CN106247303A - A kind of biomass boiler steam heater - Google Patents

A kind of biomass boiler steam heater Download PDF

Info

Publication number
CN106247303A
CN106247303A CN201610739918.7A CN201610739918A CN106247303A CN 106247303 A CN106247303 A CN 106247303A CN 201610739918 A CN201610739918 A CN 201610739918A CN 106247303 A CN106247303 A CN 106247303A
Authority
CN
China
Prior art keywords
heat pipe
row
adds heat
row adds
steam heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610739918.7A
Other languages
Chinese (zh)
Inventor
梁兵
杨俊�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU GUOXIN SIYANG BIOMASS POWER GENERATION CO Ltd
Original Assignee
JIANGSU GUOXIN SIYANG BIOMASS POWER GENERATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU GUOXIN SIYANG BIOMASS POWER GENERATION CO Ltd filed Critical JIANGSU GUOXIN SIYANG BIOMASS POWER GENERATION CO Ltd
Priority to CN201610739918.7A priority Critical patent/CN106247303A/en
Publication of CN106247303A publication Critical patent/CN106247303A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B31/00Modifications of boiler construction, or of tube systems, dependent on installation of combustion apparatus; Arrangements of dispositions of combustion apparatus
    • F22B31/08Installation of heat-exchange apparatus or of means in boilers for heating air supplied for combustion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23LSUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
    • F23L15/00Heating of air supplied for combustion
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Air Supply (AREA)

Abstract

The present invention relates to a kind of biomass boiler steam heater, described biomass boiler steam heater includes header, support, finned tube and add heat pipe, described header is supported by support, described finned tube and add heat pipe and be arranged in casing, the described serpentine-like shape of heat pipe that adds sequentially is arranged, and form 39 rows and stagger successively arrangement, remove second row and add heat pipe, 6th row adds heat pipe, tenth row adds heat pipe, 14th row adds heat pipe, 18th row adds heat pipe, 22nd row adds heat pipe, 26th row adds heat pipe, 30th row adds heat pipe and the 34th row adds heat pipe, remaining adds and is respectively sleeved on finned tube on heat pipe;The present invention not only improves the temperature of air intake and air-out, improves heat exchange and the combustion efficiency of boiler so that superficial dust speed is greatly alleviated, and effectively alleviates the corrosion of back-end ductwork and cleaner unit.

Description

A kind of biomass boiler steam heater
Technical field
The present invention relates to a kind of biomass boiler steam heater, belong to biomass boiler field.
Background technology
The Air Leakage that biomass boiler air preheater pipe dust stratification, corrosion cause always perplexs the difficulty of biomass power generation enterprise What topic, dust stratification and corrosion caused leaks out, and causes air-introduced machine load to increase, decreases the air output needed for boiler combustion, reduce Efficiency of combustion, load band is not enough.
Generally after boiler is gone into operation 1 year, check and find two boiler air preheater pipe dust stratifications and heavy corrosion, cause boiler Inleakage is big, and the air quantity affecting boiler adjusts and boiler combustion.Dust stratification position is mainly distributed on low-temperature zone air preheater both sides, every time Blowing out will be rinsed;Air preheater pipe burn into air leakage parts is low-temperature zone import cold wind section.
After there is problem above, boiler high and low temperature section air preheater pipe is removed by technical staff, is carried out by air preheater the most more Changing, tube sheet and pipe are redesigned by boiler factory, the size constancy of pipe, the external radiation enamel of pipe, and the thickness of enamel exists 0.5 millimeter, the two ends of pipe use graphite annulus to seal.After boiler air preheater is replaced by enamel pipe, eliminate air preheater pipe Leak out, can only say and alleviate dust stratification, but the most really solve the problem of ash deposits corrosion, the service life of air preheater pipe also only two Year, change the most one by one after 2 years.The expense of every pipe about 55 yuan, renewal cost about 35 yuan, our separate unit stove low temperature Section air preheater pipe totally 2916, high temperature section totally 3939.Normal pipe is changed and is concentrated mainly on low-temperature zone, and we are total to up to now Change enamel pipe 1673.If the expense that separate unit boiler low-temperature section pipe is all changed is about at 270,000 yuan.Add every Secondary because the liter blowing out that air preheater problem causes is lost, it is seen that air preheater problem is to affect the key subjects that we run.
Summary of the invention
The present invention provides a kind of biomass boiler steam heater, not only improves air intake and the temperature of air-out, improves pot The heat exchange of stove and combustion efficiency so that superficial dust speed is greatly alleviated, and effectively alleviate back-end ductwork and remove The corrosion of dirt device.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of biomass boiler steam heater, described biomass boiler steam heater includes header, support, finned tube and adds Heat pipe, described header is supported by support, described finned tube and add heat pipe and be arranged in casing, described in add heat pipe serpentine-like Shape is sequentially arranged, and forms 39 rows and stagger successively arrangement, and second row adds heat pipe, the 6th row adds heat pipe, the tenth row in removing Add heat pipe, the 14th row adds heat pipe, the 18th row adds heat pipe, the 22nd row adds heat pipe, the 26th row adds heat pipe, the 30th Row adds heat pipe and the 34th row adds heat pipe, and remaining adds and is respectively sleeved on finned tube on heat pipe;
As present invention further optimization, described finned tube uses pressed-steel aluminum composite helical fin pipe;
As present invention further optimization, described in add heat pipe and use metallic aluminium or metallic copper to make;
As present invention further optimization, described header is respectively arranged at two ends with inlet header and outlet header;
As present invention further optimization, described inlet header is equipped with Pressure gauge and thermometer, and described outlet header is equipped with row Dirty valve.
By above technical scheme, relative to prior art, the method have the advantages that
The present invention sequentially arranges by adding the serpentine-like shape of heat pipe, and forms 39 rows and stagger successively arrangement, second row, the 6th Row, the tenth row, the 14th row, the 18th row, the 22nd row, the 26th row, the 30th row and the 34th row add heat pipe On be respectively sleeved on finned tube, compared with the adding and be all socketed with finned tube on heat pipe of serpentine shaped in prior art, the application subtracts Lack by temperature area, not only improved air intake and the temperature of air-out, improve heat exchange and the combustion efficiency of boiler so that superficial dust Speed is greatly alleviated, and effectively alleviates the corrosion of back-end ductwork and cleaner unit.
Accompanying drawing explanation
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the axonometric chart of the preferred embodiments of the present invention;
Fig. 2 is the overall structure figure of the preferred embodiments of the present invention;
Fig. 3 is the front view of the preferred embodiments of the present invention;
Fig. 4 is the left view of the preferred embodiments of the present invention.
In figure: 1 adds heat pipe for second row, 2 is that the 6th row adds heat pipe, and 3 is that the tenth row adds heat pipe, and 4 is the 14th row's heating Pipe, 5 is that the 18th row adds heat pipe, and 6 is that the 22nd row adds heat pipe, and 7 is that the 26th row adds heat pipe, and 8 is the 30th row's heating Pipe, 9 is that the 34th row adds heat pipe.
Detailed description of the invention
In conjunction with the accompanying drawings, the present invention is further detailed explanation.These accompanying drawings are the schematic diagram of simplification, only with The basic structure of the illustration explanation present invention, therefore it only shows the composition relevant with the present invention.
As Figure 1-Figure 4, the present invention provides a kind of biomass boiler steam heater, and described biomass boiler steam adds Hot device includes header, support, finned tube and adds heat pipe, and described header is supported by support, described finned tube and add heat pipe Be arranged in casing, described in add the serpentine-like shape of heat pipe and sequentially arrange, and form 39 rows and stagger successively arrangement, removing second Row adds heat pipe, the 6th row adds heat pipe, the tenth row adds heat pipe, the 14th row adds heat pipe, the 18th row adds heat pipe, the 22nd row adds Heat pipe, the 26th row adds heat pipe, the 30th row adds heat pipe and the 34th row adds heat pipe, and remaining adds and is respectively sleeved on heat pipe Finned tube;
As present invention further optimization, described finned tube uses pressed-steel aluminum composite helical fin pipe;
As present invention further optimization, described in add heat pipe and use metallic aluminium or metallic copper to make;
As present invention further optimization, described header is respectively arranged at two ends with inlet header and outlet header;
As present invention further optimization, described inlet header is equipped with Pressure gauge and thermometer, and described outlet header is equipped with row Dirty valve.
Existing heater how is made to reach the purpose of the application: 1, first the shrouding of header both sides to be passed through gas cutting or carbon Arc gouge cuts open;2, by second row, the 6th row, the tenth row, the 14th row, the 18th row, the 22nd row, the 26th row, 30th row adds the corresponding elbow in two ends of heat pipe and cuts off with the 34th row, cuts hole Φ 60, take in the fixed plate of any a section Go out the finned tube being respectively sleeved on;3, shrouding is recovered, and by shrouding seal weld;4, the former reserved section tube coupling flame of header is coordinated After beaing closing in, solder up, thus cut off the bank of tubes sealing of header;5, hydraulic test pressure is modulated 105MPa, steam without Can use after leakage.
The biomass boiler steam heater of the application is positioned at zero meter of layer Boiler Furnace primary air fan outlet conduits and air preheater Between, fixed form is horizontal support.The material of main pressurized element is Q235-B, and steam side design pressure is 1.0Mpa, real Border operating pressure is at 0.7-0.8 Mpa, and air side design pressure is 5.0Kpa, and actual motion pressure is 2.0Kpa, design temperature Being 100 DEG C 250 DEG C, air side inlet temperature is outdoor temperature, and outlet temperature can reach 80 DEG C, steam side inlet temperature exists 250 DEG C, outlet temperature is at 165 DEG C.Steam flow is 2180kg/h, and hydraulic test pressure is 1.05Mpa, and heat exchange area is 628 ㎡.The vapour source of air vapor heater is taken from heat supply mother's pipe to chemical bases tank and is added hot channel, steam main valve (PN1.6 DN80) Between chemical acid alkali tank divider wall and slag storehouse fire hydrant, back-steam is divided into two-way, and a road is to drain tank, and a road is to oxygen-eliminating device.
After heater by use the application, superficial dust speed has obtained greatly alleviating, and improves First air and enters Wind and leaving air temp, improve heat exchange and the combustion efficiency of boiler, and the longest natural law of boiler continuous service reaches 78 days.Discharge fume temperature simultaneously Degree improves about 20~25 DEG C, and current exhaust gas temperature controls at about 145 DEG C, effectively alleviates back-end ductwork and cleaner unit Corrosion, economic benefit is fairly obvious.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, and all terms used herein (include technology art Language and scientific terminology) have with the those of ordinary skill in the application art be commonly understood by identical meaning.Also should Being understood by, those terms defined in such as general dictionary should be understood that the meaning having with the context of prior art The meaning that justice is consistent, and unless defined as here, will not explain by idealization or the most formal implication.
The implication of "and/or" described herein refers to respective individualism or both simultaneous situations are all wrapped Including including.
The implication of " connection " described herein can be being directly connected between parts can also be to pass through between parts Being indirectly connected with of other parts.
With the above-mentioned desirable embodiment according to the present invention for enlightenment, by above-mentioned description, relevant staff is complete Entirely can carry out various change and amendment in the range of without departing from this invention technological thought.The technology of this invention The content that property scope is not limited in description, it is necessary to determine its technical scope according to right.

Claims (5)

1. a biomass boiler steam heater, it is characterised in that: described biomass boiler steam heater includes header, props up Frame, finned tube and add heat pipe, described header is supported by support, described finned tube and add heat pipe and be arranged in casing, institute Stating and add the serpentine-like shape of heat pipe and sequentially arrange, and form 39 rows and stagger successively arrangement, removing second row adds heat pipe, the 6th row Add heat pipe, the tenth row adds heat pipe, the 14th row adds heat pipe, the 18th row adds heat pipe, the 22nd row adds heat pipe, the 26th row Add heat pipe, the 30th row adds heat pipe and the 34th row adds heat pipe, and remaining adds and is respectively sleeved on finned tube on heat pipe.
Biomass boiler steam heater the most according to claim 1, it is characterised in that: described finned tube uses pressed-steel Aluminum composite helical fin pipe.
Biomass boiler steam heater the most according to claim 1, it is characterised in that add heat pipe described in: and use metallic aluminium Or metallic copper is made.
Biomass boiler steam heater the most according to claim 1, it is characterised in that: described header is respectively arranged at two ends with Inlet header and outlet header.
Biomass boiler steam heater the most according to claim 4, it is characterised in that: described inlet header is equipped with pressure Table and thermometer, described outlet header is equipped with blowoff valve.
CN201610739918.7A 2016-08-29 2016-08-29 A kind of biomass boiler steam heater Pending CN106247303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610739918.7A CN106247303A (en) 2016-08-29 2016-08-29 A kind of biomass boiler steam heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610739918.7A CN106247303A (en) 2016-08-29 2016-08-29 A kind of biomass boiler steam heater

Publications (1)

Publication Number Publication Date
CN106247303A true CN106247303A (en) 2016-12-21

Family

ID=57597110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610739918.7A Pending CN106247303A (en) 2016-08-29 2016-08-29 A kind of biomass boiler steam heater

Country Status (1)

Country Link
CN (1) CN106247303A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101140061A (en) * 2007-10-26 2008-03-12 中国石油天然气第八建设有限公司 Subcritical pressure pouring boiler furnace
CN201327013Y (en) * 2009-04-08 2009-10-14 辽河石油勘探局总机械厂 100t/h fuel or gas steam injection boiler
CN102537994A (en) * 2011-12-21 2012-07-04 西安交通大学 Device for eliminating flue gas temperature deviation
CN202442318U (en) * 2012-01-09 2012-09-19 张泉义 Vacuum tube heat exchanger
CN202630214U (en) * 2012-06-07 2012-12-26 王喜 Integrated type finned tube energy-saving radiator
CN103697455A (en) * 2013-12-30 2014-04-02 江苏正通宏泰股份有限公司 Low-pressure economizer with finned tubes
CN205424875U (en) * 2016-03-09 2016-08-03 江苏东九重工股份有限公司 Iron -smelter coke oven low temperature waste heat from flue gas boiler
CN206055590U (en) * 2016-08-29 2017-03-29 江苏国信泗阳生物质发电有限公司 A kind of biomass boiler steam heater

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101140061A (en) * 2007-10-26 2008-03-12 中国石油天然气第八建设有限公司 Subcritical pressure pouring boiler furnace
CN201327013Y (en) * 2009-04-08 2009-10-14 辽河石油勘探局总机械厂 100t/h fuel or gas steam injection boiler
CN102537994A (en) * 2011-12-21 2012-07-04 西安交通大学 Device for eliminating flue gas temperature deviation
CN202442318U (en) * 2012-01-09 2012-09-19 张泉义 Vacuum tube heat exchanger
CN202630214U (en) * 2012-06-07 2012-12-26 王喜 Integrated type finned tube energy-saving radiator
CN103697455A (en) * 2013-12-30 2014-04-02 江苏正通宏泰股份有限公司 Low-pressure economizer with finned tubes
CN205424875U (en) * 2016-03-09 2016-08-03 江苏东九重工股份有限公司 Iron -smelter coke oven low temperature waste heat from flue gas boiler
CN206055590U (en) * 2016-08-29 2017-03-29 江苏国信泗阳生物质发电有限公司 A kind of biomass boiler steam heater

Similar Documents

Publication Publication Date Title
CN203771380U (en) Condensation waste heat recovery steam boiler
CN101000175B (en) Low temp. afterheat recovery type heat pipe boiler
CN203980334U (en) A kind of air preheater
CN102183088A (en) Condensing hot-water boiler with external condensers
CN102252311B (en) Flue gas heat exchange device of oil field gas injection boiler and heat exchange method thereof
CN206055590U (en) A kind of biomass boiler steam heater
CN205980320U (en) Hanging is secondary condensing heat exchanger for stove
CN202057049U (en) Condensation hot water boiler with externally-arranged condensers
CN107328090A (en) Gas wall-mounted furnace
CN201926121U (en) Horizontal type condensing normal pressure hot water boiler
CN203704427U (en) Two-section type flue gas hot water single effect and double effect combined type lithium bromide absorption type water chilling unit
CN103363663B (en) Heavy die block assembling high-efficiency condensing type gas-fired water heating boiler
CN106247303A (en) A kind of biomass boiler steam heater
CN203907660U (en) Heat tube air preheater
CN206094536U (en) Middle and high voltage single -drum structure fast -assembling water tube boiler
CN207196907U (en) Gas wall-mounted furnace
CN103245058B (en) Micro-positive pressure combustion combined cooling energy-saving boiler
CN103759460B (en) Two-period form fume hot-water single-double effect compound type lithium bromide absorption type handpiece Water Chilling Units
CN103759461B (en) With the fume hot-water type lithium bromide absorption refrigerating set of smoke solution heat exchanger
CN203869074U (en) Device for recovering waste heat of gas boiler
CN206959344U (en) A kind of gas normal-pressure hot-water boiler flue gas condenser
CN203797949U (en) Integrated membrane wall type condensing vacuum hot water boiler
CN202166191U (en) Solar energy photothermal and vacuum superconductive heating device
CN205481766U (en) High -efficient energy -saving pot stove of condensing
CN205402669U (en) Hot tube -type evaporator absorption heat pump residual heat from flue gas system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221

RJ01 Rejection of invention patent application after publication