CN106193316A CN201610551552.0A CN201610551552A CN106193316A CN 106193316 A CN106193316 A CN 106193316A CN 201610551552 A CN201610551552 A CN 201610551552A CN 106193316 A CN106193316 A CN 106193316A
Authority
CN
China
Prior art keywords
box beam
platform
support box
protection system
draconis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610551552.0A
Other languages
Chinese (zh)
Other versions
CN106193316B (en
Inventor
李可柏
苏亚武
邓明胜
周洪涛
刘鹏
裴鸿斌
孙加齐
周申彬
高辉
杨红岩
康晋宇
汤淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610551552.0A priority Critical patent/CN106193316B/en
Publication of CN106193316A publication Critical patent/CN106193316A/en
Application granted granted Critical
Publication of CN106193316B publication Critical patent/CN106193316B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3505Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the in situ moulding of large parts of a structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Ladders (AREA)

Abstract

The invention discloses a kind of integral jacking platform box beam assembled protection system, including: two the first protective platforms, it is respectively arranged at top and the bottom of the upper support box beam of lifting platform support box beam, forms working space between two the first protective platforms and be provided with for the first current cat ladder;Two the second protective platforms, are respectively arranged at top and the bottom of the lower support box beam of lifting platform support box beam, form working space and be provided with for the second current cat ladder between two the second protective platforms;Access staircase, is fixedly arranged in support box beam, is used for connecting support box beam and lower support box beam.It is operator by the first protective platform and the second protective platform and provides the working space of abundance, but also can be realized by cat ladder current.Can be realized current between upper support box beam and lower support box beam by access staircase, access staircase can promote with upper support box beam and lifting platform, and can adapt to the jacking step pitch that platform is different.

Description

Integral jacking platform box beam assembled protection system
Technical field
The present invention relates to technical field of building construction, refer in particular to a kind of integral jacking platform box beam assembled protection System.
Background technology
Along with the raising of construction technology, high-rise building gets more and more.In order to accelerate speed of application, Super High Core Walls Structure erects Integral jacking platform (backform) is mostly used to structure construction formwork system.Integral jacking platform is that one is applicable to Super High and builds Build, the formwork system that can certainly climb.The support system of lifting platform is mainly made up of column and upper and lower support box beam.Upper and lower Support box beam is positioned in Core Walls Structure, is held in the hole that shear wall is reserved by telescopic little bracket.
Core Walls Structure construction is typically all vertical wall body structure top standard's structure and constructs in advance, and both construct asynchronous causing Vertical there is certain height difference with level to operation side, cause the upper and lower support box beam to be in high-altitude, in addition can be sharp in box beam Narrow and small with free air anomaly, lifting platform jacking and daily to maintenance and inspection such as jack-up system, column, box beams time be all not easy to Operation, abnormally dangerous during operation.Additionally, after horizontal structure during construction, in Core Walls Structure, easily there is falling object from high altitude in box beam position, right Horizontal structure crossed construction operating personnel's life security causes the biggest threat, there is serious potential safety hazard.
Existing mostly being for integral jacking platform box beam safeguard procedures sets up steel pipe scaffold temporarily, hangs safety Net, completely spreads scaffold board.This kind of method has the disadvantage that steel pipe protection installation, dismounting operation are loaded down with trivial details, sets up difficulty;Although energy Enough play certain protection effect, but protect imprecision, falling object from high altitude easily occurs;Owing to platform uses the time longer, safety Net etc. need to often be changed;Between upper and lower support box beam, passage uses steel pipe to set up packway, due to lifting platform each jacking step pitch The most identical, cause packway to set up difficulty and walking disorder, abnormally dangerous, potential safety hazard is big;These safeguard procedures are overall simultaneously Image effect is poor.Seeing shown in Fig. 1~Fig. 3, Fig. 1 is the front elevation view of the support box beam of existing integral jacking platform.Fig. 2 It it is the plane graph of the support box beam of existing integral jacking platform.Fig. 3 is the side of the support box beam of existing integral jacking platform Elevation.As shown in FIG. 1 to 3, it is shown that integral jacking platform 91, platform column 92, hydraulic jack 93, hanger 94, shearing Position relationship between wall 95 and upper support box beam 96, lower support box beam 97, upper support box beam 96 and lower support box beam 97 are divided It is not provided with box beam small oil tank 98.Upper support box beam 96 and lower support box beam 97 stretch into and are shelved on the shear wall 95 of advance reservation In hole.There is a certain distance between upper support box beam 96 and hanger and lower support box beam 97, be unfavorable for walking.Upper support case Beam 96 and lower support box beam 97 are all in high aerial, and owing to supporting available narrow space in box beam, operation is the most up Just and work high above the ground is abnormally dangerous.
In order to solve current technical scheme exist defect, it is necessary to design one safely, be easy to operation, image effective Support box beam guard system.
Summary of the invention
In order to solve in above-mentioned prior art conventional support box beam guard system peace and tear that operation is loaded down with trivial details open, protection imprecision, Use the defect such as inconvenience, overall image weak effect, the invention provides a kind of integral jacking platform box beam assembled protection System, including:
Two the first protective platforms, are respectively arranged at top and the bottom of the upper support box beam of lifting platform support box beam, Form working space between two described first protective platforms and be provided with for the first current cat ladder;
Two the second protective platforms, are respectively arranged at top and the bottom of the lower support box beam of lifting platform support box beam, Form working space between two described second protective platforms and be provided with for the second current cat ladder;
Access staircase, is fixedly arranged in described upper support box beam, is used for connecting described upper support box beam and described lower support case Beam.
The integral jacking platform box beam assembled protection system of the present invention, the first protective platform and the second protective platform It is operator and provides the working space of abundance, but also can be realized by cat ladder current.Permissible by access staircase Realizing current between upper support box beam and lower support box beam, access staircase can carry with upper support box beam and lifting platform Rise, and can adapt to the jacking step pitch that platform is different.Therefore, operating personnel can support operation readiness in box beam, up and down Walk unobstructed, and adapt to different jacking step pitches, safe and reliable, improve working performance.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention:
Described upper support box beam includes two upper support bars be arrangeding in parallel, and the top shelf of two described upper support bars is provided with Multiple first crossbeams, the top of described first crossbeam and bottom are installed with multiple first vertical rod respectively;
First protective platform at described upper support box beam top is fixed in multiple the first of multiple described first crossbeam top The bottom of vertical rod, the first protective platform bottom described upper support box beam is fixed in bottom multiple described first crossbeam multiple The bottom of one vertical rod.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention, two described upper The top of strut is respectively equipped with box beam small oil tank, being respectively provided on two sides with and the described little oil of upper box beam of described upper box beam small oil tank The first pad pipe that cylinder flushes, described first crossbeam is set up on two respective described first pad pipes of described upper support bar.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention, described first protection Platform includes the first shaped steel Os Draconis, the first steel plate being layed on described first shaped steel Os Draconis and is arranged at described first shaped steel Net is found in the first protection of side of Os Draconis week, and described first shaped steel Os Draconis are fixed in multiple first vertical rods bottom described first crossbeam Bottom.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention:
Described lower support box beam includes two lower support bars be arrangeding in parallel, and the top shelf of two described lower support bars is provided with Multiple second cross beams, the top of described second cross beam and bottom are installed with multiple second vertical rod respectively;
Second protective platform at described lower support box beam top is fixed in multiple the second of multiple described second cross beam top The bottom of vertical rod, the second protective platform bottom described lower support box beam is fixed in bottom multiple described second cross beam multiple The bottom of two vertical rods.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention, two described lower The top of strut is respectively equipped with lower box beam small oil tank, being respectively provided on two sides with and the described little oil of lower box beam of described lower box beam small oil tank The second pad pipe that cylinder flushes, described second cross beam is set up on two respective described second pad pipes of described lower support bar.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention, described second protection Platform includes Second-Type steel joist, the second steel plate being layed on described Second-Type steel joist and is arranged at described second shaped steel Net is found in the second protection of side of Os Draconis week, and described Second-Type steel joist is fixed in multiple second vertical rods bottom described second cross beam Bottom.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention, described upper support case The bottom of beam is installed with outward extending 3rd crossbeam, and described access staircase is fixed in described 3rd crossbeam and extends described upper The part of support box beam.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention, described access staircase Including the most interconnective multiple staircase framework, described staircase framework include the 3rd shaped steel Os Draconis, be layed in described The 3rd steel plate on 3rd shaped steel Os Draconis and be arranged at described 3rd shaped steel Os Draconis week side the 3rd vertical net of protection, multiple described It is respectively provided with the 3rd current cat ladder between the respective 3rd shaped steel Os Draconis of staircase framework.
Further improvement is that of integral jacking platform box beam assembled protection system of the present invention, described staircase framework Also include the half space being adjacent to described 3rd shaped steel Os Draconis.
Integral jacking platform box beam assembled protection system of the present invention uses above technical scheme so that it is have has Benefit effect is:
In integral jacking platform box beam assembled protection system, each protective unit is provided with enough working spaces, energy Enough guarantee that protection is tight, convenient working.Box beam access staircase is provided with some cat ladders and multistage half space, and three facades are respectively mounted Having protection network, current convenient, protection effect is good.Simultaneously protective unit, between box beam access staircase and crossbeam and vertical rod use spiral shell Tethering and connect, be installed in box beam, convenient installation was removed with the later stage.Add owing to each component of this guard system all can shift to an earlier date canalization Work makes, and scene takes assembled assembled, saves peace and tears the duration open, improves efficiency of construction.Between component, major part uses spiral shell Tether and connect, it is ensured that integrity when each component is removed, can recycle, meet green construction requirement.Each component Jun Shi factory Qualitatively processing and fabricating, after installation, overall image is effective.
Accompanying drawing explanation
Fig. 1 is the front elevation view of the support box beam of existing integral jacking platform.
Fig. 2 is the plane graph of the support box beam of existing integral jacking platform.
Fig. 3 is the side elevational view of the support box beam of existing integral jacking platform.
Fig. 4 is the side elevational view of integral jacking platform box beam assembled protection system of the present invention.
Fig. 5 is the plane graph in A-A face in Fig. 4.
Fig. 6 is that the upper support box beam of integral jacking platform box beam assembled protection system of the present invention arranges first crossbeam Plane graph with the first vertical rod.
Fig. 7 is the elevation in B-B face in Fig. 5.
Fig. 8 is the view before integral jacking platform box beam assembled protection system jacking of the present invention.
Fig. 9 is the view after integral jacking platform box beam assembled protection system jacking of the present invention.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, right The present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, not For limiting the present invention.
Coordinating referring to shown in Fig. 4, Fig. 4 is the side elevation of integral jacking platform box beam assembled protection system of the present invention Figure.The present invention puies forward integral jacking platform box beam assembled protection system, including:
Two the first protective platforms 10, are respectively arranged at top and the end of the upper support box beam 96 of lifting platform support box beam Portion, forms working space and is provided with for the first current cat ladder 110 between two the first protective platforms 10;
Two the second protective platforms 20, are respectively arranged at top and the end of the lower support box beam 97 of lifting platform support box beam Portion, forms working space and is provided with for the second current cat ladder 210 between two the second protective platforms 20;
Access staircase 30, is fixedly arranged in support box beam 96, is used for connecting support box beam 96 and lower support box beam 97.
The integral jacking platform box beam assembled protection system of the present invention, the first protective platform and the second protective platform It is operator and provides the working space of abundance, but also can be realized by cat ladder current.Permissible by access staircase Realizing current between upper support box beam and lower support box beam, access staircase can carry with upper support box beam and lifting platform Rise, and can adapt to the jacking step pitch that platform is different.Therefore, operating personnel can support operation readiness in box beam, up and down Walk unobstructed, and adapt to different jacking step pitches, safe and reliable, improve working performance.
Specifically, seeing described in Fig. 5, Fig. 5 is the plane graph in A-A face in Fig. 4.Shown in Fig. 4 Yu Fig. 5, upper support case Beam 96 includes two upper support bars be arrangeding in parallel 961, and the top shelf of two upper support bars 961 is provided with multiple first crossbeam 410, The top of first crossbeam 410 and bottom are installed with multiple first vertical rod 510 respectively.I.e. first crossbeam 410 go-and-retum is every a spacing From being provided with the first vertical rod 510 connected, first crossbeam 410 is positioned in the middle part of the first vertical rod 510.Preferably, first crossbeam 410 For shaped steel crossbeam, the first vertical rod 510 is square steel tube vertical rod.
The first protective platform 10 being positioned at support box beam 96 top is fixed in multiple the of multiple first crossbeam 410 top The bottom of one vertical rod 510, is positioned at the first protective platform 10 bottom support box beam 96 and is fixed in bottom multiple first crossbeam 410 The bottom of multiple first vertical rods 510.I.e. it is respectively mounted at the top of upper support box beam 96 and bottom by the first vertical rod 510 One protective platform 10.
Lower support box beam 97 includes two lower support bars be arrangeding in parallel 971, and the top shelf of two lower support bars 971 is provided with Multiple second cross beams 420, the top of second cross beam 420 and bottom are installed with multiple second vertical rod 520 respectively.I.e. second cross beam 420 go-and-retum are provided with the second vertical rod 520 connected at a certain distance, and second cross beam 420 is positioned in the middle part of the second vertical rod 520. Preferably, second cross beam 420 is shaped steel crossbeam, and the second vertical rod 520 is square steel tube vertical rod.
The second protective platform 20 being positioned at lower support box beam 97 top is fixed in multiple the of multiple second cross beam 420 top The bottom of two vertical rods 520, is positioned at the second protective platform 20 bottom lower support box beam 97 and is fixed in bottom multiple second cross beam 420 The bottom of multiple second vertical rods 520.I.e. it is respectively mounted at the top of lower support box beam 97 and bottom by the second vertical rod 520 Two protective platforms 20.
Wherein, shown in Figure 6, Fig. 6 be integral jacking platform box beam assembled protection system of the present invention upper Support box beam arranges first crossbeam and the plane graph of the first vertical rod.As shown in Figure 6, the top of two upper support bars 961 sets the most respectively There is upper box beam small oil tank 962, cause box beam upper surface uneven, for welding the on the upper support bar 961 of upper support box beam 96 One crossbeam 410, the first pad pipe 610 that being respectively provided on two sides with of upper box beam small oil tank 962 flushes with upper box beam small oil tank 962, with Guarantee that box beam upper surface is smooth, it is simple to welding first crossbeam 410, it is respective that first crossbeam 410 is set up in two upper support bars 961 On first pad pipe 610.The top of two lower support bars 971 is respectively equipped with lower box beam small oil tank 972, causes box beam upper surface not Flat, in order to weld second cross beam 420 on the upper support bar 971 of lower support box beam 97, the both sides of lower box beam small oil tank 972 are respectively It is provided with the second pad pipe 620 flushed with lower box beam small oil tank 972, smooth to guarantee box beam upper surface, it is simple to welding second cross beam 420, second cross beam 420 is set up on two respective second pad pipes 620 of described lower support bar 971.Preferably, the first pad pipe 610 is shaped steel pad pipe, and the second pad pipe 620 is shaped steel pad pipe.
Further, the first protective platform 10 include the first shaped steel Os Draconis, be layed on described first shaped steel Os Draconis One steel plate and be arranged at described first shaped steel Os Draconis week side the first vertical net of protection, described first shaped steel Os Draconis are fixed in first The bottom of multiple first vertical rods 510 bottom crossbeam 410.Second protective platform 20 include Second-Type steel joist, be layed in described The second steel plate on Second-Type steel joist and be arranged at the second vertical net of protection of side of described Second-Type steel joist week, described second Shaped steel Os Draconis are fixed in the bottom of multiple second vertical rods 520 bottom second cross beam 420.Preferably, described first shaped steel Os Draconis For the shaped steel Os Draconis of canalization, described first steel plate is checkered steel plate, and the described first vertical net of protection is the punching protection of canalization Vertical net.Described Second-Type steel joist is the shaped steel Os Draconis of canalization, and described second steel plate is checkered steel plate, and described second protection is vertical Net is the vertical net of punching protection of canalization.
It addition, shown in Figure 7, Fig. 7 is the elevation in B-B face in Fig. 5.Shown in Fig. 4 Yu Fig. 7, upper support box beam The bottom of 96 is installed with outward extending 3rd crossbeam 430, it is preferable that first crossbeam 410 also stretches out, and access staircase 30 is solid It is connected to first crossbeam 410 and the 3rd crossbeam 430 extends the part of upper support box beam 96.I.e. upper and lower by upper support box beam 96 The first crossbeam 410 of surface soldered is installed with the 3rd crossbeam 430 for connecting the logical of upper support box beam 96 and lower support box beam 97 Road stair 30, arrange certain spacing distance, just between this access staircase 30 and the second protective platform 20 of lower support box beam 97 Upper support box beam 96 can be followed in this access staircase 30 to move up and down, the jacking step pitch different to adapt to integral jacking platform. For the ease of current, also hanger 94 and on support between box beam 96, cat ladder 80 be set.
Further, further in conjunction with shown in Fig. 5, access staircase 30 includes the most interconnective multiple stair frame Frame 310, staircase framework 310 includes the 3rd shaped steel Os Draconis, the 3rd steel plate and the setting being layed on described 3rd shaped steel Os Draconis In described 3rd shaped steel Os Draconis week side the 3rd vertical net of protection, between the respective 3rd shaped steel Os Draconis of multiple staircase framework 310 point It is not provided with for the 3rd current cat ladder 320.Preferably, described 3rd shaped steel Os Draconis are the shaped steel Os Draconis of canalization, described Three steel plates are checkered steel plate, and the described 3rd vertical net of protection is the vertical net of punching protection of canalization.Preferably, Fig. 5 institute is referred again to Showing, staircase framework 310 also includes the half space 330 being adjacent to described 3rd shaped steel Os Draconis, has a rest for operating personnel.
When integral jacking platform box beam assembled protection system of the present invention is installed, assembled at the scene can be shifted to an earlier date and spell Install the first protective platform 10 of support box beam 96, the second protective platform 20 of lower support box beam 97 and access staircase 30, Then in upper support box beam 96 and lower support box beam 97, install first crossbeam 410, second cross beam the 420, the 3rd crossbeam simultaneously 430, the first vertical rod 510 and the second vertical rod 520, then uses hoisting tool integral hoisting the first protective platform 10, second to prevent Protect platform 20 and access staircase 30, complete to install.Otherwise technological process is then during dismounting.This kind is pacified, mode of tearing open is convenient and swift, joint Save peace, tear the duration open.The above each component all can shift to an earlier date canalization processing and fabricating, and assembled in situ formula is assembled, after installation Overall image is effective.
See shown in Fig. 8 and Fig. 9, before Fig. 8 is integral jacking platform box beam assembled protection system jacking of the present invention View.Fig. 9 is the view after integral jacking platform box beam assembled protection system jacking of the present invention. As shown in Figure 8 and Figure 9, during supporting box beam jacking, operating personnel can be implemented in hanger 94 with upper by cat ladder 80 Support and walk between box beam 96;Two first protection that be can be implemented in upper support box beam 96 by the first cat ladder 110 are flat Walk between platform 10;By the second cat ladder 210 can be implemented in lower support box beam 97 two the second protective platforms 20 it Between walk;Be can be implemented in by the 3rd cat ladder 320 and walk between each staircase framework 310 of access staircase 30.Cause This, operating personnel passes through integral jacking platform box beam assembled protection system of the present invention, it is achieved convenient supporting in box beam Operation, walks up and down unobstructed, and adapts to different jacking step pitches, safe and reliable, improves working performance.
The above is only presently preferred embodiments of the present invention, and the present invention not does any pro forma restriction, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any technology people being familiar with this specialty Member, in the range of without departing from technical solution of the present invention, when the technology contents of available the disclosure above makes a little change or repaiies Decorations are the Equivalent embodiments of equivalent variations, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real Any simple modification, equivalent variations and the modification that confrontation above example is made, all still falls within the scope of technical solution of the present invention In.

Claims (10)

1. an integral jacking platform box beam assembled protection system, it is characterised in that including:
Two the first protective platforms, are respectively arranged at lifting platform and support the top of upper support box beam and the bottom of box beam, two Form working space between described first protective platform and be provided with for the first current cat ladder;
Two the second protective platforms, are respectively arranged at lifting platform and support the top of lower support box beam and the bottom of box beam, two Form working space between described second protective platform and be provided with for the second current cat ladder;
Access staircase, is fixedly arranged in described upper support box beam, is used for connecting described upper support box beam and described lower support box beam.
2. integral jacking platform box beam assembled protection system as claimed in claim 1, it is characterised in that:
Described upper support box beam includes two upper support bars be arrangeding in parallel, and the top shelf of two described upper support bars is provided with multiple First crossbeam, the top of described first crossbeam and bottom are installed with multiple first vertical rod respectively;
First protective platform at described upper support box beam top is fixed in multiple first vertical rods at multiple described first crossbeam top Bottom, the first protective platform bottom described upper support box beam be fixed in multiple first bottom multiple described first crossbeam stand The bottom of bar.
3. integral jacking platform box beam assembled protection system as claimed in claim 2, it is characterised in that described in two The top of upper support bar is respectively equipped with box beam small oil tank, being respectively provided on two sides with and described upper box beam of described upper box beam small oil tank The first pad pipe that small oil tank flushes, described first crossbeam is set up on two respective described first pad pipes of described upper support bar.
4. integral jacking platform box beam assembled protection system as claimed in claim 2, it is characterised in that described first Protective platform includes the first shaped steel Os Draconis, the first steel plate being layed on described first shaped steel Os Draconis and is arranged at described first Net is found in the first protection of side of shaped steel Os Draconis week, and described first shaped steel Os Draconis are fixed in multiple first bottom described first crossbeam and stand The bottom of bar.
5. integral jacking platform box beam assembled protection system as claimed in claim 1, it is characterised in that:
Described lower support box beam includes two lower support bars be arrangeding in parallel, and the top shelf of two described lower support bars is provided with multiple Second cross beam, the top of described second cross beam and bottom are installed with multiple second vertical rod respectively;
Second protective platform at described lower support box beam top is fixed in multiple second vertical rods at multiple described second cross beam top Bottom, the second protective platform bottom described lower support box beam be fixed in multiple second bottom multiple described second cross beam stand The bottom of bar.
6. integral jacking platform box beam assembled protection system as claimed in claim 5, it is characterised in that described in two The top of lower support bar is respectively equipped with lower box beam small oil tank, being respectively provided on two sides with and described lower box beam of described lower box beam small oil tank The second pad pipe that small oil tank flushes, described second cross beam is set up on two respective described second pad pipes of described lower support bar.
7. integral jacking platform box beam assembled protection system as claimed in claim 5, it is characterised in that described second Protective platform includes Second-Type steel joist, the second steel plate being layed on described Second-Type steel joist and is arranged at described second Net is found in the second protection of side of shaped steel Os Draconis week, and described Second-Type steel joist is fixed in multiple second bottom described second cross beam and stands The bottom of bar.
8. integral jacking platform box beam assembled protection system as claimed in claim 1, it is characterised in that described upper The bottom of support box beam is installed with outward extending 3rd crossbeam, and described access staircase is fixed in described 3rd crossbeam and extends described The part of upper support box beam.
9. integral jacking platform box beam assembled protection system as claimed in claim 8, it is characterised in that described passage Stair include the most interconnective multiple staircase framework, and described staircase framework includes the 3rd shaped steel Os Draconis, is layed in The 3rd steel plate on described 3rd shaped steel Os Draconis and be arranged at described 3rd shaped steel Os Draconis week side the 3rd vertical net of protection, multiple It is respectively provided with the 3rd current cat ladder between the respective 3rd shaped steel Os Draconis of described staircase framework.
10. integral jacking platform box beam assembled protection system as claimed in claim 9, it is characterised in that described building Ladder framework also includes the half space being adjacent to described 3rd shaped steel Os Draconis.
CN201610551552.0A 2016-07-14 2016-07-14 Integral jacking platform box beam assembled protection system Active CN106193316B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610551552.0A CN106193316B (en) 2016-07-14 2016-07-14 Integral jacking platform box beam assembled protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610551552.0A CN106193316B (en) 2016-07-14 2016-07-14 Integral jacking platform box beam assembled protection system

Publications (2)

Publication Number Publication Date
CN106193316A true CN106193316A (en) 2016-12-07
CN106193316B CN106193316B (en) 2018-09-04

Family

ID=57478012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610551552.0A Active CN106193316B (en) 2016-07-14 2016-07-14 Integral jacking platform box beam assembled protection system

Country Status (1)

Country Link
CN (1) CN106193316B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3402515A (en) * 1965-10-07 1968-09-24 Rainaut Marc Pierre Folding multi-storeyed buildings
CN102704676A (en) * 2012-05-30 2012-10-03 徐州徐液液压科技有限公司 Jacking formwork mechanism
CN203769341U (en) * 2014-01-17 2014-08-13 上海建工集团股份有限公司 Anti-falling grating plate of steel platform
CN104631822A (en) * 2014-12-16 2015-05-20 中冶天工集团有限公司 Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN204781929U (en) * 2015-05-22 2015-11-18 武汉凡肯智能装备有限公司 Convenient intelligent hydraulic pressure jacking die carrier system of standard form shellfish thunder frame of assembling
CN205077845U (en) * 2015-09-08 2016-03-09 中国建筑第二工程局有限公司 Hydraulic intelligent climbing operation scaffold for core barrel well of building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3402515A (en) * 1965-10-07 1968-09-24 Rainaut Marc Pierre Folding multi-storeyed buildings
CN102704676A (en) * 2012-05-30 2012-10-03 徐州徐液液压科技有限公司 Jacking formwork mechanism
CN203769341U (en) * 2014-01-17 2014-08-13 上海建工集团股份有限公司 Anti-falling grating plate of steel platform
CN104631822A (en) * 2014-12-16 2015-05-20 中冶天工集团有限公司 Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN204781929U (en) * 2015-05-22 2015-11-18 武汉凡肯智能装备有限公司 Convenient intelligent hydraulic pressure jacking die carrier system of standard form shellfish thunder frame of assembling
CN205077845U (en) * 2015-09-08 2016-03-09 中国建筑第二工程局有限公司 Hydraulic intelligent climbing operation scaffold for core barrel well of building

Also Published As

Publication number Publication date
CN106193316B (en) 2018-09-04

Similar Documents

Publication Publication Date Title
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN203531344U (en) Tool type scaffold
CN105257009B (en) Device for anti-falling partition in elevator shaft
CN103206074B (en) Elevator shaft template construction method, platform and support
CN108331336A (en) The integrated lifting steel plateform system and its construction method of floor synchronous construction
CN205224567U (en) Collapsible foldable elevartor shaft construction platform
CN102912996B (en) Steel tube concrete column high-altitude construction safety protection system
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN103912128B (en) The construction method of high-altitude disjunctor steel truss
CN106758862B (en) Lattice tubular tower and frame peace tears platform open
CN104563280B (en) A kind of operating construction elevator basis conversion method
CN215441501U (en) Cantilever steel structure combined construction hanging basket
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN106193316A (en) Integral jacking platform box beam assembled protection system
CN201148726Y (en) Independent hanging scaffold super large operating platform
CN208870379U (en) The integrated lifting steel plateform system of floor synchronous construction
EP2820365B1 (en) Method and apparatus for assembling field erected cooling tower frame
CN205382718U (en) Sparse passway for escaping of steel platform die carrier system
CN211775603U (en) Combined type step construction platform
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
CN212895943U (en) Operation platform device for binding small-section pier column reinforcing steel bars
CN107795267A (en) A kind of hanging ladder
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN204038917U (en) Detachable external hanging type operating platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant