CN106241485A - Assembled moving cable pay off rack - Google Patents
Assembled moving cable pay off rack Download PDFInfo
- Publication number
- CN106241485A CN106241485A CN201610840620.5A CN201610840620A CN106241485A CN 106241485 A CN106241485 A CN 106241485A CN 201610840620 A CN201610840620 A CN 201610840620A CN 106241485 A CN106241485 A CN 106241485A
- Authority
- CN
- China
- Prior art keywords
- fixed
- unwrapping wire
- columns
- thick stick
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H49/00—Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
- B65H49/18—Methods or apparatus in which packages rotate
- B65H49/20—Package-supporting devices
- B65H49/30—Swifts or skein holders
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/34—Handled filamentary material electric cords or electric power cables
Landscapes
- Road Signs Or Road Markings (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The invention discloses assembled moving cable pay off rack, including left socle, unwrapping wire thick stick and right support;It is characterized in that: described left socle, including left base, two left columns, two left cross bars, two left side outer support bars, two left side inner bracing pieces and two main road wheels;Described right support, including right base, two right columns, two right cross bars, two right side inner bracing pieces and two right side outer support bars;The bottom of left column and right column is all fixed with jack and fixes the middle part of seat, left column and right column and be designed with sliding seat, and sliding seat is fixed with unwrapping wire thick stick locating piece, and unwrapping wire thick stick locating piece and jack are fixed and be provided with jack between seat;On the medial wall of described left base, symmetry is fixed with two pallets;The upper end of said two left column is all fixed with main hook.Present configuration is simple, easy to use, and mobile dismounting is rapidly, time saving and energy saving, reduces labor intensity, improves cable and lay efficiency.
Description
Technical field
The present invention relates to the improvement of a kind of cable pay off rack, be the cable laying apparatus of power supply department use, specifically
It is a kind of assembled moving cable pay off rack, is a kind of cable pay off rack that may be used for vehicle traction.
Background technology
In the cable of power supply department lays, as laid the work of Electric Wires & Cables under road surface, current cable is typically to twine
Being wound on large-scale cable drum, unwrapping wire thick stick inserts in the centre bore of cable drum, and the two ends of unwrapping wire thick stick are carried on a shoulder pole respectively and put in left and right
On the bracing frame of both sides, rotational line reeler, unwrapping wire limit, limit is laid.It is disadvantageous in that: due to cable drum weight very
Greatly, cable cable laying operation needs ceaselessly to change construction point position simultaneously, and changes construction point position every time and be required for carrying out cable wire
Dish entrucking, transport, unload, the action of fixed cable drum, it is therefore desirable to the crane gear such as application truck crane, manpower consumption repeatedly
The biggest, waste time and energy, work efficiency is relatively low, and the expense of laying of cable remains high.
Summary of the invention
It is an object of the invention to provide a kind of simple in construction, easy to use, mobile dismounting rapidly, improves cable and lays effect
The assembled moving cable pay off rack of rate.
In order to reach object above, the technical solution adopted in the present invention is: this assembled moving cable pay off rack, including
Left socle, unwrapping wire thick stick and right support;It is characterized in that: described left socle, including left base, two left columns, two left cross bars,
Two symmetrical left side outer support bars, two symmetrical left side inner bracing pieces and two main road wheels, two left sides are stood
The middle part being fixed on left base that post lower end is symmetrical, the upper end sidewall of two left columns is fixed with symmetrical left horizontal stroke
Bar, each left cross bar is fixing with the outside of left base and inner side even by left side outer support bar and left side inner bracing piece respectively
Connecing, the bottom of two left side outer support bars is all fixed with main road wheel;Described right support, including right base, two right columns,
Two right cross bars, two symmetrical right side inner bracing pieces and two symmetrical right side outer support bars, two right columns
Lower end symmetry is fixedly installed on the middle part of right base, and the upper end sidewall of two right columns is fixed with symmetrical right horizontal stroke
Bar, each right cross bar connects by right side inner bracing piece and right side outer support bar are fixing with the inner side and outer side of right base respectively
Connect;The bottom of two left columns and two right columns is all fixed with jack and fixes seat, two left columns and two right columns
Middle part be designed with sliding seat, sliding seat is fixed with unwrapping wire thick stick locating piece, unwrapping wire thick stick locating piece and jack fix seat it
Between be provided with jack;On the medial wall of described left base, symmetry is fixed with two pallets;The upper end of said two left column
All it is fixed with main hook.
The auxiliary hook suitable with left cross bar all it is fixed with on two described right cross bars.
It is fixed with auxiliary road wheel on the lower outside wall of described right side outer support bar.
The bottom of described left side inner bracing piece is fixed with and is suitable to the positioning tube that unwrapping wire thick stick end is inserted, left side inner support
The middle part of bar is fixed with and is suitable to the positioning sleeve that unwrapping wire thick stick passes.
The beneficial effects of the present invention is: simple in construction, easy to use, mobile dismounting is rapidly, time saving and energy saving, reduces labor
Fatigue resistance, improves cable and lays efficiency.
Accompanying drawing explanation
Fig. 1 is the structure schematic front view of the present invention.
Fig. 2 is that the structure of the left base of the present invention overlooks enlarged diagram.
Fig. 3 is the structure left view enlarged diagram of the unwrapping wire thick stick of the present invention left fixed mount when packing up.
Detailed description of the invention
The present invention is made with reference to Fig. 1, Fig. 2, Fig. 3.This assembled moving cable pay off rack, including left socle, unwrapping wire thick stick 5 and
Right support;It is characterized in that: described left socle, mutual right including 1, two left cross bars 12, two of 3, two left columns of left base
The symmetrical left side inner bracing piece 14 of 13, two, left side outer support bar claimed and two main road wheels 15, two left columns 1 time
The middle part being fixed on left base 3 that end is symmetrical, the upper end sidewall of two left columns 1 is fixed with symmetrical left cross bar
12, each left cross bar 12 is respectively by left side outer support bar 13 and left side inner bracing piece 14 and the outside of left base 3 and inner side
Fixing connection, so that left column 1 can be more firm with the connection of left base 3, strengthen overall stability, props up outside two left sides
The bottom of strut 13 is all fixed with main road wheel 15;Described right support, including right base 2, two right horizontal strokes of 4, two right columns
Right side inner bracing piece 21 that 20, two, bar is symmetrical and two symmetrical right side outer support bars 22, identical with left socle,
Two right column 2 lower end symmetries are fixedly installed on the middle part of right base 4, and the upper end sidewall of two right columns 2 is fixed with phase
The most symmetrical right cross bar 20, each right cross bar 20 is respectively by right side inner bracing piece 21 and right side outer support bar 22 and right base
The inner side and outer side of 4 is fixing to be connected, so that right column 2 can be more firm with the connection of right base 4, strengthens stability in the large;
The bottom of two left columns 1 and two right columns 2 is all fixed with jack and fixes seat 6, two left columns 1 and two right columns
The middle part of 2 is designed with sliding seat 7, and the sliding seat 7 on left column 1 slides up and down along left column 1, in like manner, and the cunning on right column 2
Dynamic seat 7 slides up and down along right column 2, and sliding seat 7 is fixed with unwrapping wire thick stick locating piece 9, unwrapping wire thick stick locating piece 9 and jack
It is provided with jack 8 between fixing seat 6, unwrapping wire thick stick locating piece 9 can be driven to move up and down by jack 8, adjust left column 1 He
Unwrapping wire thick stick locating piece 9 on right column 2 is on uniform height, and the two ends of unwrapping wire thick stick 5 are carried on a shoulder pole respectively and put at left column 1 and right column 2
On unwrapping wire thick stick locating piece 9 on, setting-out work can be carried out;On the medial wall of described left base 3, symmetry is fixed with two
Pallet 10, in order to the medial wall of right base 4 is placed on pallet 10 lastblock and moves;The upper end of said two left column 1 is the most solid
Surely main hook 11 it is provided with, in order to the upper end of two left columns 1 is suspended on the afterbody vehicle frame of motorcycle or other haulage vehicles
On, it is simple to move integrally.
The auxiliary hook 19 suitable with left cross bar 12 all it is fixed with, when right base 4 is put on two described right cross bars 20
When putting on pallet 10, auxiliary hook 19 can hang on left cross bar 12, in order to keeps right support firm with what left socle combined
Property.
It is fixed with auxiliary road wheel 16, when right support placement location on the lower outside wall of described right side outer support bar 22
Time improper, right support can be tilted, make two auxiliary road wheels 16 land, be moved easily adjustment position.
In optional two left side inner bracing pieces 14 one, is fixed with bottom it and is suitable to determining of unwrapping wire thick stick 5 end insertion
Position cylinder 18, the middle part of left side inner bracing piece 14 is fixed with and is suitable to the positioning sleeve 17 that unwrapping wire thick stick 5 passes, puts being packed up by right support
After putting on left socle, unwrapping wire thick stick 5 can be packed up and be placed in positioning sleeve 17 and positioning tube 18, move with left socle.
When using the present invention, left socle and right support are put unwrapping wire position, adjusts two jack 8, make left column 1
Highly consistent with the unwrapping wire thick stick locating piece 9 on right column 2, after unwrapping wire thick stick 5 passes cable disc, two ends are carried on a shoulder pole respectively and are put putting in both sides
On line thick stick locating piece 9, then two jack 8 of adjustment rise respectively, make unwrapping wire thick stick 5 raise, and cable disc lifts off ground, so
Just can rotate cable disc unwrapping wire to lay;After setting-out work completes, fall jack 8 herein, take off unwrapping wire thick stick 5, the right side is propped up
Frame is placed on the pallet 10 of left socle, auxiliary hook 19 hangs on left cross bar 12, tilts left socle, makes two main road wheels 15
Ground, main hook 11 is hung over the afterbody of motorcycle or other vehicles, can tethered sliding to new unwrapping wire position, reenter and put
Lineman makees, time saving and energy saving, reduces labor intensity, improves work efficiency.
Claims (4)
1. assembled moving cable pay off rack, including left socle, unwrapping wire thick stick (5) and right support;It is characterized in that: a described left side is propped up
Frame, including left base (3), two left columns (1), two left cross bars (12), two symmetrical left sides outer support bar (13),
Two symmetrical left side inner bracing pieces (14) and two main road wheels (15), two symmetrical fixing in left column (1) lower end
At the middle part of left base (3), the upper end sidewall of two left columns (1) is fixed with symmetrical left cross bar (12), each
Left cross bar (12) is the most respectively by left side outer support bar (13) and left side inner bracing piece (14) and the outside of left base (3) and inner side
Fixing connection, the bottom of two left sides outer support bar (13) is all fixed with main road wheel (15);Described right support, including the right end
Seat (4), two right columns (2), two right cross bars (20), two symmetrical right side inner bracing pieces (21) and two are mutual right
Right side outer support bar (22) claimed, two right column (2) lower end symmetries are fixedly installed on the middle part of right base (4), and two right sides are stood
Being fixed with symmetrical right cross bar (20) on the upper end sidewall of post (2), each right cross bar (20) is respectively by right side
Support bar (21) and right side outer support bar (22) are fixing with the inner side and outer side of right base (4) to be connected;Two left columns (1) and two
The bottom of individual right column (2) is all fixed with jack and fixes seat (6), two left columns (1) and the middle part of two right columns (2)
Being designed with sliding seat (7), sliding seat (7) is fixed with unwrapping wire thick stick locating piece (9), unwrapping wire thick stick locating piece (9) is solid with jack
Jack (8) it is provided with between reservation (6);On the medial wall of described left base (3), symmetry is fixed with two pallets (10);Institute
The upper end stating two left columns (1) is all fixed with main hook (11).
Assembled moving cable pay off rack the most according to claim 1, it is characterised in that: two described right cross bars (20)
On be all fixed with the auxiliary hook (19) suitable with left cross bar (12).
Assembled moving cable pay off rack the most according to claim 1, it is characterised in that: described right side outer support bar
(22) auxiliary road wheel (16) it is fixed with on lower outside wall.
Assembled moving cable pay off rack the most according to claim 1, it is characterised in that: described left side inner bracing piece
(14) bottom is fixed with and is suitable to the positioning tube (18) that unwrapping wire thick stick (5) end is inserted, and the middle part of left side inner bracing piece (14) is solid
Surely it is provided with and is suitable to the positioning sleeve (17) that unwrapping wire thick stick (5) passes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610840620.5A CN106241485B (en) | 2016-09-22 | 2016-09-22 | Assembled moving cable releasing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610840620.5A CN106241485B (en) | 2016-09-22 | 2016-09-22 | Assembled moving cable releasing frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106241485A true CN106241485A (en) | 2016-12-21 |
CN106241485B CN106241485B (en) | 2019-04-05 |
Family
ID=57600326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610840620.5A Expired - Fee Related CN106241485B (en) | 2016-09-22 | 2016-09-22 | Assembled moving cable releasing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106241485B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107826885A (en) * | 2017-11-24 | 2018-03-23 | 国网湖北省电力公司宜昌供电公司 | Engineering residue cable take-up |
CN108033310A (en) * | 2017-12-22 | 2018-05-15 | 梅吉玲 | A kind of power ampere puts line apparatus |
CN110371772A (en) * | 2019-06-25 | 2019-10-25 | 南安市劲沣工业设计有限公司 | Pay-off equipment is used in a kind of processing of cable |
CN110625043A (en) * | 2019-09-21 | 2019-12-31 | 嘉兴市光炬五金科技有限公司 | Spring processing is with sending traditional thread binding putting |
CN112357350A (en) * | 2020-09-30 | 2021-02-12 | 国网浙江新昌县供电有限公司 | Cable reel support convenient to loading and unloading and transportation |
Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09284937A (en) * | 1996-04-09 | 1997-10-31 | Sumitomo Electric Ind Ltd | Laying of cable in conduit line, connection method and device |
US6612516B1 (en) * | 1991-01-16 | 2003-09-02 | H. Norman Clarkson | Method and apparatus for cable dispensing and placement |
CN201402957Y (en) * | 2009-03-02 | 2010-02-10 | 于韶红 | Automatic aligning type double-vertical-frame payoff rack |
CN201868789U (en) * | 2010-12-04 | 2011-06-15 | 中铁建电气化局集团北方工程有限公司 | Portable paying-off frame |
CN201895984U (en) * | 2010-10-10 | 2011-07-13 | 辽宁省电力有限公司营口供电公司 | Hydraulic pay-off stand |
CN202107373U (en) * | 2011-06-21 | 2012-01-11 | 中煤第五建设有限公司 | Cable and steel wire rope roller support device |
CN202175469U (en) * | 2011-07-26 | 2012-03-28 | 中国十九冶集团有限公司 | Cable reel supporting device |
CN202687622U (en) * | 2012-06-04 | 2013-01-23 | 邯郸供电公司 | Portable power cable and wire pay-off device |
CN203754110U (en) * | 2014-03-19 | 2014-08-06 | 中建八局大连建设工程有限公司 | Cable coil releasing support |
CN104003242A (en) * | 2014-06-07 | 2014-08-27 | 国家电网公司 | Cable reel paying off device |
CN203865696U (en) * | 2014-05-09 | 2014-10-08 | 葛洲坝集团电力有限责任公司 | Pay-off rack |
CN203903634U (en) * | 2014-05-30 | 2014-10-29 | 国家电网公司 | Cable paying-off device |
CN204022083U (en) * | 2014-06-14 | 2014-12-17 | 国网河南禹州市供电公司 | A kind of hydraulic pressure wire-unfolding rack |
US9079745B2 (en) * | 2011-03-01 | 2015-07-14 | Southwire Company, Llc | Pay-off assembly |
CN104891256A (en) * | 2015-05-29 | 2015-09-09 | 中铁电气化局集团北京建筑工程有限公司 | Subway coil cable wire feeder |
CN205034872U (en) * | 2015-07-14 | 2016-02-17 | 王伟东 | Spool frame |
CN105398874A (en) * | 2015-11-16 | 2016-03-16 | 中国十七冶集团有限公司 | Cable reel bracket |
CN205407205U (en) * | 2016-03-13 | 2016-07-27 | 安徽华希电力科技有限公司 | Cable spool wire rack |
CN205397673U (en) * | 2016-02-26 | 2016-07-27 | 嘉善恒兴电力建设有限公司 | Cable -placing device |
CN205471963U (en) * | 2016-03-21 | 2016-08-17 | 国网安徽省电力公司电力科学研究院 | Cable dish floor truck |
KR20160109883A (en) * | 2015-03-13 | 2016-09-21 | 허광학 | Cable Drum Hydraulic Pulling Apparatus |
-
2016
- 2016-09-22 CN CN201610840620.5A patent/CN106241485B/en not_active Expired - Fee Related
Patent Citations (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6612516B1 (en) * | 1991-01-16 | 2003-09-02 | H. Norman Clarkson | Method and apparatus for cable dispensing and placement |
JPH09284937A (en) * | 1996-04-09 | 1997-10-31 | Sumitomo Electric Ind Ltd | Laying of cable in conduit line, connection method and device |
CN201402957Y (en) * | 2009-03-02 | 2010-02-10 | 于韶红 | Automatic aligning type double-vertical-frame payoff rack |
CN201895984U (en) * | 2010-10-10 | 2011-07-13 | 辽宁省电力有限公司营口供电公司 | Hydraulic pay-off stand |
CN201868789U (en) * | 2010-12-04 | 2011-06-15 | 中铁建电气化局集团北方工程有限公司 | Portable paying-off frame |
US9079745B2 (en) * | 2011-03-01 | 2015-07-14 | Southwire Company, Llc | Pay-off assembly |
CN202107373U (en) * | 2011-06-21 | 2012-01-11 | 中煤第五建设有限公司 | Cable and steel wire rope roller support device |
CN202175469U (en) * | 2011-07-26 | 2012-03-28 | 中国十九冶集团有限公司 | Cable reel supporting device |
CN202687622U (en) * | 2012-06-04 | 2013-01-23 | 邯郸供电公司 | Portable power cable and wire pay-off device |
CN203754110U (en) * | 2014-03-19 | 2014-08-06 | 中建八局大连建设工程有限公司 | Cable coil releasing support |
CN203865696U (en) * | 2014-05-09 | 2014-10-08 | 葛洲坝集团电力有限责任公司 | Pay-off rack |
CN203903634U (en) * | 2014-05-30 | 2014-10-29 | 国家电网公司 | Cable paying-off device |
CN104003242A (en) * | 2014-06-07 | 2014-08-27 | 国家电网公司 | Cable reel paying off device |
CN204022083U (en) * | 2014-06-14 | 2014-12-17 | 国网河南禹州市供电公司 | A kind of hydraulic pressure wire-unfolding rack |
KR20160109883A (en) * | 2015-03-13 | 2016-09-21 | 허광학 | Cable Drum Hydraulic Pulling Apparatus |
CN104891256A (en) * | 2015-05-29 | 2015-09-09 | 中铁电气化局集团北京建筑工程有限公司 | Subway coil cable wire feeder |
CN205034872U (en) * | 2015-07-14 | 2016-02-17 | 王伟东 | Spool frame |
CN105398874A (en) * | 2015-11-16 | 2016-03-16 | 中国十七冶集团有限公司 | Cable reel bracket |
CN205397673U (en) * | 2016-02-26 | 2016-07-27 | 嘉善恒兴电力建设有限公司 | Cable -placing device |
