CN106207885B - The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps - Google Patents

The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps Download PDF

Info

Publication number
CN106207885B
CN106207885B CN201610585832.3A CN201610585832A CN106207885B CN 106207885 B CN106207885 B CN 106207885B CN 201610585832 A CN201610585832 A CN 201610585832A CN 106207885 B CN106207885 B CN 106207885B
Authority
CN
China
Prior art keywords
pipe bus
fixture
equipotential
pipe
electricians
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610585832.3A
Other languages
Chinese (zh)
Other versions
CN106207885A (en
Inventor
丁涛
何忠伟
于潇
张善
张德伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610585832.3A priority Critical patent/CN106207885B/en
Publication of CN106207885A publication Critical patent/CN106207885A/en
Application granted granted Critical
Publication of CN106207885B publication Critical patent/CN106207885B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/14Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for joining or terminating cables

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Clamps And Clips (AREA)

Abstract

The present invention relates to the short circuit fixture of charged for replacement 220kV pipe bus telescoping wire clamps, including pipe bus clip, fixed support, drainage thread pressing plate, body cradle, support bar, sliding outer cover, insulated handle, double end shunt line, pipe bus clip is hinged with fixed support, drainage thread pressing plate is bolted in the both sides of pipe bus clip, and connect double end shunt line, fixed support is fixedly connected with support bar, sliding outer cover is set in outside support bar, sliding outer cover is hinged by fixing the body cradle of its front end with pipe bus clip, support bar between fixed support and sliding outer cover is provided with stage clip, the end of support bar is provided with insulated handle.The fixture small volume of the present invention, it is lightweight, it is readily transported and preserves, it is suitable for the operating environment of transformer station's 220kV tube type bus, charged for replacement heating flexing line clamp is become a reality, solve the powered dismounting of tube type bus, the problem of heating flexing line clamp does not have instrument is installed, easy-to-operate is quick.

Description

The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps
Technical field
The present invention relates to 220kV pipe bus hotline maintenances field, more particularly to a kind of charged for replacement 220kV pipe bus telescopings The short circuit fixture and its application method of wire clamp.
Background technology
Outdoor Trusses For Transformer Substation 220kV pipe busbar distribution devices have small floor space, framework simplicity, arrange clear, through-current capacity Big the features such as.Last century Mo, outdoor 220kV pipes busbar distribution device is at home using very universal, existing state net Liaoning electric power grid The transformer station 220kV pipe bus runs time limit that affiliated electric company puts into operation in advance is substantially all more than 20 years.Liaoning electric power grid is run In outdoor 220kV pipes bus telescoping wire clamp put into operation that of the remote past, construction technology is uneven, bad weather takes place frequently, power , there is fever phenomenon successively in the factors influences such as load is big, contact surface oxidation, the conductive paste aging of smearing.Pipe bus is Aluminum metallic material is made, because its phase spacing is small, and technical standard requires higher, and various live line work insulating instruments can not be hung over Or ride on pipe bus, cause the current powered operation technique of the soft buses of transformer station 220kV to have met powered on pipe bus Change the requirement of flexing line clamp.At present, do not have in charged for replacement 220kV pipe bus telescoping wire clamp short circuit fixtures and its application method Before finding out, it can only be handled by overhauling teams and groups' power failure, have a strong impact on substation equipment safe operation and power supply reliability.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of short circuit card of charged for replacement 220kV pipes bus telescoping wire clamp Tool and its application method, realize and powered dismounting are carried out on pipe bus in operation, flexing line clamp operation is installed, solve original There is technology to carry out the powered technical barrier removed, install flexing line clamp operation on pipe bus.
To achieve the above object, the present invention is realized using following technical scheme:
The short circuit fixture of charged for replacement 220kV pipe bus telescoping wire clamps, including pipe bus clip, fixed support, drainage thread pressure Plate, body cradle, support bar, sliding outer cover, insulated handle, double end shunt line, pipe bus clip are hinged with fixed support, drainage thread pressure Plate is bolted in the both sides of pipe bus clip, and connects double end shunt line, and fixed support is fixedly connected with support bar, is slided outer It is set in outside support bar, sliding outer cover is hinged by fixing the body cradle of its front end with pipe bus clip, fixed support and cunning Support bar between dynamic overcoat is provided with stage clip, and the end of support bar is provided with insulated handle.
Pipe bus clip includes pipe bus dop one and pipe bus dop two, pipe bus dop one and pipe bus dop two-way mistake Swivel pin is hinged with fixed support, and jaws is formed between pipe bus dop one and pipe bus dop two, and jaws clamps pipe bus Fastened afterwards by bolt.
Described support bar includes the bar one and bar two of threaded connection.
Described sliding outer cover includes the sleeve pipe one and sleeve pipe two of threaded connection.
Described pipe bus clip, fixed support, drainage thread pressing plate, body cradle, support bar and sliding outer cover is aluminium alloy Material.
A kind of charged for replacement 220kV pipes bus telescoping wire clamp short circuit method, removes heat-generating pipe bus using above-mentioned fixture and stretches Diminishing line presss from both sides, installs new pipe bus telescoping wire clamp, and concrete operation step is as follows:
1. operation insulating ladder is assembled, and move to below setting;
2.2 equipotential electricians do security protection, and ascending stair;
3.2 name equipotential electrician fastens seat belts to setting, No. 1 equipotential electrician enters highfield, female in 220kV pipes Shielding cable bond is hung up properly on line flexing line clamp wire jumper, it is ensured that equipotential is remained during operation, and in 220kV pipe bus telescoping lines At 0.1 meter of folder outside, contact surface backed off after random highfield is handled well with wire brush, keep state before operation, now No. 2 isopotential electricals Work is stayed where one is, pending further orders, and keeps being not less than with electrical body 0.5 meter of safe distance;
No. 4.2 equipotential electricians enter highfield, and shielding cable bond is hung up properly on 220kV pipe bus telescoping wire clamp wire jumpers, Ensure to remain equipotential in operation, extinguishing arc connecting line is installed on flexing line clamp wire jumper, in 220kV pipe bus telescoping lines At 0.1 meter of folder outside, contact surface backed off after random highfield is handled well with wire brush, keep state before operation, now No. 1 isopotential electrical Work is stayed where one is, pending further orders, and keeps being not less than with electrical body 0.5 meter of safe distance;
5.2 ground electricians are connect on the inside of the jaws of the short circuit fixture of charged for replacement 220kV pipe bus telescoping wire clamps Contacting surface, which is handled and applied, wipes vaseline, and fixture is promoted into the upper 2 equipotential Electrician Operations position of ladder;
One hand of No. 6.1 equipotential electricians holds fixture insulated handle, and the sliding outer cover of another hand propelled fixture makes pipe The pipe bus of bus clip clamping 220kV pipe bus telescoping wire clamps side, when fixture opening is more than pipe bus diameter, pushes fixture Pipe bus is held in the mouth, sliding outer cover is unclamped, fixture folder is hung on pipe bus;
No. 7.1 equipotential electricians enter highfield, and shielding cable bond is hung up properly on the wire jumper of pipe bus telescoping wire clamp, by card Tool pipe bus clip openend is fastened with bolt, and the insulation transmission rope that fixture one end is fastened is opened and ties up to pipe bus telescoping wire clamp Wire jumper top center, the insulation pull rope that fixture one end is fastened is opened, and is tied up on pipe bus telescoping wire clamp lower end position, is removed After 220kV pipe bus telescoping cable clip bolts, shielding cable bond is opened, highfield is exited, state, now No. 2 etc. before operation is kept Current potential electrician stays where one is, pending further orders, and keeps being not less than with electrical body 0.5 meter of safe distance;
One hand of No. 8.2 equipotential electricians holds fixture insulated handle, and another hand push sliding outer cover presss from both sides pipe bus clip The pipe bus of 220kV pipe bus telescoping wire clamp opposite sides is held, when fixture opening is more than pipe bus diameter, push fixture, which is held in the mouth, firmly manages Bus, unclamps sliding outer cover, and fixture folder is hung on pipe bus;
No. 9.2 equipotential electricians enter highfield, and shielding cable bond is hung up properly on the double end shunt line of fixture, by fixture pipe Bus clip openend is fastened with bolt, and the metal connecting line for the extinguishing arc rope front end that fixture one end is fastened, which is opened and ties up to pipe bus, to be stretched Diminishing line presss from both sides wire jumper top center, and the insulation transmission rope fastened with No. 1 equipotential electrician is formed and intersected, extinguishing arc connecting line from stretching Removed and on the double end shunt line of fixture on diminishing line folder wire jumper, remove after 220kV pipe bus telescoping cable clip bolts, open Cable bond is shielded, highfield is exited, state before operation is kept, now No. 1 equipotential electrician stays where one is, pending further orders, is kept with electrical body not Safe distance less than 0.5 meter;
10. 1, during No. 2 equipotential electrician's operated in turn, any position of two equipotential personnel's bodies must be kept Safe distance not less than 0.8 meter, forbids two people to operate simultaneously, prevents human body and seals among loop, and work director sends finger Order, 4 ground electricians are cooperated, and the 220kV pipe bus telescoping wire clamps of original heating are at the uniform velocity down into ground, remove 220kV Awaited orders on pipe bus telescoping wire clamp end-of-job, 2 equipotential ladder for electrician;
Insulation transmission rope, extinguishing arc rope are tied up to new pipe bus telescoping wire clamp wire jumper top center by 11.1 ground electricians, Two ropes are fastened and formed after intersection, are handled new pipe bus telescoping wire clamp contact surface and are coated vaseline, another 1 ground electrician exists A bar insulation pull rope is respectively fastened below new pipe bus telescoping wire clamp two ends;
12. under work director commander, 2 ground electricians lift insulation transmission rope, extinguishing arc rope, another 2 ground respectively Electrician coordinates the insulation pull rope at drawing pipe bus telescoping wire clamp two ends, pipe bus telescoping wire clamp is at the uniform velocity risen to setting, After extinguishing arc, the specified location being sitting on pipe bus is stopped at pipe bus telescoping wire clamp two ends, and the flexing line clamp of installation end does not stop to be sitting in When on pipe bus, forbid No. 1 or No. 2 equipotential electricians are hand-held puts, prevent human body from sealing in loop;
No. 13.1 equipotential electricians enter highfield, and shielding cable bond, fixing pipe are hung up properly on the double end shunt line of fixture Seat bolt above and below bus telescoping wire clamp, check it is errorless after, open insulation transmission rope, insulation pull rope and by two rope be connected to one Rise, tie up to the double end shunting thread end of fixture, open shielding cable bond, exit highfield, keep state, now No. 2 before operation Equipotential electrician stays where one is, pending further orders, and keeps being not less than with electrical body 0.5 meter of safe distance;
No. 14.2 equipotential electricians enter highfield, and shielding cable bond, fixing pipe are hung up properly on the double end shunt line of fixture Seat bolt above and below bus telescoping wire clamp, after inspection is errorless, opens extinguishing arc rope and ties up to the double end shunting thread end of fixture, open exhausted Edge pull rope also ties up to the double end shunting thread end of fixture, removes the extinguishing arc connecting line on fixture and ties up to the pipe bus newly installed On flexing line clamp wire jumper, shielding cable bond is opened, highfield is exited, state before operation is kept, now No. 2 equipotential electrician original places Await orders, keep being not less than with electrical body 0.5 meter of safe distance;
15.1st, No. 2 isopotential electrical work points are not removed after respective side fixture pipe bus clip opening terminal bolt, and a hand is held Fixture insulated handle, another hand propelled sliding outer cover, when fixture opening is more than pipe bus diameter, by fixture from pipe bus Exit;
16. under work director commander, fixture is at the uniform velocity down to ground by the upper 2 equipotential electricians of ladder and ground electrician cooperation Face;
No. 17.2 equipotential electricians, which enter, hangs up properly shielding cable bond on highfield, pipe bus telescoping wire clamp wire jumper, remove pipe Extinguishing arc connecting line on bus telescoping wire clamp wire jumper, disk is got well and tied up in closing arc suppression tackle rotating shaft, is opened shielding cable bond, is exited Highfield;
18.1st, No. 2 equipotential electricians return to ground;
19. removing operation insulating ladder, finishing tool after operation maintenance personnel acceptance(check), handles work ticket termination, withdraws existing , work all terminates.
Compared with prior art, the beneficial effects of the invention are as follows:
The fixture small volume of the present invention, it is lightweight, it is readily transported and preserves, is suitable for transformer station's 220kV tube type bus Operating environment, makes charged for replacement heating flexing line clamp become a reality, and solves the powered dismounting of tube type bus, installs heating line stretcher The problem of folder does not have instrument, easy-to-operate is quick, improves power network power supply reliability, ensures the person and electrical equipment safety.
It can not be limited using the present invention by time, the plan that has a power failure, timely abatement apparatus hidden danger, it is to avoid single busbar has a power failure or double When bus-bar fault bus has a power failure, another bus run is changed entirely in 220kV elements, 220kV bus differential protections change without selection input process In nearly 300 grid switching operations, the generation of misoperation fault is avoided from root, can reduce operation, maintenance, relay, scheduling A large amount of related works, simplify work flow, substantially reduce contingency occurrence probability, it is ensured that the person and equipment safety, so as to solve The practical challenges run into production, have important practical significance.
Brief description of the drawings
Fig. 1 is structural representation of the invention.
Fig. 2 is structure top view of the invention.
Fig. 3 is partial sectional view of the invention.
Fig. 4 is the structure chart of pipe bus dop 22.
In figure:Pipe bus dop 1, pipe bus dop 22, drainage thread pressing plate 1, fixed support 4, body cradle 5, support Bar 6, sliding outer cover 7, insulated handle 8, swivel pin 9, bolt 1, double end shunt line 11, stage clip 12, bolt 2 13, drainage thread Pressing plate 2 14, jaws 15, pinch 16, sleeve pipe 1 and sleeve pipe 2 18, bar 1 and bar 2 20.
Embodiment
The embodiment to the present invention is further illustrated below in conjunction with the accompanying drawings:
Such as Fig. 1-3, the short circuit fixture of charged for replacement 220kV pipe bus telescoping wire clamps, including pipe bus dop 1, pipe are female Wire clamp mouth 22, fixed support 4, drainage thread pressing plate 1, drainage thread pressing plate 2 14, body cradle 5, support bar 6, sliding outer cover 7, absolutely Edge handle 8, double end shunt line 11, pipe bus dop 1 and pipe bus dop 22 are combined into the pipe with jaws 15 and pinch 16 Bus clip, pipe bus dop 1 and pipe bus dop 22 are hinged by swivel pin 9 with fixed support 4, the He of pipe bus dop 1 Fastened between pipe bus dop 22 by bolt 1.Drainage thread pressing plate 1 and drainage thread pressing plate 2 14 are fixed on by bolt 2 13 The both sides of pipe bus clip, and double end shunt line 11 is connected, fixed support 4 is fixedly connected with support bar 6, and sliding outer cover 7 is set in Outside support bar 6, sliding outer cover 7 is hinged by the pinch 16 of the body cradle 5 and pipe bus clip of fixing its front end, fixed support 4 Support bar 6 between sliding outer cover 7 is provided with stage clip 12, and support bar 6 includes the bar 1 and bar 2 20 of threaded connection, support The end of bar 6 is provided with insulated handle 8.Sliding outer cover 7 includes the sleeve pipe 1 and sleeve pipe 2 18 of threaded connection.
Pipe bus clip, fixed support, drainage thread pressing plate, body cradle, support bar and sliding outer cover are aluminum alloy material.
A kind of charged for replacement 220kV pipes bus telescoping wire clamp short circuit method, using two sets of above-mentioned fixtures, insulation combination herringbone Small pole is insulated on ladder to pipe bus vertical direction side, two equipotential electricians, keep relevant voltage grade live-working safety away from From powered nipple bus telescoping wire clamp removes heat-generating pipe bus telescoping wire clamp, installs new pipe bus telescoping wire clamp, specific behaviour Make step as follows:
First, flexing line clamp standardized work flows are removed:
1. assemble 1 on ground, No. 2 insulation combination double ladders.Fasten 2 bar insulation tricing lines respectively in each ladder top portion, and 1 group of level insulation pole respectively is installed in terraced top appropriate location and the protection rope of 1 equipotential electrician is respectively hung up properly, in No. 1 pole On hang up properly 1 transmission rope, the winding extinguishing arc justified well with disk in 1 extinguishing arc rope, closing arc suppression tackle rotating shaft is hung up properly on No. 2 poles Connecting line, hangs up properly snakelike limit ladder 1, on the inside of No. 2 insulation combination double ladders and opens away from rope respectively, 1, No. 2 insulation combination double ladders V-type insulation limit rope is fastened in outside middle and upper part, stands on ground by two groups of insulation combination double ladders respectively in the case where ground electrician coordinates Face, is slowly moved to after operation point location one by one, fastens all tricing lines and limit ladder is opened away from rope, whole ladder is fixed well.
2. equipotential electrician wears a full set of qualified screening clothing, goggles is worn, specific responsibility guardian checks again for screening clothing outward appearance Whether good, whether each several part connection is reliable, and whether protection rope is fastened, and whether outfit is complete, through each side passed examination And after determining that insulating ladder is firm, equipotential personnel just allow ascending stair.
3.4 ground electricians respectively help two groups of insulating combined ladder sides, and 2 equipotential electricians climb along operating ladder passage And cross terraced head to setting and fasten seat belts.In climbing, 2 ground electricians remain corresponding equipotential electrician Loins protection rope control operation, while equipotential electrician keeps the various safe distances of 220kV voltage class.
No. 4.1 equipotential electricians enter highfield, and shielding cable bond is hung up properly on 220kV pipe bus telescoping wire clamp wire jumpers, Ensure that equipotential electrician, in operation, remains equipotential, and use steel at 0.1 meter on the outside of the 220kV pipe bus telescoping wire clamps Wire brush is handled well after contact surface, is removed shielding cable bond and is exited highfield, keeps state before operation.Now No. 2 equipotential electricians Stay where one is, pending further orders, keep being not less than with electrical body 0.5 meter of safe distance.
No. 5.2 equipotential electricians enter highfield, and shielding cable bond is hung up properly on 220kV pipe bus telescoping wire clamp wire jumpers, Ensure that equipotential electrician, in operation, remains equipotential, extinguishing arc connecting line is installed on flexing line clamp wire jumper and contacted good Good, 0.1 meter of place, is handled well with wire brush after contact surface on the outside of 220kV pipe bus telescoping wire clamps, is removed and is shielded cable bond and exit Highfield, keeps state before operation, and now No. 1 equipotential electrician stays where one is, pending further orders, and keeps being not less than with electrical body 0.5 meter of safety Distance.
6.1 ground electricians fasten insulation transmission rope in charged for replacement 220kV pipe bus telescoping wire clamp fixtures one end, another Extinguishing arc rope metal connecting line is fastened at end, and another 1 ground electrician fastens two at 220kV pipe bus telescoping wire clamp fixtures two ends absolutely respectively Edge pull rope, and fixture opening inner side carry out contact surface processing and apply wipe vaseline.
7. under work director commander, 2 ground electricians lift insulation transmission rope, extinguishing arc rope, another 2 ground electricity respectively Work coordinates the insulation pull rope at drawing charged for replacement 220kV pipe bus telescoping wire clamp fixtures two ends, and fixture is passed into upper 2 of ladder Equipotential electrician, after to setting extinguishing arc, is stopped at specified location before fixture short circuit.
One hand of No. 8.1 equipotential electricians holds fixture insulated handle, and the sliding outer cover of another hand propelled fixture makes pipe The pipe bus of bus clip clamping 220kV pipe bus telescoping wire clamps side, when fixture opening is more than pipe bus diameter, pushes fixture Pipe bus is held in the mouth, sliding outer cover is unclamped, fixture folder is hung on pipe bus.
No. 9.1 equipotential electricians enter highfield, shielding cable bond are hung up properly on the wire jumper of pipe bus telescoping wire clamp, card Has terminal bolt fastening above and below jaws, the insulation transmission rope that fixture one end is fastened is opened and ties up to pipe bus telescoping wire clamp wire jumper top End center, the insulation pull rope that fixture one end is fastened is opened, and is tied up on pipe bus telescoping wire clamp lower end position, removes 220kV After pipe bus telescoping cable clip bolt, shielding cable bond is opened, highfield is exited, state before operation is kept, now No. 2 isopotential electricals Work is stayed where one is, pending further orders, and keeps being not less than with electrical body 0.5 meter of safe distance.
One hand of No. 10.2 equipotential electricians holds fixture insulated handle, and another hand propelled sliding outer cover makes pipe bus The pipe bus of folder clamping 220kV pipe bus telescoping wire clamp opposite sides, when fixture opening is more than pipe bus diameter, pushes fixture rank Firmly pipe bus, unclamps sliding outer cover, and fixture folder is hung on pipe bus.
No. 11.2 equipotential electricians enter highfield, shielding cable bond are hung up properly on the double end shunt line of fixture, fixture Terminal bolt is fastened above and below jaws, and the metal connecting line for the extinguishing arc rope front end that fixture one end is fastened is opened and ties up to pipe bus telescoping line Wire jumper top center is pressed from both sides, and the insulation transmission rope fastened with No. 1 equipotential electrician is formed and intersected, extinguishing arc connecting line from line stretcher Press from both sides and removed on wire jumper and on the double end shunt line of fixture, removed after 220kV pipe bus telescoping cable clip bolts, open shielding Cable bond, exits highfield, keeps state before operation, and now No. 1 equipotential electrician stays where one is, pending further orders, and holding is not less than with electrical body 0.5 meter of safe distance.4 ground electricians have carried out insulation transmission rope, extinguishing arc rope, insulation pull rope and have been lifted, fall to preparing.
12. 1, during No. 2 equipotential electrician's operated in turn, any position of two equipotential personnel's bodies must be kept Safe distance not less than 0.8 meter, forbids two people to operate simultaneously, prevents human body and seals among loop.Work director, which sends, to be carried Rise, fall to instructing, 4 ground electricians cooperate, tricing line lifting at any time, the speed and angle that fall, by original heating 220kV pipe bus telescoping wire clamps are at the uniform velocity down to ground, remove 220kV pipe bus telescoping wire clamp end-of-jobs.2 equipotential personnel Awaited orders on ladder.
13. flexing line clamp heating cause is searched in the relevant leader of the unit through scene, specific responsibility, determine that the flexing line clamp whether may be used With the 2 equipotential electricians awaited orders on ladder if available refer to according to the powered flexing line clamp standardized work of installing of 220kV pipe buses Book is led to be operated.If unavailable, there are following two kinds of possibility:One is changed using ready spare unit;If two be temporary Without spare unit, pipe bus run demand can be met with the flexing line clamp short circuit fixture of the present invention, treat that the product bought to producer is arrived Implement to change again after goods.
14. more than work and be fully completed after, 1, No. 2 equipotential electricians open safety belt and climb and cross along operating ladder passage Terraced head is returned in ground, climbing, and 2 ground electricians remain corresponding equipotential electrician loins protection rope control behaviour Make, while equipotential electrician keeps the various safe distances of 220kV voltage class.According to vertical terraced reverse order by two groups of insulation groups Close double ladder steadily to fall on the tarpaulin of ground, team finishing tool is dropped back from scene, this end of job.
The 2nd, flexing line clamp standardized work flows are installed:
1. assemble 1 on ground, No. 2 insulation combination double ladders.Fasten 2 bar insulation tricing lines respectively in each ladder top portion, and 1 group of level insulation pole respectively is installed in terraced top appropriate location and the protection rope of 1 equipotential electrician is respectively hung up properly, in No. 1 pole On hang up properly 1 transmission rope, the winding extinguishing arc justified well with disk in 1 extinguishing arc rope, closing arc suppression tackle rotating shaft is hung up properly on No. 2 poles Connecting line, hangs up properly snakelike limit ladder 1, on the inside of No. 2 insulation combination double ladders and opens away from rope respectively, 1, No. 2 insulation combination double ladders V-type insulation limit rope is fastened in outside middle and upper part, stands on ground by two groups of insulation combination double ladders respectively in the case where ground electrician coordinates Face, is slowly moved to after operation point location one by one, fastens all tricing lines and limit ladder is opened away from rope, whole ladder is fixed well.
2. equipotential electrician wears a full set of qualified screening clothing, goggles is worn, specific responsibility guardian checks again for screening clothing outward appearance Whether good, whether each several part connection is reliable, and whether protection rope is fastened, and whether outfit is complete, through each side passed examination And after determining that insulating ladder is firm, equipotential personnel just allow ascending stair.
3.4 ground electricians respectively help two groups of insulation combination double ladder sides, and 2 equipotential electricians are along operating ladder passage Climb and cross terraced head to setting and fasten seat belts.In climbing, 2 ground electricians remain corresponding equipotential Electrician's loins protection rope control operation, while equipotential electrician keeps the various safe distances of 220kV voltage class.
No. 4.1 equipotential electricians enter highfield, and shielding cable bond is hung up properly on the double end shunt line of fixture, in original hair The 220kV pipe bus telescoping wire clamp contact link positions of hot hidden danger handle contact surface well, open shielding cable bond, exit forceful electric power , keep operation before state, now No. 2 equipotential electricians stay where one is, pending further orders, keep with electrical body not less than 0.5 meter safety away from From.
No. 5.2 equipotential electricians enter highfield, and shielding cable bond is hung up properly on the double end shunt line of fixture, in original hair The 220kV pipe bus telescoping wire clamp contact link positions of hot hidden danger handle contact surface well, on fixture install extinguishing arc connecting line and Contact is good, opens shielding cable bond, exits highfield, keep state before operation, now No. 1 equipotential electrician stays where one is, pending further orders, Keep the safe distance not less than 0.5 meter with electrical body.
6. 1, during No. 2 equipotential electrician's operated in turn, any position of two equipotential electrician's bodies must be kept Safe distance not less than 0.8 meter, forbids two people to operate simultaneously.Whether No. 1 equipotential electrician, or No. 2 equipotential electricians, When handling contact surface, any position of body or instrument must not surmount pipe bus closed end, prevent arcing, prevent human body Seal in loop event generation.
Insulation transmission rope, extinguishing arc rope are tied up to new pipe bus telescoping wire clamp wire jumper top center, two by 7.1 ground electricians Rope is fastened and formed after intersection, is handled new pipe bus telescoping wire clamp contact surface and is coated vaseline, 1 ground electrician is new A bar insulation pull rope is respectively fastened below pipe bus telescoping wire clamp two ends.
8. under work director commander, 2 ground electricians lift insulation transmission rope, extinguishing arc rope, another 2 ground electricity respectively Work coordinates the insulation pull rope at drawing pipe bus telescoping wire clamp two ends, pipe bus telescoping wire clamp is at the uniform velocity risen to setting, passes through After extinguishing arc, the specified location being sitting on pipe bus is stopped at pipe bus telescoping wire clamp two ends.The flexing line clamp of installation end does not stop to be sitting in pipe When on bus, forbid No. 1 or No. 2 equipotential electricians are hand-held puts, prevent human body from sealing in loop.
9.4 ground electricians should be noted that angle control when pipe bus telescoping wire clamp rises, and prevent pipe bus telescoping wire clamp Insulation porcelain knob is touched, and keeps the various safe distances of its 220kV voltage class.
No. 10.1 equipotential electricians enter highfield, and shielding cable bond, fixing pipe are hung up properly on the double end shunt line of fixture Seat bolt above and below bus telescoping wire clamp, after inspection is errorless, opens transmission rope, pull rope and simultaneously two ropes links together, tie up to card The double end shunting thread end of tool, opens shielding cable bond, exits highfield, keep state before operation, now No. 2 equipotential electricians Stay where one is, pending further orders, keep being not less than with electrical body 0.5 meter of safe distance.
No. 11.2 equipotential electricians enter highfield, and shielding cable bond, fixing pipe are hung up properly on the double end shunt line of fixture Seat bolt above and below bus telescoping wire clamp, after inspection is errorless, opens extinguishing arc rope and ties up to the double end shunting thread end of fixture, opening is led Messenger also ties up to the double end shunting thread end of fixture, removes extinguishing arc connecting line and ties up to the pipe bus telescoping wire clamp wire jumper newly installed On, open shielding cable bond, exit highfield, keep state before operation, now No. 1 equipotential electrician stays where one is, pending further orders, keep with Electrical body is not less than 0.5 meter of safe distance.
12.1st, No. 2 isopotential electrical work points are not removed after respective side fixture pipe bus clip opening terminal bolt, and a hand is held Fixture insulated handle, another hand propelled sliding outer cover, when fixture opening is more than pipe bus diameter, by fixture from pipe bus Exit.Now 4 ground electricians have carried out cooperation and prepared.
13. under work director commander, 2 ground electricians are lifted respectively, fall insulation transmission rope, extinguishing arc rope, another 2 Ground electrician coordinates the insulation pull rope at drawing fixture two ends, and after extinguishing arc, the fixture of whereabouts is at the uniform velocity down to ground.
No. 14.2 equipotential electricians enter highfield, and shielding cable bond is hung up properly on pipe bus telescoping wire clamp wire jumper, remove Extinguishing arc connecting line on pipe bus telescoping wire clamp wire jumper, disk is got well and tied up in closing arc suppression tackle rotating shaft, opens shielding cable bond, Exit highfield.
15.1st, No. 2 equipotential electricians open safety belt and are climbed along operating ladder passage and cross terraced head return ground.Climbed Cheng Zhong, 2 ground electricians remain corresponding equipotential electrician loins protection rope control operation, while equipotential electrician protects Hold the various safe distances of 220kV voltage class.
16. two groups of insulation combination double ladders were steadily fallen on the tarpaulin of ground according to vertical terraced reverse order, finishing tool, After operation maintenance personnel acceptance(check), work ticket termination is handled, scene, the work of charged for replacement 220kV pipe bus telescopings wire clamp is withdrawn All terminate.
Described above is only the general principle of the present invention, and not the present invention is imposed any restrictions, every right according to the present invention It carries out equivalent variations and modification, within the category of the art of this patent protection scheme.

Claims (1)

1. a kind of charged for replacement 220kV pipes bus telescoping wire clamp short circuit method, charged for replacement 220kV pipe bus telescoping wire clamps it is short Connect fixture, including pipe bus clip, fixed support, drainage thread pressing plate, body cradle, support bar, sliding outer cover, insulated handle, double end Shunt line, pipe bus clip is hinged with fixed support, and drainage thread pressing plate is bolted in the both sides of pipe bus clip, and connects double end Shunt line, fixed support is fixedly connected with support bar, and sliding outer cover is set in outside support bar, and sliding outer cover is by fixing before it The body cradle at end is hinged with pipe bus clip, and the support bar between fixed support and sliding outer cover is provided with stage clip, the end of support bar End is provided with insulated handle;Characterized in that, removing heat-generating pipe using the short circuit fixture of charged for replacement 220kV pipe bus telescoping wire clamps Bus telescoping wire clamp, the new pipe bus telescoping wire clamp of installation, concrete operation step are as follows:
1. operation insulating ladder is assembled, and move to below setting;
2.2 equipotential electricians do security protection, and ascending stair;
3.2 equipotential electricians fasten seat belts to setting, and No. 1 equipotential electrician enters highfield, are stretched in 220kV pipe buses Shielding cable bond is hung up properly on diminishing line folder wire jumper, it is ensured that equipotential is remained during operation, and outside 220kV pipe bus telescoping wire clamps At 0.1 meter of side, contact surface backed off after random highfield being handled well with wire brush, keeping state before operation, now No. 2 equipotential electricians are former Ground is awaited orders, and keeps being not less than with electrical body 0.5 meter of safe distance;
No. 4.2 equipotential electricians enter highfield, and shielding cable bond is hung up properly on 220kV pipe bus telescoping wire clamp wire jumpers, it is ensured that Equipotential is remained in operation, extinguishing arc connecting line is installed on flexing line clamp wire jumper, outside 220kV pipe bus telescoping wire clamps At 0.1 meter of side, contact surface backed off after random highfield being handled well with wire brush, keeping state before operation, now No. 1 equipotential electrician is former Ground is awaited orders, and keeps being not less than with electrical body 0.5 meter of safe distance;
5.2 ground electricians carry out contact surface on the inside of the jaws of the short circuit fixture of charged for replacement 220kV pipe bus telescoping wire clamps Handle and apply and wipe vaseline, fixture is promoted to the upper 2 equipotential Electrician Operations position of ladder;
One hand of No. 6.1 equipotential electricians holds fixture insulated handle, and the sliding outer cover of another hand propelled fixture makes pipe bus The pipe bus of folder clamping 220kV pipe bus telescoping wire clamps side, when fixture opening is more than pipe bus diameter, pushes fixture and holds in the mouth Pipe bus, unclamps sliding outer cover, and fixture folder is hung on pipe bus;
No. 7.1 equipotential electricians enter highfield, and shielding cable bond is hung up properly on the wire jumper of pipe bus telescoping wire clamp, by fixture pipe Bus clip openend is fastened with bolt, and the insulation transmission rope that fixture one end is fastened is opened and ties up to pipe bus telescoping wire clamp wire jumper Top center, the insulation pull rope that fixture one end is fastened is opened, and is tied up on pipe bus telescoping wire clamp lower end position, is removed After 220kV pipe bus telescoping cable clip bolts, shielding cable bond is opened, highfield is exited, state, now No. 2 etc. before operation is kept Current potential electrician stays where one is, pending further orders, and keeps being not less than with electrical body 0.5 meter of safe distance;
One hand of No. 8.2 equipotential electricians holds fixture insulated handle, and another hand push sliding outer cover clamps pipe bus clip The pipe bus of 220kV pipe bus telescoping wire clamp opposite sides, when fixture opening is more than pipe bus diameter, pushes fixture and holds in the mouth pipe mother Line, unclamps sliding outer cover, and fixture folder is hung on pipe bus;
No. 9.2 equipotential electricians enter highfield, and shielding cable bond is hung up properly on the double end shunt line of fixture, by fixture pipe bus Folder openend is fastened with bolt, and the metal connecting line for the extinguishing arc rope front end that fixture one end is fastened is opened and ties up to pipe bus telescoping line Wire jumper top center is pressed from both sides, and the insulation transmission rope fastened with No. 1 equipotential electrician is formed and intersected, extinguishing arc connecting line from line stretcher Press from both sides and removed on wire jumper and on the double end shunt line of fixture, removed after 220kV pipe bus telescoping cable clip bolts, open shielding Cable bond, exits highfield, keeps state before operation, and now No. 1 equipotential electrician stays where one is, pending further orders, and holding is not less than with electrical body 0.5 meter of safe distance;
10. 1, during No. 2 equipotential electrician's operated in turn, any position of two equipotential personnel's bodies must keep not small In 0.8 meter of safe distance, forbid two people to operate simultaneously, prevent human body and seal among loop, work director sends instruction, 4 Name ground electrician is cooperated, and the 220kV pipe bus telescoping wire clamps of original heating are at the uniform velocity down into ground, removes 220kV pipes female Awaited orders on line flexing line clamp end-of-job, 2 equipotential ladder for electrician;
Insulation transmission rope, extinguishing arc rope are tied up to new pipe bus telescoping wire clamp wire jumper top center, two ropes by 11.1 ground electricians Fasten and formed after intersection, handle new pipe bus telescoping wire clamp contact surface and coat vaseline, another 1 ground electrician is new A bar insulation pull rope is respectively fastened below pipe bus telescoping wire clamp two ends;
12. under work director commander, 2 ground electricians lift insulation transmission rope, extinguishing arc rope, another 2 ground electricians respectively Coordinate the insulation pull rope at drawing pipe bus telescoping wire clamp two ends, pipe bus telescoping wire clamp is at the uniform velocity risen to setting, through disappearing After arc, the specified location being sitting on pipe bus is stopped at pipe bus telescoping wire clamp two ends, and the flexing line clamp of installation end does not stop to be sitting in pipe mother When on line, forbid No. 1 or No. 2 equipotential electricians are hand-held puts, prevent human body from sealing in loop;
No. 13.1 equipotential electricians enter highfield, and shielding cable bond, fixing pipe bus are hung up properly on the double end shunt line of fixture Seat bolt above and below flexing line clamp, check it is errorless after, open insulation transmission rope, insulation pull rope and by two rope link together, be Thread end is shunted in the double end of fixture, shielding cable bond is opened, exits highfield, keep state before operation, now No. 2 equipotentials Electrician stays where one is, pending further orders, and keeps being not less than with electrical body 0.5 meter of safe distance;
No. 14.2 equipotential electricians enter highfield, and shielding cable bond, fixing pipe bus are hung up properly on the double end shunt line of fixture Seat bolt above and below flexing line clamp, after inspection is errorless, opens extinguishing arc rope and ties up to the double end shunting thread end of fixture, open insulation and lead Messenger also ties up to the double end shunting thread end of fixture, removes the extinguishing arc connecting line on fixture and ties up to the pipe bus telescoping newly installed On wire clamp wire jumper, shielding cable bond is opened, highfield is exited, state before operation is kept, now No. 2 equipotential electrician original places are treated Life, keeps the safe distance not less than 0.5 meter with electrical body;
15.1st, No. 2 isopotential electrical work points are not removed after respective side fixture pipe bus clip opening terminal bolt, and a hand holds fixture Insulated handle, another hand propelled sliding outer cover, when fixture opening is more than pipe bus diameter, fixture is moved back from pipe bus Go out;
16. under work director commander, fixture is at the uniform velocity down to ground by the upper 2 equipotential electricians of ladder and ground electrician cooperation;
No. 17.2 equipotential electricians, which enter, hangs up properly shielding cable bond on highfield, pipe bus telescoping wire clamp wire jumper, remove pipe bus Extinguishing arc connecting line on flexing line clamp wire jumper, disk is got well and tied up in closing arc suppression tackle rotating shaft, is opened shielding cable bond, is exited forceful electric power ;
18.1st, No. 2 equipotential electricians return to ground;
19. removing operation insulating ladder, finishing tool after operation maintenance personnel acceptance(check), handles work ticket termination, withdraws scene, Work all terminates.
CN201610585832.3A 2016-07-22 2016-07-22 The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps Active CN106207885B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610585832.3A CN106207885B (en) 2016-07-22 2016-07-22 The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610585832.3A CN106207885B (en) 2016-07-22 2016-07-22 The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps

Publications (2)

Publication Number Publication Date
CN106207885A CN106207885A (en) 2016-12-07
CN106207885B true CN106207885B (en) 2017-11-07

Family

ID=57492311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610585832.3A Active CN106207885B (en) 2016-07-22 2016-07-22 The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps

Country Status (1)

Country Link
CN (1) CN106207885B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108528136A (en) * 2018-04-11 2018-09-14 温州商学院 A kind of adjustable for height portable mural painting prosthetic device
CN109149321B (en) * 2018-07-02 2020-03-27 北京长城华冠汽车科技股份有限公司 Installation tool and method of wiring harness connector
CN113964718B (en) * 2021-11-22 2023-06-02 国网辽宁省电力有限公司鞍山供电公司 Method for treating wire heating fault in electrified way
CN115117825B (en) * 2022-06-24 2023-06-27 广西电网有限责任公司桂林供电局 Pipe box electrified operation device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2462033A1 (en) * 1979-07-18 1981-02-06 Catu Ets Overhead cable earth clamp - has two jaws pivotable by abutting central screw threaded rod and carrying freely pivotable contact shoes
CN201717173U (en) * 2010-07-28 2011-01-19 辽宁省电力有限公司鞍山供电公司 220KV vertically-opened disconnecting switch shunt device
CN202189909U (en) * 2011-08-18 2012-04-11 辽宁省电力有限公司铁岭供电公司 Clamping type square bus earth clamp
CN202206051U (en) * 2011-09-15 2012-04-25 刘成志 Protecting device used in electrified replacement of fuse wire of fuse
CN102664358A (en) * 2012-04-23 2012-09-12 辽宁省电力有限公司鞍山供电公司 Live replacement method for static contact of 220 kV flexible busbar
CN104167617A (en) * 2014-07-31 2014-11-26 河南省电力公司济源供电公司 Bus fixed contact grounding device for KYN28 type switch cabinet
CN104409891A (en) * 2014-12-24 2015-03-11 广西大学 Scissor type spring self-locking lead end grounding cable clamp
CN204858367U (en) * 2015-09-08 2015-12-09 国网新疆电力公司检修公司 Substation grounding fastener utensil
CN105356090A (en) * 2015-11-30 2016-02-24 国网河南省电力公司商丘供电公司 Engaging-type ground wire clamp
CN205985993U (en) * 2016-07-22 2017-02-22 国网辽宁省电力有限公司鞍山供电公司 Change short circuit fixture that 220kV pipe generating line line stretcher pressed from both sides with electricity

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2462033A1 (en) * 1979-07-18 1981-02-06 Catu Ets Overhead cable earth clamp - has two jaws pivotable by abutting central screw threaded rod and carrying freely pivotable contact shoes
CN201717173U (en) * 2010-07-28 2011-01-19 辽宁省电力有限公司鞍山供电公司 220KV vertically-opened disconnecting switch shunt device
CN202189909U (en) * 2011-08-18 2012-04-11 辽宁省电力有限公司铁岭供电公司 Clamping type square bus earth clamp
CN202206051U (en) * 2011-09-15 2012-04-25 刘成志 Protecting device used in electrified replacement of fuse wire of fuse
CN102664358A (en) * 2012-04-23 2012-09-12 辽宁省电力有限公司鞍山供电公司 Live replacement method for static contact of 220 kV flexible busbar
CN104167617A (en) * 2014-07-31 2014-11-26 河南省电力公司济源供电公司 Bus fixed contact grounding device for KYN28 type switch cabinet
CN104409891A (en) * 2014-12-24 2015-03-11 广西大学 Scissor type spring self-locking lead end grounding cable clamp
CN204858367U (en) * 2015-09-08 2015-12-09 国网新疆电力公司检修公司 Substation grounding fastener utensil
CN105356090A (en) * 2015-11-30 2016-02-24 国网河南省电力公司商丘供电公司 Engaging-type ground wire clamp
CN205985993U (en) * 2016-07-22 2017-02-22 国网辽宁省电力有限公司鞍山供电公司 Change short circuit fixture that 220kV pipe generating line line stretcher pressed from both sides with electricity

Also Published As

Publication number Publication date
CN106207885A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106207885B (en) The short circuit fixture and method of charged for replacement 220kV pipe bus telescoping wire clamps
CN105449392B (en) A kind of 10kV circuits band electrical bonding and dismounting drainage thread apparatus for work and method
CN104868403B (en) A kind of portable 120~400mm2Steel-cored aluminium strand shunt line fixture and application method
CN103618249B (en) ± 500kV common-tower double-return DC power transmission line hotline maintenance techniques
CN101894701B (en) 220KV vertical opening type isolating switch shunting device and method thereof
CN101640391A (en) Live-wire operation method for replacing insulator for 35kV distribution circuit
CN106099768B (en) Outdoor complicated piping lane cable laying of bridge frame method
WO2016023141A1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN112701617A (en) Tool for entering 500kV compact electric transmission line electric field and electric field entering method
CN103746314A (en) Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN104505763B (en) UHVDC Transmission Lines charged for replacement duplex V string composite insulator operational methods
CN104113002B (en) A kind of high tension cable cross connection grounding system switching device
CN108808544A (en) Pass in and out forceful electric power field device
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN109462184A (en) A kind of hot line maintenance device and its application method
CN201449397U (en) Multipurpose connection operating lever based on field high pressure test
CN104617513B (en) The UHVDC Transmission Lines treatment connection gold utensil powered operational method of heating
CN204376311U (en) The heavy electric power cable high-altitude of lifting formula is handed over across unfolding device
CN103500966A (en) Electrified power disconnecting method for leading wire from 66kv disconnecting switch to pipe busbar
CN105811301B (en) The insulation of the 35kV supply lines livewire work of low cost carries line apparatus
CN203573924U (en) Fuse tube sleeve and fuse
CN207134721U (en) One kind is super, ultra-high voltage transformer station is automatically reset earthing or grounding means with high-altitude operation vehicle
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN205985993U (en) Change short circuit fixture that 220kV pipe generating line line stretcher pressed from both sides with electricity
CN204189991U (en) A kind of portable can electrical verification power distribution network earthing device

Legal Events

Date Code Title Description