CN106193685B - Prefabricated assembled communications equipment room structure - Google Patents

Prefabricated assembled communications equipment room structure Download PDF

Info

Publication number
CN106193685B
CN106193685B CN201610756554.3A CN201610756554A CN106193685B CN 106193685 B CN106193685 B CN 106193685B CN 201610756554 A CN201610756554 A CN 201610756554A CN 106193685 B CN106193685 B CN 106193685B
Authority
CN
China
Prior art keywords
plate
computer room
prefabricated
bottom plate
wallboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610756554.3A
Other languages
Chinese (zh)
Other versions
CN106193685A (en
Inventor
巫浏淏
钱龙
陈元伟
龚海涛
夏昊天
解文祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Palm Communication Technology Co Ltd
Original Assignee
Nanjing Palm Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Palm Communication Technology Co Ltd filed Critical Nanjing Palm Communication Technology Co Ltd
Priority to CN201610756554.3A priority Critical patent/CN106193685B/en
Publication of CN106193685A publication Critical patent/CN106193685A/en
Application granted granted Critical
Publication of CN106193685B publication Critical patent/CN106193685B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The present invention provides a kind of prefabricated assembled communications equipment room structure, including spliced computer room;The spliced computer room includes top plate, wallboard, bottom plate and base plate;On the base, the bottom end of the wallboard is perpendicularly fixed on the bottom plate for the bottom plate tiling;The top plate is perpendicularly fixed at the top of the wallboard, and parallel with the bottom plate;The wallboard includes four pieces of insulation boards, is equipped with door-plate on one of insulation board.Computer room structure of the invention, top plate, wallboard etc. are all made of precast construction, during actual use, it can quickly be spliced at the scene, substantially increase the efficiency of construction of computer room, and not influenced by extraneous construction environment.

Description

Prefabricated assembled communications equipment room structure
Technical field
The present invention relates to prefabricated computer room manufacturing technology more particularly to a kind of prefabricated assembled communications equipment room structures, belong to logical Interrogate infrastructure manufacturing technology field.
Background technique
Tradition be civil engineering structure communications equipment room exist in building course pollution environment, disturb residents, construction period is long, by weather Influence the unfavorable factors such as big.Due to the fast development of communication career, in, friendship higher and higher in face of major operator's requirement It pays that the period is shorter and shorter and is full there is an urgent need to make reform in the case that the common people are increasingly stronger to number one protective awareness Sufficient communication infrastructure base station construction period shorter, more environmentally-friendly, more standardized modularization, quality is higher and more economically needs It wants, the prior art needs to research and develop a kind of prefabricated assembled communications equipment room.
Summary of the invention
The present invention provide it is a kind of can quick assembling prefabricated assembled communications equipment room structure, to solve civil engineering in the prior art Construction period existing for communication machine room is long, influenced by weather, noise is big and the technical issues of polluting environment.
Prefabricated assembled communications equipment room structure of the invention, comprising: spliced computer room;
The spliced computer room includes top plate, wallboard, bottom plate and base plate;The bottom plate tiling is on the base, described The bottom end of wallboard is perpendicularly fixed on the bottom plate;The top plate is perpendicularly fixed at the top of the wallboard, and with the bottom plate In parallel;
The wallboard includes four pieces of insulation boards, is equipped with door-plate on one of insulation board.
Prefabricated assembled communications equipment room structure as described above, wherein the top plate include three pieces be generally aligned in the same plane according to Secondary connected concrete slab;Waterproof roll is provided on the concrete slab;The edge of the concrete slab is provided with card Groove is closed, adjacent two pieces of concrete slabs form S-shaped seam by the snap-in groove, are provided with rubber in the seam Sealing strip and PE filler rod.
Prefabricated assembled communications equipment room structure as described above, wherein the side of the insulation board is provided with U-shaped reinforcing bar and connects The U-shaped opening of head, the U-shaped splice is arranged inwardly;Vertical joint bar, institute are additionally provided between the two neighboring insulation board Vertical joint bar is stated for being inserted into the U-shaped splice of the connected two insulation board sides.
Prefabricated assembled communications equipment room structure as described above, wherein the pedestal includes successively being laid with from bottom to top Blotter, plain concrete cushion layer and seat pulp layer;The base plate paving is on the seat pulp layer.
Prefabricated assembled communications equipment room structure as described above, wherein the steel tower is arranged with cushion cap;It is described spliced It is provided with and marks time outside computer room, it is described to mark time below the door-plate and corresponding with the door-plate.
Prefabricated assembled communications equipment room structure as described above, wherein be provided with prefabricated penetration pipe in the insulation board, connect Ground lead and terminal box.
Prefabricated assembled communications equipment room structure as described above, wherein be equipped with floor tile on the bottom plate.
Prefabricated assembled communications equipment room structure as described above, wherein be provided with and hang in the top plate and bottom plate and wallboard Loading nut.
Prefabricated assembled communications equipment room structure as described above, wherein the bottom plate includes two block concrete prefabricated boards, institute It states and is provided with steel mesh in concrete prefabricated board.
Prefabricated assembled communications equipment room structure as described above, wherein hand well is provided with outside the spliced computer room;It is described Spliced computer room bottom outside is additionally provided with a circle aproll plate.
Computer room structure of the invention, top plate, wallboard etc. be all made of precast construction, the classifying rationally weight of every block of prefabricated panels Amount and structure, just can design in advance pre-buried, spool etc. when prefabricated;In actual use, it can carry out at the scene fast Speed Pinyin connects, and substantially increases the efficiency of construction of computer room, and is not influenced by extraneous construction environment.
Detailed description of the invention
Fig. 1 is the overall schematic of the prefabricated assembled communications equipment room structure of the embodiment of the present invention;
Fig. 2 is the main view of the prefabricated assembled communications equipment room structure of the embodiment of the present invention;
Fig. 3 is the rearview of the prefabricated assembled communications equipment room structure of the embodiment of the present invention;
Fig. 4 is the sectional view of Fig. 3;
Fig. 5 is the top cross-sectional view of Fig. 2;
Fig. 6 is the component enlarged drawing of Fig. 5;
Fig. 7 is enlarged drawing at A in Fig. 4;
Fig. 8 is enlarged drawing at B in Fig. 6;
Fig. 9 is enlarged drawing at C in Fig. 5.
Specific embodiment
As shown in Figure 1, Figure 2 and Fig. 3, and referring to Fig. 4;The prefabricated assembled communications equipment room structure of the present embodiment, comprising: spliced Computer room 100;It sometimes further include steel tower, spliced computer room 100 is connected with steel tower by outdoor feeder shelf;Outdoor feeder shelf is general It is set to the top of spliced computer room.
Spliced computer room 100 includes top plate 1, wallboard 2, bottom plate 3 and pedestal 4;Bottom plate 3 is laid on pedestal 4, wallboard 2 Bottom end is perpendicularly fixed on bottom plate 3;Top plate 1 is perpendicularly fixed at the top of wallboard 2, and parallel with bottom plate 3;Wallboard 2 includes four pieces Insulation board 20 is equipped with door-plate 26 on one of insulation board 20.
Under normal circumstances, wherein steel tower is arranged with cushion cap;Cushion cap is generally concreting, for carrying steel tower Weight.It is provided with outside spliced computer room 100 and marks time 25, marking time 25 is located at 26 lower section of door-plate, and corresponding with door-plate 26.Mark time 25 It is marked time using prefabricated, after the equal completion of bottom plate 3, is directly set to outside spliced computer room by concrete cushion.
The main body of the entire spliced computer room structure of the present embodiment is assembled by different piece;General top plate is divided into three Block, wallboard are divided into four pieces, and bottom plate is divided into two pieces;Every moiety by weight control is easy to lift operation within 6t.Every part Heat preservation, waterproof, interior exterior, built-in pipe, wire box, door etc. are completed in factory substantially, and simple process is only needed after the completion of assembled in situ Cabling, mounted lamp and inner veneer and appearance are made up a deficiency.The prefabricated assembled communications equipment room structure of the present embodiment, scene Installation speed is fast, and joining quality is high.
The prefabricated assembled communications equipment room structure of the present embodiment, as shown in figs. 4 and 7, top plate 1 include three pieces positioned at same Plane is sequentially connected concrete slab 10;Waterproof roll 15 is provided on concrete slab 10;The edge of concrete slab 10 is set It is equipped with snap-in groove, adjacent two pieces of concrete slabs form S-shaped seam by the snap-in groove, and S-shaped seam facilitates Waterproof and increase airtightness.Rubber weather strip 17 and PE filler rod 18 are provided in the seam.Rubber weather strip 17 and PE filling After stick 18 inserts seam, Reperfu- sion concrete mortar smoothes out seam, while the rainwater gradient being arranged on top plate, can guarantee connect in this way Good waterproofness and leakproofness at seam;Moreover, rubber weather strip 17 and PE filler rod 18 are elastic construction, also function to closed The effect of shrinkage joint.
The prefabricated assembled communications equipment room structure of the present embodiment, such as Fig. 5 and Fig. 6, and referring to shown in Fig. 8 and Fig. 9;Insulation board The thermal insulation board 201 of 50mm thickness, generally styrofoam or polyurethane sheet are provided in 20.The side of insulation board 20 is provided with U-shaped steel The U-shaped opening of muscle connector 202, the U-shaped splice 202 is arranged inwardly;That is the side of insulation board 20 is provided with multiple semicircles The reinforcing bar ring structure of shape.Vertical joint bar 203 is additionally provided between two neighboring insulation board 20, vertical joint bar 203 is for being inserted into phase The even U-shaped splice 202 of two 20 sides of insulation board.It, can be by the side of two pieces of adjacent insulation boards after vertical joint bar insertion While being connected firmly, and this structure is highly susceptible to installing, quickly metope can be stitched together.
As shown in figure 3, the pedestal 4 includes blotter 41,42 and of plain concrete cushion layer being successively laid with from bottom to top Sit pulp layer 43;Bottom plate 3, which is layed in, to be sat on pulp layer 43;Floor tile is generally also equipped on bottom plate 3.
The prefabricated assembled communications equipment room structure of the present embodiment is provided with prefabricated penetration pipe, ground lead in insulation board 20 And terminal box, it as needed can be with prefabricated air-conditioning penetration pipe etc..
The prefabricated assembled communications equipment room structure of the present embodiment, bottom plate 3 include two block concrete prefabricated boards 30, the coagulation Steel mesh is provided in native prefabricated board 30.There is vertical seam 301 between two block concrete prefabricated boards 30;In vertical seam 301 It is perfused with mortar, vertical seam 301 can also cooperate the connection structure of vertical joint bar using U-shaped splice, with fast and easy Concatenation construction.
In addition, for the ease of installation, the prefabricated assembled communications equipment room structure of the present embodiment, wherein top plate 1,3 and of bottom plate It is provided with lifting nut on wallboard 2, can be convenient lifting in this way.Hand well 35 is provided with outside spliced computer room 100;Spliced machine 100 bottom outside of room is additionally provided with a circle aproll plate.
The computer room of the present embodiment can resist the earthquake intensity of 6 degree of area 0.05g and the wind pressure of the 50 years one 0.45KN/ ㎡ met, The design working load of floor plate is 6KN/ ㎡, and the live load of roof boarding is 2KN/ ㎡, and the computer room after assembling always weighs about 40t.
The prefabricated assembled communications equipment room structure of the present embodiment has following technical advantage.
1) save cost angle: novel computer room building technology can more save material, so that it is whole to be finally reached saving Body cost is witnessed;The prefabricated assembled communications equipment room of the present embodiment is structurally characterized in that light body, and every square metre of total weight only has The 60% of " brick mix structure computer room ", 80% or so of " cast-in-place framework computer room ", therefore, the computer room base of same area and height Plinth materials can save 10% or more.
2) shorten the construction period angle: novel computer room building technology is completed more accelerate than traditional machine room from design to installation It is prompt;The preposition research and development of prefabricated assembled communications equipment room structure and design of the present embodiment, after digitlization drawing output, utilization is most fast Speed accurately produces and tentatively assembly is completed, and greatly reduces Contraction in Site face and time;And produce prefabricated post, beam, Wall, plate are all not necessarily to branch mold materials using nonexpondable punching block, and every cubic metre can save working hour 30%, based on primary damage It calculates, formwork fee of material is 3% one 5%.
3) adaptable angle of environment: novel computer room building technology can be without being that rainy season, winter, summer etc. are extreme in opinion Normal construction under climatic condition;" traditional machine room " is influenced by natural environments such as hot weather, rainy season, frozen soil, be may cause and is applied The indefinite duration of duration extends, and causes computer room to deliver delay, finally influences entire project progress;And the communications equipment room knot of the present embodiment Structure without field operation, disturbs less space enrironment, the influence to nearby residents is small substantially.Number is it was demonstrated that become situ wet operation For prefabrication assembling work, significantly reduce the discharge of waste water,waste gas and industrial residue, effectively improve to water, energy, material, etc. section About, the green idea of " four sections, one environmental protection " is realized, and the communications equipment room structure of the present embodiment passes through series of products to various fields Ground landform, weather conditions have stronger adaptability, and can flexibly move, combine, and recycle.
4) quality point of computer room: novel computer room building technology can break the computer room at regular intervals of traditional machine room The continuous disadvantage of big indisposition, possesses higher quality, higher standard;Since traditional civil engineering computer room is mostly handwork, Cracking the common faults such as hollowing, falls off, leaks frequent occurrence.The quality of construction is irregular;And the communications equipment room structure of the present embodiment Structure safety, operational safety, insulation, waterproof fireproofing performance are fully considered.The full prefabricated components of factory, main body preassembling, Live profession lifting in place, ensure that component component and the good quality of combination product and performance, avoids cracking, hollowing, takes off The common common fault such as fall, leak.Situ wet operation is zero, short construction period, live weather and season environment to construction infection not Greatly.Advanced system and the materials such as long-range monitoring, BA, high-performance thermal insulation material can also be constantly integrated in practical application according to demand Material, further increases computer room performance.
5) disturb residents angle: novel computer room building technology more quickly can not influence the living environment of the periphery common people;Root Show according to investigations, send the administrative department of environmental protection in one's power put on record middle significant portion be resident can not endure periphery construction site pair The influence of their daily lifes, " traditional brick mixes computer room " the site operation period about 40 days, and the communications equipment room structure of the present embodiment On-site construction time be only two and half.
6) protect environmental: novel computer room building technology can not pollute surrounding enviroment in building course, generate Less building waste;The pollution such as air-borne dust generated in the prefabricated assembled communications equipment room structure manufacturing process of the present embodiment Seldom (air-borne dust is only the 20% of " traditional brick mixes computer room ", and the building waste of generation is only " traditional brick mixes computer room " 30%), and " traditional brick mixes computer room " will cause a large amount of dust in process of construction, and leave the house refuse of construction personnel.
7) computer room standardization, modularization angle: novel computer room building technology can make the instrument of novel computer room picture precision Equally more standardized, modular production, reduces the probability of defect ware;For example same portion's essence of the communications equipment room structure of the present embodiment True equipment changes the looks of traditional civil construction operation, and the unstable of quality will not be caused because of human factor, and product is to be Columnization, and have quality standard, each product can collateral use handbook, guidance transport, installation and routine use maintenance can be with Say that traditional computer room is the house for accommodating equipment, the communications equipment room structure of the present embodiment itself is a equipment, it and it is internal Equipment be an organic whole and establish modulus basis and modular system, have miniaturization, light weight downwards on this basis The light version that change, detachable, equipment and the integration of civil engineering computer room consider, it is fully integrated, comprising device context operation same day completion Minimum version can form the growth money that standard money is composed upwards, to adapt to different use demands.
8) reduce energy consumption angle: novel computer room building technology is in the use process in construction and later period, it is necessary to have more Low energy consumption;The prefabricated assembled communications equipment room structure manufacturing process of the present embodiment can save 15% energy, use process In energy saving about 25%~35%.
9) from water resource angle: novel computer room building technology in building course can reduction as far as possible do not sacrifice even The water resource environment on periphery;The prefabricated assembled communications equipment room structure manufacturing process of the present embodiment can save 36% or more water Resource and the water resource that periphery will not be polluted, and " traditional machine room " can impact neighbouring water environment in process of construction And pollution.
10) noise pollution angle: novel computer room building technology can not generate noise pollution in building course;This reality Prefabricated assembled communications equipment room structure manufacture noise ratio " traditional type brick mixes computer room " for applying example builds 15 decibels of low noise, this implementation The prefabricated assembled communications equipment room structure soundproof effect of example mixes computer room better than traditional type brick ", it is low 8 points average by ambient noise interference Shellfish.
11) meet national implementation policy angle: novel computer room building technology need to meet the existing section carried out energetically of country The policy of energy environmental protection;Light cement combined wall is used in factory inside and outside the prefabricated assembled communications equipment room structure of the present embodiment Mold production, surface is smooth, without doing bottom surface layer again, can directly do decorative cover after the processing of gap, save surface material 25% or so.It is researched and developed for China's national situation, complies with building industrialization and housing industrialization direction, meet national energy-saving, environmental protection, low Carbon saves land, water-saving requirement, realizes 65% or more synthesis energy saving of building, safety, anti-seismic performance are superior: building weight reduction 30% or more.There is great advantage to construction unit, user, unit in charge of construction.
12) convenience for construction angle: novel computer room building technology need to improve the construction environment of field worker;The present embodiment The manufacture of prefabricated assembled communications equipment room structure install for unit in charge of construction, reduce construction area area, reduce existing Wet construction face, noise pollution are conducive to safety construction scene plane and build and manage.Easy construction, it is easily operated, can have Effect improves the operating environment of construction worker, alleviates labor intensity, reduces the skill requirement to operation element.Construction period contracting It is short, reduce the expenses such as mechanical equipment, circulation material lease expenditure.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (3)

1. a kind of prefabricated assembled communications equipment room structure, which is characterized in that including spliced computer room;
The spliced computer room includes top plate, wallboard, bottom plate and base plate;The bottom plate tiles on the base, the wallboard Bottom end be perpendicularly fixed on the bottom plate;The top plate is perpendicularly fixed at the top of the wallboard, and parallel with the bottom plate; The wallboard includes four pieces of insulation boards, and door-plate is equipped on one of insulation board, is provided with and marks time outside spliced computer room, mark time Below door-plate, and it is corresponding with door-plate, it marks time and is marked time using prefabricated, after bottom plate completion, directly pass through concrete cushion It is set to outside the spliced computer room;
The top plate is generally aligned in the same plane including three pieces and is sequentially connected concrete slab;Waterproof is provided on the concrete slab Coiled material;The edge of the concrete slab is provided with snap-in groove, and adjacent two pieces of concrete slabs pass through the engaging groove Slot forms S-shaped seam, is provided with rubber weather strip and PE filler rod in the seam, the rubber weather strip and PE filler rod are filled out After entering seam, Reperfu- sion concrete mortar smoothes out seam, while the rainwater gradient being arranged on top plate;
The side of the insulation board is provided with U-shaped splice, and the U-shaped opening of the U-shaped splice is arranged inwardly;Adjacent two Vertical joint bar is additionally provided between a insulation board, the vertical joint bar is for being inserted into the connected two insulation board sides U-shaped splice,
The pedestal includes the blotter being successively laid with from bottom to top, plain concrete cushion layer and seat pulp layer;The base plate paving On the seat pulp layer;
It is provided with prefabricated penetration pipe, ground lead and terminal box in insulation board, also sets up prefabricated air-conditioning penetration pipe as needed;
Bottom plate includes two block concrete prefabricated boards, is provided with steel mesh, two block concrete prefabricated boards in the concrete prefabricated board Between have vertical seam;Mortar is perfused in vertical seam, the vertical seam cooperates vertical joint bar using U-shaped splice Connection structure;
Lifting nut is provided in above-mentioned top plate and bottom plate and wallboard.
2. prefabricated assembled communications equipment room structure according to claim 1, which is characterized in that be equipped with ground on the bottom plate Face brick.
3. prefabricated assembled communications equipment room structure according to claim 1, which is characterized in that the spliced computer room peripheral hardware It is equipped with hand well;The spliced computer room bottom outside is additionally provided with a circle aproll plate.
CN201610756554.3A 2016-08-26 2016-08-26 Prefabricated assembled communications equipment room structure Active CN106193685B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610756554.3A CN106193685B (en) 2016-08-26 2016-08-26 Prefabricated assembled communications equipment room structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610756554.3A CN106193685B (en) 2016-08-26 2016-08-26 Prefabricated assembled communications equipment room structure

Publications (2)

Publication Number Publication Date
CN106193685A CN106193685A (en) 2016-12-07
CN106193685B true CN106193685B (en) 2019-07-30

Family

ID=58088117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610756554.3A Active CN106193685B (en) 2016-08-26 2016-08-26 Prefabricated assembled communications equipment room structure

Country Status (1)

Country Link
CN (1) CN106193685B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836468A (en) * 2016-12-22 2017-06-13 清华大学建筑设计研究院有限公司 A kind of low multilayer assembled heat insulation energy saving building
CN112982813A (en) * 2021-03-19 2021-06-18 深圳市海多嘉新建材有限公司 Self-heat-preservation quick-mounting plate and house heat preservation method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5904004A (en) * 1997-02-25 1999-05-18 Monosite, Inc. Integrated communications equipment enclosure and antenna tower
US6557312B2 (en) * 2000-08-24 2003-05-06 Mcginnis Henry J. Prefabricated-building tower foundation
WO2002056411A2 (en) * 2001-01-11 2002-07-18 Udo Paul Topka Installations for wireless communication
FR2839591B1 (en) * 2002-05-10 2008-07-11 Girardot Video Comm TELECOMMUNICATION STATION FOR DESERT AND / OR ISOLATED AREAS
CN102071818A (en) * 2009-11-25 2011-05-25 ***通信集团广东有限公司深圳分公司 Anti-theft communication machine room with spliced concrete interlayer
CN203188657U (en) * 2013-03-05 2013-09-11 江阴市阪纳奇自动化机械设备有限公司 Built-in type integrated tower room communication base station
CN103243945A (en) * 2013-05-29 2013-08-14 江苏健德铁塔有限公司 Integrated energy-saving base station
CN203594247U (en) * 2013-11-28 2014-05-14 梁峰 Prefabricated assembly type integrated roof self-supporting communication base station
CN105464283A (en) * 2016-01-05 2016-04-06 博思集团股份有限公司 Fabricated wallboard and fabricated station building
CN206158255U (en) * 2016-08-26 2017-05-10 南京掌澜通信科技有限公司 Prefabricated assembled communication machinery room

Also Published As

Publication number Publication date
CN106193685A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN205444458U (en) Integrated assembled steel construction building
CN100513717C (en) Steel structure assisted layered installation and construction method for superhigh PRC partition plate
CN103711238B (en) Assembled ring muscle fastens and is anchored concrete shear wall structure system
CN106759420B (en) A kind of prefabricated assembled transformer substation foundation structure
CN102758509A (en) Horizontal seam waterproof plate of prefabricated exterior wall cladding
CN101545307A (en) Roof green insulation system and method thereof
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN202787603U (en) Light-weight heat preservation house roof plate or floor plate
CN103352569A (en) Construction method of integrally-poured architecture building
CN105863317A (en) Energy-saving environmentally-friendly type distribution room based on quick construction technique
CN106193685B (en) Prefabricated assembled communications equipment room structure
CN103669707A (en) Light composite prefabricated wallboard for house and preparation method thereof
CN209145323U (en) Balcony is transformed in the low energy consumption of existing building
CN206158255U (en) Prefabricated assembled communication machinery room
Hall et al. European modern earth construction
CN210178013U (en) Fully-prefabricated assembled house
CN203684522U (en) Lightweight composite prefabricated wall plate for house
CN111101594A (en) Cold-formed thin-wall light steel structure building
CN203412143U (en) Wall body structure of integrally poured building house
CN104989124A (en) Modularization earthquake-proof and heat preservation integrated straw composite wooden frame house
CN206737496U (en) A kind of integral prefabricated concrete assembled base station room
CN206635786U (en) Prefabricated assembled transformer substation foundation structure
CN204754291U (en) Compound wooden frame structure of integrative straw of modularization antidetonation heat preservation
CN210713208U (en) Transformer substation's assembled integration guard room

Legal Events

Date Code Title Description