CN106245841A - A kind of boom mounting structure and construction method thereof - Google Patents
A kind of boom mounting structure and construction method thereof Download PDFInfo
- Publication number
- CN106245841A CN106245841A CN201610787654.2A CN201610787654A CN106245841A CN 106245841 A CN106245841 A CN 106245841A CN 201610787654 A CN201610787654 A CN 201610787654A CN 106245841 A CN106245841 A CN 106245841A
- Authority
- CN
- China
- Prior art keywords
- hole
- support piece
- horizontal support
- nut
- positioning suspender
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
- E04B9/20—Means for suspending the supporting construction adjustable
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of boom mounting structure, including positioning suspender, described positioning suspender top is threaded expansion bolt, described positioning suspender bottom connects horizontal support piece, described horizontal support piece is provided with the kidney ellipsoid adjustment hole running through positioning suspender, the second hanger erection hole it is additionally provided with on described horizontal support piece, described horizontal support piece is equipped with, with positioning suspender through part top and bottom, the nut playing fixation, run through in described kidney ellipsoid adjustment hole and have load-bearing suspension rod, described load-bearing suspension rod is again provided with playing the nut of fixation with kidney ellipsoid adjustment hole through part top and bottom, one end, described horizontal support piece top is additionally provided with oblique pull and plays the oblique drawing device of fixation to positioning suspender.Structure is simpler and scalable, safety and reliability, improves work efficiency and also reduces labor intensity.
Description
Technical field
The present invention relates to fit up accessory technical field, particularly relate to a kind of boom mounting structure and construction method thereof.
Background technology
Now with development and the progress in epoch of building industry, building capital construction terminates substantially to be required for finishing, design top
Canopy furred ceiling, mounted lamp and pipe condition are more and more, and the hanger erection related to is the most more.Suspension rod is that indoor suspended ceiling is most important
One of parts, its effect in installation of ceiling is particularly significant, and it plays a part to be connected whole furred ceiling face with top, room,
It it is the basis of whole furred ceiling engineering.In installation of ceiling engineering, one of them step is the installation of suspension rod, will be connected to suspension rod
The threaded rod of upper end is screwed in the screw that crab-bolt is good, and in general, the lower end of threaded rod is provided with installation nut, installs on nut
Side is provided with pad, installs nut by rotating, threaded rod can be screwed into screw, will be fixed on top, room by suspension rod.
But, the when that top board being drilled by the position of unwrapping wire, the reinforcing bar that is frequently encountered in top board or
Light fixture and pipeline and dodge, thus produce deviation with the size of unwrapping wire, and then need to carry out secondary drilling.And hanger erection
Being work high above the ground and have certain danger, working procedure is complicated, artificial and equipment cost is high, and secondary drilling just may require that
Workman's upper and lower ladder continually, will waste the plenty of time, affect work efficiency, and the work simultaneously also increasing workmen is strong
Degree, adds danger coefficient.
Summary of the invention
The invention aims to solve shortcoming present in prior art, and a kind of boom mounting structure proposed and
Its construction method.
To achieve these goals, present invention employs following technical scheme:
A kind of boom mounting structure, including positioning suspender, described positioning suspender top is threaded expansion bolt, described location
Suspension rod bottom connects has horizontal support piece, described horizontal support piece to be provided with the kidney ellipsoid adjustment hole running through positioning suspender, described
Being additionally provided with the second hanger erection hole on horizontal support piece, described horizontal support piece is all provided with positioning suspender through part top and bottom
Having the nut playing fixation, running through in described kidney ellipsoid adjustment hole has load-bearing suspension rod, and described load-bearing suspension rod is adjusted with kidney ellipsoid
Knothole through part top and bottom are again provided with playing the nut of fixation, and one end, described horizontal support piece top is additionally provided with tiltedly
Move positioning suspender to and play the oblique drawing device of fixation.
Preferably, oblique drawing device can be the first skewed horizontal load part, and the described first long edge of skewed horizontal load part is provided with first
Ribbed stiffener, described first skewed horizontal load part two ends are equipped with the first link bolt hole, are provided with location in the middle part of described positioning suspender
Regulating part, described upper location regulating part is corner brace type, and the horizontal face of regulating part, upper location is provided with and runs through the first of positioning suspender
Hanger erection hole, described location regulating part vertical face is provided with the 3rd link bolt hole, regulating part top, described location and bottom
It is equipped with and is socketed on positioning suspender the nut playing fixation, first link bolt of described first skewed horizontal load part one end
Horizontal support piece one end is fixed on by link bolt in hole, and the first link bolt hole of the described first skewed horizontal load part other end leads to
Cross the 3rd link bolt hole that bolt is fixed on the regulating part of location.
Preferably, oblique drawing device can be the second skewed horizontal load part, and on described second skewed horizontal load part, one end is provided with second
Link bolt hole, and the other end is provided with crescent screw, the described second long edge of skewed horizontal load part is provided with the second ribbed stiffener, described
Horizontal support piece one end is fixed on by link bolt in the second link bolt hole on second skewed horizontal load part, described second oblique
The crescent screw of the support member other end is socketed on positioning suspender by U-shaped fixture, and described U-shaped fixture runs through crescent moon
The two ends of shape screw are all fixed by nut.
Preferably, first positioning suspender one end is installed nut and expansion bolt, by suspension rod through upper location regulating part
First hanger erection hole and use, lower position nut is fixed, the other end through the kidney ellipsoid adjustment hole of horizontal support piece and use,
Lower position nut is fixed;Again with link bolt also cross the first hinged screw of the first skewed horizontal load part and upper location regulating part
The 3rd link bolt hole, first skewed horizontal load part one end is fixed with upper location regulating part, then by first oblique
First link bolt hole of the support member other end is attached with the screw link bolt of horizontal support piece so that it is form hinged knot
Structure;The most again with load-bearing suspension rod through the second hanger erection hole of horizontal support piece, use simultaneously, lower position nut by suspension rod with
Transverse connection is fixed, and thus completes the assembling of hanger erection assembly;This assembly finally have one end of expansion bolt insert
In the hole that ceiling is drilled, the nut tightening expansion bolt lower end secures the assembly on ceiling.
Preferably, first positioning suspender one end being installed nut and expansion bolt, the other end is through the waist of horizontal support piece
Circular adjustment hole, and use, lower position nut is fixed;Screw and the crescent moon of the second skewed horizontal load part is passed again with U-shaped fixture
Shape screw, is fixed second skewed horizontal load part one end with positioning suspender, then by the of the second skewed horizontal load part other end
Two link bolt holes are attached with the screw link bolt of horizontal support piece so that it is form articulated structure;The most again with holding
Heavy Derrick, through the second hanger erection hole of horizontal support piece, is used, lower position nut is by positioning suspender and lateral connection simultaneously
Part is fixed, and thus completes the assembling of hanger erection assembly;One end that this assembly finally has expansion bolt is inserted ceiling and is drilled
Hole in, the nut tightening expansion bolt lower end secures the assembly on ceiling.
Compared with prior art, the invention has the beneficial effects as follows: the present invention is capable of centered by positioning suspender, laterally
Center, support member hanger erection hole is adjusted in the horizontal extent that spacing is radius at kidney ellipsoid adjustment hole distalmost end center
Joint, carries out vertical direction by regulating the fixed position of upper and lower stop nut and upper location regulating part and positioning suspender simultaneously
Regulation, this structure is simpler and scalable, safety and reliability, improves work efficiency and also reduces labor intensity, it can be said that
This boom mounting structure has possessed multiple advantage, is particularly suitable for popularization and application in the industry such as house ornamentation, building;It is capable of
Centered by positioning suspender, center, horizontal support piece hanger erection hole is half with the spacing at kidney ellipsoid adjustment hole distalmost end center
It is adjusted in the horizontal extent in footpath, simultaneously by regulating the fixed bit of upper and lower stop nut and U-shaped fixture and positioning suspender
Putting and carry out vertical direction regulation, this structure is simpler and scalable, safety and reliability, improves work efficiency and also reduces work
Intensity, it can be said that this boom mounting structure has possessed multiple advantage, is particularly suitable for pushing away in the industry such as house ornamentation, building
Wide application, its market prospect is the most wide.
Accompanying drawing explanation
Fig. 1 is that the first embodiment of the present invention installs and uses structural representation;
Fig. 2 is location regulating part structural representation in the first embodiment of the present invention;
Fig. 3 is the first embodiment the first skewed horizontal load part structural representation of the present invention;
Fig. 4 is the first embodiment of the present invention and the second embodiment horizontal support piece structural representation;
Fig. 5 is the second embodiment of the present invention second skewed horizontal load part structural representation;
Fig. 6 is the second embodiment of the present invention U-shaped anchor structure schematic diagram;
Fig. 7 is that the second embodiment of the present invention installs and uses partial structurtes schematic diagram.
In figure: 1 positioning suspender, 2 expansion bolts, position regulating part, 31 the 3rd link bolt holes, 32 first suspension rods peaces on 3
Dress hole, 4 horizontal support pieces, 41 kidney ellipsoid adjustment holes, 42 second hanger erection holes, 5 first skewed horizontal load parts, 51 first put more energy into
Rib, 52 first link bolt holes, 6 link bolts, 7 load-bearing suspension rods, 8 second skewed horizontal load parts, 81 second ribbed stiffeners, 82 second hinges
Connecting bolt hole, 83 crescent screws, 9 U-shaped fixtures.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with specific embodiment, to this
Invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, not
For limiting the present invention.
Specific embodiment one: a kind of boom mounting structure, including positioning suspender 1, described positioning suspender 1 top is threaded
Having expansion bolt 2, described positioning suspender 1 bottom connects has horizontal support piece 4, described horizontal support piece 4 to be provided with and run through location
The kidney ellipsoid adjustment hole 41 of suspension rod 1, described horizontal support piece 4 is additionally provided with the second hanger erection hole 42, described horizontal support piece 4
It is equipped with the nut playing fixation with positioning suspender 1 through part top and bottom, runs through in described kidney ellipsoid adjustment hole 41
Load-bearing suspension rod 7, described load-bearing suspension rod 7 is had to be again provided with playing fixation with kidney ellipsoid adjustment hole 41 through part top and bottom
Nut, one end, described horizontal support piece 4 top is additionally provided with oblique pull and plays the oblique drawing device of fixation to positioning suspender 1.Tiltedly
Drawing device can be the first skewed horizontal load part 5, and the described first long edge of skewed horizontal load part 5 is provided with the first ribbed stiffener 51, described
One skewed horizontal load part 5 two ends are equipped with the first link bolt hole 52, are provided with location regulating part 3, institute in the middle part of described positioning suspender 1
Stating location regulating part 3 is corner brace type, and the horizontal face of upper location regulating part 3 is provided with the first suspension rod peace running through positioning suspender 1
Dress hole 32, described location regulating part 3 vertical face is provided with the 3rd link bolt hole 31, regulating part 3 top, described location and bottom
It is equipped with and is socketed on the nut playing fixation on positioning suspender 1, the first hinged spiral shell of described first skewed horizontal load part 5 one end
Keyhole 52 is fixed on horizontal support piece 4 one end by link bolt 6, and the first of described first skewed horizontal load part 5 other end is hinged
Bolt hole 52 is secured by bolts in the 3rd link bolt hole 31 on location regulating part 3.
The construction method of a kind of boom mounting structure that the present invention also provides for, first positioning suspender one end is installed nut and
Expansion bolt, by suspension rod through the first hanger erection hole of upper location regulating part and use, lower position nut is fixed, the other end is worn
Cross the kidney ellipsoid adjustment hole of horizontal support piece and use, lower position nut is fixed;Oblique also cross first with link bolt again
First hinged screw of support member and the 3rd link bolt hole of upper location regulating part, by fixed with upper for first skewed horizontal load part one end
Position regulating part is fixed, then by the screw in the first link bolt hole of the first skewed horizontal load part other end Yu horizontal support piece
It is attached with link bolt so that it is form articulated structure;The second suspension rod of horizontal support piece is passed the most again with load-bearing suspension rod
Installing hole, uses, suspension rod is fixed by lower position nut with transverse connection, thus completes the group of hanger erection assembly simultaneously
Dress;One end that this assembly finally has expansion bolt is inserted in the hole that ceiling is drilled, and the nut tightening expansion bolt lower end will
Assembly is fixed on ceiling.
Specific embodiment two: oblique drawing device can be the second skewed horizontal load part 8, one end on described second skewed horizontal load part 8
Being provided with the second link bolt hole 82, and the other end is provided with crescent screw 83, the described second long edge of skewed horizontal load part 8 is provided with
Two ribbed stiffeners 81, cross-brace is fixed on by link bolt 6 in the second link bolt hole 82 on described second skewed horizontal load part 8
Part 4 one end, the crescent screw 83 of described second skewed horizontal load part 8 other end is socketed on positioning suspender 1 by U-shaped fixture 9
On, the two ends that described U-shaped fixture 9 runs through crescent screw 83 are all fixed by nut.
The construction method of a kind of boom mounting structure that the present invention also provides for, first positioning suspender one end is installed nut and
Expansion bolt, the other end is through the kidney ellipsoid adjustment hole of horizontal support piece, and use, lower position nut is fixed;Again with U-shaped fixing
Part passes screw and the crescent screw of the second skewed horizontal load part, second skewed horizontal load part one end and positioning suspender is carried out solid
Fixed, then the second link bolt hole of the second skewed horizontal load part other end is carried out with the screw link bolt of horizontal support piece
Connect so that it is form articulated structure;The most again with load-bearing suspension rod through the second hanger erection hole of horizontal support piece, use simultaneously
Positioning suspender is fixed by upper and lower stop nut with transverse connection, thus completes the assembling of hanger erection assembly;Finally should
Assembly has one end of expansion bolt to insert in the hole that ceiling is drilled, and the nut tightening expansion bolt lower end secures the assembly in top
On canopy.
The present invention is capable of centered by positioning suspender, center, horizontal support piece hanger erection hole and kidney ellipsoid adjustment hole
The spacing at distalmost end center be radius horizontal extent in be adjusted, simultaneously by regulating upper and lower stop nut and upper fixed
The fixed position of position regulating part and positioning suspender and carry out vertical direction regulation, this structure is simpler and scalable, safer can
Lean on, improve work efficiency and also reduce labor intensity, it can be said that this boom mounting structure has possessed multiple advantage, especially
It is suitable for popularization and application in the industry such as house ornamentation, building;It is capable of centered by positioning suspender, horizontal support piece hanger erection
Center, hole is adjusted in the horizontal extent that spacing is radius at kidney ellipsoid adjustment hole distalmost end center, simultaneously by regulation
Upper and lower stop nut and U-shaped fixture and the fixed position of positioning suspender and carry out vertical direction regulation, this structure simpler and
Scalable, safety and reliability, improves work efficiency and also reduces labor intensity, it can be said that this boom mounting structure possesses
Multiple advantage, is particularly suitable for popularization and application in the industry such as house ornamentation, building, and its market prospect is the most wide.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto,
Any those familiar with the art in the technical scope that the invention discloses, according to technical scheme and
Inventive concept equivalent or change in addition, all should contain within protection scope of the present invention.
Claims (5)
1. a boom mounting structure, including positioning suspender (1), it is characterised in that: described positioning suspender (1) top is threaded
Having expansion bolt (2), described positioning suspender (1) bottom connects has horizontal support piece (4), described horizontal support piece (4) to be provided with
Run through the kidney ellipsoid adjustment hole (41) of positioning suspender (1), described horizontal support piece (4) is additionally provided with the second hanger erection hole
(42), described horizontal support piece (4) is equipped with, with positioning suspender (1) through part top and bottom, the nut playing fixation,
Running through in described kidney ellipsoid adjustment hole (41) and have load-bearing suspension rod (7), described load-bearing suspension rod (7) is run through with kidney ellipsoid adjustment hole (41)
Top, place and bottom are again provided with playing the nut of fixation, and described horizontal support piece (4) one end, top is additionally provided with oblique pull and arrives
Positioning suspender (1) plays the oblique drawing device of fixation.
A kind of boom mounting structure the most according to claim 1, it is characterised in that: oblique drawing device can be first oblique
Support member (5), described first skewed horizontal load part (5) long edge is provided with the first ribbed stiffener (51), described first skewed horizontal load part (5) two
End is equipped with the first link bolt hole (52), and described positioning suspender (1) middle part is provided with location regulating part (3), described upper location
Regulating part (3) is corner brace type, and upper location regulating part (3) is laterally provided with the first hanger erection running through positioning suspender (1) in face
Hole (32), described location regulating part (3) vertical face is provided with the 3rd link bolt hole (31), regulating part (3) top, described location
It is equipped with bottom and is socketed on the nut playing fixation on positioning suspender (1), described first skewed horizontal load part (5) one end
Horizontal support piece (4) one end, described first skewed horizontal load part are fixed on by link bolt (6) in first link bolt hole (52)
(5) the first link bolt hole (52) of the other end is secured by bolts in the 3rd link bolt hole on location regulating part (3)
(31).
A kind of boom mounting structure the most according to claim 1, it is characterised in that: oblique drawing device can be second oblique
Support member (8), the upper one end of described second skewed horizontal load part (8) is provided with the second link bolt hole (82), and the other end is provided with crescent
Screw (83), described second skewed horizontal load part (8) long edge is provided with the second ribbed stiffener (81), described second skewed horizontal load part (8)
On the second link bolt hole (82) be fixed on horizontal support piece (4) one end, described second skewed horizontal load by link bolt (6)
The crescent screw (83) of part (8) other end is socketed on positioning suspender (1) by U-shaped fixture (9), described U-shaped fixture
(9) two ends running through crescent screw (83) are all fixed by nut.
4. the construction method according to the boom mounting structure described in claim 1 and 2, it is characterised in that: first will location
Suspension rod one end installs nut and expansion bolt, and through the first hanger erection hole of upper location regulating part and suspension rod is used upper and lower limit
Position nut is fixed, the other end through the kidney ellipsoid adjustment hole of horizontal support piece and use, lower position nut is fixed;Use hinged spiral shell again
Bolt is also cross the first hinged screw of the first skewed horizontal load part and the 3rd link bolt hole of upper location regulating part, oblique by first
It is fixed with upper location regulating part to support member one end, then by the first link bolt hole of the first skewed horizontal load part other end
It is attached with the screw link bolt of horizontal support piece so that it is form articulated structure;The most again with load-bearing suspension rod through horizontal stroke
To the second hanger erection hole of support member, use, suspension rod is fixed with transverse connection by lower position nut simultaneously, thus complete
The assembling of hanger erection assembly;One end that this assembly finally has expansion bolt is inserted in the hole that ceiling is drilled, and tightens expansion
The nut of bolt lower end secures the assembly on ceiling.
5. the construction method according to the boom mounting structure described in claim 1 and 3, it is characterised in that: first will location
Suspension rod one end installs nut and expansion bolt, and the other end is through the kidney ellipsoid adjustment hole of horizontal support piece, and use, lower limit spiral shell
Female fixing;Screw and the crescent screw of the second skewed horizontal load part is passed again, by second skewed horizontal load part one end with U-shaped fixture
It is fixed with positioning suspender, then by the spiral shell in the second link bolt hole of the second skewed horizontal load part other end Yu horizontal support piece
Hole link bolt is attached so that it is form articulated structure;Hang through the second of horizontal support piece with load-bearing suspension rod the most again
Bar installing hole, uses, positioning suspender is fixed by lower position nut with transverse connection, thus completes hanger erection assembly simultaneously
Assembling;One end that this assembly finally has expansion bolt is inserted in the hole that ceiling is drilled, and tightens the spiral shell of expansion bolt lower end
Mother secures the assembly on ceiling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610787654.2A CN106245841B (en) | 2016-08-31 | 2016-08-31 | A kind of boom mounting structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610787654.2A CN106245841B (en) | 2016-08-31 | 2016-08-31 | A kind of boom mounting structure and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106245841A true CN106245841A (en) | 2016-12-21 |
CN106245841B CN106245841B (en) | 2018-11-16 |
Family
ID=58080804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610787654.2A Active CN106245841B (en) | 2016-08-31 | 2016-08-31 | A kind of boom mounting structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106245841B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237444A (en) * | 2017-06-26 | 2017-10-10 | 浙江亚厦装饰股份有限公司 | Adjustable vertical top hang device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011185024A (en) * | 2010-03-05 | 2011-09-22 | Uchiyama Sangyo:Kk | Fitting for preventing fall and vibration for post-fittable suspension bolt |
JP2013144891A (en) * | 2012-01-13 | 2013-07-25 | Okuju Co Ltd | Brace material mounting fitting and brace material mounting method using the same |
CN103669676A (en) * | 2013-12-09 | 2014-03-26 | 重庆诚硕科技有限公司 | Ceiling suspending device |
CN203684491U (en) * | 2014-01-20 | 2014-07-02 | 苏州苏明装饰股份有限公司 | Suspender system with adjustable installing position |
CN204126102U (en) * | 2014-05-30 | 2015-01-28 | 苏州苏明装饰股份有限公司 | A kind of sheet material fast-assembling ceiling structure |
CN206070846U (en) * | 2016-08-31 | 2017-04-05 | 浙江亚厦装饰股份有限公司 | A kind of boom mounting structure |
-
2016
- 2016-08-31 CN CN201610787654.2A patent/CN106245841B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011185024A (en) * | 2010-03-05 | 2011-09-22 | Uchiyama Sangyo:Kk | Fitting for preventing fall and vibration for post-fittable suspension bolt |
JP2013144891A (en) * | 2012-01-13 | 2013-07-25 | Okuju Co Ltd | Brace material mounting fitting and brace material mounting method using the same |
CN103669676A (en) * | 2013-12-09 | 2014-03-26 | 重庆诚硕科技有限公司 | Ceiling suspending device |
CN203684491U (en) * | 2014-01-20 | 2014-07-02 | 苏州苏明装饰股份有限公司 | Suspender system with adjustable installing position |
CN204126102U (en) * | 2014-05-30 | 2015-01-28 | 苏州苏明装饰股份有限公司 | A kind of sheet material fast-assembling ceiling structure |
CN206070846U (en) * | 2016-08-31 | 2017-04-05 | 浙江亚厦装饰股份有限公司 | A kind of boom mounting structure |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237444A (en) * | 2017-06-26 | 2017-10-10 | 浙江亚厦装饰股份有限公司 | Adjustable vertical top hang device |
CN107237444B (en) * | 2017-06-26 | 2022-09-16 | 浙江亚厦装饰股份有限公司 | Adjustable vertical top hanging device |
Also Published As
Publication number | Publication date |
---|---|
CN106245841B (en) | 2018-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204901062U (en) | A three -dimensional antidetonation gallows | |
KR20140035100A (en) | Beam clamp | |
CN206070846U (en) | A kind of boom mounting structure | |
CN109138201A (en) | A kind of self-locking type para-seismic support being easily installed | |
CN106245841A (en) | A kind of boom mounting structure and construction method thereof | |
CN108894329B (en) | Overhanging type pipe truss and mounting method of supporting rod thereof | |
CN209227877U (en) | Hood type ceiling system for steel structure truss roof system | |
CN204781895U (en) | Adjustable hanging flower basket leans on guide bracket and hanging flower basket of wall distance | |
CN205772625U (en) | A kind of U-shaped special wall-attached frame of single cage-lifter | |
JP2020041422A (en) | Protective net stretching structure | |
CN105672677A (en) | Support tool used for fabricated building wallboard installation and use method of support tool | |
CN204164505U (en) | Universal Joining clasp lifting device | |
CN206608615U (en) | Underground pipe gallery support erector shelves | |
CN205777020U (en) | A kind of large span space furred ceiling reversely and changes support means | |
CN209924167U (en) | Anti-collision device for architectural shockproof joints | |
CN106121120A (en) | A kind of hanger rod mounting device | |
CN116876737A (en) | Suspended ceiling installation system with steel wire rope as stressed keel and construction method thereof | |
CN105804418A (en) | Prefabricated wallboard fixed supporting system and construction method | |
CN216952211U (en) | Hoisting system of air pipe for purification engineering | |
CN206784725U (en) | Large span assembled open-type builds bottom plate I-beam erection support and mounting assembly | |
CN210372515U (en) | Large-span comprehensive support hanger | |
CN213332803U (en) | Fire-fighting pipeline fixing device | |
CN208986875U (en) | A kind of tile-roofed house roof photovoltaic bracket fixes device | |
CN203308073U (en) | Adjustable wall connecting piece | |
CN208214402U (en) | A kind of civil construction perforating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |