CN106241598A - Wind electricity blade web hanging method - Google Patents

Wind electricity blade web hanging method Download PDF

Info

Publication number
CN106241598A
CN106241598A CN201610726777.5A CN201610726777A CN106241598A CN 106241598 A CN106241598 A CN 106241598A CN 201610726777 A CN201610726777 A CN 201610726777A CN 106241598 A CN106241598 A CN 106241598A
Authority
CN
China
Prior art keywords
web
blade
distance
hoisting tool
frock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610726777.5A
Other languages
Chinese (zh)
Other versions
CN106241598B (en
Inventor
刘玉辉
王峥
王清志
刘志杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Chengfei New Materials Co.,Ltd.
Jilin Chengfei New Materials Co.,Ltd.
Original Assignee
Jilin Chong Tongchengfei New Material Joint-Stock Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Chong Tongchengfei New Material Joint-Stock Co filed Critical Jilin Chong Tongchengfei New Material Joint-Stock Co
Priority to CN201610726777.5A priority Critical patent/CN106241598B/en
Publication of CN106241598A publication Critical patent/CN106241598A/en
Application granted granted Critical
Publication of CN106241598B publication Critical patent/CN106241598B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/62Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B11/00Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding
    • F16B11/006Connecting constructional elements or machine parts by sticking or pressing them together, e.g. cold pressure welding by gluing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2230/00Manufacture
    • F05B2230/60Assembly methods
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Abstract

The present invention relates to technical field of wind power generation, disclose a kind of wind electricity blade web hanging method, including: S1: after type is repaiied in the web demoulding, from the beginning of at web position length 4m in a mold, fixes one piece U-shaped piece spaced a predetermined distance to length direction;S2: before lifting web, according to web correspondence blade root, blade and blade tip trizonal leading edge web and the width of trailing edge web medial gap, select the hoisting tool supporting with internal layer width dimensions;S3: hoisting tool is installed in the base region corresponding at web;S4: repeat S3 step, to install the hoisting tool of blade, tip region at blade corresponding to web, tip region;S5: after fixing to three hoisting tools and driving, with driving, web is lifted to bonding region;S6: after being placed on housing by web, takes off hoisting tool.The present invention decreases the labor intensity of operator compared with conventional harness lifting web by the use of rotary fixture, improves production efficiency, it is ensured that product quality.

Description

Wind electricity blade web hanging method
Technical field
The present invention relates to wind electricity blade manufacturing technology field, particularly to a kind of wind electricity blade web hanging method.
Background technology
Wind electricity blade is as the core component of unit, and wind electricity blade technology is one of core technology of wind generator system, It is mainly formed by bonding agent is bonding with web by suction surface (SS) housing of blade, pressure face (PS) housing, and web includes Leading edge web and trailing edge web symmetrically arranged with it.Web lifting is the first step of web structure and case bonding, lifting Method determines quality and the production efficiency of follow-up blade of web.
Tradition web hanging method is to use bandage to be transported by fixing with driving after the picking-up of SS bonding plane by web, hangs After being filled to correct position, bandage is extracted out.The method is lost time, and labor intensity is big.And affect web bonding and location effect Really.
Summary of the invention
The present invention proposes a kind of wind electricity blade web hanging method, solves that efficiency in prior art is low, labor intensity big, And affect the bonding problem with locating effect of web.
A kind of wind electricity blade web hanging method of the present invention, including:
S1: after type is repaiied in the web demoulding, from the beginning of at web position length 4m in a mold, predetermined to length direction interval Distance fixes one piece U-shaped piece, to ensure leading edge web and the inner side of trailing edge web of the presumptive area on web length direction The width in gap reaches preset width, and described preset distance is 1.8~2.2 meters;
S2: before lifting web, according to web correspondence blade root, blade and blade tip trizonal leading edge web and trailing edge web The width of medial gap, selects the hoisting tool supporting with internal layer width dimensions;
S3: in the base region that web is corresponding, rotates the inner side frock of hoisting tool to axially in parallel with web, outside Frock is axially vertical with web, inner side frock is put into by web medial gap, and rotated inside frock makes it axial with web Vertically, outside frock blocks leading edge web and the respective outside of trailing edge web;
S4: repeat S3 step, to install the hoisting tool of blade, tip region at blade corresponding to web, tip region;
S5: after fixing to three hoisting tools and driving, with driving, web is lifted the suction surface housing to blade and pressure The bonding region that power face-piece body is bonding with web respectively;
S6: after being placed on housing by web, takes off hoisting tool.
Wherein, the mode using hands to stick with paste glass-fiber-fabric in described step S1 fixes described U-shaped piece.
Wherein, in described step S1, described preset distance is 2 meters.
Wherein, start away from web positioning end in a mold, from positioning end apart from different bonding regions and U-shaped block length Corresponding relation be: the adhesion zone that U-shaped block length is 180mm, 16m-22m distance that the bonding region of 4.5m-14m distance is corresponding The U-shaped block length that the bonding region that U-shaped piece of distance is 170mm, 24m-30m distance corresponding to territory is corresponding is 180mm, 32m-38m The U-shaped block length that the bonding region that U-shaped block length is 190mm, 40m-48m distance that the bonding region of distance is corresponding is corresponding is 180mm。
The method of the present invention uses web hoisting tool lift web to bonding region, and use U-shaped piece of guarantee Spacing between web before and after in hoisting process, greatly reduces the time of web lifting, improves production efficiency, will not be to abdomen Plate bonding plane damages, and does not interferes with adhesive effect, and the process removing frock does not interferes with the original location of web, greatly yet Improve the quality of product and safety.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, also may be used To obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the wind electricity blade web hanging method median ventral plate upper spacer making U-shaped piece along its length of the present invention From schematic diagram;
Fig. 2 be the present invention wind electricity blade web hanging method in made between front and rear edge web after U-shaped piece cut Face schematic diagram;
Fig. 3 is the hoisting tool schematic diagram of the wind electricity blade web hanging method employing of the present invention;
Fig. 4 be the present invention wind electricity blade web hanging method in use frock lifting web structural representation;
Fig. 5 be web bonding with blade shell after schematic diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
A kind of wind electricity blade web hanging method of the present embodiment, including:
Step S1, as it is shown in figure 1, after type is repaiied in the web demoulding, from the beginning of at web position length 4m in a mold, to length Degree direction fixes one piece U-shaped piece spaced a predetermined distance, to ensure that presumptive area on web length direction is (i.e. when bonding Bonding region) leading edge web and the width of medial gap of trailing edge web reach preset width, described preset distance be 1.8~ 2.2 rice.Fix the sectional view after U-shaped piece as in figure 2 it is shown, the gap inside leading edge web 1 and trailing edge web 2 fixes U-shaped piece 3, the two ends up and down in cross section are each fixes one piece U-shaped piece 3, to ensure that leading edge web 1 and trailing edge web 2 medial gap reach pre-fixed width Degree.
Step S2, before lifting web, according to web correspondence blade root, blade and blade tip trizonal leading edge web and trailing edge The width of web medial gap, selects the hoisting tool supporting with internal layer width dimensions.As it is shown on figure 3, hoisting tool includes: vertical Post 4, outside frock 5 and inner side frock 6, outside frock 5 is identical with inner side frock 6 shape, inner side frock 6 be smaller in size than outside Frock 5, inner side frock 5 can be rotatably mounted at one end of column 4 around the axis of column 4, and outside frock 5 is fixed on inner side frock Above in the of 6.Owing to blade size in the longitudinal direction is different, it is therefore desirable to hoisting tool size the most different.
Step S3, as shown in Figure 4, in the base region that web is corresponding, the inner side frock 6 of hoisting tool is rotated to abdomen Plate is axially in parallel, and outside frock 5 is axially vertical with web, inner side frock is put into by web medial gap, rotated inside work Filling 6 makes it axially vertical with web, and outside frock 5 blocks leading edge web 1 and the respective outside of trailing edge web 2, i.e. outside frock 5 The spacing at two ends is slightly larger than outside spacing r2, the spacing at inner side frock 6 two ends slightly smaller than inner side spacing r1.
Step S4, repeats S3 step, to install the lifting of blade, tip region at blade corresponding to web, tip region Frock;
Step S5, after fixing to three hoisting tools and driving, with driving by the suction surface housing of web lifting to blade And the bonding region that pressure face housing is bonding with web respectively;
Step S6, as it is shown in figure 5, after being placed on housing by web, take off hoisting tool.Specifically, respectively by blade root, Inside at blade and blade tip, frock rotates to axially in parallel with web, is taken out by web hoisting fixture at web medial gap, It is placed on frock storeroom and treats use next time.Wherein, one end of blade profile circular arc is leading edge, and one end of tip is trailing edge, leaf Region bonding with web on sheet is formed with PS spar cap 7 and SS spar cap 8.
The method of the present embodiment uses web hoisting tool lift web to bonding region, and use U-shaped piece of guarantor Card in hoisting process before and after spacing between web, greatly reduce the time of web lifting, improve production efficiency, will not be right Web bonding plane damages, and does not interferes with adhesive effect, and the process removing frock does not interferes with the original location of web, pole yet The big quality improving product and safety.
In the present embodiment, the mode using hands to stick with paste glass-fiber-fabric in step S1 fixes U-shaped piece 3, glass-fiber-fabric light weight, and hands Paste mode is to carry out after fixing leading edge web 1 and trailing edge web 2, it is possible to keep leading edge web 1 and the spacing of trailing edge web 2 Because of fixing U-shaped piece 3, minor variations will not occur.
In step S1, preset distance is 2 meters, to be convenient for measuring.
In the present embodiment, start away from web positioning end in a mold, from the bonding region of positioning end different distance with U-shaped The corresponding relation of block length is: the U-shaped block length that the bonding region of 4.5m-14m distance is corresponding is 180mm, 16m-22m distance The U-shaped block length that the bonding region that U-shaped piece of distance is 170mm, 24m-30m distance that bonding region is corresponding is corresponding is 180mm, U-shaped piece that the bonding region that U-shaped block length is 190mm, 40m-48m distance that the bonding region of 32m-38m distance is corresponding is corresponding A length of 180mm.It is specifically shown in following table:
Bonding region is from positioning end distance 4.5m-14m 16m-22m 24m-30m 32m-38m 40m-48m
U-shaped block length 180mm 170mm 180mm 190mm 180mm
Due to the shape change in its longitudinal direction of blade, length (the i.e. inner side of front and rear edge web of the most U-shaped piece The distance in gap) also different, above-mentioned bonding region is more suitable for blade from the corresponding relation of positioning end distance with U-shaped block length Shape so that web and blade shell are bonding more firm.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all spirit in the present invention and Within principle, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (4)

1. a wind electricity blade web hanging method, it is characterised in that including:
S1: after type is repaiied in the web demoulding, from the beginning of at web position length 4m in a mold, to length direction spaced a predetermined distance Fix one piece U-shaped piece, to ensure leading edge web and the medial gap of trailing edge web of the presumptive area on web length direction Width reach preset width, described preset distance is 1.8~2.2 meters;
S2: before lifting web, inside web correspondence blade root, blade and blade tip trizonal leading edge web and trailing edge web The width in gap, selects the hoisting tool supporting with internal layer width dimensions;
S3: in the base region that web is corresponding, rotates the inner side frock of hoisting tool to axially in parallel with web, outside frock Axially vertical with web, inner side frock to be put into by web medial gap, rotated inside frock makes it axially vertical with web, Outside frock blocks leading edge web and the respective outside of trailing edge web;
S4: repeat S3 step, to install the hoisting tool of blade, tip region at blade corresponding to web, tip region;
S5: after fixing to three hoisting tools and driving, with driving, web is lifted the suction surface housing to blade and pressure face The bonding region that housing is bonding with web respectively;
S6: after being placed on housing by web, takes off hoisting tool.
2. wind electricity blade web hanging method as claimed in claim 1, it is characterised in that use hands to stick with paste glass in described step S1 The mode of fine cloth fixes described U-shaped piece.
3. wind electricity blade web hanging method as claimed in claim 1, it is characterised in that in described step S1, described predetermined Distance is 2 meters.
4. the wind electricity blade web hanging method as according to any one of claims 1 to 3, it is characterised in that away from web at mould Positioning end in tool starts, and from positioning end apart from the corresponding relation of different bonding regions with U-shaped block length is: 4.5m-14m away from From U-shaped piece of distance corresponding to the bonding region that U-shaped block length is 180mm, 16m-22m distance corresponding to bonding region be The bonding region that U-shaped block length is 180mm, 32m-38m distance that the bonding region of 170mm, 24m-30m distance is corresponding is corresponding U-shaped block length be the U-shaped block length that the bonding region of 190mm, 40m-48m distance is corresponding be 180mm.
CN201610726777.5A 2016-08-25 2016-08-25 Wind electricity blade web hanging method Active CN106241598B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610726777.5A CN106241598B (en) 2016-08-25 2016-08-25 Wind electricity blade web hanging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610726777.5A CN106241598B (en) 2016-08-25 2016-08-25 Wind electricity blade web hanging method

Publications (2)

Publication Number Publication Date
CN106241598A true CN106241598A (en) 2016-12-21
CN106241598B CN106241598B (en) 2017-12-26

Family

ID=57594794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610726777.5A Active CN106241598B (en) 2016-08-25 2016-08-25 Wind electricity blade web hanging method

Country Status (1)

Country Link
CN (1) CN106241598B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107150946A (en) * 2017-06-29 2017-09-12 湖北三江航天江河化工科技有限公司 A kind of wing plate boom hoisting and its hanging method
CN112374341A (en) * 2020-10-22 2021-02-19 浙江景兴纸业股份有限公司 Hoisting device for screen cylinder
CN113878900A (en) * 2021-08-18 2022-01-04 中复连众(沈阳)复合材料有限公司 Manufacturing and mounting method for wind power blade sectional web

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201770414U (en) * 2010-09-17 2011-03-23 中复连众(包头)复合材料有限公司 Jig apparatus for installing and lifting shear webs of megawatt wind generator
CN201785134U (en) * 2010-09-17 2011-04-06 连云港中复连众复合材料集团有限公司 Auxiliary installing hanging tool of megawatt wind turbine blade shearing webs
CN201785125U (en) * 2010-07-27 2011-04-06 国电联合动力技术有限公司 Blade shear web sling
CN204041659U (en) * 2014-08-01 2014-12-24 中国科学院宁波材料技术与工程研究所 MW grade wind driven generator blade web connection set and blade assembling method
DE102013224392A1 (en) * 2013-11-28 2015-05-28 Senvion Se Stegsetzvorrichtung, bridge and manufacturing method for a rotor blade of a wind turbine
CN204729242U (en) * 2015-07-10 2015-10-28 国电联合动力技术(连云港)有限公司 A kind of fan blade web assembling and positioning device
CN205034944U (en) * 2015-09-30 2016-02-17 中材科技(酒泉)风电叶片有限公司 Web hoisting accessory

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201785125U (en) * 2010-07-27 2011-04-06 国电联合动力技术有限公司 Blade shear web sling
CN201770414U (en) * 2010-09-17 2011-03-23 中复连众(包头)复合材料有限公司 Jig apparatus for installing and lifting shear webs of megawatt wind generator
CN201785134U (en) * 2010-09-17 2011-04-06 连云港中复连众复合材料集团有限公司 Auxiliary installing hanging tool of megawatt wind turbine blade shearing webs
DE102013224392A1 (en) * 2013-11-28 2015-05-28 Senvion Se Stegsetzvorrichtung, bridge and manufacturing method for a rotor blade of a wind turbine
CN204041659U (en) * 2014-08-01 2014-12-24 中国科学院宁波材料技术与工程研究所 MW grade wind driven generator blade web connection set and blade assembling method
CN204729242U (en) * 2015-07-10 2015-10-28 国电联合动力技术(连云港)有限公司 A kind of fan blade web assembling and positioning device
CN205034944U (en) * 2015-09-30 2016-02-17 中材科技(酒泉)风电叶片有限公司 Web hoisting accessory

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107150946A (en) * 2017-06-29 2017-09-12 湖北三江航天江河化工科技有限公司 A kind of wing plate boom hoisting and its hanging method
CN112374341A (en) * 2020-10-22 2021-02-19 浙江景兴纸业股份有限公司 Hoisting device for screen cylinder
CN113878900A (en) * 2021-08-18 2022-01-04 中复连众(沈阳)复合材料有限公司 Manufacturing and mounting method for wind power blade sectional web

Also Published As

Publication number Publication date
CN106241598B (en) 2017-12-26

Similar Documents

Publication Publication Date Title
CN106241598A (en) Wind electricity blade web hanging method
CN109895411B (en) Web integral type bonding frock
PE20161201A1 (en) MANUFACTURING METHOD OF A HOLLOW FAN BLADE
CN104465882A (en) Method for producing sectional material of frame of solar photovoltaic module
CN104085411B (en) The inserted camber beam in rail vehicle end top
CN205178976U (en) Adjustable compatible type wiring cassette positioning tool
CN103541859A (en) Vane, manufacturing method thereof and electric generator provided with vane
CN204248701U (en) A kind of Novel V-shaped aluminium section bar hold down gag
CN204094256U (en) Aluminium section bar is with cutting bridge machine
CN207149642U (en) A kind of lithium ion battery tab welding positioning fixture
CN202292840U (en) Hard paper tube cutting device
CN206551268U (en) Graphite boat inner side edge repairs face milling fixture
CN104999438A (en) Main grider turnover tooling for blade of wind-driven generator and using method of main grider turnover tooling
CN206415705U (en) It is a kind of to increase the high length-diameter ratio gong knife that gong plate folds number
CN205870366U (en) Positioner of tunnel segment mould plug
CN205834548U (en) A kind of welding tooling
CN205989144U (en) A kind of three reflective welding toolings
CN205753733U (en) A kind of blower fan and the fixing device of air curtain motor
CN204646781U (en) A kind of aft-fan of motor
CN205291634U (en) Large -scale aerogenerator blade butt end wooden model
CN204657453U (en) A kind of aluminium bar cutting blanking device
CN204646780U (en) A kind of front fan of motor
CN203285038U (en) Working platform for cross arms of electric transmission line steel tube tower
CN208196008U (en) A kind of parallel centering welding tooling
CN206309579U (en) A kind of urea pump fixed support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CP03 Change of name, title or address

Address after: 401336 Science and Technology Building, No. 6 Jiangxi Road, Changshengqiao Town, Nan'an District, Chongqing City

Patentee after: Chongqing Chengfei New Materials Co.,Ltd.

Country or region after: China

Address before: 131300 No.2 Xinggong Road, Da'an City, Baicheng City, Jilin Province

Patentee before: JILIN CHONGTONG CHENGFEI NEW MATERIAL Co.

Country or region before: China

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20240410

Address after: No. 2, Clean Energy Equipment Manufacturing Industrial Park, Da'an City, Baicheng City, Jilin Province, 131300 (within the demonstration park for integrated development of clean energy equipment manufacturing in Sikeshu Township)

Patentee after: Jilin Chengfei New Materials Co.,Ltd.

Country or region after: China

Address before: 401336 Science and Technology Building, No. 6 Jiangxi Road, Changshengqiao Town, Nan'an District, Chongqing City

Patentee before: Chongqing Chengfei New Materials Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right