CN106194140B - Shaft bottom water drainage gas production device and its method - Google Patents

Shaft bottom water drainage gas production device and its method Download PDF

Info

Publication number
CN106194140B
CN106194140B CN201610738239.8A CN201610738239A CN106194140B CN 106194140 B CN106194140 B CN 106194140B CN 201610738239 A CN201610738239 A CN 201610738239A CN 106194140 B CN106194140 B CN 106194140B
Authority
CN
China
Prior art keywords
gas
shaft bottom
closed burner
natural gas
water pumping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610738239.8A
Other languages
Chinese (zh)
Other versions
CN106194140A (en
Inventor
尹俊禄
姚兰
邓继学
樊启国
米志学
陶长州
慕鑫
陈恒
许洪星
杨军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201610738239.8A priority Critical patent/CN106194140B/en
Publication of CN106194140A publication Critical patent/CN106194140A/en
Application granted granted Critical
Publication of CN106194140B publication Critical patent/CN106194140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/243Combustion in situ
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)

Abstract

The present invention provides a kind of shaft bottom water drainage gas production device, including casing, oil pipe, closed burner and ignition control device, the oil pipe is located in casing, the closed burner is located in oil pipe, it is connected with combustion gas discharge pipe at the top of the closed burner, the combustion gas discharge pipe extends upwardly to outer wellhead;The closed burner bottom is connected with air injection tube line and natural gas reflux pipeline, and the natural gas reflux pipeline is also connected to casing;The air injection tube line extends upwardly to outer wellhead;The ignition control device is located at the bottom in closed burner.Air and natural gas are enclosed in the shaft bottom hydrops of surrounding, it are made to be vaporizated into vapor in closed burner through ignition control device ignition, heating;Exhaust gas and vapor after burning go out pit shaft with natural gas mining together.Mining tubing string oil pipe is added and applies insulating layer to ensure that shaft bottom hydrops is the discharge pit shaft in the form of vapor is gaseous.

Description

Shaft bottom water drainage gas production device and its method
Technical field
Patent of the present invention belongs to gas field gas well water pumping gas production field, more particularly to a kind of shaft bottom water drainage gas production device and its side Method.
Background technology
Gas field gas well exploits the middle and later periods, and shaft bottom hydrops occurs in the gas well of larger proportion, causes gas well yield to reduce and even stops Production.Traditional drainage gas production technology or need is external to provide energy to change the ability that gas takes liquid, or is changed by tool research and development Become the fluidised form of gas-liquid flow, or change air water phase by the way that medicament is added to realize the purpose of water pumping gas production, but there are certain Application limitation, cannot extensive use on, gas well that gas production is different different in shaft bottom hydrops amount.Gas field gas well water pumping gas production There is an urgent need to one kind for aspect with relatively broad applicability, and without the extraneous energy supply that excessively provides to can be realized continuously The drainage gas production technology of property.
Invention content
The external energy that provides is needed to be researched and developed to change the ability that gas takes liquid, or by tool in existing water pumping gas production in order to overcome Change the fluidised form of gas-liquid flow, or by addition medicament change air water phase to realize water pumping gas production, it cannot be to shaft bottom hydrops amount not The problem of gas well same, gas production is different carries out water pumping gas production, shaft bottom water drainage gas production device provided by the invention, patent of the present invention Purpose be by change shaft bottom hydrops water physical state thinking, by shaft bottom burn gas well it is self-produced go out natural gas to well Bottom hydrops is heated, it is made to be vaporizated into vapor, under the premise of ensureing that temperature in wellbore diffusion is unlikely to keep vapor liquefied, Make combustion product gases that pit shaft be discharged with natural gas with vapor, realizes the purpose of water pumping gas production.
The technical solution adopted by the present invention is:
Shaft bottom water drainage gas production device, including casing, oil pipe, closed burner and ignition control device, the oil pipe position In in casing, the closed burner is located in oil pipe, and combustion gas discharge pipe is connected on the closed burner top, The combustion gas discharge pipe extends upwardly to outer wellhead;The closed burner bottom is connected with air injection tube line and natural gas Reflux pipeline, the natural gas reflux pipeline are also connected to casing;The air injection tube line extends upwardly to outer wellhead; The ignition control device is located at the bottom in closed burner.
It is coated with insulating layer in the oil pipe.
It is provided with check-valves on the combustion gas discharge pipe.
It is provided with gas control equipment on the natural gas reflux pipeline.
The gas control equipment is gas flowmeter.
The closed burner is combustion barrel.
The ignition control device includes at least controller and igniter, and the controller is electrically connected with igniter.
A kind of shaft bottom water pumping gas production method, includes the following steps:
The closed burner that step 1 enters from ground downwards to shaft bottom injects air;
Step 2 is to the closed burner re-injection natural gas in shaft bottom;
Step 3 air and natural gas are enclosed in closed burner through ignition control device ignition, heating The shaft bottom hydrops of surrounding, makes it be vaporizated into vapor;
Exhaust gas and vapor after step 4 burning go out pit shaft with natural gas mining together.
Air is injected to closed burner by air injection tube line in the step 1.
By natural gas reflux pipeline to closed burner re-injection natural gas in the step 2.
Beneficial effects of the present invention are:
Closed internal combustion device is used in technique provided by the invention, and air is injected by ground and realizes pit shaft from producing natural gas Burning is controlled by gas control equipment and is burnt, and then indirectly heat shaft bottom hydrops, so that its vaporization is formed vapor, to well Under conditions of cylinder takes Insulation, pit shaft is discharged with natural gas with vapor in combustion product gases.
The present invention is further detailed below with reference to attached drawing.
Description of the drawings
Fig. 1 is shaft bottom water drainage gas production device schematic diagram.
In figure, reference numeral is:1, natural gas;2, casing;3, oil pipe;4, air injection tube line;5, gas control equipment; 6, natural gas reflux pipeline;7, combustion gas discharge pipe;8, closed burner;9, ignition control device;10, reservoir.
Specific implementation mode
Embodiment 1:
The external energy that provides is needed to be researched and developed to change the ability that gas takes liquid, or by tool in existing water pumping gas production in order to overcome Change the fluidised form of gas-liquid flow, or by addition medicament change air water phase to realize water pumping gas production, it cannot be to shaft bottom hydrops amount not The problem of gas well same, gas production is different carries out water pumping gas production, the present invention provide a kind of water pumping gas production dress in shaft bottom as shown in Figure 1 It sets, the purpose of patent of the present invention is the thinking by changing shaft bottom hydrops water physical state, self-produced by shaft bottom burning gas well The natural gas gone out heats shaft bottom hydrops, it is made to be vaporizated into vapor, ensureing that temperature in wellbore is spread is unlikely to that water is made to steam Under the premise of gas liquefaction, make combustion product gases that pit shaft be discharged with natural gas with vapor, realizes the purpose of water pumping gas production.
Shaft bottom water drainage gas production device, including casing 2, oil pipe 3, closed burner 8 and ignition control device 9, the oil Pipe 3 is located in casing 2, and the closed burner 8 is located in oil pipe 3, and the closed burner is connected with combustion gas on 8 top Discharge pipe 7, the combustion gas discharge pipe 7 extend upwardly to outer wellhead;8 bottom of closed burner is connected with air injection Pipeline 4 and natural gas reflux pipeline 6, the natural gas reflux pipeline 6 are also connected to casing 2;The air injection tube line 4 Extend upwardly to outer wellhead;The ignition control device 9 is located at the bottom in closed burner 8.
Exhaust gas and vapor after step 4 burning go out pit shaft with 1 mining of natural gas together.
Step provided by the invention is equipped with casing 2 before work in the well on reservoir 10,2 the inside of casing is equipped with oil pipe 3, closed burner 8 is located in oil pipe 3, is then connected each road pipeline and is carried out operation.
First inject air, then the re-injection natural gas 1 into closed burner 8 into closed burner 8, air with it is natural Gas 1, through 9 ignition of ignition control device, the shaft bottom hydrops surrounded outside closed burner 8 is added in closed burner 8 Heat boiling makes its vaporization.Exhaust gas after burning is discharged into oil pipe 3, and pit shaft is discharged with natural gas 1 and vapor.And then the row of realization The purpose of hydromining gas.
Embodiment 2:
On the basis of embodiment 1, insulating layer is coated in oil pipe 3 described in the present embodiment.
The closed burner is connected with combustion gas discharge pipe 7 on 8 top, is provided on the combustion gas discharge pipe 7 Check-valves.
8 bottom of closed burner is connected with air injection tube line 4 and natural gas reflux pipeline 6, the natural gas Reflux pipeline 6 is also connected to casing 2, and gas control equipment 5 is provided on the natural gas reflux pipeline 6.
The gas control equipment 5 is gas flowmeter.
The closed burner 8 is combustion barrel.
The ignition control device 9 includes at least controller and igniter, and the controller is electrically connected with igniter.
The ignition control device 9 includes at least controller and igniter, and the controller is electrically connected with igniter;It is described Ignition control device 9 is located at the bottom in closed burner 8.The ignition control device 9 in monitoring well bottom head of liquid, Automatic ignition after hydrops fluid column reach a certain height when shaft bottom, heating evaporation shaft bottom hydrops, when shaft bottom hydrops discharge to a certain degree, Head of liquid is reduced to shaft bottom air-flow that can realize that ignition control device 9 is realized flame-out from when taking liquid output.
As shown in Figure 1, shaft bottom water drainage gas production device provided by the present invention, passes through natural gas 1, casing 2, oil pipe 3, air Inject pipeline 4, gas control equipment 5, natural gas reflux pipeline 6, combustion gas discharge pipe 7, closed burner 8, ignition control Device 9 and reservoir 10 carry out operation.Air is injected through gas control equipment 5 from ground by air injection tube line 4, passes through day Right gas reflux pipeline 6 is through 5 re-injection natural gas 1 of gas control equipment, and air is with natural gas 1 through igniting in closed burner 8 The shaft bottom hydrops ebuillition of heated surrounded outside closed burner 8 is made its vaporization by 9 ignition of control device.It is useless after burning Gas is discharged into oil pipe through combustion gas discharge pipe 7, and pit shaft is discharged with natural gas 1 and vapor.And then realize the mesh of water pumping gas production 's.
Whether the gas control equipment 5 can be by lighting a fire, and then to control in the closed burner in real-time monitoring well bottom 8 The injection rate of natural gas 1 and air, and realize continuous gas supply ensuring to inject under the premise of oxygen is clean-burning in air.It is described Closed burner 8 is that combustion barrel effect is that control gas burning occurs only inside it, prevents the oxygen in the air of injection well bottom Gas diffuses to pit shaft, generates the risk of pit shaft explosion.
Embodiment 3:
A kind of shaft bottom water pumping gas production method, including following step are provided on the basis of above-described embodiment, in the present embodiment Suddenly:
The closed burner 8 that step 1 enters from ground downwards to shaft bottom injects air;
Step 2 is to the closed 8 re-injection natural gas 1 of burner in shaft bottom;
Step 3 air and natural gas 1 surround in closed burner 8 through 9 ignition of ignition control device, heating In the shaft bottom hydrops of surrounding, it is made to be vaporizated into vapor;
Exhaust gas and vapor after step 4 burning go out pit shaft with 1 mining of natural gas together.
Air is injected to closed burner 8 by air injection tube line 4 in the step 1.
By natural gas reflux pipeline 6 to 8 re-injection natural gas 1 of closed burner in the step 2.
Air is injected through gas control equipment 5 from ground by air injection tube line 4, is passed through by natural gas reflux pipeline 6 5 re-injection natural gas 1 of gas control equipment, air is lighted a fire in closed burner 8 through ignition control device 9 with natural gas 1 to be fired It burns, the shaft bottom hydrops ebuillition of heated surrounded outside closed burner 8 is made into its vaporization.Exhaust gas after burning is through combustion gas discharge pipe 7 are discharged into oil pipe, and pit shaft is discharged with natural gas 1 and vapor.And then realize the purpose of water pumping gas production.
Whether the gas control equipment 5 can be by lighting a fire, and then to control in the closed burner in real-time monitoring well bottom 8 The injection rate of natural gas 1 and air, and realize continuous gas supply ensuring to inject under the premise of oxygen is clean-burning in air.
The closed burner 8 is that combustion barrel effect is that control gas burning occurs only inside it, prevents injection well Oxygen in the air of bottom diffuses to pit shaft, generates the risk of pit shaft explosion.
The ignition control device 9 includes at least controller and igniter, and the controller is electrically connected with igniter;It is described Ignition control device 9 is located at the bottom in closed burner 8.
The ignition control device 9 is in monitoring well bottom head of liquid, after when shaft bottom, hydrops fluid column reach a certain height certainly Dynamic igniting, heating evaporation shaft bottom hydrops, when shaft bottom hydrops is discharged to a certain degree, head of liquid is reduced to shaft bottom air-flow that can realize certainly When taking liquid output, ignition control device 9 is realized flame-out.
As described above, being only the rough embodiment of the present invention, limit in any form not is made to the principle of the present invention System.Any simple modification or modification that all technologies according to the present invention substantially make said program, still fall within this hair In bright technical proposal scope, the apparatus structure of non-specified otherwise, is existing apparatus in the present invention, will be without in the present invention It describes one by one.

Claims (9)

1. shaft bottom water pumping gas production method, it is characterised in that:The shaft bottom water drainage gas production device that this method uses includes casing(2), oil Pipe(3), closed burner(8)And ignition control device(9), the oil pipe(3)Positioned at casing(2)It is interior, the closed burning Device(8)Positioned at oil pipe(3)It is interior, the closed burner(8)Combustion gas discharge pipe is connected on top(7), the combustion gas Discharge pipe(7)Extend upwardly to outer wellhead;The closed burner(8)Bottom is connected with air injection tube line(4)With it is natural Gas reflux pipeline(6), the natural gas reflux pipeline(6)Also with casing(2)Connection;The air injection tube line(4)To On extend to outer wellhead;The ignition control device(9)Positioned at closed burner(8)Interior bottom;Shaft bottom water pumping gas production Method the specific steps are:
Step 1 enters the closed burner to shaft bottom from ground downwards(8)Inject air;
Step 2 is to the closed burner in shaft bottom(8)Re-injection natural gas(1);
Step 3 air and natural gas(1)In closed burner(8)It is middle through ignition control device(9)Ignition, heating packet It is trapped among the shaft bottom hydrops of surrounding, it is made to be vaporizated into vapor;
Exhaust gas and vapor after step 4 burning is together with natural gas(1)Mining goes out pit shaft.
2. water pumping gas production method in shaft bottom according to claim 1, it is characterised in that:The oil pipe(3)Inside it is coated with insulating layer.
3. water pumping gas production method in shaft bottom according to claim 1, it is characterised in that:The combustion gas discharge pipe(7)On set It is equipped with check-valves.
4. water pumping gas production method in shaft bottom according to claim 1, it is characterised in that:The natural gas reflux pipeline(6)On It is provided with gas control equipment(5).
5. water pumping gas production method in shaft bottom according to claim 4, it is characterised in that:The gas control equipment(5)For gas Flowmeter body.
6. water pumping gas production method in shaft bottom according to claim 1, it is characterised in that:The closed burner(8)For combustion Burn cylinder.
7. water pumping gas production method in shaft bottom according to claim 1, it is characterised in that:The ignition control device(9)At least Including controller and igniter, the controller is electrically connected with igniter.
8. water pumping gas production method in shaft bottom according to claim 1, it is characterised in that:It is injected by air in the step 1 Pipeline(4)To closed burner(8)Inject air.
9. water pumping gas production method in shaft bottom according to claim 1, it is characterised in that:It is returned by natural gas in the step 2 Flow tube line(6)To closed burner(8)Re-injection natural gas(1).
CN201610738239.8A 2016-08-29 2016-08-29 Shaft bottom water drainage gas production device and its method Active CN106194140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610738239.8A CN106194140B (en) 2016-08-29 2016-08-29 Shaft bottom water drainage gas production device and its method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610738239.8A CN106194140B (en) 2016-08-29 2016-08-29 Shaft bottom water drainage gas production device and its method

Publications (2)

Publication Number Publication Date
CN106194140A CN106194140A (en) 2016-12-07
CN106194140B true CN106194140B (en) 2018-09-04

Family

ID=57526920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610738239.8A Active CN106194140B (en) 2016-08-29 2016-08-29 Shaft bottom water drainage gas production device and its method

Country Status (1)

Country Link
CN (1) CN106194140B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577245B (en) * 2020-05-19 2023-03-28 成都佳广知科技有限公司 Intelligent water lifting gas production system and method for natural gas well

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2321731C2 (en) * 2006-05-02 2008-04-10 Общество с ограниченной ответственностью "ЛУКОЙЛ-ВолгоградНИПИморнефть" ООО "ЛУКОЙЛ-ВолгоградНИПИморнефть" Oil field development method (variants)
CN201884015U (en) * 2010-12-10 2011-06-29 中国石油天然气股份有限公司 Liquid drainage and gas production system for gas wells
CN102230372A (en) * 2011-06-24 2011-11-02 中国海洋石油总公司 Thermal recovery technology of multielement thermal fluid of thickened oil well
CN103573232B (en) * 2013-11-01 2019-06-18 栾天 Secondary steam heats pressurization directly spray device
CN105134152B (en) * 2015-08-24 2018-02-09 中国石油大学(北京) A kind of method and system using heating power jet exploitation of gas hydrate
CN206190273U (en) * 2016-08-29 2017-05-24 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Shaft bottom water -discharging and gas -producing unit

Also Published As

Publication number Publication date
CN106194140A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
RU2013126047A (en) FIRE HEAT GENERATOR, SYSTEM AND METHOD FOR INCREASING OIL TRANSFER OF LAYER
CN202338305U (en) Layered fireflood ignition gas injection pipe column
CN102587880A (en) Oil extraction method
CN104453821B (en) In-situ combustion layered ignition method
CN204627576U (en) The portable layering electric ignition of fireflood and monitoring process pipe string
CN206035462U (en) A novel tubular column of gas injection in pit for oil development
CN105135428A (en) Nozzle-free porous medium combustion device and fuel oil combustion method
CN110043235A (en) A kind of thick oil filling vaporization method burnt using underground supercritical water
CN105134153B (en) Fireflood ignition method and its tubing string
CN203335050U (en) Steam generating device for seabed natural gas hydrate exploitation
CN107120097A (en) Temperature activation method quarrying apparatus for exploitation of gas hydrates in marine sediment
CN106194140B (en) Shaft bottom water drainage gas production device and its method
CN106918053B (en) Ignition device for oil field exploitation and oil field exploitation method
CN206190273U (en) Shaft bottom water -discharging and gas -producing unit
CN101825279A (en) Method for achieving water-injecting high-pressure combustion through pipeline of fuel nozzle
CN102818250B (en) Method and device for improving steam dryness of steam injection boiler
CA2867328C (en) Steam environmentally generated drainage system and method
CN201386541Y (en) Wax removal and well cleanout device for gas heat carrier
CN201666571U (en) Water injection type high-pressure burner
CN104265249B (en) A kind of combustion in situ huff and puff oil recovery method
CN104343418A (en) Water jacket furnace matched with oil-field high-pressure oil gas well
CN205383646U (en) Ignition device
CN208966315U (en) It is layered fireflood tubing string
CN102128450B (en) Heat accumulating vaporization burner
CN1614189B (en) Combustion heating apparatus for underground thermal production of petroleum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211013

Address after: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING Co.

Address before: 710018 room 1207, Changqing building, xinglongyuan community, Changqing, Xi'an, Shaanxi

Patentee before: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING COMPANY LIMITED CHANGQING DOWNHOLE TECHNOLOGY Co.