CN205407205U (en) * | 2016-03-13 | 2016-07-27 | 安徽华希电力科技有限公司 | Cable spool wire rack |
CN205471963U (en) * | 2016-03-21 | 2016-08-17 | 国网安徽省电力公司电力科学研究院 | Cable dish floor truck |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107826885A (en) * | 2017-11-24 | 2018-03-23 | 国网湖北省电力公司宜昌供电公司 | Engineering residue cable take-up |
CN107826885B (en) * | 2017-11-24 | 2023-07-07 | 国网湖北省电力公司宜昌供电公司 | Engineering residual cable winding device |
CN108033310A (en) * | 2017-12-22 | 2018-05-15 | 梅吉玲 | A kind of power ampere puts line apparatus |
CN108033310B (en) * | 2017-12-22 | 2024-01-30 | 山西国嘉送变电安装有限公司 | Electric power installation pay-off |
CN110371772A (en) * | 2019-06-25 | 2019-10-25 | 南安市劲沣工业设计有限公司 | Pay-off equipment is used in a kind of processing of cable |
CN110371772B (en) * | 2019-06-25 | 2021-03-30 | 南通远景电工器材有限公司 | Paying-off equipment for cable processing |
CN110625043A (en) * | 2019-09-21 | 2019-12-31 | 嘉兴市光炬五金科技有限公司 | Spring processing is with sending traditional thread binding putting |
CN110625043B (en) * | 2019-09-21 | 2021-10-29 | 嘉兴市光炬五金科技有限公司 | Spring processing is with sending traditional thread binding putting |
CN112357350A (en) * | 2020-09-30 | 2021-02-12 | 国网浙江新昌县供电有限公司 | Cable reel support convenient to loading and unloading and transportation |
Also Published As
Publication number | Publication date |
---|---|
CN106241485B (en) | 2019-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106241485A (en) | Assembled moving cable pay off rack | |
CN203998856U (en) | Lifting mode power equipment maintaining device | |
CN105421736A (en) | Highly stable movable scaffold for building | |
CN203833394U (en) | Labor-saving winding tool flexible in winding and unwinding | |
CN205421940U (en) | Concrete spreader | |
CN203472896U (en) | Electric rod transportation auxiliary handcart | |
CN105350779A (en) | Concrete spreader | |
CN105756551B (en) | The crawling ladder fixing device of cylindrical type equipment | |
CN107181198A (en) | Lift single pole crossing frame | |
CN209038882U (en) | A kind of moveable suspended bracket for lifting pipeline in piping lane | |
CN207607524U (en) | A kind of Hydraulic trolley | |
CN203504065U (en) | Simple temporary bracket for raising wire | |
CN205104193U (en) | Propaganda banner suspension support frame | |
CN105347227A (en) | Mobile lifting device | |
CN106467282A (en) | Tractor rod member hangs, transports, vertical rod equipment integrating | |
CN206172810U (en) | Portable lifting device | |
CN205524327U (en) | Novel fortune pole gun carriage | |
CN204895808U (en) | L type hangs foot hand support | |
CN203756227U (en) | Single hydraulic prop trolley | |
CN203813325U (en) | Extension ladder and transmission line crossing rack having same | |
CN204802893U (en) | Electronic hoisting frame | |
CN203511699U (en) | Customized trolley for delivering rectangular weight | |
CN207212407U (en) | Walking type tunnel center ditch water pipe installation trolley | |
CN105439024A (en) | Simple movable hanging lifting device | |
CN206580407U (en) | Winding device for engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190405 Termination date: 20190922 |
|
CF01 | Termination of patent right due to non-payment of annual fee |