CN106193102A - A kind of tower crane relay handling Shelf device - Google Patents

A kind of tower crane relay handling Shelf device Download PDF

Info

Publication number
CN106193102A
CN106193102A CN201610692431.8A CN201610692431A CN106193102A CN 106193102 A CN106193102 A CN 106193102A CN 201610692431 A CN201610692431 A CN 201610692431A CN 106193102 A CN106193102 A CN 106193102A
Authority
CN
China
Prior art keywords
steel pipe
steel
tower crane
pipe post
square steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610692431.8A
Other languages
Chinese (zh)
Other versions
CN106193102B (en
Inventor
张凤勇
代凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ershiye Construction Co Ltd filed Critical Shanghai Ershiye Construction Co Ltd
Priority to CN201610692431.8A priority Critical patent/CN106193102B/en
Publication of CN106193102A publication Critical patent/CN106193102A/en
Application granted granted Critical
Publication of CN106193102B publication Critical patent/CN106193102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Jib Cranes (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The present invention relates to a kind of tower crane relay handling Shelf device, including body, wherein said body includes removable basis, steel pipe post and square steel tube crossbeam, described removable basis is fixed on ground, upper end, described removable basis is provided with pre-embedded bolt, described steel pipe post is arranged on upper end, removable basis, described steel pipe post interior lower end is provided with spring, described spring top is provided with circular steel plate, described square steel tube crossbeam lower end is respectively provided on two sides with bearing, described bearing diameter is corresponding with steel pipe post diameter, described bearing lower end is provided with round steel pipe, described round steel pipe diameter is less than steel pipe post diameter, described square steel tube crossbeam is arranged on steel pipe post by round steel pipe, and on the circular steel plate that is pressed in steel pipe post of round steel pipe.The present invention makes and is simply easily installed, and complete unit can have enough to meet the need use and be conducive to green construction, and this device is provided with damping device and is conducive to improving service life and safe construction, solves a difficult problem for buildings on the hillside transport of materials.

