CN106208047A - A kind of electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit - Google Patents

A kind of electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit Download PDF

Info

Publication number
CN106208047A
CN106208047A CN201610650417.1A CN201610650417A CN106208047A CN 106208047 A CN106208047 A CN 106208047A CN 201610650417 A CN201610650417 A CN 201610650417A CN 106208047 A CN106208047 A CN 106208047A
Authority
CN
China
Prior art keywords
unit
iter
area division
sub area
emission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610650417.1A
Other languages
Chinese (zh)
Other versions
CN106208047B (en
Inventor
王魁
闫大威
李媛媛
崔广胜
雷铮
周进
宣文博
***
李慧
丁承第
宋佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610650417.1A priority Critical patent/CN106208047B/en
Publication of CN106208047A publication Critical patent/CN106208047A/en
Application granted granted Critical
Publication of CN106208047B publication Critical patent/CN106208047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A kind of electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit.It includes utilizing weighting factor method that local unit is ranked up numbering;Mark Iter=0 of sub area division is set;Make Iter=Iter+1;Judge to identify the sub area division number Itermax whether Iter provides more than operation of power networks department;All units in the sub area division being designated Iter are constituted a set;Choose the maximum unit of numbering;Load flow calculation instrument BPA is utilized to calculate electric network swim;Judge whether the unit output numbering maximum in Iter sub area division unit set is 0;Choose the unit numbering maximum in Iter sub area division unit set, this unit output is set and exerts oneself at present the steps such as 5 percent plus this unit rated capacity equal to this unit;The present invention can effectively reduce local unit discharge, reduces environmental pollution, and the operation of urban distribution network grown with each passing day for current environmental protection pressure provides helpful reference.

Description

A kind of electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit
Technical field
The invention belongs to electric power system dispatching running technology field, particularly relate to a kind of electricity considering energy-saving and emission-reduction benefit Net unit output method of adjustment.
Background technology
In recent years, the environmental problem of some urban areas of China is constantly aggravated, and haze weather is day by day serious, in the urgent need to turning Become energy development mode, adjust energy production structure.Reduce consumption of coal proportion, greatly develop clean energy resource, optimize power supply knot Structure and layout, improve the Critical policies being subject to electricity ratio to be improvement haze outside the receiving end electrical network of city.It addition, go out formulating local unit During power strategy, also should take into full account the energy-output ratio under local unit unit quantity of electricity, emission behaviour etc..Therefore, for the most slow Solve urban area environmental problem, first should fully improve external electric power ratio, secondly reduce local unit discharge.I.e. should ensure On the premise of urban distribution network safe and stable operation, take into full account the situations such as local unit primary energy consumption, discharge, formulate this locality Unit output adjustable strategies so that discharge accepting the maximized this locality unit that reduces of external electric power simultaneously as far as possible, alleviate city Environment and haze problem.But, there is no a kind of general urban distribution network this locality unit output considering energy-saving and emission-reduction benefit at present Method of adjustment.
Summary of the invention
In order to solve the problems referred to above, it is an object of the invention to provide a kind of electrical network unit considering energy-saving and emission-reduction benefit and go out Power method of adjustment.
In order to achieve the above object, the electrical network unit output method of adjustment bag considering energy-saving and emission-reduction benefit that the present invention provides Include the following step performed in order:
Step 1) according to the primary energy consumption amount under certain urban distribution network this locality unit unit quantity of electricity, carbon emission amount, utilize Weighting factor method is ranked up numbering to local unit;
Step 2) mark Iter=0 of sub area division is set;
Step 3) make Iter=Iter+1;
Step 4) judge to identify the sub area division number Itermax whether Iter provides more than operation of power networks department, the most then Enter step 10), this flow process so far terminates, and otherwise enters step 5);The sub area division number that wherein operation of power networks department provides The numerical value of Itermax is to be computed analyzing grid short circuit level by operation of power networks department to determine;
Step 5) all units in the sub area division being designated Iter are constituted a set, referred to as Iter electrical network divides District's unit set, and arrange all units in Iter sub area division unit set all overfill power run;
Step 6) choose the unit numbering maximum in Iter sub area division unit set, and this unit output is set equal to being somebody's turn to do Unit is exerted oneself at present and is deducted 5 the percent of this unit rated capacity;
Step 7) utilize Load flow calculation instrument BPA to calculate electric network swim, to judge whether to be designated the sub area division of Iter Meet " N-1 " verification, the most then enter step 8), otherwise enter step 9);
Step 8) judge whether the unit output numbering maximum in Iter sub area division unit set is 0, the most then should Unit is rejected from Iter sub area division unit set, then proceeds to step 6), the most directly proceed to step 6);
Step 9) choose the unit numbering maximum in Iter sub area division unit set, this unit output is set equal to this machine Organize 5 percent plus this unit rated capacity of exerting oneself at present, then proceed to step 3);
Step 10) terminate.
In step 1) in, described weighting factor method refers to the primary energy consumption amount under unit unit quantity of electricity, carbon row High-volume weight is disposed as 0.5, and weighted sum obtains the comprehensive weight result of each unit, according to comprehensive weight result, to respectively Unit starts number consecutively, the unit that comprehensive weight result is the biggest, numbers the biggest, represents unit energy-saving and emission-reduction benefit the poorest.
In step 7) in, described meet arbitrary electromotor that " N-1 " verification refers to be designated in the sub area division of Iter, When circuit or main transformer fault-free disconnect, the stable operation of electrical network can be kept, and do not cause other element to exceed the accident mistake of regulation Load and the requirement of voltage tolerance.
The beneficial effect of the electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit that the present invention provides:
Compared with prior art, the present invention by maximized reduction unit output to obtain maximum external electric power ratio Example, has simultaneously taken into full account unit energy-saving and emission-reduction benefit when reducing unit output, formulated can quantify, the unit easily implemented goes out Power adjustable strategies.This unit output adjustable strategies can effectively reduce local unit discharge, reduces environmental pollution, for current environmental protection The operation of urban distribution network that pressure grows with each passing day provides helpful reference.
Accompanying drawing explanation
The flow chart of the electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit that Fig. 1 provides for the present invention.
Detailed description of the invention
With specific embodiment offer of the present invention considered the electrical network unit output of energy-saving and emission-reduction benefit below in conjunction with the accompanying drawings Method of adjustment is described in detail.
As it is shown in figure 1, the electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit that the present invention provides includes by suitable The following step that sequence performs:
Step 1) according to the primary energy consumption amount under certain urban distribution network this locality unit unit quantity of electricity, carbon emission amount, utilize Weighting factor method is ranked up numbering to local unit;
Step 2) mark Iter=0 of sub area division is set;
Step 3) make Iter=Iter+1;
Step 4) judge to identify the sub area division number Itermax whether Iter provides more than operation of power networks department, the most then Enter step 10), this flow process so far terminates, and otherwise enters step 5);The sub area division number that wherein operation of power networks department provides The numerical value of Itermax is to be computed analyzing grid short circuit level by operation of power networks department to determine;
Step 5) all units in the sub area division being designated Iter are constituted a set, referred to as Iter electrical network divides District's unit set, and arrange all units in Iter sub area division unit set all overfill power run;
Step 6) choose the unit numbering maximum in Iter sub area division unit set, and this unit output is set equal to being somebody's turn to do Unit is exerted oneself at present and is deducted 5 the percent of this unit rated capacity;
Step 7) utilize Load flow calculation instrument BPA to calculate electric network swim, to judge whether to be designated the sub area division of Iter Meet " N-1 " verification, the most then enter step 8), otherwise enter step 9);
Step 8) judge whether the unit output numbering maximum in Iter sub area division unit set is 0, the most then should Unit is rejected from Iter sub area division unit set, then proceeds to step 6), the most directly proceed to step 6);
Step 9) choose the unit numbering maximum in Iter sub area division unit set, this unit output is set equal to this machine Organize 5 percent plus this unit rated capacity of exerting oneself at present, then proceed to step 3);
Step 10) terminate.
In step 1) in, described weighting factor method refers to the primary energy consumption amount under unit unit quantity of electricity, carbon row High-volume weight is disposed as 0.5, and weighted sum obtains the comprehensive weight result of each unit, according to comprehensive weight result, to respectively Unit starts number consecutively, the unit that comprehensive weight result is the biggest, numbers the biggest, represents unit energy-saving and emission-reduction benefit the poorest.
In step 7) in, described meet arbitrary electromotor that " N-1 " verification refers to be designated in the sub area division of Iter, When circuit or main transformer fault-free disconnect, the stable operation of electrical network can be kept, and do not cause other element to exceed the accident mistake of regulation Load and the requirement of voltage tolerance.
The present invention is ensureing on the premise of power network safety operation, the external electric power of the most maximized receiving, a side Face takes into full account the energy-output ratio under the unit unit quantity of electricity of urban distribution network this locality, emission behaviour etc., reduces local unit discharge, Formulate a kind of urban distribution network this locality unit output adjustable strategies considering energy-saving and emission-reduction benefit.The unit output that this invention is formulated Adjustable strategies, is conducive to alleviating urban area environment and increasingly sharpens and haze weather problem, provide for urban distribution network unit operation Helpful reference.
As it will be easily appreciated by one skilled in the art that and the foregoing is only presently preferred embodiments of the present invention, not in order to Limit the present invention, all any amendment, equivalent and improvement etc. made within the spirit and principles in the present invention, all should comprise Within protection scope of the present invention.

Claims (3)

1. the electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit, it is characterised in that: described consideration is energy-conservation to be subtracted The electrical network unit output method of adjustment of row's benefit includes the following step of performing in order:
Step 1) according to the primary energy consumption amount under certain urban distribution network this locality unit unit quantity of electricity, carbon emission amount, utilize weighting Y-factor method Y is ranked up numbering to local unit;
Step 2) mark Iter=0 of sub area division is set;
Step 3) make Iter=Iter+1;
Step 4) judge to identify the sub area division number Itermax whether Iter provides more than operation of power networks department, the most then enter Step 10), this flow process so far terminates, and otherwise enters step 5);The sub area division number Itermax that wherein operation of power networks department provides Numerical value be by operation of power networks department be computed analyze grid short circuit level determine;
Step 5) all units in the sub area division being designated Iter are constituted a set, referred to as Iter sub area division machine Group set, and arrange all units in Iter sub area division unit set all overfill power run;
Step 6) choose the unit numbering maximum in Iter sub area division unit set, and this unit output is set equal to this unit Exert oneself at present and deduct 5 the percent of this unit rated capacity;
Step 7) utilize Load flow calculation instrument BPA to calculate electric network swim, to judge whether the sub area division being designated Iter meets " N-1 " verifies, the most then enter step 8), otherwise enter step 9);
Step 8) judge whether the unit output numbering maximum in Iter sub area division unit set is 0, the most then by this unit Reject from Iter sub area division unit set, then proceed to step 6), the most directly proceed to step 6);
Step 9) choose the unit numbering maximum in Iter sub area division unit set, this unit output is set equal to this unit mesh Before exert oneself 5 percent plus this unit rated capacity, then proceed to step 3);
Step 10) terminate.
The electrical network unit output method of adjustment of consideration energy-saving and emission-reduction benefit the most according to claim 1, it is characterised in that: Step 1) in, described weighting factor method refers to equal to the primary energy consumption amount under unit unit quantity of electricity, carbon emission amount weight It is set to 0.5, and weighted sum obtains the comprehensive weight result of each unit, according to comprehensive weight result, starts to depend on to each unit Secondary numbering, the unit that comprehensive weight result is the biggest, number the biggest, represent unit energy-saving and emission-reduction benefit the poorest.
The electrical network unit output method of adjustment of consideration energy-saving and emission-reduction benefit the most according to claim 1, it is characterised in that: Step 7) in, described meets arbitrary electromotor, circuit or the main transformer that " N-1 " verification refers to be designated in the sub area division of Iter When fault-free disconnects, the stable operation of electrical network can be kept, and do not cause other element to exceed accident overload and the voltage of regulation The requirement of tolerance.
CN201610650417.1A 2016-08-08 2016-08-08 A kind of power grid unit output method of adjustment considering energy-saving and emission-reduction benefit Active CN106208047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610650417.1A CN106208047B (en) 2016-08-08 2016-08-08 A kind of power grid unit output method of adjustment considering energy-saving and emission-reduction benefit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610650417.1A CN106208047B (en) 2016-08-08 2016-08-08 A kind of power grid unit output method of adjustment considering energy-saving and emission-reduction benefit

Publications (2)

Publication Number Publication Date
CN106208047A true CN106208047A (en) 2016-12-07
CN106208047B CN106208047B (en) 2018-08-17

Family

ID=57514762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610650417.1A Active CN106208047B (en) 2016-08-08 2016-08-08 A kind of power grid unit output method of adjustment considering energy-saving and emission-reduction benefit

Country Status (1)

Country Link
CN (1) CN106208047B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110192168A1 (en) * 2006-10-09 2011-08-11 Narendra Digamber Joshi Method and system for reducing power plant emissions
CN102930351A (en) * 2012-10-26 2013-02-13 安徽省电力公司 Comprehensive energy-conservation optimal operation daily plan generation method
CN104484543A (en) * 2014-07-10 2015-04-01 国家电网公司 Unit comprehensive operation evaluation method taking energy saving and emission reduction and just, fair and open scheduling into consideration
CN105528466A (en) * 2014-09-28 2016-04-27 国家电网公司 Wind power optimal planning modeling method considering adaptability and economy of power system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110192168A1 (en) * 2006-10-09 2011-08-11 Narendra Digamber Joshi Method and system for reducing power plant emissions
CN102930351A (en) * 2012-10-26 2013-02-13 安徽省电力公司 Comprehensive energy-conservation optimal operation daily plan generation method
CN104484543A (en) * 2014-07-10 2015-04-01 国家电网公司 Unit comprehensive operation evaluation method taking energy saving and emission reduction and just, fair and open scheduling into consideration
CN105528466A (en) * 2014-09-28 2016-04-27 国家电网公司 Wind power optimal planning modeling method considering adaptability and economy of power system

Also Published As

Publication number Publication date
CN106208047B (en) 2018-08-17

Similar Documents

Publication Publication Date Title
Kuang et al. Discussion on advantages and disadvantages of distributed generation connected to the grid
Zeng et al. Orderly grid connection of renewable energy generation in China: Management mode, existing problems and solutions
CN104410091B (en) Wind energy storage management system based on converter control and wind energy storage management system control method
CN103956773B (en) Backup configuration optimization method containing wind power system unit
CN110198030A (en) Consider the direct-current emergency control method for coordinating and system that photovoltaic generation power quickly regulates and controls
CN109524988A (en) A kind of wind-powered electricity generation based on total active power trend prediction collects station voltage control method
Li et al. Monitoring and analysis of power quality in electric vehicle charging stations
CN107784373A (en) A kind of Transaction algorithm arrangement method transprovincially for considering energy-saving and emission-reduction
CN104348162B (en) 330kV wind energy turbine set collects control method of transformer station voltage
CN103761680B (en) Grid and provincial dispatching method and system for AC/DC interconnected large power grid with wind farm
CN108039728B (en) Real-time scheduling method for improving clean energy consumption capability of power grid
CN105976046B (en) Low-carbon power grid planning method considering demand side management
CN202455093U (en) Reverse power protection system of photovoltaic grid-connected inverter
CN107359619A (en) The load shedding control method of system voltage stability after a kind of meter and photovoltaic access
CN114336756B (en) Camera adjustment configuration method and system of new energy island Direct Current (DC) outgoing system
CN104348180B (en) Distributed power supply grid-connected point and access mode selection method
CN106208047A (en) A kind of electrical network unit output method of adjustment considering energy-saving and emission-reduction benefit
Habib et al. Demand and application of energy storage technology in renewable energy power system
CN106849111B (en) A kind of statements based on collusion route pressure regulation method based on photovoltaic DC-to-AC converter phase modulation
CN113690925B (en) Energy interaction optimization method and system based on micro-grid
CN110661268B (en) Dynamic reactive power compensation requirement determining method and system for new energy collection station
CN115085189A (en) Chain type energy network load transfer method and device
Li et al. Proportion optimization of wind and solar power capacity for regional power network
CN207518286U (en) Energy-storage system cooperates with Steam Turbine governing stage full load operating system in power station
CN107834542B (en) Effectiveness analysis method for access of extra-high voltage power grid to receiving-end power grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant