaker tripping coil to complete instantaneous trip action, thus cut off the electricity supply and play overload or short circuit
Protective effect.
Two, earth leakage protective.When having in by protection circuit phase line grounding or the person to get an electric shock, as long as residual current reaches to adjust
Working value, zero-sequence current sample coil just one signal of output, under the control of described leakage protection module, drive chopper to take off
Fastening wire circle completes instantaneous trip action, starts electric leakage and electrical shock protection effect.
After above-mentioned technological improvement, the present embodiment can bring following benefit:
One, power supplying efficiency is improved.The effectively containment platform district uncontrolled growth of load, reduces the damage that circuit increases because of overload
Consumption, reduces transformator heavy duty, the generation of overload situations, improves the controllability of load and orderly development, alleviate power supply enterprise with
Electric power distribution transforming increase-volume pressure during electricity peak.
Two, power supply cost is saved.All of electric cost, finally can embody by the way of finance are settled accounts with cash
Out, the expense not causing other rises and increases extra work amount.As caused transformator because of user's unordered increase load
The demand of capacity strengthens, and the investment of increase-volume and labour cost;Transformator heavy duty, overload is caused because of user's unordered increase load
The line loss loss brought increases, degradation loss under quality of voltage;Because user's unordered increase load causes transformator overload to burn out
Replacing and labour cost etc..
Three, power supply quality is improved.There is provided stable electric power for electrical equipment, effectively control line losses indices, improve platform district electricity
Pressure quality.
Four, arrearage trip avoidance function.The expense control function newly increased, coordinates with described marketing mis system and gauge table, can realize
Arrearage trip remotely function, thus it is prevented effectively from the risk of big power family owing electricity charges, save manpower output.
After the present embodiment is by above-mentioned technological means, power user is regardless of whether connect and use zero line, and central processing unit can
The voltage utilizing 380V normally works so that user cannot walk around the detection of central processing unit, so that customer charge begins
Eventually all in monitoring, it is to avoid promise breaking electricity consumption, the containment Liao Tai district uncontrolled growth of load, reduces line losses indices, carries effectively
Gao Liaotai district quality of voltage, in addition, also add power consumption control function, i.e. takes control function, utilize the tripping operation of chopper
Mechanism coordinates with marketing system and gauge table, can realize arrearage trip remotely function, can be effectively prevented from big power family and be in arrears with electricity
The risk taken, it is to avoid the uncertain factor urging expense and produce of manually visiting, reduces artificial output, is effectively prevented from urging expense process
In the generation of the phenomenon such as the complaint that causes with user's confusing communication.
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.The technology of the industry
Personnel, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrating this described in above-described embodiment and description
The principle of invention, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, and these become
Change and improvement both falls within scope of the claimed invention.Claimed scope by appending claims and
Equivalent defines.
Claims (7)
1. control load intelligent breaker, including housing, it is characterised in that: described housing tip is provided with connection three-phase four-wire system line
Four input terminals on road, the corresponding described input terminal in described housing bottom is provided with four outlet terminals, described input terminal with
Described outlet terminal correspondence electrically connects, and connecting between any two phase lines in described housing has power module, described electricity
The connection of the electric power output of source module has central processing unit, and on the three-phase line in described housing, correspondence is serially connected with gearing respectively
Chopper normally-closed contact, described chopper normally-closed contact connects circuit breaker tripping coil, and described circuit breaker tripping coil connects
There are leakage protection module, described central processing unit to be connected with described leakage protection module, are additionally provided with in described housing and described leakage
The overload trip protection device that electric protection module connects;The arrearage being connected with described leakage protection module it is additionally provided with in described housing
Tripping operation modular device;Described housing is outer and three-phase line is correspondingly provided with three phase current sample coil, described phase current sample line
Circle is connected to described central processing unit by phase current signal modular converter, and the outfan of described central processing unit is also associated with using
Electricity monitoring module and display module, described display module is flush-mounted in the surface of described housing, and described central processing unit is by also
Communication module is connected to pc client.
2. control load intelligent breaker as claimed in claim 1, it is characterised in that: described overload trip protection device includes
The zero-sequence current sample coil being provided with in described housing, described zero-sequence current sample coil is connected to described earth leakage protective mould
Block.
3. control load intelligent breaker as claimed in claim 1, it is characterised in that: described three-phase four-wire circuit includes phase
Line A, phase line B and phase line C and zero line N, be connected between described central processing unit with described zero line N and have zero line leakage tests branch road.
4. control load intelligent breaker as claimed in claim 3, it is characterised in that: described zero line leakage tests branch road includes
The outfan connection being connected to the safe Resistance R on described zero line N, described safe Resistance R has leakage tests button K, described leakage
The wire of electrical testing button K outfan is connected in any one phase line, and described leakage tests button K both sides are parallel with button and move
Making to control circuit, described button actions controls circuit and is connected to described central processing unit, and described leakage tests button K is flush-mounted in institute
State on housing.
5. the control load intelligent breaker as described in claim 1,2,3 or 4, it is characterised in that: described power consumption monitoring mould
Block includes mis module of marketing, and the outfan of described marketing mis module connects has intelligent electric meter, described intelligent electric meter to be installed on institute
State in housing.
6. as claimed in claim 5 control load intelligent breaker, it is characterised in that: described pc client include processor,
Hard disk, internal memory and system bus.
7. control load intelligent breaker as claimed in claim 6, it is characterised in that: described communication module is set to based on having
Line communication interface or wireless communication interface based on GPRS, EDGE, WLAN, Wi-Fi, 3G, 4G technology.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610695396.5A CN106253218A (en) | 2016-08-19 | 2016-08-19 | Control load intelligent breaker |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610695396.5A CN106253218A (en) | 2016-08-19 | 2016-08-19 | Control load intelligent breaker |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106253218A true CN106253218A (en) | 2016-12-21 |
Family
ID=57592488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610695396.5A Pending CN106253218A (en) | 2016-08-19 | 2016-08-19 | Control load intelligent breaker |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106253218A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115060944A (en) * | 2022-06-09 | 2022-09-16 | 国网山东省电力公司金乡县供电公司 | Three-phase four-wire electric energy meter charge control system and method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201174571Y (en) * | 2008-03-31 | 2008-12-31 | 林龙杰 | Micro circuit breaker having micro-computer protection and liquid crystal display |
CN102290861A (en) * | 2011-07-26 | 2011-12-21 | 大江控股集团有限公司 | Intelligent modular comprehensive terminal protector |
CN202363377U (en) * | 2011-11-24 | 2012-08-01 | 天津市百利电气有限公司 | Electric leakage breaker capable of providing continuous working power supply |
CN102761173A (en) * | 2012-06-15 | 2012-10-31 | 王成楷 | Intelligent electric meter with functions of leakage remote monitoring and protection |
CN204215976U (en) * | 2014-12-03 | 2015-03-18 | 国网山东桓台县供电公司 | Remote bill control function four atomic type leakage, breaking apparatus |
CN204649834U (en) * | 2015-04-28 | 2015-09-16 | 吴京蓁 | A kind of integral and intelligent electric energy meter with leakage current monitoring and protecting function |
CN105680416A (en) * | 2016-03-22 | 2016-06-15 | 首瑞(天津)电气设备有限公司 | Residual current protector |
CN205945020U (en) * | 2016-08-19 | 2017-02-08 | 国网山东省电力公司昌邑市供电公司 | Intelligent circuit breaker of control load |
-
2016
- 2016-08-19 CN CN201610695396.5A patent/CN106253218A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201174571Y (en) * | 2008-03-31 | 2008-12-31 | 林龙杰 | Micro circuit breaker having micro-computer protection and liquid crystal display |
CN102290861A (en) * | 2011-07-26 | 2011-12-21 | 大江控股集团有限公司 | Intelligent modular comprehensive terminal protector |
CN202363377U (en) * | 2011-11-24 | 2012-08-01 | 天津市百利电气有限公司 | Electric leakage breaker capable of providing continuous working power supply |
CN102761173A (en) * | 2012-06-15 | 2012-10-31 | 王成楷 | Intelligent electric meter with functions of leakage remote monitoring and protection |
CN204215976U (en) * | 2014-12-03 | 2015-03-18 | 国网山东桓台县供电公司 | Remote bill control function four atomic type leakage, breaking apparatus |
CN204649834U (en) * | 2015-04-28 | 2015-09-16 | 吴京蓁 | A kind of integral and intelligent electric energy meter with leakage current monitoring and protecting function |
CN105680416A (en) * | 2016-03-22 | 2016-06-15 | 首瑞(天津)电气设备有限公司 | Residual current protector |
CN205945020U (en) * | 2016-08-19 | 2017-02-08 | 国网山东省电力公司昌邑市供电公司 | Intelligent circuit breaker of control load |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115060944A (en) * | 2022-06-09 | 2022-09-16 | 国网山东省电力公司金乡县供电公司 | Three-phase four-wire electric energy meter charge control system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108859830B (en) | Power management system of electric automobile charging pile intelligent power distribution and charging pile with same | |
CN106476650A (en) | Portable charging energy-storing system and its control method | |
CN206100017U (en) | Electric automobile fills electric pile communication protocol detection device | |
CN108767952A (en) | A kind of off-board charging system to interconnect | |
CN106841876A (en) | A kind of monitoring method of relay protection outlet pressing plate | |
CN203537035U (en) | Pre-charging/discharging device of energy storage system | |
CN205544419U (en) | Movable stores up and joins in marriage integrated electric wire netting box -type substation that initiatively declines | |
CN107834578A (en) | A kind of automatic commutation system and method for low pressure phase-change switch | |
CN105811553B (en) | A kind of family expenses quick charge device and its control method | |
CN106707030A (en) | Method and device for measuring grounding impedance and power loss of distribution transformer | |
CN102185290A (en) | Self-recovering method of single-phase earth faults | |
CN104393602B (en) | Adjusting method and device for distributed energy resource network | |
CN205945020U (en) | Intelligent circuit breaker of control load | |
CN113629830A (en) | Safety protection method for electric vehicle charging facility | |
CN106253218A (en) | Control load intelligent breaker | |
CN105048562A (en) | Direct-current charging pile | |
CN104467050A (en) | Charging and discharging control method and device for storage battery | |
CN206788308U (en) | Full-automatic multiloop secondary cable Insulation test servicing unit | |
CN206416866U (en) | Portable charging energy-storing system | |
CN204858159U (en) | Smart jack case with network and state monitoring | |
CN105186457B (en) | Motor Protective Device | |
CN205029333U (en) | Little electric wire netting intelligent protection device based on regional information | |
CN207572954U (en) | AC three-phase intelligent object | |
CN207780125U (en) | A kind of test device for relay protection | |
CN110320414A (en) | It is a kind of applied to the precharge Phase sequence detection of single-phase SVG and guard method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161221 |
|
RJ01 | Rejection of invention patent application after publication |