CN106245627A - A kind of quick positioning construction method of steel pipe stanchion - Google Patents

A kind of quick positioning construction method of steel pipe stanchion Download PDF

Info

Publication number
CN106245627A
CN106245627A CN201610767137.9A CN201610767137A CN106245627A CN 106245627 A CN106245627 A CN 106245627A CN 201610767137 A CN201610767137 A CN 201610767137A CN 106245627 A CN106245627 A CN 106245627A
Authority
CN
China
Prior art keywords
steel pipe
pipe column
steel
reinforcement cage
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610767137.9A
Other languages
Chinese (zh)
Inventor
王晓明
马良
祁小龙
谢孟权
李大洋
焦银峰
熊伟
巨鹏
杨大壮
丁汉庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Second Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201610767137.9A priority Critical patent/CN106245627A/en
Publication of CN106245627A publication Critical patent/CN106245627A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a kind of quick positioning construction method of steel pipe stanchion.The step that is embodied as of the method for Plate Welding, casting concrete bottom (1) steel pipe column and pastes reflection plaster, (2) joint steel pipe post and steel reinforcement cage, 4 hydraulic jack bottom steel pipe column are installed, (3) lifting steel pipe column and steel reinforcement cage, upper steel tubing string is fixed according to design attitude, (4) suspention sash weight, adjust steel pipe column bottom position, (5) drilled pile concrete is poured, (6) steel pipe column interior concrete is poured, (7) backfill steel pipe column peripheral space.It is high that the present invention has steel pipe column setting accuracy, good integrity, the advantages such as the duration is short, security risk is low, construction cost is low.

Description

A kind of quick positioning construction method of steel pipe column-stake
Technical field
The present invention relates to when underground engineering is bright do time need the barrier such as highway crossing, building and the engineering construction side that takes Method, is specifically related to a kind of quick positioning construction method of steel pipe column-stake.
Background technology
Cap excavation method be when underground engineering is bright do time need the barrier such as highway crossing, building and the Novel engineering construction taked Method, be faced down by ground and be excavated to certain depth after, by top seal, remaining bottom engineering is carried out under the top cover closed Construction.Agent structure can be along making, it is also possible to inverse work.
In recent years, along with the fast development of China's infrastructure construction, in track traffic and high-rise Construction of Basement, adopt Dig, with lid, the engineering that Counter procedure builds to get more and more.
Sheltered reverse excavation has many good qualities, and there is also a lot of difficult point.Such as erection of steel pipe column perpendicularity, setting accuracy are wanted Asking high, construction depth is big, and in China's contrary sequence method station and hypogee, the installation of steel pipe column uses two kinds of construction methods mostly: (1) manually abolish pile crown installation positioner after burying steel thimble underground and fix steel pipe column;(2) HPE hydraulic tools are used to be inserted perpendicularly into steel Tubing string.It is long to there is the construction period in the first Traditional Man broken pile head installation positioner positioning steel tube post method, complex procedures, construction peace The shortcoming that full blast danger is big, the second HPE hydraulic tools are inserted perpendicularly into steel pipe column positioning mode and there is (hydraulic pressure high to construction site requirement Need to harden leveling in device bottom basis), the shortcoming that construction cost is big.
Summary of the invention
The goal of the invention of the present invention is that a kind of quick positioning construction method of steel pipe column-stake of offer, construction party of the present invention Method has compared with above two engineering method: steel pipe column setting accuracy is high, good integrity, and the duration is short, security risk is low, construction The features such as low cost.
The technical scheme is that
One steel pipe column of the present invention-quick positioning construction method of stake, its method step is:
(1) it is first according to process sequence carry out measure of pile position → drilled pile pore-forming → steel reinforcement cage and transfer to aperture → lifting steel The work of tubing string, during for preventing from pouring drilled pile concrete, steel pipe column floats, and must use 4~6mm thickness steel before steel pipe column lifts Plate is setting height soldering and sealing plugging plate bottom steel pipe column and above bottom, and position pours design between steel pipe column two plugging plate The slightly expanded concrete of the number of being calibrated vibration compacting, on concrete, interface plugging plate centre adhesive band crosshair is reflective Patch.
(2) joint steel pipe post and steel reinforcement cage, 4 hydraulic jack bottom steel pipe column are installed
Hanging drilled pile reinforcing cage suitable for reading to ground, lifting steel pipe column is connected with steel reinforcement cage, 90 ° of directions bottom steel pipe column Installing four hydraulic jack, jack is placed on above the steel plate welded with steel pipe column, and jack head stress surface is steel pipe Post sidewall, root stress surface is steel pile casting side at steel reinforcement cage, and steel pile casting length is about 1.2~1.7m, outside internal diameter is with steel reinforcement cage Footpath is identical, and steel pile casting uses with steel reinforcement cage and is welded to connect.
(3) lifting steel pipe column and steel reinforcement cage, fix upper steel tubing string according to design attitude.
After connecting steel pipe column and steel reinforcement cage and having debugged hydraulic jack, lifting steel pipe column is to designed elevation, steel pipe column Four hand jacks are installed in direction, 90 °, upper end, use hand jack to adjust plan-position, steel pipe column upper end to the position designed Postpone fixing.
(4) suspention sash weight, adjusts steel pipe column bottom position
Use at steel pipe column mouth and hang cross hairs alignment position, at the bottom of center suitable for reading suspention plumb bob positioning steel tube post Center, portion, makes reflection plaster cross searching match with plumb bob tip by adjusting four hydraulic jack bottom steel pipe column, Hydraulic jack is used to fix after being adjusted to design attitude bottom steel pipe column.When adjusting steel pipe column bottom position by bright light torch Irradiate reflection plaster, adopt the position relationship between the plumb bob of telescopic observation suspention hammer and reflection plaster cross searching.
(5) drilled pile concrete is poured
Through check steel pipe column plan-position and absolute altitude errorless after, outside steel pipe column install concreting conduit, be anti- Only card pipe phenomenon is transferred and existed in lifting process to conduit, welds three catheter directed reinforcing bars, conduit in advance in steel pipe column side Along guiding reinforcement location installation in installation process;For preventing the foreign material such as mud, rubble in concreting process from entering steel pipe column In, steel plate flange closure is used at steel pipe column top.Concreting checks steel pipe column plane position after bottom steel pipe column again Putting and absolute altitude, confirmed plan-position and absolute altitude continue casting concrete to designed elevation after meeting design specification.
(6) steel pipe column interior concrete is poured
After drilled pile concreting completes, extract and conduit be installed after conduit water is rinsed well again in steel pipe column, Pour steel pipe column interior concrete.
(7) backfill steel pipe column peripheral space
For ensureing to close on drilled pile construction safety, after pile concrete intensity hole to be drilled reaches design strength, use sand material Backfill steel pipe column peripheral space.
The invention have the benefit that
The inventive point summary of the present invention is just utilized in 90 ° of directions bottom steel pipe column and installs 4 hydraulic jack, steel pipe columns Direction, 90 ° of top is installed 4 hand jacks and is fixed steel pipe column, utilizes bottom steel pipe column suspention suitable for reading plumb bob alignment steel pipe column anti- Positioning mode in light patch cross searching point tune, steel pipe column completes with pile concrete primary concreting.With aforementioned two kinds of construction parties Method compares, and the inventive method has: steel pipe column setting accuracy is high, good integrity, and the duration is short, security risk is low, be constructed into The advantages such as this is low.The inventive method has been put to use in Practical Project is constructed, the effect of each unit in charge of construction reflection present invention The best, not only construction cost is low, and speed of application is fast, location is the most accurate, and during construction, workman represents that safety is the highest, More than existing build engineering time the lid that uses to dig Counter procedure strong.
Accompanying drawing explanation
Fig. 1 is steel pipe column interior concrete in method described in the embodiment of the present invention, reflection plaster scheme of installation;
Fig. 2 is steel reinforcement cage and steel pipe column connection diagram in method described in the embodiment of the present invention;
Fig. 3 is that in method described in the embodiment of the present invention, schematic diagram is fixed at steel pipe column top;
Fig. 4 is hydraulic jack and suspention plumb bob centering schematic diagram in method described in the embodiment of the present invention;
Fig. 5 be in method described in the embodiment of the present invention cast-in-situ bored pile pour schematic diagram;
Fig. 6 is that in method described in the embodiment of the present invention, in steel pipe column, concrete pours into a mould schematic diagram.
1 steel pipe column in figure;2 band crosshair reflection plasters;3 slightly expanded concretes;4 steel reinforcement cages;Steel pile casting outside 5 steel reinforcement cages;6 The hydraulic jack installed bottom steel pipe column;7 oil pressure cntrol casees;The hydraulic jack that 8 steel pipe column upper ends are installed;9 suspention hammers;10 Concreting conduit;11 steel plate flanges.
Detailed description of the invention
The quick positioning construction method of steel pipe column-stake of the present invention as shown in accompanying drawing 1,2,3,4,5,6, the technique of its construction includes Measure of pile position → drilled pile pore-forming → steel reinforcement cage transfers to aperture → lifting steel pipe column be connected → install hydraulic pressure thousand with steel reinforcement cage Jin pushes up and carries out hydraulic top debugging → lifting steel pipe column to designed elevation → steel pipe column upper end and uses hand jack to fix → profit It is directed at reflection plaster cross searching point bottom steel pipe column with suspention plumb bob and adjusts steel pipe column bottom position → fixing steel pipe column → boring Pile concreting → steel pipe column interior concrete pours → backfills steel pipe column peripheral space.
Method step when Specific construction is:
(1) Plate Welding, casting concrete and stickup reflection plaster bottom steel pipe column
During for preventing from pouring drilled pile concrete, steel pipe column floats, and 5mm steel plate must be used at steel before steel pipe column 1 lifts Above bottom tubing string and bottom, (setting height described here sets setting height soldering and sealing plugging plate the most in advance Fixed), between steel pipe column two plugging plate, position pours slightly expanded concrete 3 vibration compacting of the design number of being calibrated, at concrete Plugging plate centre, upper interface adhesive band crosshair reflection plaster 2.
(2) joint steel pipe post and steel reinforcement cage, 4 hydraulic jack bottom steel pipe column are installed
Hanging drilled pile reinforcing cage 4 suitable for reading to ground, lifting steel pipe column 1 is connected with steel reinforcement cage 4, bottom steel pipe column 1 90 ° Four hydraulic jack 6 are installed in direction, and jack 6 is placed on above the steel plate welded with steel pipe column, jack head stress surface For steel pipe column sidewall, root stress surface is steel pile casting 5 side at steel reinforcement cage, and steel pile casting 5 length is about 1.5m, internal diameter and steel reinforcement cage 4 external diameters are identical, and steel pile casting 5 uses with steel reinforcement cage 4 and is welded to connect, and oil pressure cntrol case is 7.
(3) lifting steel pipe column and steel reinforcement cage, fix upper steel tubing string according to design attitude.
After connecting steel pipe column 1 and steel reinforcement cage 4 and having debugged hydraulic jack, lifting steel pipe column is to designed elevation, steel pipe Four hand jacks 8 are installed in direction, 90 °, post upper end, use hand jack to adjust plan-position, steel pipe column 1 upper end to design Fix behind position.
(4) suspention sash weight, adjusts steel pipe column bottom position
Use at steel pipe column mouth and hang cross hairs alignment position, according to center suitable for reading suspention 9 positioning steel tube post 1 ends of hammer Center, portion, makes the cross searching of reflection plaster 2 and the hammer of suspention hammer 9 by adjusting four hydraulic jack 6 bottom steel pipe column 1 Ball tip matches, and uses hydraulic jack 6 to fix bottom steel pipe column 1 after being adjusted to design attitude.Adjusting position bottom steel pipe column Irradiate reflection plaster 2 by bright light torch when putting, adopt the position relationship between telescopic observation plumb bob and reflection plaster 2 cross searching.
(5) drilled pile concrete is poured
Through check steel pipe column plan-position and absolute altitude errorless after, outside steel pipe column install concreting conduit 10, for Prevent conduit 10 from transferring and lifting process exist card pipe phenomenon, welding three catheter directed reinforcing bars in advance in steel pipe column 1 side, Conduit installation process is installed along guiding rib position;For preventing the foreign material such as mud, rubble in concreting process from entering steel pipe In post, use steel plate flange closure at steel pipe column top.Concreting checks steel pipe column plane after bottom steel pipe column again Position and absolute altitude, confirmed plan-position and absolute altitude continue casting concrete to designed elevation after meeting design specification.
(6) steel pipe column interior concrete is poured
After drilled pile concreting completes, extract and conduit is installed after conduit 10 is rinsed well with water again in steel pipe column 10, pour steel pipe column interior concrete.
(7) backfill steel pipe column peripheral space
For ensureing to close on drilled pile construction safety, after pile concrete intensity hole to be drilled reaches design strength, use sand material Backfill steel pipe column peripheral space.

Claims (1)

1. the quick positioning construction method of steel pipe column-stake, it is characterised in that:
(1) it is first according to process sequence carry out measure of pile position → drilled pile pore-forming → steel reinforcement cage and transfer to aperture → lifting steel pipe column Work, during for preventing from pouring drilled pile concrete steel pipe column float, must steel pipe column lifting before employing 4~6mm steel plates exist Bottom steel pipe column and bottom above setting height soldering and sealing plugging plate, and between steel pipe column two plugging plate position pour design determined Label slightly expanded concrete vibration compacting, interface plugging plate centre adhesive band crosshair reflection plaster on concrete;
(2) joint steel pipe post and steel reinforcement cage, 4 hydraulic jack bottom steel pipe column are installed
Hanging drilled pile reinforcing cage suitable for reading to ground, lifting steel pipe column is connected with steel reinforcement cage, and bottom steel pipe column, 90 ° of directions are installed Four hydraulic jack, jack is placed on above the steel plate welded with steel pipe column, and jack head stress surface is steel pipe column side Wall, root stress surface is steel pile casting side at steel reinforcement cage, steel pile casting a length of 1.2~1.7m, and internal diameter is identical with steel reinforcement cage external diameter, Steel pile casting uses with steel reinforcement cage and is welded to connect;
(3) lifting steel pipe column and steel reinforcement cage, fix upper steel tubing string according to design attitude.
After connecting steel pipe column and steel reinforcement cage and having debugged hydraulic jack, lifting steel pipe column is to designed elevation, steel pipe column upper end Four hand jacks are installed in 90 ° of directions, solid behind employing hand jack adjustment plan-position, steel pipe column upper end to design attitude Fixed;
(4) suspention sash weight, adjusts steel pipe column bottom position
Use at steel pipe column mouth and hang cross hairs alignment position, according in suspention plumb bob positioning steel tube column bottom, center suitable for reading Heart position, makes reflection plaster cross searching match with plumb bob tip by adjusting four hydraulic jack bottom steel pipe column, steel pipe Column bottom uses hydraulic jack to fix after being adjusted to design attitude;
(5) drilled pile concrete is poured
Through check steel pipe column plan-position and absolute altitude errorless after, outside steel pipe column install concreting conduit, for preventing from mixing Solidifying soil pours conduit and is transferring and existing in lifting process card pipe phenomenon, welds three concretings in advance in steel pipe column side Catheter directed reinforcing bar, along guiding reinforcement location installation in concreting conduit installation process;For preventing concreting process The foreign material such as middle mud, rubble enter in steel pipe column, use steel plate flange closure at steel pipe column top;Concreting is to steel pipe column Again checking steel pipe column plan-position and absolute altitude after Di Bu, confirmed plan-position and absolute altitude continue to pour after meeting design specification Concrete is to designed elevation;
(6) steel pipe column interior concrete is poured
After drilled pile concreting completes, extract and again install in steel pipe column after concreting conduit water is rinsed well Concreting conduit, pours steel pipe column interior concrete;
(7) backfill steel pipe column peripheral space
After pile concrete intensity hole to be drilled reaches design strength, use sand material backfill steel pipe column peripheral space.
CN201610767137.9A 2016-08-30 2016-08-30 A kind of quick positioning construction method of steel pipe stanchion Pending CN106245627A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610767137.9A CN106245627A (en) 2016-08-30 2016-08-30 A kind of quick positioning construction method of steel pipe stanchion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610767137.9A CN106245627A (en) 2016-08-30 2016-08-30 A kind of quick positioning construction method of steel pipe stanchion

Publications (1)

Publication Number Publication Date
CN106245627A true CN106245627A (en) 2016-12-21

Family

ID=58079580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610767137.9A Pending CN106245627A (en) 2016-08-30 2016-08-30 A kind of quick positioning construction method of steel pipe stanchion

Country Status (1)

Country Link
CN (1) CN106245627A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316290A (en) * 2018-03-30 2018-07-24 中铁第四勘察设计院集团有限公司 One pile for one column structure without cushion cap and its construction method
CN108374418A (en) * 2018-03-26 2018-08-07 中铁五局集团有限公司 Steel pipe column precise positioning Fast Installation construction technology in a kind of sheltered reverse excavation
CN108643192A (en) * 2018-05-16 2018-10-12 深圳市工勘岩土集团有限公司 Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN109024651A (en) * 2018-07-24 2018-12-18 山西省交通科学研究院 A kind of concrete filled steel tube mixing pile foundation and construction method
CN109403343A (en) * 2018-11-19 2019-03-01 深圳市工勘岩土集团有限公司 The deep foundation pit supporting construction method of steel reinforcement cage and steel pipe column combination
CN110206034A (en) * 2019-06-06 2019-09-06 深圳市工勘岩土集团有限公司 Annular method of excavation of deep foundation pit
CN111622224A (en) * 2020-06-06 2020-09-04 江西中恒地下空间科技有限公司 Construction method of connected column pile in reverse construction method
CN111980013A (en) * 2019-05-22 2020-11-24 深圳市佰邦建筑设计顾问有限公司 Large-span building supporting structure and construction method thereof
CN112267486A (en) * 2020-09-02 2021-01-26 浙江中正岩土技术有限公司 Steel pipe concrete anti-seismic bridge pile foundation and pile foundation construction method
CN115198738A (en) * 2022-07-06 2022-10-18 深圳市工勘岩土集团有限公司 Offshore platform steel sleeve reinforcement cage and hydraulic jack combined positioning construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH111924A (en) * 1997-06-12 1999-01-06 Nippon Steel Corp Erection method and device of insertion type steel pipe column
CN2915952Y (en) * 2006-06-30 2007-06-27 天津三建建筑工程有限公司 Underground building steel pipe column positioning and verticality adjusting device
CN104912062A (en) * 2015-07-02 2015-09-16 广东省第四建筑工程有限公司 Concrete pile steel pipe column continuous construction method
CN105887811A (en) * 2015-12-17 2016-08-24 深圳市福田建安建设集团有限公司 Ultra-deep soft soil pile integral construction method based on high-precision information monitoring
CN205857238U (en) * 2016-07-08 2017-01-04 中铁三局集团有限公司 A kind of underground engineering steel pipe column pilework

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH111924A (en) * 1997-06-12 1999-01-06 Nippon Steel Corp Erection method and device of insertion type steel pipe column
CN2915952Y (en) * 2006-06-30 2007-06-27 天津三建建筑工程有限公司 Underground building steel pipe column positioning and verticality adjusting device
CN104912062A (en) * 2015-07-02 2015-09-16 广东省第四建筑工程有限公司 Concrete pile steel pipe column continuous construction method
CN105887811A (en) * 2015-12-17 2016-08-24 深圳市福田建安建设集团有限公司 Ultra-deep soft soil pile integral construction method based on high-precision information monitoring
CN205857238U (en) * 2016-07-08 2017-01-04 中铁三局集团有限公司 A kind of underground engineering steel pipe column pilework

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374418A (en) * 2018-03-26 2018-08-07 中铁五局集团有限公司 Steel pipe column precise positioning Fast Installation construction technology in a kind of sheltered reverse excavation
CN108316290A (en) * 2018-03-30 2018-07-24 中铁第四勘察设计院集团有限公司 One pile for one column structure without cushion cap and its construction method
CN108316290B (en) * 2018-03-30 2024-01-23 中铁第四勘察设计院集团有限公司 One-column one-pile structure without bearing platform and construction method thereof
CN108643192A (en) * 2018-05-16 2018-10-12 深圳市工勘岩土集团有限公司 Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN109024651B (en) * 2018-07-24 2020-06-19 山西省交通科学研究院 Steel pipe concrete mixed pile foundation and construction method
CN109024651A (en) * 2018-07-24 2018-12-18 山西省交通科学研究院 A kind of concrete filled steel tube mixing pile foundation and construction method
CN109403343A (en) * 2018-11-19 2019-03-01 深圳市工勘岩土集团有限公司 The deep foundation pit supporting construction method of steel reinforcement cage and steel pipe column combination
CN111980013A (en) * 2019-05-22 2020-11-24 深圳市佰邦建筑设计顾问有限公司 Large-span building supporting structure and construction method thereof
CN110206034A (en) * 2019-06-06 2019-09-06 深圳市工勘岩土集团有限公司 Annular method of excavation of deep foundation pit
CN111622224A (en) * 2020-06-06 2020-09-04 江西中恒地下空间科技有限公司 Construction method of connected column pile in reverse construction method
CN112267486A (en) * 2020-09-02 2021-01-26 浙江中正岩土技术有限公司 Steel pipe concrete anti-seismic bridge pile foundation and pile foundation construction method
CN112267486B (en) * 2020-09-02 2022-09-27 浙江中正岩土技术有限公司 Steel pipe concrete anti-seismic bridge pile foundation and pile foundation construction method
CN115198738A (en) * 2022-07-06 2022-10-18 深圳市工勘岩土集团有限公司 Offshore platform steel sleeve reinforcement cage and hydraulic jack combined positioning construction method

Similar Documents

Publication Publication Date Title
CN106245627A (en) A kind of quick positioning construction method of steel pipe stanchion
CN102146672B (en) Method for constructing pile foundation in karst area
CN203846485U (en) Long pile percussion drill hole forming construction device
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN205857238U (en) A kind of underground engineering steel pipe column pilework
CN111962504A (en) Construction method for covering and digging top-down permanent steel pipe column
CN108894214A (en) A kind of solution cavity geological environment bored concrete pile and its bore forming method
CN110805029A (en) Subway underground-excavated station drilling and grouting fender post construction method
CN105926672A (en) Mined metro station steel pipe column construction method
CN107246007A (en) A kind of construction method CFG
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN102587386A (en) Reverse HPE (hydraulic perpendicular embedding) construction method for steel pipe columns in basement
CN110145232A (en) A kind of construction method for not mending slurry churning driven borehole
CN113668564A (en) Construction method for supporting and reinforcing open-cut underground passage adjacent to subway station
CN109056808A (en) Stake and steel pipe column construction method in a kind of subway station
CN113216215A (en) Deep groove support reverse construction method in complex environment
CN115369860A (en) Construction method of super-long isolation pile close to subway
CN206477240U (en) A kind of trestle pile foundation for deep water drift net riverbed
CN110714459A (en) Construction method of cast-in-situ bored pile
CN108035357A (en) Filling pile construction scheme and its funnel
CN103790148A (en) Combined treatment construction method for collapsible loess foundation
CN107489140A (en) A kind of method of accurate control CFG stake height of pile top
CN110485413B (en) Combined type protection rapid hole forming method for pile foundation of viaduct adjacent to subway
CN114687356B (en) Construction method for deep foundation pit excavation of building
CN216788421U (en) Reinforcement construction system of tunnel business turn over hole portal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161221

WD01 Invention patent application deemed withdrawn after publication