CN106203773A - A kind of method and device of automatic management employee - Google Patents

A kind of method and device of automatic management employee Download PDF

Info

Publication number
CN106203773A
CN106203773A CN201610476509.2A CN201610476509A CN106203773A CN 106203773 A CN106203773 A CN 106203773A CN 201610476509 A CN201610476509 A CN 201610476509A CN 106203773 A CN106203773 A CN 106203773A
Authority
CN
China
Prior art keywords
employee
target
index
workload
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610476509.2A
Other languages
Chinese (zh)
Inventor
陈包容
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610476509.2A priority Critical patent/CN106203773A/en
Publication of CN106203773A publication Critical patent/CN106203773A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

nullThe method and device automatically managing employee that the present invention provides,The method is by obtaining the target of employee,Target is decomposed into corresponding work plan,Employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node,And obtain the result of appraisal corresponding with employee according to the result of contrast,Solve prior art and can not automatically manage the technical problem of employee,And by being corresponding work plan by the target automatic classifying of acquisition,Achieve and employee work plan is arranged automatically,Simultaneously by employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node,And obtain the result of appraisal corresponding with employee according to the result of contrast,Achieve and employee is carried out automatic examination,Participate in without artificial,Reduce manpower management cost,Improve staff's benefits efficiency,Embody higher intelligent level.

Description

A kind of method and device of automatic management employee
Technical field
The present invention relates to communication technical field, be specifically related to the method and device of a kind of automatic management employee.
Background technology
Staff's benefits is an important component part of business administration, existing enterprise be managed employee being primarily present with More lower problems:
1, work schedules is difficult, and specifically, existing enterprise is all based on to Staffing work plan or the task of sharing out the work Subjective or manual type is carried out, and whole process workload is big, process is loaded down with trivial details, and by manual type to Staffing work plan The most scientific and reasonable.
2, inspection employee performs work plan difficulty.Specifically, employee work situation is exercised supervision mainly by existing enterprise Realizing by the way of manual oversight, intelligence degree is low.
3, examination employee work performance is difficult.Specifically, what the performance appraisal of existing enterprise generally used is all with person in charge The subjective judgement of member is main, in the way of some manually recorded data are auxiliary.Such Assessment makes the result of appraisal very Being easily subject to the interference of the subjective impression of person in charge, therefore objectivity is poor;And whole examination process is nearly all manual Completing, when headcount is numerous, person in charge needs to expend considerable time and effort in performance appraisal.
Additionally, the intelligence degree that employee is managed by enterprise is low.Such as when employee work wants help, the completeest Kind help suggesting system for wearing, or occur in time its unlawful practice to be carried out error correction or report when that work being in violation of rules and regulations employee Alert.In a word, existing enterprise is mainly based upon manual type and carries out staff's benefits, causes needing bigger human cost, and Using manual type to be managed employee complicated loaded down with trivial details, efficiency is low, and intelligence degree is low, therefore needs offer one collection badly automatically Generate work plan, automatically inspection employee and perform work plan and automatic examination employee work performance in the automatic management of one The method and device of employee.
Summary of the invention
The invention provides the method and device of a kind of automatic management employee, with solve prior art can not manager automatically The technical problem of work.
According to an aspect of the present invention, it is provided that a kind of method of automatic management employee, including:
Obtain the target of employee;
Target is decomposed into corresponding work plan, and work plan includes timing node and corresponding with timing node Planned workload;
Employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node, and according to contrast Result obtain the result of appraisal corresponding with employee.
Further, the target obtaining employee includes:
Obtain employee place enterprise or the task of department;
Gathering the working attributes feature corresponding with employee, working attributes is characterized as and the relevant feature that works;
According to the working attributes feature corresponding with employee, task is decomposed, it is thus achieved that the son work corresponding with employee is appointed Business, and using sub-task as the target of employee.
Further, gather the working attributes feature corresponding with employee to include:
Preset working attributes feature entry;
Gather the property value corresponding with working attributes feature entry, and property value is special as the working attributes corresponding with employee Levy.
Further, according to the working attributes feature corresponding with employee, task is decomposed, it is thus achieved that with employee couple The sub-task answered includes:
Obtain the working attributes feature entry relevant to task, as related work attribute character entry;
According to the weight pre-set and the property value corresponding with related work attribute character entry, calculate corresponding with employee Related work attribute score;
According to related work attribute score, task is decomposed, it is thus achieved that the sub-task corresponding with employee.
Further, target is decomposed into corresponding work plan to include:
Obtain the index of performance for disintegration target;
The desired value corresponding with index of performance is obtained with the relation of index of performance according to target;
Desired value is divided by default plan node unit, it is thus achieved that the work plan corresponding with target.
Further, obtain the desired value corresponding with index of performance according to target with the relation of index of performance to include:
Judge whether index of performance can decompose further, the most then decomposition further to index of performance, it is thus achieved that secondary execution refers to Mark;
The desired value corresponding with time index of performance is obtained with the relation of time index of performance according to index of performance.
Further, by employee timing node actually accomplish workload and the planned workload of timing node carry out right Ratio afterwards, also includes before obtaining the result of appraisal corresponding with employee according to the result of contrast:
Result according to contrast carries out progress prompting to employee, and there is deviation when actually accomplishing workload with planned workload Time, automatically generate the help proposed projects solving deviation.
According to a further aspect in the invention, it is provided that the device of a kind of automatic management employee, including:
Target acquisition device, for obtaining the target of employee;
Work plan acquisition device, for target is decomposed into corresponding work plan, work plan includes the time Node and the planned workload corresponding with timing node;
Checking device, for by employee timing node actually accomplish workload and the planned workload of timing node carry out right Ratio, and obtain the result of appraisal corresponding with employee according to the result of contrast.
Further, the device of management employee also includes automatically:
Automatic alarm set, for entering employee in the planned workload actually accomplishing workload and timing node of timing node Row contrast, and according to the result of contrast, employee is carried out progress prompting;
Further, the device of management employee also includes automatically:
Automatically aid-device, for entering employee in the planned workload actually accomplishing workload and timing node of timing node Row contrast, and when actually accomplishing workload and there is deviation with planned workload, automatically generate the help suggestion side solving deviation Case,
And/or automatic error-correcting device, for monitoring the unlawful practice of employee, and unlawful practice is carried out automatic error-correcting.
The method have the advantages that
The method and device automatically managing employee that the present invention provides, the method is by obtaining the target of employee, by work Goal decomposition is corresponding work plan, by employee in the plan actually accomplishing workload and timing node of timing node Workload contrasts, and obtains the result of appraisal corresponding with employee according to the result of contrast, and solving prior art can not be certainly The technical problem of dynamic management employee, and by being corresponding work plan by the target automatic classifying of acquisition, it is achieved Employee work plan arranged automatically, simultaneously by by employee timing node actually accomplish workload with time segmentum intercalaris The planned workload of point contrasts, and obtains the result of appraisal corresponding with employee according to the result of contrast, it is achieved that to employee Carry out automatic examination, it is not necessary to manually participate in, reduce manpower management cost, improve staff's benefits efficiency, embody higher Intelligent level.
In addition to objects, features and advantages described above, the present invention also has other objects, features and advantages. Below with reference to figure, the present invention is further detailed explanation.
Accompanying drawing explanation
The accompanying drawing of the part building the application is used for providing a further understanding of the present invention, and the present invention's is schematic real Execute example and illustrate for explaining the present invention, not building inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the method flow diagram automatically managing employee of the preferred embodiment of the present invention;
Fig. 2 is that the preferred embodiment of the present invention is for first method flow diagram automatically managing employee simplifying embodiment;
Fig. 3 is that the preferred embodiment of the present invention is for second method flow diagram automatically managing employee simplifying embodiment;
Fig. 4 is the apparatus structure block diagram automatically managing employee of the preferred embodiment of the present invention.
Description of reference numerals:
10, target acquisition device;20, work plan acquisition device;30, checking device.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail, but the present invention can be defined by the claims Implement with the multitude of different ways covered.
With reference to Fig. 1, the preferred embodiments of the present invention provide a kind of method of automatic management employee, including:
Step S101, obtains the target of employee;
Step S102, is decomposed into corresponding work plan by target, work plan include timing node and and time The planned workload that intermediate node is corresponding;
Step S103, contrasts employee in the planned workload actually accomplishing workload and timing node of timing node, And obtain the result of appraisal corresponding with employee according to the result of contrast.
The method automatically managing employee that the present invention provides, by obtaining the target of employee, decomposes target For corresponding work plan, work plan includes timing node and the planned workload corresponding with timing node, by member Work contrasts in the planned workload actually accomplishing workload and timing node of timing node, and obtains according to the result of contrast The result of appraisal that must be corresponding with employee, solve prior art and can not automatically manage the technical problem of employee, and by obtaining Target automatic classifying be corresponding work plan, it is achieved that employee work plan is arranged automatically, simultaneously By employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node, and according to contrast Result obtain the result of appraisal corresponding with employee, it is achieved that employee is carried out automatic examination so that from employee plan arrangement to Staff performance evaluation whole during, it is not necessary to manually participate in, thus substantially reduce manpower management cost, improve employee pipe Reason efficiency, embodies higher intelligent level.
In the present embodiment, the timing node of indication can be in units of sky, it is also possible in units of week, the moon, season or year, Namely the present embodiment decomposes, according to target, the work plan obtained and can be a day work plan, week work plan, work by the moon Plan, season work plan or annual work program etc..
It should be noted that in the present embodiment, the target of indication should be energetic target, when system obtains Get the target of employee the most energetic time, should first be converted into quantifiable target, carry out follow-up point the most again Solve, so that the work plan more rationally science automatically generated according to target, the most specifically.Additionally, the present embodiment By employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node, and according to contrast Result obtain the detailed process of the result of appraisal corresponding with employee and can refer to existing more ripe checking system, such as according to reality Border completes the ratio of workload and planned workload and determines examination score or grade, when there being multinomial examination item, the most respectively to many Item examination item is examined, and uses the method for weighting to obtain the final result of appraisal of employee the most again.Employee is entered by the present embodiment Having the beneficial effects that of row examination, carrying out automatic examination in the present embodiment is that the employee work plan automatically generated based on system is entered Go, and system acquisition employee is also automatically to gather in the workload that actually accomplishes of timing node, namely compared to existing Checking system needs appraisal management personnel manually to arrange examination item, more manually obtains examination data and planning data, it is not necessary to examine Core personnel participate in, and can be achieved with the automatic examination to employee, and intelligence degree is high.
Alternatively, the target obtaining employee includes:
Obtain employee place enterprise or the task of department;
Gathering the working attributes feature corresponding with employee, working attributes is characterized as and the relevant feature that works;
According to the working attributes feature corresponding with employee, task is decomposed, it is thus achieved that the son work corresponding with employee is appointed Business, and using sub-task as the target of employee.
The employee place enterprise of the present embodiment indication or the task of department can be the tasks that granularity is bigger, example As, sale or production work task, it is also possible to be the task that granularity is less, such as total sales volume or sales growth rate Deng task.In actual implementation process, the present embodiment can be according to first bigger to the granularity task of practical situation Carry out artificial preliminary exposition, further according to the working attributes feature corresponding with employee, the task after artificial preliminary exposition is carried out Decompose, thus realize more rapid or more accurately task decomposed.
Additionally, the working attributes feature of the present embodiment indication refers to and the relevant feature that works, such as sales force, study Ability, service ability, innovation ability, inter personal contact disposal ability, Post Match Degree, grade of skill, length of service, position hierarchy Etc..The present embodiment is based on the working attributes feature corresponding with employee gathered, and decomposes task, thus obtains Sub-task that must be corresponding with employee, and using the sub-task corresponding with employee as the target of employee, thus real Having showed and formulated matched target according to different working attributes feature personalizations, intelligence degree is high.
In actual implementation process, the present embodiment can pre-set for storing employee place enterprise or department Task data base in read enterprise or the task of department, or the history work according to employee place enterprise or department Make task prediction enterprise or the task of department.Such as, when in the present embodiment, employee needs to obtain monthly target, then First read in the data base of the monthly task for storing employee place enterprise or department pre-set and obtain enterprise Or the monthly task of department, the most again based on the working attributes feature corresponding with employee gathered to enterprise or the moon of department Degree task decomposes, thus finally obtains the monthly target of employee.The most such as, when employee's needs in the present embodiment When formulating target of the year, it is also possible to first according to the history annual work task of employee place enterprise or department predict enterprise or The annual work task of department, the most again based on the working attributes feature corresponding with employee gathered to enterprise or the year of department Task decomposes, thus finally obtains the target of the year of employee.Wherein, the present embodiment is in prediction enterprise or department Annual work task time can use multiple Forecasting Methodology, such as time series forecasting, moving average method, computing method of formula And the Forecasting Methodology that regression analysis etc. is ripe.
The present embodiment is by the data base at the task for storing employee place enterprise or department pre-set Middle reading enterprise or the task of department, or predict enterprise or portion according to the history task of employee place enterprise or department The task of door, provides target derived data and target source foundation for obtaining employee work target so that The target that task according to enterprise or department obtains, close around enterprise or the task of department, embodies further The employee work target obtained has higher reliability and a credibility.
Alternatively, gather the working attributes feature corresponding with employee to include:
Preset working attributes feature entry;
Gather the property value corresponding with working attributes feature entry, and property value is special as the working attributes corresponding with employee Levy.
Specifically, the working attributes feature entry of the present embodiment can be sales force, learning capacity, service ability, wound One or many in new ability, inter personal contact disposal ability, Post Match Degree, grade of skill, length of service, position hierarchy entry Kind.In concrete implementation process, the present embodiment can take the genus that various ways collection is corresponding with working attributes feature entry Property value, such as can search in checking system and obtain the property value corresponding with working attributes entry, it is also possible to from the base of employee The office system of this information or enterprise obtains the property value corresponding with working attributes entry.Wherein, the attribute in the present embodiment Value can be quantitative result, and such as sales force scoring is 90 points, it is also possible to be that result, such as sales force are general qualitatively Etc..
Wherein, the present embodiment after gathering the property value corresponding with working attributes feature entry, using property value as with Can also include before the working attributes feature that employee is corresponding:
The property value corresponding with working attributes feature entry is normalized according to default rule.
The property value corresponding with working attributes feature entry gathered due to this enforcement is probably result qualitatively, it is also possible to Be quantitative result, therefore the present embodiment be after gathering the property value corresponding with working attributes feature entry, using property value as Before the working attributes feature corresponding with employee, the property value corresponding with working attributes feature entry is entered according to default rule Row normalized.And task is decomposed by the follow-up basis working attributes feature corresponding with employee, this Embodiment is typically chosen and according to default rule, property value is carried out quantification process.Such as, the present embodiment in order to work Property value corresponding to attribute character entry is normalized, the genus corresponding with working attributes feature entry that can gather Property value is arranged between scope 0-100, referring in particular to table 1.Wherein, the normalization rule that the present embodiment is preset is made by oneself by user Attribute-value ranges after justice, and the normalization preset also is determined according to demand by user.
Table 1
Alternatively, according to the working attributes feature corresponding with employee, task is decomposed, it is thus achieved that the son corresponding with employee Task includes:
Obtain the working attributes feature entry relevant to task, as related work attribute character entry;
According to the weight pre-set and the property value corresponding with related work attribute character entry, calculate corresponding with employee Related work attribute score;
According to related work attribute score, task is decomposed, it is thus achieved that the sub-task corresponding with employee.
Owing to different tasks is different to the requirement of working attributes feature, namely different tasks is from different The degree of association of working attributes feature entry is different.Such as when task is sale task, the most relevant work Attribute character entry is probably sales force, inter personal contact disposal ability entry etc.;And when task is R&D work task Time, the most associated working attributes feature entry is it is more likely that innovation ability and learning capacity entry, rather than sales force bar Mesh.The present embodiment is different from the degree of association of different working attributes feature entries according to different tasks, preset with The working attributes feature entry that task is corresponding, and according to the working attributes feature bar corresponding with task pre-set Mesh obtains the working attributes feature entry relevant to task, as related work attribute character entry.With reference to table 2, such as The working attributes feature entry relevant to sale task can be set as sales force and inter personal contact disposal ability entry, The working attributes feature entry relevant to R&D work task is learning capacity and innovation ability entry, with production work task phase The working attributes closed is grade of skill entry, and the working attributes feature entry relevant to task after sale is interpersonal Automated generalization Ability and client's positive rating entry etc..
Table 2
Task The working attributes feature entry relevant to task
Sales target/sales growth amount Sales force entry, inter personal contact disposal ability entry
Newly-increased client's amount Sales force entry, inter personal contact disposal ability entry
R&D work task Learning capacity entry, innovation ability entry
Production work task Grade of skill entry
Task after sale Inter personal contact disposal ability entry, client's positive rating entry
Owing to the working attributes feature entry relevant to task may have multiple, and each related work attribute character bar Purpose degree of association is the most different, such as working attributes feature bar relevant to sales target/sales growth amount task in table 2 Mesh includes sales force and two working attributes feature entries of inter personal contact disposal ability, according to daily experience road, Compared to inter personal contact disposal ability entry, sales force entry is bigger with the degree of association of sale task, therefore this enforcement Example pre-sets different weights for different related work attribute character entries, and according to the weight pre-set and with The property value that related work attribute character entry is corresponding, calculates the related work attribute score corresponding with employee, and according to phase Close working attributes score to be decomposed by task, it is thus achieved that the sub-task corresponding with employee.It is thus possible to more accurately with proper Task is decomposed by locality, and obtains the target more mated with employee and be more suitable for further, embodies relatively High personalization and intelligent level.
The present embodiment is after obtaining the related work attribute score corresponding with employee, according to related work attribute score by work Decompose as task, it is thus achieved that the sub-task corresponding with employee.Specifically, the present embodiment can be according to corresponding with employee Related work attribute score, carries out ratio decomposition by task or grade is decomposed.Such as include altogether three employees when enterprise Related work attribute score time (specially A employee, B employee and C employee) and the most corresponding with this three zooids work point is respectively 60 points, 30 points and 10 points, then when assuming that the total sales volume task obtained is 1,000,000, then the present embodiment can basis The related work attribute score corresponding with employee, carries out ratio decomposition by task, namely the most corresponding with this three zooids work point Total sales volume work plan be respectively 600,000,300,000 and 100,000.The most such as, include that altogether three employees are (concrete when enterprise For A employee, B employee and C employee) time, and the related work attribute score the most corresponding with this three zooids work point be respectively 60 points, 30 points and 10 points, then when assuming that the R&D work task obtained is Three Estate (the most highly difficult research and development part, middle difficulty Research and development part and low difficulty research and development part) time, then the present embodiment can according to the related work attribute score corresponding with employee, Task carrying out grade decomposition, namely A employee is responsible for highly difficult research and development part, B is responsible for middle difficulty research and development part and C bears Blame low difficulty research and development part.Certainly, the present embodiment, when being decomposed by task according to related work attribute score, does not limits In task is carried out ratio decomposition or grade decomposition according to related work attribute score, it is also possible to take according to user's request Other self-defining isolations, such as hierarchical decomposition, ladder decomposition etc..
Alternatively, target is decomposed into corresponding work plan to include:
Obtain the index of performance for disintegration target;
The desired value corresponding with index of performance is obtained with the relation of index of performance according to target;
Desired value is divided by default plan node unit, it is thus achieved that the work plan corresponding with target.
Existing enterprise, when formulating target, often selects quantitative objective that is mensurable and that be easy to examination as work Make target, and these quantitative targets often can from different dimensions with one or more index of performances to its degree of carrying out Amount.Such as in realm of sale, the index of performance measuring sales volume can be sales volume and sales price, namely when selling Amount and sales price reach how many times, can be achieved with the target of sales volume.And the present embodiment is obtaining for disintegration During the index of performance of target, both can artificially preset the index of performance the most corresponding with different types of target, also Can rule of thumb obtain the index of performance the most corresponding with different types of target.And in concrete implementation process, The possible only one of which of the index of performance corresponding with target, it is also possible to have multiple, and the index of performance corresponding with target It is likely to multiple combination.
Due to the target in the present embodiment be probably target of the year, monthly target, season target, All target, day target etc., therefore the work plan obtained can be annual work plans, monthly work plan, season Degree work plan, week work plan, day work plan etc..Therefore desired value is entered by the present embodiment by default plan node unit Row divides, and just can obtain the work plan corresponding with the plan node unit preset, such as when default plan node unit During for sky, then the work plan obtained can be specific to sky, and when default plan node unit is week, then the execution obtained is worked as Amount can be specific to week etc..As can be seen here, the present embodiment plans node unit by presetting, and by desired value based on default Draw node unit to divide, it is possible to obtain the work plan corresponding with default plan node unit, the most specifically, execution degree By force, and obtain work plan scientific and reasonable.
It should be noted that in actual implementation process, system gets the index of performance for disintegration target Possible more than one, thus obtain the desired value corresponding with index of performance according to target with the relation of index of performance and be likely to More than one, for this situation, the work that system obtains after desired value being divided by default plan node unit again Plan potentially includes multinomial.
The present embodiment specifically includes for the index of performance of disintegration target in acquisition:
Presetting target type and the index of performance corresponding with target type, index of performance is used for disintegration Target;
Type according to target obtains the index of performance corresponding with the type of target.
Owing to different targets needs to characterize with different index of performances, such as, it is used for decomposing sales volume work The index of performance of target is sales volume and sales price index, and the index of performance measuring target for decomposing client is old visitor Family amount and new client's figureofmerit, namely when frequent customer's amount and new client amount respectively reach how many, can be achieved with the index of client's amount. In concrete implementation process, first the present embodiment presets target type and hold corresponding with target type Row index, index of performance is used for disintegration target, then obtains the type pair with target according to the type of target The index of performance answered.Table 3 give realm of sale some be commonly used in the index of performance decomposing different types of target.
Table 3
Target type Index of performance
Sales volume Sales volume, sales price
Sales volume Trade debtor amount, sale probability of transaction
Trade debtor amount Frequent customer's amount, newly-increased client's amount
Newly-increased client's amount Visit quantity, interview quantity, quantity of making a phone call
Market share The market sales revenue, market total sales volume
The present embodiment is by obtaining the index of performance for disintegration target;Relation according to target with index of performance obtains Desired value that must be corresponding with index of performance;Desired value is divided by default plan node unit, it is thus achieved that with target Corresponding work plan, solves prior art and can not automatically generate the technical problem of work plan according to target, newly Propose to use the mode of index decomposition target to obtain work plan cleverly, not only achieve and generate automatically according to target Work plan, significantly reduces the enterprise staff workload according to target manually formulation and implementation plan, and the present embodiment By carrying out quantifying to decompose by index by target so that the work plan of acquisition is concrete in detail, can degree of execution strong, intelligent Degree is high.
Alternatively, obtain the desired value corresponding with index of performance according to target with the relation of index of performance to include:
Judge whether index of performance can decompose further, the most then decomposition further to index of performance, it is thus achieved that secondary execution refers to Mark;
The desired value corresponding with time index of performance is obtained with the relation of time index of performance according to index of performance.
Owing to the present embodiment is by desired value being divided by default plan node unit, thus obtain work meter Draw, therefore the work plan that different types of desired value obtains is different, such as the target in the present embodiment is monthly sale Volume target is 1,000,000, then first pass through the predefined index of performance for decomposing sales volume, it is thus achieved that index of performance is for selling Amount and sales price, owing to sales price is usually fixing, therefore the present embodiment is for decomposing the actual index of performance of sales volume For sales volume.Assume that in the present embodiment, sales price is 10 yuan/part, then the present embodiment is according to sales volume target and sales volume It is 100,000 that the relation of index of performance obtains the desired value corresponding with sales volume index of performance.Based on the desired value obtained, it is assumed that The plan node unit that the present embodiment is preset is sky, then the work plan obtained is to sell 100000/30 commodity every day.
By the example above it can be seen that can obtain corresponding with target by index of performance is carried out level of decomposition Work plan, but in concrete implementation process, the work plan of science should meet Smart principle, the work i.e. decomposed as far as possible Make a plan it suffices that be concrete, accessible, measurable, there is dependency and there is clear and definite deadline 's.Therefore the present embodiment is when obtaining the desired value corresponding with index of performance according to target with the relation of index of performance, also wraps Include and judge whether index of performance can decompose further, the most then decomposition further to index of performance, it is thus achieved that secondary index of performance, The desired value corresponding with time index of performance is obtained with the relation of time index of performance according to index of performance.
In actual implementation process, index of performance can be carried out by partition of the level by the present embodiment, i.e. first order decomposition, Second level decomposition etc., until the decomposition of last rank.The present embodiment is in the relation according to target Yu index of performance When obtaining the desired value corresponding with index of performance, it is judged that whether index of performance can decompose, the most further to index of performance Decompose further, it is thus achieved that secondary index of performance.Namely the present embodiment judge to carry out sales volume to decompose for the first time after the execution that obtains Whether index sales volume can decompose further, decompose it the most further.Assume that the present embodiment is according to pre- The index of performance first set decomposes rank to be known, can decompose sales volume further, and get for decomposing sale The index of performance of amount is trade debtor amount and sells probability of transaction, it is assumed that the sale probability of transaction in the present embodiment is empirical value, then use Actual index of performance in decomposition sales volume is trade debtor amount.Namely the present embodiment is by entering sales volume index of performance One step is decomposed, it is possible to obtain secondary index of performance is trade debtor amount, then further according to sales volume index of performance and trade debtor amount The relation of index of performance obtains the desired value corresponding with trade debtor amount time index of performance.Such as with sale in hypothesis the present embodiment The desired value that amount index of performance is corresponding is 100,000, and acquisition sale probability of transaction is 10% based on experience value, then hold according to sales volume Row index obtains the desired value corresponding with trade debtor amount time index of performance with the relation of trade debtor amount index of performance 100000/10%.Then obtain further according to the desired value corresponding with trade debtor amount time index of performance and the plan node unit preset Obtain work plan.
Although it should be noted that the present embodiment is when decomposing index of performance, it is to be decomposed last layer Just stop, but in actual implementation process, it is also possible to as required index of performance is decomposed different ranks, such as when in advance First set and index of performance is decomposed sales volume, then system just stops when detecting and index of performance decomposing sales volume rank Decomposing, when presetting index of performance and decomposing trade debtor amount, then index of performance is decomposed sale detecting by system Just stop when client's magnitude is other decomposing.
The present embodiment, and can be further in Predicated execution index by judging whether index of performance can decompose further Decomposition further to index of performance during decomposition, it is thus achieved that secondary index of performance, and obtain according to the relation of index of performance with time index of performance Desired value that must be corresponding with secondary index of performance, so that the work plan obtained according to the desired value corresponding with secondary index of performance Concrete in further detail, practical, also provide the most concrete examination data for follow-up employee is examined simultaneously.
Alternatively, employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node Afterwards, also include before obtaining the result of appraisal corresponding with employee according to the result of contrast:
Result according to contrast carries out progress prompting to employee, and there is deviation when actually accomplishing workload with planned workload Time, automatically generate the help proposed projects solving deviation.
Owing to employee is when performing work plan, may be because of the concrete condition performing work plan not being slapped in time Hold and the progress that dallies over one's work, such as, be 300,000 when the monthly sales volume of employee, and the 20th day when, just complete 100,000, the brightest Aobvious this situation is not inconsistent with the planned workload planning complete, for this situation, the present embodiment by employee in the time After the planned workload actually accomplishing workload and timing node of node contrasts, obtain and member according to the result of contrast Also include before the result of appraisal that work is corresponding that the result according to contrast carries out progress prompting to employee.Additionally, the present embodiment is being incited somebody to action Employee is after the planned workload actually accomplishing workload and timing node of timing node contrasts, if finding actual complete When becoming workload and planned workload to there is deviation, then automatically generate and solve the help proposed projects of deviation and be pushed to employee.
The present embodiment by by employee in the planned workload actually accomplishing workload and timing node of timing node After contrasting, according to the result of contrast, employee carried out progress prompting, and when actually accomplish workload and planning work When amount exists deviation, automatically generate the help proposed projects solving deviation, it is achieved that employee performs the complete monitoring of work, and Employee actually accomplish workload and planned workload there is deviation time, automatically generate and solve the help proposed projects of deviation also It is pushed to employee, not only achieves the automatic inspection that employee is performed work, and actually accomplish workload and meter employee Draw workload when there is deviation, automatically push the help proposed projects solving deviation to it, have higher intelligent.
It should be noted that in the present embodiment there is deviation specifically with planned workload in the workload that actually accomplishes of indication Refer to that actually accomplishing working condition is not reaching to the situation of planned workload, namely in the present embodiment, the deviation of indication specifically refers to bear Deviation.Additionally, the process that the present embodiment automatically generates the help proposed projects solving deviation according to deviation specifically includes: the most right Occurring that the reason of above-mentioned deviation is analyzed classification, e.g. because not grasping sales technique, being also because not grasping face Talk skill etc., then provide corresponding help proposed projects or line therewith further according to the questions and prospect type analyzed Corresponding expert answers system.
Simplify embodiment below for two and the present invention is automatically generated work plan process and principle more enters one Step explanation.
Simplify embodiment one
With reference to Fig. 2, in the present embodiment, the method for management employee includes automatically:
Step S201, obtains employee place enterprise or the task of department.
Specifically, the present embodiment is in the data of the task for storing employee place enterprise or department pre-set When storehouse is read the task of enterprise or department, multiple tasks of enterprise or department may be read, such as, sell work Make to potentially include again multiple granule under task, R&D work task, production work task, and the task of each big granularity The task of degree.Such as sale task includes: total sales volume task, sells increment task, profit on sales Task etc..For this situation, the present embodiment can be chosen the task of suitable particle size according to practical situation and carry out Subsequent decomposition, thus obtain the work plan of employee.And when choosing the task of suitable particle size, choose follow-up as far as possible Decompose, the task such as quantified.
It should be noted that when the present embodiment exists multiple task, can respectively multiple tasks be carried out point Solve thus obtain the multinomial work plan corresponding with employee.Assume the task that the present embodiment obtains be total sales volume be 100 The monthly task of ten thousand.Additionally, the present embodiment obtains the task of employee place enterprise or department except by advance Reading in the data base of the task storing employee place enterprise or department of arranging obtains, it is also possible to according to employee institute History task in enterprise or department is predicted and is obtained.Specifically can use time series forecasting, moving average method, formula The Forecasting Methodologies such as calculating method and regression analysis obtain employee place enterprise or the task of department.
Step S202, presets working attributes feature entry.
Specifically, the present embodiment working attributes set in advance feature entry can be sales force, learning capacity, service Ability, innovation ability, inter personal contact disposal ability, Post Match Degree, grade of skill, length of service, position hierarchy, client's favorable comment One or more in rate entry.Assume that the present embodiment working attributes set in advance feature entry includes sales force, service Ability, inter personal contact disposal ability, client's positive rating entry.
Step S203, gathers the property value corresponding with working attributes feature entry, and using property value as corresponding with employee Working attributes feature.
Specifically, the present embodiment can take the property value that various ways collection is corresponding with working attributes feature entry, example Obtain the property value corresponding with working attributes entry as searched in checking system, it is also possible to from the essential information of employee or The office system of enterprise obtains the property value corresponding with working attributes entry.Assume that the enterprise in the present embodiment includes three zooids Work (respectively employee A, employee B, employee C), and the working attributes that acquisition step S202 sets respectively for these three employee is special Levying the property value that entry is corresponding, the final property value obtaining the working attributes feature entry the most corresponding with three zooid's work points is specifically shown in Shown in table 4.
Table 4
Additionally, the present embodiment also includes special with working attributes after gathering the property value corresponding with working attributes feature entry Levy property value corresponding to entry to be normalized according to default rule, it is thus achieved that the working attributes feature corresponding with employee. Specifically, from step S203, the attribute-value ranges corresponding from different working attributes entries is different, the marking system taked The most different, for this situation, the present embodiment pair property value corresponding with working attributes feature entry is according to default rule It is normalized.Specifically, the property value corresponding with working attributes feature entry gathered is arranged at by the present embodiment Between scope 0-100.After property value being normalized by referring to default rule (being specifically shown in Table 1), it is possible to obtain final The working attributes feature corresponding with employee, be specifically shown in Table 5.
Table 5
  Sales force Service ability Inter personal contact disposal ability Client's positive rating entry
Employee A 50 90 80 60
Employee B 90 50 70 70
Employee C 70 70 90 85
Step S204, obtains the working attributes feature entry relevant to task, as related work attribute character entry.
Specifically, according to table 2, the working attributes feature entry relevant to total sales volume task is sales force Entry and inter personal contact disposal ability entry, namely the present embodiment two related work attribute character entries of acquisition, be respectively pin Sell ability entry and inter personal contact disposal ability entry.
Step S205, according to the weight pre-set and the property value corresponding with related work attribute character entry, meter Calculate the related work attribute score corresponding with employee.
Specifically, owing to the working attributes feature entry relevant to task may have multiple, and each relevant work Make the degree of association of attribute character entry different, therefore the present embodiment pre-sets and each related work attribute character entry Corresponding weights.Present embodiment assumes that two related work attribute character entries for total sales volume task (sell energy Power entry and inter personal contact disposal ability entry), the weights being respectively provided with are 0.7 and 0.3.And belong to related work by calculating Property property value corresponding to feature entry weighted sum, be not difficult to obtain the related work attribute score corresponding with employee.Wherein, employee The related work attribute score=50*0.7+80*0.3=59 of A;The related work attribute score=90*0.7+70*0.3=of employee B 84;The related work attribute score=70*0.7+90*0.3=76 of employee C.
Step S206, decomposes task according to related work attribute score, it is thus achieved that the sub-work corresponding with employee Make task, and using sub-task as the target of employee.
Specifically, task can be compared by the present embodiment according to the related work attribute score corresponding with employee Example is decomposed.The final total sales volume task=100*59/(59+84+76 obtaining employee A) ten thousand, about 26.9 ten thousand;Employee B's Total sales volume task=100*84/(59+84+76) ten thousand, about 38.4 ten thousand;Total sales volume task=the 100* of employee C 76/(59+84+76) ten thousand, about 34.7 ten thousand.
Step S207, is decomposed into corresponding work plan by target, work plan include timing node and The planned workload corresponding with timing node.
Specifically, the target of employee A, B, C is decomposed into corresponding work plan by the present embodiment respectively.Due to The task that the present embodiment obtains be total sales volume be the monthly task of 1,000,000, therefore obtain the work mesh of employee according to this It is designated as monthly target.Assume that this month is 30 days, then easily target is simply decomposed and obtains corresponding Work plan, the work plan of specially employee A every day is sales volume=26.9/30 ten thousand, and the work plan of employee B every day is pin The amount of selling=38.4/30 ten thousand, the work plan of employee C every day is sales volume=34.7/30 ten thousand.
Step S208, by employee timing node actually accomplish workload and the planned workload of timing node carry out right Ratio, and obtain the result of appraisal corresponding with employee according to the result of contrast.
Specifically, the present embodiment can determine examination according to the ratio of the workload actually accomplished every day Yu planned workload Score or grade, when the work plan of employee includes multiple project, examine each project the most respectively, adopt Method with weighting obtains the final result of appraisal of employee.
The method automatically managing employee that the embodiment of the present invention provides, by obtaining the target of employee, by work mesh Mark is decomposed into corresponding work plan, and work plan includes timing node and the planning work corresponding with timing node Amount, contrasts employee in the planned workload actually accomplishing workload and timing node of timing node, and according to contrast Result obtain the result of appraisal corresponding with employee, solve prior art and can not automatically manage the technical problem of employee, and lead to Crossing the target automatic classifying of acquisition is corresponding work plan, it is achieved that automatically pacify employee work plan Row, simultaneously by employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node, and Result according to contrast obtains the result of appraisal corresponding with employee, it is achieved that employee is carried out automatic examination so that count from employee Draw arrange to staff performance evaluation whole during, it is not necessary to manually participate in, thus substantially reduce manpower management cost, improve Staff's benefits efficiency, embodies higher intelligent level.
Additionally, the present embodiment is by gathering the working attributes feature corresponding with employee, and according to collection with employee couple The task of employee place enterprise or department is decomposed by the working attributes feature answered, and will decompose task The sub-task obtained is as the target of employee so that the target of formulation fully combines the work corresponding with employee Attribute character, has higher personalized level, and intelligence degree is high.
Simplify embodiment two
With reference to Fig. 3, in the present embodiment, the method for management employee includes automatically:
Step S301, obtains the target of employee.
Specifically, it is assumed that it is monthly sales volume 100,000 that the present embodiment gets the target of employee.
Step S302, obtains the index of performance for disintegration target.
Specifically, it is assumed that in the present embodiment, the target of employee is monthly sales volume 100,000, then easily obtain according to table 3 Corresponding index of performance is two, respectively sales volume and sales price.In actual implementation process, the present embodiment obtains Take target can in the target reading employee in the data base storing employee work target pre-set, or History target according to employee predicts current target.
Step S303, it is judged that whether index of performance can decompose further, the most then decomposition further to index of performance, Obtain time index of performance.
Specifically, it is two owing to the present embodiment gets the index of performance corresponding with target, respectively sales volume And sales price, and sales price is substantially fixing, therefore the index of performance of the actual acquisition of the present embodiment is sales volume index.Then The present embodiment is when obtaining the desired value corresponding with index of performance, it is judged that whether sales volume index of performance can divide further Solve, by the predefined index of performance corresponding with target, be specifically shown in Table 3, it is known that sales volume index of performance can enter one Step is decomposed into trade debtor amount and sells probability of transaction index of performance, and the rest may be inferred, and trade debtor amount index of performance can be decomposed into Frequent customer measures and increases newly client and measures index of performance, and newly-increased client amount can be decomposed into again visit quantity, interview quantity, make a phone call Quantity etc..
Step S304, obtains the desired value corresponding with time index of performance according to index of performance with the relation of time index of performance.
Specifically, owing to the target in the present embodiment is monthly sales volume 100,000, by monthly sales volume and sale Amount and the relation of sales price, it is assumed that in the present embodiment, sales price is 100 yuan/part, then being readily available sales volume is 100000/ 100=1000, then by sales volume is decomposed, it is assumed that the sale probability of transaction in the present embodiment is 10%, the most easily obtains Obtaining trade debtor amount is 10,000, it is assumed that the frequent customer in the present embodiment is 8,000, then being readily available newly-increased client amount is 2,000, with This analogizes, further according to newly-increased client amount with visit quantity, interview quantity, the relation of quantity of making a phone call obtains respectively and visits number Amount, interview quantity, desired value that quantity of making a phone call index of performance is corresponding.
Step S305, is divided desired value by default plan node unit, it is thus achieved that the work corresponding with target Make a plan.
Specifically, it is assumed that the present embodiment preset plan node unit be sky, also will step S304 obtain index Value (respectively visit quantitative index value, interview quantitative index value, quantitative index of making a phone call value) is respectively divided by the natural law in this month, then The final work plan obtaining every day.
Step S306, by employee timing node actually accomplish workload and the planned workload of timing node carry out right Ratio, and according to the result of contrast, employee is carried out progress prompting.
Specifically, the present embodiment by employee in the planning work actually accomplishing workload and timing node of timing node After amount contrasts, if find that actually accomplishing workload exists deviation with planned workload, then according to the result pair of contrast Employee carries out progress prompting and the help proposed projects automatically generating solution deviation and is pushed to employee.In actual enforcement Cheng Zhong, system can take various ways to send progress prompting, such as SMS, instant communication information, mail etc. to employee Deng, and concrete form can be to be the forms such as word, picture, voice.
Step S307, obtains the result of appraisal corresponding with employee according to the result of contrast.
Specifically, the present embodiment can determine examination according to the ratio of the workload actually accomplished every day Yu planned workload Score or grade, when the work plan of employee includes multiple project, examine each project the most respectively, adopt Method with weighting obtains the final result of appraisal of employee.
The method automatically managing employee that the embodiment of the present invention provides, by obtaining the target of employee, by work mesh Mark is decomposed into corresponding work plan, and work plan includes timing node and the planning work corresponding with timing node Amount, contrasts employee in the planned workload actually accomplishing workload and timing node of timing node, and according to contrast Result obtain the result of appraisal corresponding with employee, solve prior art and can not automatically manage the technical problem of employee, and lead to Crossing the target automatic classifying of acquisition is corresponding work plan, it is achieved that automatically pacify employee work plan Row, simultaneously by employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node, and Result according to contrast obtains the result of appraisal corresponding with employee, it is achieved that employee is carried out automatic examination so that count from employee Draw arrange to staff performance evaluation whole during, it is not necessary to manually participate in, thus substantially reduce manpower management cost, improve Staff's benefits efficiency, embodies higher intelligent level.
Additionally, the embodiment of the present invention is by obtaining the index of performance for disintegration target;According to target with hold The relation of row index obtains the desired value corresponding with index of performance;Desired value is divided by default plan node, it is thus achieved that Work plan, solves prior art and can not automatically generate the technical problem of work plan according to target, carry relatively newly The mode going out to use index decomposition target obtains work plan, not only achieves automatically according to target generation work meter Draw, significantly reduce the workload according to target manually formulation and implementation plan, and the present embodiment is by by target Carry out quantifying to decompose by index so that the work plan of acquisition is concrete in detail, can degree of execution strong, intelligence degree is high.
With reference to Fig. 4, the device automatically managing employee that the preferred embodiments of the present invention provide, including:
Target acquisition device 10, for obtaining the target of employee;
Work plan acquisition device 20, for being decomposed into corresponding work plan by target, when work plan includes Intermediate node and the planned workload corresponding with timing node;
Checking device 30, for carrying out employee in the planned workload actually accomplishing workload and timing node of timing node Contrast, and obtain the result of appraisal corresponding with employee according to the result of contrast.
Alternatively, the device of management employee also includes automatically:
Automatic alarm set, for entering employee in the planned workload actually accomplishing workload and timing node of timing node Row contrast, and according to the result of contrast, employee is carried out progress prompting;
Alternatively, the device of management employee also includes automatically:
Automatically aid-device, for entering employee in the planned workload actually accomplishing workload and timing node of timing node Row contrast, and when actually accomplishing workload and there is deviation with planned workload, automatically generate the help suggestion side solving deviation Case,
And/or automatic error-correcting device, for monitoring the unlawful practice of employee, and unlawful practice is carried out automatic error-correcting.
The device automatically managing employee that the embodiment of the present invention provides, by obtaining the target of employee, by work mesh Mark is decomposed into corresponding work plan, and work plan includes timing node and the planning work corresponding with timing node Amount, contrasts employee in the planned workload actually accomplishing workload and timing node of timing node, and according to contrast Result obtain the result of appraisal corresponding with employee, solve prior art and can not automatically manage the technical problem of employee, and lead to Crossing the target automatic classifying of acquisition is corresponding work plan, it is achieved that automatically pacify employee work plan Row, simultaneously by employee is contrasted in the planned workload actually accomplishing workload and timing node of timing node, and Result according to contrast obtains the result of appraisal corresponding with employee, it is achieved that employee is carried out automatic examination so that count from employee Draw arrange to staff performance evaluation whole during, it is not necessary to manually participate in, thus substantially reduce manpower management cost, improve Staff's benefits efficiency, embodies higher intelligent level.
The present embodiment manages the specific works process of the device of employee automatically and operation principle can refer to the present embodiment from The work process of the method for dynamic management employee and operation principle.
These are only the preferred embodiments of the present invention, be not limited to the present invention, for those skilled in the art For Yuan, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any amendment of being made, Equivalent, improvement etc., should be included within the scope of the present invention.

Claims (10)

1. the method for an automatic management employee, it is characterised in that including:
Obtain the target of employee;
Described target is decomposed into corresponding work plan, and described work plan includes timing node and with described The planned workload that timing node is corresponding;
By described employee described timing node actually accomplish workload and the planned workload of described timing node carry out right Ratio, and obtain the result of appraisal corresponding with described employee according to the result of contrast.
The method of automatic management employee the most according to claim 1, it is characterised in that obtain the target bag of employee Include:
Obtain employee place enterprise or the task of department;
Gathering the working attributes feature corresponding with described employee, described working attributes is characterized as and the relevant feature that works;
According to the working attributes feature corresponding with described employee, described task is decomposed, it is thus achieved that with described employee couple The sub-task answered, and using described sub-task as the target of described employee.
The method of automatic management employee the most according to claim 2, it is characterised in that gather the work corresponding with described employee Include as attribute character:
Preset working attributes feature entry;
Gather the property value corresponding with described working attributes feature entry, and using described property value as corresponding with described employee Working attributes feature.
The method of automatic management employee the most according to claim 3, it is characterised in that according to the work corresponding with described employee Make attribute character, described task decomposed, it is thus achieved that the sub-task corresponding with described employee includes:
Obtain the working attributes feature entry relevant to described task, as related work attribute character entry;
According to the weight pre-set and the property value corresponding with described related work attribute character entry, calculate and described member The related work attribute score that work is corresponding;
According to described related work attribute score, described task is decomposed, it is thus achieved that the son work corresponding with described employee Task.
5. according to the method automatically managing employee described in claim 1 or 4, it is characterised in that described target is decomposed Include for corresponding work plan:
Obtain the index of performance for decomposing described target;
The desired value corresponding with described index of performance is obtained with the relation of described index of performance according to described target;
Described desired value is divided by default plan node unit, it is thus achieved that the work meter corresponding with described target Draw.
The method of automatic management employee the most according to claim 5, it is characterised in that according to described target with described The relation of index of performance obtains the desired value corresponding with described index of performance and includes:
Judge whether described index of performance can decompose further, the most described index of performance is decomposed further, it is thus achieved that secondary Index of performance;
The desired value corresponding with described index of performance is obtained according to described index of performance and the relation of described index of performance.
The method of automatic management employee the most according to claim 6, it is characterised in that by described employee segmentum intercalaris when described After the planned workload actually accomplishing workload and described timing node of point contrasts, according to the result of contrast obtain with Also include before the result of appraisal that described employee is corresponding:
Result according to contrast carries out progress prompting to described employee, and when described in actually accomplish workload and described plan work As amount there is deviation time, automatically generate the help proposed projects solving described deviation.
8. the device of an automatic management employee, it is characterised in that including:
Target acquisition device, for obtaining the target of employee;
Work plan acquisition device, for being decomposed into corresponding work plan, described work plan by described target Including timing node and the planned workload corresponding with described timing node;
Checking device, for by described employee in the plan actually accomplishing workload and described timing node of described timing node Workload contrasts, and obtains the result of appraisal corresponding with described employee according to the result of contrast.
The device of automatic management employee the most according to claim 8, it is characterised in that the device of described automatic management employee Also include:
Automatic alarm set, for actually accomplishing workload and described timing node by described employee at described timing node Planned workload contrasts, and according to the result of contrast, described employee is carried out progress prompting.
The device of automatic management employee the most according to claim 9, it is characterised in that the dress of described automatic management employee Put and also include:
Automatically aid-device, for actually accomplishing workload and described timing node by described employee at described timing node Planned workload contrasts, and when described actually accomplish workload and described planned workload there is deviation time, automatically generate Solve the help proposed projects of described deviation,
And/or automatic error-correcting device, for monitoring the unlawful practice of described employee, and described unlawful practice is entangled automatically Wrong.
CN201610476509.2A 2016-06-27 2016-06-27 A kind of method and device of automatic management employee Pending CN106203773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610476509.2A CN106203773A (en) 2016-06-27 2016-06-27 A kind of method and device of automatic management employee

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610476509.2A CN106203773A (en) 2016-06-27 2016-06-27 A kind of method and device of automatic management employee

Publications (1)

Publication Number Publication Date
CN106203773A true CN106203773A (en) 2016-12-07

Family

ID=57461794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610476509.2A Pending CN106203773A (en) 2016-06-27 2016-06-27 A kind of method and device of automatic management employee

Country Status (1)

Country Link
CN (1) CN106203773A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107392422A (en) * 2017-06-13 2017-11-24 北京欣欣苹果网络科技有限公司 Evaluation of employee method and system
CN108459891A (en) * 2017-09-30 2018-08-28 平安科技(深圳)有限公司 Achievement data screenshotss method, apparatus, equipment and the storage medium of financial APP
CN108806016A (en) * 2018-08-16 2018-11-13 浙江绿维环境股份有限公司 A kind of wisdom management electronics point detection system and equipment based on interactive voice
CN109242319A (en) * 2018-09-15 2019-01-18 广东麟辉建设工程有限公司 A kind of intelligence finishing management system
WO2019033770A1 (en) * 2017-08-16 2019-02-21 平安科技(深圳)有限公司 Workload distribution method, device, storage medium and server
CN109460943A (en) * 2018-12-14 2019-03-12 平安城市建设科技(深圳)有限公司 KPI Key Performance Indicator management method, equipment, storage medium and device
CN109472492A (en) * 2018-11-07 2019-03-15 用友网络科技股份有限公司 A kind of performance quantization assessment system and method
WO2019196207A1 (en) * 2018-04-09 2019-10-17 平安科技(深圳)有限公司 Task progress monitoring method, readable storage medium, terminal device and apparatus
CN110457286A (en) * 2019-06-27 2019-11-15 安徽鸿途创智图文快印有限公司 A kind of digital printing enterprise information management method
CN111062573A (en) * 2019-11-19 2020-04-24 平安金融管理学院(中国·深圳) Staff performance data determination method, device, medium and computer equipment
CN111177242A (en) * 2019-12-19 2020-05-19 中国平安财产保险股份有限公司 Time-based data display method and device, computer equipment and storage medium
CN111539681A (en) * 2020-04-10 2020-08-14 广州地铁设计研究院股份有限公司 Work plan summarizing method and device
CN112132421A (en) * 2020-09-07 2020-12-25 北京思特奇信息技术股份有限公司 Personnel management method and system based on data analysis
CN115953063A (en) * 2022-12-29 2023-04-11 广州市亿博信息技术有限公司 Method and device for tracking performance management
CN116797084A (en) * 2023-06-16 2023-09-22 广东铭太信息科技有限公司 Digital supervision and assessment system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1475949A (en) * 2002-08-15 2004-02-18 英业达股份有限公司 Management method and system of working program
CN102073927A (en) * 2010-12-30 2011-05-25 浪潮集团山东通用软件有限公司 Cooperative office-based project type working plan management system
US20140039962A1 (en) * 2010-10-19 2014-02-06 ClearCare, Inc. System and Apparatus for Generating Work Schedules

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1475949A (en) * 2002-08-15 2004-02-18 英业达股份有限公司 Management method and system of working program
US20140039962A1 (en) * 2010-10-19 2014-02-06 ClearCare, Inc. System and Apparatus for Generating Work Schedules
CN102073927A (en) * 2010-12-30 2011-05-25 浪潮集团山东通用软件有限公司 Cooperative office-based project type working plan management system

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107392422A (en) * 2017-06-13 2017-11-24 北京欣欣苹果网络科技有限公司 Evaluation of employee method and system
WO2019033770A1 (en) * 2017-08-16 2019-02-21 平安科技(深圳)有限公司 Workload distribution method, device, storage medium and server
CN108459891A (en) * 2017-09-30 2018-08-28 平安科技(深圳)有限公司 Achievement data screenshotss method, apparatus, equipment and the storage medium of financial APP
WO2019196207A1 (en) * 2018-04-09 2019-10-17 平安科技(深圳)有限公司 Task progress monitoring method, readable storage medium, terminal device and apparatus
CN108806016A (en) * 2018-08-16 2018-11-13 浙江绿维环境股份有限公司 A kind of wisdom management electronics point detection system and equipment based on interactive voice
CN109242319A (en) * 2018-09-15 2019-01-18 广东麟辉建设工程有限公司 A kind of intelligence finishing management system
CN109472492A (en) * 2018-11-07 2019-03-15 用友网络科技股份有限公司 A kind of performance quantization assessment system and method
CN109460943A (en) * 2018-12-14 2019-03-12 平安城市建设科技(深圳)有限公司 KPI Key Performance Indicator management method, equipment, storage medium and device
CN110457286A (en) * 2019-06-27 2019-11-15 安徽鸿途创智图文快印有限公司 A kind of digital printing enterprise information management method
CN111062573A (en) * 2019-11-19 2020-04-24 平安金融管理学院(中国·深圳) Staff performance data determination method, device, medium and computer equipment
CN111177242A (en) * 2019-12-19 2020-05-19 中国平安财产保险股份有限公司 Time-based data display method and device, computer equipment and storage medium
CN111539681A (en) * 2020-04-10 2020-08-14 广州地铁设计研究院股份有限公司 Work plan summarizing method and device
CN111539681B (en) * 2020-04-10 2023-09-26 广州地铁设计研究院股份有限公司 Work plan summarizing method and device
CN112132421A (en) * 2020-09-07 2020-12-25 北京思特奇信息技术股份有限公司 Personnel management method and system based on data analysis
CN115953063A (en) * 2022-12-29 2023-04-11 广州市亿博信息技术有限公司 Method and device for tracking performance management
CN115953063B (en) * 2022-12-29 2023-09-08 广州市亿博信息技术有限公司 Method and device for tracking performance management
CN116797084A (en) * 2023-06-16 2023-09-22 广东铭太信息科技有限公司 Digital supervision and assessment system and method

Similar Documents

Publication Publication Date Title
CN106203773A (en) A kind of method and device of automatic management employee
Babel et al. A multivariate econometric approach for domestic water demand modeling: an application to Kathmandu, Nepal
Mao et al. Faster deliveries and smarter order assignments for an on-demand meal delivery platform
US7797182B2 (en) Method and apparatus for improved forecasting using multiple sources
Qiang Chen et al. Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA)
Young et al. Can agent-based models forecast spot prices in electricity markets? Evidence from the New Zealand electricity market
Ustinovichius Determination of efficiency of investments in construction
KR100842231B1 (en) System for integrated performance management
CN107808346A (en) A kind of appraisal procedure and apparatus for evaluating of potential target object
Renigier-Bilozor et al. Rating attributes toolkit for the residential property market
Hsueh et al. Integrating the AHP and TOPSIS decision processes for evaluating the optimal collection strategy in reverse logistic for the TPI
Hoyos et al. Convergent validity between revealed and stated recreation demand data: Some empirical evidence from the Basque Country, Spain
Wang et al. A systematic approach for public-private partnership projects CSFs evaluation
Brussevich et al. Who bears the brunt of lockdown policies? Evidence from tele-workability measures across countries
CN108921425A (en) A kind of method, system and the server of asset item classifcation of investment
Plantinga et al. Efficient policies for environmental protection: an econometric analysis of incentives for land conversion and retention
CN114529197A (en) Data management method, system, terminal and storage medium for engineering cost
CN105976170A (en) Method and device for automatically generating work plans
Stillman et al. The long-run impact of New Zealand’s structural reform on local communities
Martini SCOR-based information modeling for managing supply chain performance of palm oil industry at Riau and Jambi Provinces, Indonesia
Ramanathan Successful transfer of environmentally sound technologies for greenhouse gas mitigation: a framework for matching the needs of developing countries
CN105260944A (en) Method for calculating statistical line loss based on LSSVM (Least Square Support Vector Machine) algorithm and association rule mining
Zolochevskaya et al. Public Procurement Management as a Factor of National Sustainability (the Case of KPI Implementation in Russia)
Lee et al. Are factors affecting RFID adoption different between public and private organisations?
Mendoza et al. Multicriteria and critical threshold value analyses in assessing sustainable forestry: model development and application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication