CN106193169B - A kind of deep construction method of cutter suction dredger near limit digging - Google Patents

A kind of deep construction method of cutter suction dredger near limit digging Download PDF

Info

Publication number
CN106193169B
CN106193169B CN201610704918.3A CN201610704918A CN106193169B CN 106193169 B CN106193169 B CN 106193169B CN 201610704918 A CN201610704918 A CN 201610704918A CN 106193169 B CN106193169 B CN 106193169B
Authority
CN
China
Prior art keywords
ship
construction
piling bar
depth
accommodation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610704918.3A
Other languages
Chinese (zh)
Other versions
CN106193169A (en
Inventor
宋俊强
邵亮
孟祥翔
刘涛
张博
王兴博
孙永奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Tianjin Harbour Engineering Co Ltd
Original Assignee
CCCC Tianjin Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Tianjin Harbour Engineering Co Ltd filed Critical CCCC Tianjin Harbour Engineering Co Ltd
Priority to CN201610704918.3A priority Critical patent/CN106193169B/en
Publication of CN106193169A publication Critical patent/CN106193169A/en
Application granted granted Critical
Publication of CN106193169B publication Critical patent/CN106193169B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/06Floating substructures as supports
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/06Floating substructures as supports
    • E02F9/062Advancing equipment, e.g. spuds for floating dredgers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

Deep construction method is dug the present invention relates to a kind of cutter suction dredger near limit, 1), the construction technology that ship near limit excavates is formulated according to ship performance, soil property, tide type etc.;2) it, determines underwater piling bar safe length, reserves enough excess lengths and intensity, according to ship whether there is slow stake mechanism to determine its construction area;Assuming that piling bar vertical and horizontal mud face when the ship limit digs deep construction, calculates rationally effective accommodation:3), bridge is transferred to when designing angle maximum value over the ground, makes hull center of gravity to Forward, stem, which absorbs water, to be increased, while ship aft draft reduces, to make reamer decentralization depth increase;4), construction area is single construction, can also include adjacent parallel 2 job executions in construction area.The present invention can carry out the construction for digging deep dredging and reclamation class engineering greatly, improve the adaptability of dredger, near limit excavation construction can be carried out on the basis of nominal depth of dredging, the limitation of ship self performance has been freed, great space is provided in terms of ship selection.

Description

A kind of deep construction method of cutter suction dredger near limit digging
Technical field
The invention belongs to port engineering dredging technology fields, dig deep apply more particularly to a kind of cutter suction dredger near limit Work method.
Background technique
China builds and has upgraded a collection of deep water port successively to adapt to rapid development of economy, while to construction dredger Digging deep ability, more stringent requirements are proposed, therefore digs deep ability as one to increase ship on the basis of not changing Ship Structure A problem.
Construction continuity, precision are high, high-efficient are widely used in Dredging and filling engineering because it has for cutter suction dredger In, but in the biggish area of the region by tidal effect, especially tidal range, cutting depth is by pole when ship continuity is constructed Big limitation, low so as to cause ship construction efficiency, construction speed is slow.
Summary of the invention
The present invention is to solve technical problem present in well-known technique and provide a kind of in the biggish area strand suction of tidal range The construction method of dredger, can solve the ship piling bar excess length in the larger situation of the depth of water by the method not enough causes out The cutter suction dredger near limit for digging the limited problem of depth digs deep construction method.
The present invention is adopted the technical scheme that solve technical problem present in well-known technique:
A kind of cutter suction dredger near limit digs the construction method of depth, it is characterised in that:This approach includes the following steps:
Step 1, the construction technology that ship near limit excavates is formulated according to ship performance, soil property, tide type etc..
Step 2, it determines underwater piling bar safe length, reserves enough excess lengths and intensity, whether had according to ship Slow stake mechanism determines its construction area;
Reserve enough excess length HFAnd intensity, underwater piling bar length is determined according to formula:
H=HE+HB+h+(D-d)+HF
In formula:H-piling bar overall length (m), HE- maximum dredging depth (m), HBUnder-ship deck baseline to commandant's rope stress On along the shortest distance (m), h-guide pile 1 is inserted into soil depth (m), generally takes 2~3m, D-ship moldeed depth (m), d-ship stern It absorbs water (m), HF- excess length (m), minimum 1.5~2m of value;
Assuming that piling bar vertical and horizontal mud face when the ship limit digs deep construction, calculates rationally effective accommodation according to formula:
L=l1cosα+l2cos(α+β)+l3
In formula:The effectively accommodation (m) L-, l1- piling bar trolley 0m datum mark is to bridge trunnion spacing (m), l2- bridge trunnion To reamer distance (m), l3- safe distance, suitable 15m or so, α-ship trim angle, β-ship gantry design the limit over the ground Angle;
Step 3, bridge is transferred to when designing angle maximum value over the ground, utilizes the fresh water of cabin, fuel oil or heavy object Part etc. adjusts the ballast position of ship, makes hull center of gravity to Forward, stem drinking water increases, while ship aft draft reduces, to make Reamer is transferred depth and is increased;The height on drinking water situation of the trim maximum value depending on hull corner location, the water surface and deck is minimum Not preferably less than 50cm;
Step 4, (1) is if construction area is single construction, whenever one, drilling depth effective accommodation (piling bar trolley to gantry pole of constructing The lateral vertical range L of reamer, is formulated according to Ship Structure parameter after limit decentralization) after the completion of, ship then retreats accommodation continuation It excavates, and intact with upper accommodation overlap joint, guarantees the piling bar moment on resting on original mud face, single carries out (2) repeatedly If construction area includes adjacent parallel 2 operating areas, when there is an excavation to finish an accommodation, using ship side anchor winch by ship Move in adjacent construction item, then unmoor ship stern is pushed on middle line, continuation construct in Article 2, similarly toward complex Alternating into Row.
The invention has the advantages and positive effects that:The present invention can carry out digging applying for deep dredging and reclamation class engineering greatly Work improves the adaptability of dredger, and near limit excavation construction can be carried out on the basis of nominal depth of dredging, has freed ship certainly The limitation of body performance provides great space in terms of ship selection.
This engineering method is advanced optimized for engineering soil property feature of re-blowing and is applied based on the mature way of traditional hydraulic reclamation project Work technique, is rationally effectively controlled hydraulic reclamation area flatness, process is simple and direct controllable, and basic guarantee social resources maximize benefit With improving overall operation efficiency.
Detailed description of the invention
Fig. 1 is construction technology figure (single) of the invention;
Fig. 2 is that Fig. 1 excavates lateral side view;
Fig. 3 is construction technology figure of the invention (two or more);
Fig. 4 is piling bar head factory exploded view.
In figure;1, piling bar;2, trunnion;3, bridge;4, reamer;5, bridge rises and falls wirerope;6, bow;7, stern;8, original Mud face;9, cabin;10, deck;
Specific embodiment:
In order to further understand the content, features and effects of the present invention, and being described in detail with the accompanying drawings as follows:
Step 1, the construction technology that rational ship near limit excavates;
Step 2, enough excess length H are reservedFAnd intensity, underwater 1 length of piling bar (see Fig. 4) is determined according to formula:
H=HE+HB+h+(D-d)+HF
In formula:1 overall length (m) of H-piling bar, HE- maximum dredging depth (m), HB- ship deck baseline to commandant restrict stress Along the shortest distance (m) on lower, h-guide pile 1 is inserted into soil depth (m), generally takes 2~3m, D-ship moldeed depth (m), d-ship Aft draft (m), HF- excess length (m), minimum 1.5~2m of value.
Assuming that 1 vertical and horizontal mud face 8 of piling bar when the ship limit digs deep construction, calculates rationally effective accommodation according to formula:
L=l1cosα+l2cos(α+β)+l3
In formula:The effectively accommodation (m) L-, l11 trolley 0m datum mark of-piling bar is to 2 spacing (m) of bridge trunnion, l2- gantry ear Axis 2 is to reamer 4 apart from (m), l3- safe distance, suitable 15m or so, α-ship trim angle, β-ship gantry design is over the ground Extreme angles.
Step 3, the decentralization of bridge 3 is utilized into the fresh water, fuel oil or heavy of cabin 9 to when designing angle maximum value over the ground Object etc. adjusts the ballast position of ship, makes hull center of gravity to Forward, and the drinking water of bow 6 increases, while the drinking water of stern 7 reduces, from And so that reamer 4 is transferred depth and increase.Trim maximum value depends on the drinking water situation of hull corner location, the height of the water surface and deck 10 Spend the minimum not preferably less than 50cm of D.
Step 4, when (1) Fig. 1 is that single is constructed, after the completion of one, drilling depth effective accommodation of constructing, ship then retreats one Accommodation continues to excavate, and intact with upper accommodation overlap joint, guarantees 1 moment of piling bar on resting on original mud face 8, single is so anti- It is multiple to carry out, for shown in Fig. 2 after excavation;
(2) it when Fig. 3 is adjacent parallel 2 and 2 or more, when there is an excavation to finish an accommodation, is twisted using ship side anchor Vehicle moves to ship in adjacent construction item, and stern 7 is pushed on middle line by ship of then unmooring, and continuation is constructed in Article 2, similarly past Complex Alternating carries out.
The above is only the preferred embodiments of the present invention, and is not intended to limit the present invention in any form, Any simple modification made to the above embodiment according to the technical essence of the invention, equivalent variations and modification, belong to In the range of technical solution of the present invention.

Claims (1)

1. a kind of cutter suction dredger near limit digs deep construction method, it is characterised in that:Include the following steps:
Step 1, the construction technology that ship near limit excavates is formulated according to ship performance, soil property, tide type;
Step 2, it determines underwater piling bar safe length, reserves enough excess lengths and intensity, whether slow stake is had according to ship Mechanism determines its construction area;
Reserve enough excess length HFAnd intensity, underwater piling bar length is determined according to formula:
H=HE+HB+h+(D-d)+HF
In formula:H-piling bar overall length (m), HE- maximum dredging depth (m), HB- ship deck baseline upper edge under restricting stress to commandant The shortest distance (m);H-piling bar insertion soil depth (m), piling bar insertion soil depth take 2~3m;D-ship moldeed depth (m);d— Ship aft draft (m);HF- excess length (m), 1.5~2m of excess length (m) value;
Assuming that piling bar calculates rationally effective accommodation according to formula perpendicular to horizontal mud face when the ship limit digs deep construction:
L=l1cosα+l2cos(α+β)+l3
In formula:The effectively accommodation (m) L-, l1- piling bar trolley 0m datum mark is to bridge trunnion spacing (m), l2- bridge trunnion extremely twists Knife distance (m);l3- safe distance, safe distance 15m;α-ship trim angle, β-ship gantry design the limit over the ground Angle;
Step 3, bridge is transferred to when designing angle maximum value over the ground, utilizes the fresh water of cabin, fuel oil or heavy object tune The ballast position of whole ship oceangoing ship makes hull center of gravity to Forward, and stem drinking water increases, while ship aft draft reduces, to make under reamer Put depth increase;The height on drinking water situation of the trim maximum value depending on hull corner location, the water surface and deck is minimum unsuitable low In 50cm;
Step 4, (1) if construction area be single construction, whenever construction one effective accommodation of drilling depth, after the completion, ship then retreats one Accommodation continues to excavate, and intact with upper accommodation overlap joint, guarantees the piling bar moment on resting on original mud face, single is repeatedly It carries out;(2) if construction area includes adjacent parallel 2 operating areas, when there is an excavation to finish an accommodation, ship side anchor is utilized Winch moves to ship in adjacent construction item, and stern is pushed on middle line by ship of then unmooring, and continuation is constructed in Article 2, similarly past Complex Alternating carries out.
CN201610704918.3A 2016-08-22 2016-08-22 A kind of deep construction method of cutter suction dredger near limit digging Active CN106193169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610704918.3A CN106193169B (en) 2016-08-22 2016-08-22 A kind of deep construction method of cutter suction dredger near limit digging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610704918.3A CN106193169B (en) 2016-08-22 2016-08-22 A kind of deep construction method of cutter suction dredger near limit digging

Publications (2)

Publication Number Publication Date
CN106193169A CN106193169A (en) 2016-12-07
CN106193169B true CN106193169B (en) 2018-11-27

Family

ID=57524129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610704918.3A Active CN106193169B (en) 2016-08-22 2016-08-22 A kind of deep construction method of cutter suction dredger near limit digging

Country Status (1)

Country Link
CN (1) CN106193169B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107366257B (en) * 2017-05-24 2022-09-06 中交(天津)疏浚工程有限公司 Remote sand taking and throwing construction process
CN109750705B (en) * 2019-03-12 2020-08-25 中交天津航道局有限公司 Automatic dredging control method for target parameters of cutter suction dredger
CN110541441A (en) * 2019-09-17 2019-12-06 中交烟台环保疏浚有限公司 Construction method for retreating and dredging cutter suction dredger
CN112302041A (en) * 2019-11-27 2021-02-02 海南发控智慧环境建设集团有限公司 Sea entrance foundation rock type ecological island reef construction method
CN115094967B (en) * 2022-06-17 2024-01-16 江苏筑港建设集团有限公司 Dredger dredging construction method for cutter suction dredger

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4212121A (en) * 1978-07-31 1980-07-15 Mitsubishi Jukogyo Kabushiki Kaisha Method and apparatus for dredging having bow-stern movement of the suction means
CN100378275C (en) * 2004-08-27 2008-04-02 中交天津港航勘察设计研究院有限公司 Automatic dredging depth controller for cutter suction dredger
CN102518161B (en) * 2011-12-31 2014-08-13 中交广州航道局有限公司 Direct elevation control dredging method for dredge ship
SI2639359T1 (en) * 2012-03-16 2017-04-26 Jan De Nul N.V. Dredging equipment and method for dredging or mining with such equipment
CN103015479B (en) * 2012-12-24 2014-12-10 中国船舶重工集团公司第七○二研究所 Biological dredging platform and method
NL2012654B1 (en) * 2014-04-18 2016-07-04 Ihc Holland Ie Bv Universal cover for cutter head.

Also Published As

Publication number Publication date
CN106193169A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106193169B (en) A kind of deep construction method of cutter suction dredger near limit digging
CN202108065U (en) Buoyancy box crawler excavator
CN106594386B (en) A kind of no-dig technique brill top, which is combined, wears crossing pipeline laying method
CN203393692U (en) Bottom supported drilling platform
CN106193161B (en) A kind of strand suction super low coverage ship dredging construction method in boat landing forward position
CN110029696A (en) A kind of double work pattern submarine cable ditchers
CN219651362U (en) Combined type pushing and trailing suction marine aggregate collection ship
CN110374091A (en) A kind of rectangle friction pile mechanical hole building construction method
CN205116200U (en) Caisson for sea reclamation
CN103291312A (en) Shield tunneling machine capable of realizing three-dimensional grouting
CN103485356B (en) Overwater laying frame and method for filling sand pockets with same
CN202175972U (en) dredger for small watershed river channels
CN205101675U (en) Long distance submarine pipe line is pipe laying construction system after ditching in advance
CN104727325B (en) A kind of method of construction of polder sea wall
CN101509265B (en) Pull-type soil shifter smoothing technique for soft foundation field and pull-type soil shifter
CN104314130B (en) A kind of amphibious excavator
CN103806409B (en) The milling formation system of gravity type quay bedding and the construction method of Gravity harf structure
CN110541441A (en) Construction method for retreating and dredging cutter suction dredger
CN109372047A (en) A kind of three way ropes position system suitable for cutter suction dredger
CN206157803U (en) Formula grab dredger is dug to automatic side of bridge type
CN205776238U (en) Rubble bed leveling barge under water
CN212026387U (en) Dredger
CN201148631Y (en) Clamshell type hydraulic claw bucket for underwater dredge
CN209099429U (en) A kind of three way ropes position system applied to cutter suction dredger
CN104058071B (en) A kind of semi-submersible dredget

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant