CN106251025A - Electric power material distribution route recommendation system and method - Google Patents
Electric power material distribution route recommendation system and method Download PDFInfo
- Publication number
- CN106251025A CN106251025A CN201610662789.6A CN201610662789A CN106251025A CN 106251025 A CN106251025 A CN 106251025A CN 201610662789 A CN201610662789 A CN 201610662789A CN 106251025 A CN106251025 A CN 106251025A
- Authority
- CN
- China
- Prior art keywords
- module
- point
- data processing
- processing module
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000463 material Substances 0.000 title claims abstract description 87
- 238000009826 distribution Methods 0.000 title claims abstract description 50
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000012545 processing Methods 0.000 claims abstract description 59
- 238000007405 data analysis Methods 0.000 claims abstract description 12
- 238000013500 data storage Methods 0.000 claims abstract description 3
- 238000003860 storage Methods 0.000 claims description 18
- 238000005259 measurement Methods 0.000 claims description 11
- 241001269238 Data Species 0.000 claims description 2
- 210000000352 storage cell Anatomy 0.000 claims description 2
- 238000013439 planning Methods 0.000 abstract description 4
- 238000005457 optimization Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 5
- 206010039203 Road traffic accident Diseases 0.000 description 4
- 238000007726 management method Methods 0.000 description 3
- 238000012384 transportation and delivery Methods 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
- G06Q10/047—Optimisation of routes or paths, e.g. travelling salesman problem
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Navigation (AREA)
Abstract
A power material distribution route recommendation system and method uses an input module, an MCU module, a navigation module and a display module, wherein the MCU module comprises a data storage unit, and the system comprises a first data processing module and a second data processing module; the method comprises the following steps that 1, a driver inputs a query instruction into an MCU module through an input module; the MCU module calls a first data processing module to process the query instruction; 3. planning a general power material distribution route; 4. the second data processing module prompts and recommends an optimal material distribution route; the invention provides an initial overall distribution line from the first data module by using an optimization algorithm of introducing traffic indexes, simultaneously pushes specific driving routes of each point between the overall distribution lines by using a navigation function in the second data processing module, and provides correction for a navigation result by combining big data analysis and prediction of historical road conditions, so that final driving route planning of electric power material distribution is obtained gradually, the optimized line is more accurate, and the practicability is very high.
Description
Technical field
The present invention relates to materials measurement technology, more particularly, it relates to a kind of Power Material distribution route commending system and
Method.
Background technology
Shenzhen takes place frequently as typical coastal cities, the local natural disaster of Shenzhen power supply administration, and typhoon, heavy rain etc. are extremely disliked
Bad weather frequently occurs, and produces power grid security and brings huge impact with running, under this environment and background, how to strengthen
Power Material fast deployment manages, and improves goods and materials supply efficiency, by the damage control of disaster in the range of bottom line, for
The safety in production of electrical network and operation escort and have urgent demand and great meaning.
Along with development and the rapid rising of big data of whole world Internet of Things informationization technology, in conjunction with power grid enterprises for pipe
Becoming more meticulous and normalized demand of reason, sets up the intelligent distribution model for Power Material and becomes particularly important.
Owing to laboratory heuritic approach route between calculating each point is all as the criterion with actual coordinate, the air line distance taken.
Actual track there may be the even many foldings of many curves.And it is certain that such algorithm is built upon speed, road conditions condition between each point
Identical situation, path is optimum, the most time optimal model.But there is multiple uncontrollable factor, such as in reality delivery process:
The emergency situations such as traffic accident and other affect the actual transit time of road, such as dispensing is blocked up (morning peak, evening peak), sky conductance
The reason (heavy rain, landslide, mud-rock flow etc.) of cause, traffic aspect (traffic accident, road construction, interim road closure etc.), remove these impacts
Actual path optimum is recommended to yet suffer from Shortcomings, especially for the Power Material the highest in dispensing efficiency requirements
There is bigger unworthiness in dispensing.
Electric power enterprise is the Resources-based Enterprises typically having technology with capital-intensive feature.Its material equipment having
Category is many, quantity is big, and power generation has the seriality of height, and Power Material dispensing is directly connected to electrical network the most in time
Properly functioning.
The Internet era of entrance along with Chinese society, big data theory is fast-developing, the most efficient arrangement
Power Material is provided and delivered preferably to agree with resource-sharing, the policy theme of energy-saving and emission-reduction that current era is advocated, and meets power supply administration
Each level personnel management and operational demand, reach materials measurement carry out in order, resource rational utilization.
Summary of the invention
It is not suitable for, for traditional heuristic router algorithm, the Power Material dispensing problem that efficiency requirements is the highest, proposes one
Kind of Power Material distribution route commending system, refers to including the navigation module for pushing real-time road condition information, for processing inquiry
The MCU module making and inputting data, the first data processing module that overall Power Material distribution route is tentatively recommended
And the Power Material distribution route of described first data processing module recommendation is carried out the second data process mould that prompting is predicted
Block;Described MCU module includes data storage cell, and described memory element is for for storage repository and demand point coordinate, warehouse
Amount of storage, vehicle load and vehicle number, and between demand point and the demand point of big data analysis and demand point and storehouse
Route road conditions historical data between storehouse.
Described first data processing module (104) is used for utilizing optimized algorithm:
Wherein,
I, j are each point, including warehouse and material requirements point
cijBe i-th to the distance between jth point
xijk=1, kth vehicle is travelled to jth point by i-th
xijk=0, for vehicle also in warehouse, do not carry out materials measurement
ωijIt it is the traffic index between i-th o'clock to i-th o'clock
Introduce traffic index ωij, overall Power Material distribution route is tentatively recommended.
Described second data processing module utilizes big data analysis algorithm, according to the history road of storage in described memory element
The real-time road condition information that condition information and described navigation module send over, points out the traffic route of each goods and materials point, pushes away
Recommending, driver determines suitable distribution route according to described prompting, recommendation information and practical situation.
Described Power Material distribution route commending system also includes using the input module for input inquiry command information
And the display module of display recommended route information.
Described input module is for the instruction of driver's input inquiry or the information of control;Described memory element is used for storing each
History traffic information number between parameter information, warehouse and each material requirements point of point and between each material requirements point
According to;Described MCU module is used for processing query statement and data, calls described first and second data processing module, receives described navigation
The real-time road condition information data that module sends over;Described navigation module is for being sent to MCU module by real-time road condition information;Institute
State the first data processing module and utilize optimized algorithm and the geographical position of each point of memory element storage, information of vehicles, stock
The historical datas such as amount obtain the preliminary recommendation of Power Material entirety distribution route, and the programme path data of acquisition are sent to institute
State the second data processing module to navigate;Described second data processing module utilizes and deposits described in big data analysis algorithm, basis
The real-time road condition information that the history traffic information stored in storage unit and described navigation module send over, to each goods and materials point
Traffic route carries out pointing out, recommending, and driver determines suitably to provide and deliver road according to described prompting, recommendation information and practical situation
Line.
A kind of Power Material distribution route recommends method, uses described input module, navigation module, MCU module, storage list
Unit, the first data processing module, the second data processing module and display module, it is characterised in that method comprises the following steps:
S1), query statement is input in MCU module by driver by described input module;
S2), described MCU module is called described first data processing module and is processed query statement;
S3), described first data processing module utilize optimized algorithm and memory element storage each point geographical position,
The historical data such as information of vehicles, quantity in stock obtains the preliminary recommendation of Power Material entirety distribution route, and the planning road that will obtain
Line data are sent to described second data processing module and navigate;
S4), described second data processing module utilizes big data analysis algorithm, according to going through of storing in described memory element
The real-time road condition information that history traffic information and described navigation module send over, carries the traffic route of each goods and materials point
Showing, recommend, driver determines suitable distribution route according to described prompting, recommendation information and practical situation, and in described display
Show in module.
Recommend method according to a kind of Power Material distribution route of the present invention, step S3 utilize optimized algorithm:
Wherein,
I, j are each point, including warehouse and material requirements point
cijBe i-th to the distance between jth point
xijk=1, kth vehicle is travelled to jth point by i-th
xijk=0, for vehicle also in warehouse, do not carry out materials measurement
ωijBe i-th to the traffic index between jth point
And the geographical position of each point of memory element storage, information of vehicles, the historical data such as quantity in stock obtain electric power thing
The preliminary recommendation of the overall distribution route of money, and the programme path data of acquisition are sent to described second data processing module carry out
Navigation.
Power Material dispensing is opened towards the management at different levels such as ministry of materials of power supply administration entirety dispatcher and fleet and operator
Exhibition materials measurement business combing, comprehensive combing and analyze the feasible and optimization side of existing scheduling system and vehicle delivery problem
Case.A kind of Power Material distribution route commending system proposed and method, the first data processing module utilizes optimized algorithm to thing
The overall distribution route of money is tentatively recommended, and the second data processing module utilizes big data analysis algorithm, according in memory element
The real-time road condition information that the history traffic information of storage and navigation module send over, is carried out the traffic route of each goods and materials point
Prompting, recommendation, driver determines suitable distribution route according to described prompting, recommendation information and practical situation, and described aobvious
Show and show in module so that optimizing circuit is the most accurate, and practicality is the highest.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is a kind of Power Material distribution route commending system logical schematic in the present invention
Fig. 2 is beeline and demand schedule between each point in the present embodiment
Fig. 3 is the traffic index tables of data of the turnpike road related in the present embodiment
Fig. 4 is to utilize optimized algorithm to calculate the saving mileometer between each point in the present embodiment
Fig. 5 is the distribution route figure obtained according to optimized algorithm in the present embodiment
Fig. 6 is the final route map obtained according to optimized algorithm in the present embodiment in the present embodiment
Fig. 7 is that in the present invention, a kind of Power Material distribution route recommends method flow diagram
Detailed description of the invention
Fig. 1 is a kind of Power Material distribution route commending system 100 logical schematic in the present invention, refer to Fig. 1, system
100 include input module 101 for input inquiry command information, for pushing the navigation module 102 of real-time road condition information, using
In processing query statement and MCU module the 103, first data processing module 104, second data processing module of various data
105 and display recommended route information display module 106;Electric power enterprise is typically to have technology and capital-intensive feature
Resources-based Enterprises, the material equipment category that it has is many, quantity is big, and power generation has the seriality of height, electric power
Materials measurement is directly connected to the properly functioning of electrical network the most in time.Along with big data theory is fast-developing, the most reasonable
Efficient arrangement Power Material is provided and delivered preferably to agree with resource-sharing, the policy theme of energy-saving and emission-reduction that current era is advocated,
Meet power supply administration each level personnel management and operational demand, reach materials measurement carry out in order, resource rational utilization;This
A kind of Power Material distribution route commending system of invention proposition and method, the first data processing module 104 utilizes optimized algorithm
And the geographical position of each point of memory element 103a storage, information of vehicles, that the historical data such as quantity in stock obtains Power Material is whole
The preliminary recommendation of body distribution route, and the programme path data of acquisition are sent to described second data processing module 105 carry out
Navigation;Second data processing module 105 utilizes big data analysis algorithm, believes according to the history road conditions of storage in memory element 103a
The real-time road condition information that breath and navigation module 102 send over, points out the traffic route of each goods and materials point, recommends, drive
The person of sailing determines suitable distribution route according to described prompting, recommendation information and practical situation, and aobvious on described display module 106
Show so that optimizing circuit is the most accurate, and practicality is the highest.
Fig. 2 is beeline and demand schedule between each point in the present embodiment, and Fig. 3 is the major trunk roads related in the present embodiment
The traffic index tables of data on road, Fig. 4 is to utilize optimized algorithm to calculate the saving mileometer between each point in the present embodiment,
Fig. 5 is the distribution route figure obtained according to optimized algorithm in the present embodiment, refer to Fig. 2-Fig. 5, and MCU module 103 includes data
Memory element 103a, for route road conditions history letter between storage demand dot information and demand point and between demand point and warehouse
Breath, such as distance parameter between the coordinate parameters of each point, each material requirements point, the distance parameter of each goods and materials point to warehouse, respectively
The demand parameter of goods and materials point and traffic index etc., such as Fig. 2-Fig. 3.
Input module 101 is for the instruction of driver's input inquiry or the information of control;Memory element 103a is used for storing each
History traffic information number between parameter information, warehouse and each material requirements point of point and between each material requirements point
According to;MCU module 103 is used for processing query statement, calls first and second data processing module (104,105), receives navigation module
The real-time road condition information data that 104 send over;Navigation module 102 is used for being sent to real-time road condition information MCU module 103,
Such as Fig. 1.
First data processing module 104 utilizes optimized algorithm to obtain the recommendation of vehicle route of preliminary optimization, for recommending
Optimal route is prepared:
Wherein,
I, j are each point, including warehouse and material requirements point
cijBe i-th to the distance between jth point
xijk=1, kth vehicle is travelled to jth point by i-th
xijk=0, for vehicle also in warehouse, do not carry out materials measurement
ωijBe i-th to the traffic index between jth point, such as Fig. 3
According to above-mentioned optimized algorithm, refer to Fig. 5, according to saving mileage order, obtain more excellent in conjunction with warehouse vehicle condition
Dispensing circuit is as follows:
First select to save most the section (6-2) of mileage, followed by (2-1), owing to dispensing circuit must comprise warehouse, and
Hauled weight sum on every circulation route is less than 3t or 16t, and now load-carrying reaches 2.8t, thinks according to resource-conserving
Road preferentially uses the vehicle that loading capacity is little to provide and deliver, and first leg uses 3t vehicle delivery, and concrete route is as follows:
Route 1: 0-demand 6-demand 2-demand 1-warehouse, warehouse 0
Method is analogized successively, obtains as follows:
Route 2: 0-demand 4-demand 5-warehouse, warehouse 0
Route 3: 0-demand 3-demand 7-warehouse, warehouse 0
According to optimized algorithm calculate total distance is: 348km, save mileage: 146km the most altogether.
But owing to laboratory heuritic approach is all as the criterion with actual coordinate calculating route between each point, the straight line taken away from
From and weigh vehicle route efficiency with this, actual track there may be the even many foldings of many curves, and such algorithm is to set up
Certain in speed, the situation that between each point, road conditions condition is identical, path is optimum, the most time optimal model.But reality was provided and delivered
Journey exists multiple uncontrollable factor, such as: the emergency situations such as traffic accident and other affect the actual transit time of road, such as join
Send reason (heavy rain, landslide, mud-rock flow etc.) that block up (morning peak, evening peak), weather causes, traffic aspect (execute by traffic accident, road
Work, interim road closure etc.), remove these impacts and actual path optimum is recommended to yet suffer from deficiency, the route therefore recommended
Remain a need for the second data processing module 105 further to be located according to the data message of navigation module 102, memory element 103a
Reason.
Second data processing module 105 is according to the dispensing line be given by optimized algorithm in the first data processing module 104
Between each point of road, actual driving route is recommended, and between each point according to navigation module 102 propelling movement, real-time road is progressive simultaneously obtains
Power Material dispensing final traffic route planning, and show on display module 106, driver is pointed out, recommends, driver
According to prompting, recommend and actual path situation selection suitable route dispensing goods and materials, so that optimizing circuit is the most accurate, and
Practicality is the highest, refer to Fig. 6.
Fig. 7 is that a kind of Power Material distribution route recommends method flow diagram, refer to Fig. 7, uses input module 101, leads
Model plane block 102, MCU module, memory element 103a, first data processing module the 104, second data processing module 105 and aobvious
Showing module 106, method comprises the following steps:
S1), query statement is input in MCU module 103 by driver by input module 101;
S2), MCU module 103 is called the first data processing module 104 and is processed query statement;
S3), the historical data of each point that stores according to memory element of the first data processing module 104, the most such as each point
Coordinate parameters, the distance parameter between each material requirements point, the distance parameter of each goods and materials point to warehouse, the demand of each goods and materials point
Parameter and traffic index etc. such as Fig. 2-Fig. 4, utilizes optimized algorithm, and materials measurement entirety route is carried out preliminary recommendation, and
Result is sent to the second data processing module 105 navigate, such as Fig. 5;
S4), the second data processing module 105 utilizes big data analysis algorithm, according to going through of storing in memory element 103a
The real-time road condition information that history traffic information such as Fig. 3, navigation module 102 send over, carries the traffic route of each goods and materials point
Showing, recommend, and show on display module 106, driver determines suitably according to described prompting, recommendation information and practical situation
Distribution route, such as Fig. 6.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto,
Any those familiar with the art in the technical scope that the invention discloses, the change that can readily occur in or replacement,
All should contain within protection scope of the present invention.Therefore, protection scope of the present invention should be with scope of the claims
It is as the criterion.
Claims (6)
1. a Power Material distribution route commending system, it is characterised in that include the navigation for pushing real-time road condition information
Module (102), for processing query statement and the MCU module (103) of input data, overall Power Material distribution route being entered
Preliminary the first data processing module (104) recommended of row and the Power Material dispensing that described first data processing module is recommended
Route carries out second data processing module (105) of prompting prediction;Described MCU module (103) includes data storage cell
(103a), described memory element (103a) is for for storage repository and demand point coordinate, warehouse amount of storage, vehicle load and car
Number, and route road conditions history number between demand point and the demand point of big data analysis and between demand point and warehouse
According to.
Described first data processing module (104) is used for utilizing optimized algorithm:
Wherein,
I, j are each point, including warehouse and material requirements point
cijBe i-th to the distance between jth point
xijk=1, kth vehicle is travelled to jth point by i-th
xijk=0, for vehicle also in warehouse, do not carry out materials measurement
ωijBe i-th to the traffic index between jth point
Introduce traffic index ωij, overall Power Material distribution route is tentatively recommended.
A kind of Power Material distribution route commending system the most according to claim 1, it is characterised in that described second data
Processing module (105) utilize big data analysis algorithm, according to the history traffic information of storage in described memory element (103a) with
And the real-time road condition information that described navigation module (102) sends over, the traffic route of each goods and materials point is pointed out, is recommended,
Driver determines suitable distribution route according to described prompting, recommendation information and practical situation.
A kind of Power Material distribution route commending system the most according to claim 1, it is characterised in that described Power Material
Distribution route commending system also includes using the input module (101) for input inquiry command information and display recommended route
The display module (106) of information.
A kind of Power Material distribution route commending system the most according to claim 1, it is characterised in that described input module
(101) for the instruction of driver's input inquiry or the information of control;Described memory element (103a) is for storing each parameter put
History traffic information data between information, warehouse and each material requirements point and between each material requirements point;Described MCU
Module (103) is used for processing query statement and data, calls described first and second data processing module (104,105), receives described
The real-time road condition information data that navigation module (104) sends over;Described navigation module (102) is for passing real-time road condition information
Deliver to MCU module (103);Described first data processing module (104) utilizes optimized algorithm and memory element (103a) storage
The geographical position of each point, information of vehicles, the historical data such as quantity in stock obtain the preliminary recommendation of Power Material entirety distribution route,
And the programme path data of acquisition are sent to described second data processing module (105) navigate;At described second data
Reason module (105) utilize big data analysis algorithm, according in described memory element (103a) storage history traffic information and
The real-time road condition information that described navigation module (102) sends over, points out the traffic route of each goods and materials point, recommends, drive
The person of sailing determines suitable distribution route according to described prompting, recommendation information and practical situation.
5. Power Material distribution route recommends a method, uses described input module (101), navigation module (102), MCU mould
Block (103), memory element (103a), the first data processing module (104), the second data processing module (105) and display mould
Block (106), it is characterised in that method comprises the following steps:
S1), query statement is input in MCU module (103) by driver by described input module (101);
S2), described MCU module (103) is called described first data processing module (104) and is processed query statement;
S3), described first data processing module (104) utilizes the ground of each point that optimized algorithm and memory element (103a) store
The historical datas such as reason position, information of vehicles, quantity in stock obtain the preliminary recommendation of Power Material entirety distribution route, and by acquisition
Programme path data are sent to described second data processing module (105) and navigate;
S4), described second data processing module (105) utilizes big data analysis algorithm, according in described memory element (103a)
The real-time road condition information that the history traffic information of storage and described navigation module (102) send over, the row to each goods and materials point
Bus or train route line carries out pointing out, recommending, and driver determines suitable distribution route according to described prompting, recommendation information and practical situation,
And in the upper display of described display module (106).
A kind of Power Material distribution route the most according to claim 5 recommends method, it is characterised in that utilize in step S3
Optimized algorithm:
Wherein,
I, j are each point, including warehouse and material requirements point
cijBe i-th to the distance between jth point
xijk=1, kth vehicle is travelled to jth point by i-th
xijk=0, for vehicle also in warehouse, do not carry out materials measurement
ωijBe i-th to the traffic index between jth point
And the geographical position of each point that stores of memory element (103a), information of vehicles, the historical data such as quantity in stock obtain electric power
The preliminary recommendation of goods and materials entirety distribution route, and the programme path data of acquisition are sent to described second data processing module
(105) navigate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610662789.6A CN106251025A (en) | 2016-08-12 | 2016-08-12 | Electric power material distribution route recommendation system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610662789.6A CN106251025A (en) | 2016-08-12 | 2016-08-12 | Electric power material distribution route recommendation system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106251025A true CN106251025A (en) | 2016-12-21 |
Family
ID=57591876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610662789.6A Pending CN106251025A (en) | 2016-08-12 | 2016-08-12 | Electric power material distribution route recommendation system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106251025A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109462176A (en) * | 2018-04-10 | 2019-03-12 | 国网浙江省电力有限公司嘉兴供电公司 | Intelligent patrol command methods and system based on GIS |
CN111199309A (en) * | 2019-12-19 | 2020-05-26 | 深圳供电局有限公司 | Early warning management and control system of electric power material supply chain operation |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103927639A (en) * | 2014-02-10 | 2014-07-16 | 武汉科技大学 | Steel product logistics system and scheduling method thereof based on real-time information |
-
2016
- 2016-08-12 CN CN201610662789.6A patent/CN106251025A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103927639A (en) * | 2014-02-10 | 2014-07-16 | 武汉科技大学 | Steel product logistics system and scheduling method thereof based on real-time information |
Non-Patent Citations (1)
Title |
---|
张云翔: "引入交通指数的节约法对电力", 《物流技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109462176A (en) * | 2018-04-10 | 2019-03-12 | 国网浙江省电力有限公司嘉兴供电公司 | Intelligent patrol command methods and system based on GIS |
CN111199309A (en) * | 2019-12-19 | 2020-05-26 | 深圳供电局有限公司 | Early warning management and control system of electric power material supply chain operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Henderson | EVs are not the answer: a mobility justice critique of electric vehicle transitions | |
Shukla et al. | An optimization framework for cost effective design of refueling station infrastructure for alternative fuel vehicles | |
CN105787600A (en) | Electric taxi charging station planning method based on adaptive quantum genetic algorithm | |
McKinnon | Sustainable distribution: opportunities to improve vehicle loading | |
CN104281900A (en) | Method for optimizing bogie procedure in advanced repair of motor train unit and planning and scheduling method and system | |
CN113034055B (en) | Intelligent operation platform for hydrogen energy station scene | |
CN106373384A (en) | Remote area passenger transport regular bus route real-time generation method | |
Cerna et al. | Efficient automation of an HEV heterogeneous fleet using a two-stage methodology | |
CN106251025A (en) | Electric power material distribution route recommendation system and method | |
CN112232579B (en) | Electric power material allocation method based on ant colony algorithm | |
Staniek et al. | Smart platform for support issues at the first and last mile in the supply chain-the concept of the s-mile project | |
CN105956687A (en) | Traffic network planning method capable of decreasing ineffective traffic | |
Gao et al. | Sustainable energy management in intelligent transportation | |
CN106682759A (en) | Battery supply system for electric taxi, and network optimization method | |
Deonarain | Technological change and sustainable mobility: An overview of global trends and South African developments | |
CN116468210A (en) | Vehicle dispatching method and device for coal mine auxiliary transportation and electronic equipment | |
Huang | A review on the electric vehicle routing problem and its variations | |
Pan et al. | Monetary evaluation of the external benefits of urban underground logistics System: A case study of Beijing | |
Guo et al. | An urban metro network-based method to evaluate carbon emission and distribution cost of express delivery | |
Chang et al. | Research on path optimization of electric distribution vehicle with hybrid charging strategy | |
Wang et al. | Research on vehicle routing branch pricing algorithm for multi-model electric vehicles based on board testing | |
Nawazish Ali et al. | Urban Integrated Sustainable Transportation Networks | |
Ekins | Final report of the high-level panel of the European decarbonisation pathways initiative | |
CN104200661B (en) | Method for forecasting state changes of road traffic system | |
Colombo et al. | Preliminary Assessment for a Sustainable and Integrated Solar-Powered Transport System in Asmara–Eritrea |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161221 |
|
RJ01 | Rejection of invention patent application after publication |