Description

A kind of tower crane relay handling Shelf device
Technical field
The invention belongs to technical field of building construction, particularly relate to a kind of tower crane relay handling Shelf device.
Background technology
Typically carrying out construction on hillside, many employings first backfill lowered zones, reduce gradient ground method and carry out engineering Construction, but transport of materials is a difficult problem, hampers the development of construction speed, is therefore badly in need of a kind of tower crane relay handling rack Device, in order to solve a difficult problem for buildings on the hillside transport of materials.
Summary of the invention
The technical problem to be solved is to provide a kind of tower crane relay handling Shelf device, by first on hillside Upper installation First tower crane, then set up second tower crane by this tower crane transport member, if arranging at construction area by that analogy Dry tower crane, forms the construction environment of tower crane relay, high district construction material is progressively transported to construction material Huo Jiangdi district of low district and builds Build material and be transported to high district construction material, solve a difficult problem for buildings on the hillside transport of materials.
The technical solution adopted for the present invention to solve the technical problems is: provide a kind of tower crane relay handling glove rack-mounted Putting, including body, wherein said body includes removable basis, steel pipe post and square steel tube crossbeam, and described removable basis is solid Being scheduled on ground, upper end, described removable basis is provided with pre-embedded bolt, and described steel pipe post is arranged on upper end, removable basis, institute Stating steel pipe post interior lower end and be provided with spring, described spring top is provided with circular steel plate, is used for transmitting upper pressure, described square steel Pipe crossbeam lower end is respectively provided on two sides with bearing, and described bearing diameter is corresponding with steel pipe post diameter, and described bearing lower end is provided with Round steel pipe, described round steel pipe diameter is less than steel pipe post diameter, and described square steel tube crossbeam is arranged on steel pipe post by round steel pipe On, and on the circular steel plate that is pressed in steel pipe post of round steel pipe, described square steel tube crossbeam upper end is used for placing shifting thing conversion basket.
The further technical scheme of the present invention is, described removable basis is in prismatic table shape concrete, and removable basis Portion is provided with hole, is used for inserting anchor pole, is fixed on ground on removable basis by anchor pole.
The further technical scheme of the present invention is, described pre-embedded bolt is made up of steel plate and four bolts, described steel plate Middle part is provided with hole, and described steel plate is arranged on upper end, removable basis, and described bolt lower end is arranged on removable base through steel plate Plinth is interior, upper end is arranged on outside removable basis.
The further technical scheme of the present invention is, described square steel tube crossbeam is folded upward at for square steel of remaining silent, two ends.
The further technical scheme of the present invention is, when described square steel tube crossbeam is placed above shifting thing conversion basket, and round steel pipe Compression spring, bearing docks with steel pipe post, and born load is passed to steel pipe post, it is achieved transmit load after first damping.
The further technical scheme of the present invention is, is respectively equipped with adjustable tie-beam, is used for adding between adjacent steel tube column The stability in the large of strong body.
The further technical scheme of the present invention is, described adjustable tie-beam includes steel pipe and L-shaped rod member, described steel pipe two Side is provided with female thread, and for being connected with L-shaped rod member, described L-shaped rod member one end is provided with screw thread and fastener for connection, the other end insert The connection end device that steel pipe post side is arranged, described connection end device uses round steel pipe to be welded on steel pipe post side.
The further technical scheme of the present invention is, is provided with, in the middle of described adjustable tie-beam, the cross that short round steel is welded into Handle, is used for rotating adjustable tie-beam, degree of tightness or adjusting tie-beam.
The further technical scheme of the present invention is, described shifting thing conversion end in the key is provided with two elongated square steel masters that remain silent Beam, for the overall weight of hanging basket is delivered to rack top square steel tube crossbeam, is provided with between described two square steel girders Some square steel secondary beams of remaining silent, described two square steel girder upper ends are provided with some round steel grids, in order to place construction material.
The further technical scheme of the present invention is, described in square steel girder of remaining silent be provided with lifting-point device, described suspension centre fills Being set to portal trestle, described portal trestle is welded on inside remain silent square steel girder top, column and is welded with some round steel grids, institute State portal trestle and be arranged over hoist cable, for being connected with lifting lifting beam.
Beneficial effect
The present invention makes and is simply easily installed, and complete unit can have enough to meet the need use and be conducive to green construction, and this device sets There is damping device to be conducive to improving service life and safe construction, solve a difficult problem for buildings on the hillside transport of materials.
Accompanying drawing explanation
Fig. 1 is tower crane relay handling schematic diagram of the present invention;
Fig. 2 is that the present invention may move foundation main view;
Fig. 3 is the present invention removable basis sectional view;
Fig. 4 is Fig. 2 top view;
Fig. 5 is the fixing schematic diagram in the removable basis of the present invention;
Fig. 6 is that rack of the present invention installs transverse sectional view;
Fig. 7 is that rack of the present invention installs longitudinal cross-section schematic diagram;
Fig. 8 is that the present invention moves thing conversion basket placement transverse sectional view;
Fig. 9 is that the present invention moves thing conversion basket placement longitudinal cross-section schematic diagram.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is expanded on further.Should be understood that these embodiments are merely to illustrate the present invention Rather than restriction the scope of the present invention.In addition, it is to be understood that after having read the content that the present invention lectures, people in the art The present invention can be made various changes or modifications by member, and these equivalent form of values fall within the application appended claims equally and limited Scope.
Embodiment 1
Commodity shelf structure schematic diagram as shown in Figure 6 and Figure 7, body 15 includes removable basis 1, steel pipe post 5 and square steel Pipe crossbeam 6, described steel pipe post 5 is steel pipe manufacturing, and described steel pipe post 5 is arranged on removable basic 1 upper end, and described steel pipe stands Post 5 interior lower end is provided with spring 26, and described spring 26 top is provided with circular steel plate, is used for transmitting upper pressure, described square steel tube Crossbeam 6 is folded upward at for square steel of remaining silent, two ends, and described square steel tube crossbeam 6 lower end is respectively provided on two sides with bearing 16, described bearing 16 Diameter is corresponding with steel pipe post 5 diameter, and described bearing 16 lower end is provided with round steel pipe 17, and described round steel pipe 17 diameter is less than steel pipe Column 5 diameter, described square steel tube crossbeam 6 is arranged on steel pipe post 5 by round steel pipe 17, and round steel pipe 17 is pressed in steel pipe post On circular steel plate in 5, when described square steel tube crossbeam 6 is placed above shifting thing conversion basket 8, round steel pipe 17 compression spring 26, bearing 16 dock with steel pipe post 5, and born load is passed to steel pipe post 5, it is achieved transmit load after first damping.
And it is respectively equipped with adjustable tie-beam 7 between adjacent steel tube column 5, for strengthening the stability in the large of body 15, institute State adjustable tie-beam 7 and include that steel pipe 20 and L-shaped rod member 21, described steel pipe 20 both sides are provided with female thread, for L-shaped rod member 21 even Connecing, described L-shaped rod member 21 one end is provided with screw thread and fastener for connection, the other end insert the connection end device that steel pipe post 5 side is arranged 22, described connection end device 22 uses round steel pipe to be welded in the middle of steel pipe post 5 side, described adjustable tie-beam 7 and is provided with short circle The cross handle 23 that steel is welded into, is used for rotating adjustable tie-beam 7, degree of tightness or adjusting tie-beam.
As shown in Figures 2 to 4 for removable basic schematic, described removable basic 1 is fixed on ground 4, described can Mobile basic 1 upper end is provided with pre-embedded bolt 2, and described pre-embedded bolt 2 is made up of steel plate 18 and four bolts 19, in described steel plate 18 Portion is provided with hole, and described steel plate 18 is arranged on removable basic 1 upper end, and described bolt 19 lower end is arranged on can move through steel plate 18 Dynamic basis 1 is interior, upper end is arranged on outside removable basis 1.
Being illustrated in figure 5 the fixing schematic diagram in removable basis, removable basis 1 is prismatic table shape concrete, and removable base It is provided with hole in the middle part of plinth 1, is used for inserting anchor pole 3, be fixed on removable basic 1 on ground 4 by anchor pole 3.
Move thing conversion basket structural representation as shown in Figure 8 and Figure 9, described shifting thing conversion basket 8 lower end be provided with two elongated Remain silent square steel girder 24, for the overall weight of hanging basket being delivered to body 15 top square steel tube crossbeam 6, described two square steel Being provided with some square steel secondary beams of remaining silent between girder 24, described two square steel girder 24 upper ends are provided with some round steel grids, use To place construction material, described in square steel girder 24 of remaining silent be provided with lifting-point device, described lifting-point device is portal trestle 25, described Portal trestle 25 is welded on inside remain silent square steel girder top, column and is welded with some round steel grids, on described portal trestle 25 Side is provided with hoist cable 9, for being connected with lifting lifting beam 10.
Be illustrated in figure 1 tower crane relay handling schematic diagram, including hillside 11, tower crane 12 and body 15, hillside 11 to Have some tower cranes 12, high district construction material 13 is transported to construction material 14 Huo Jiangdi district of low district construction material 14 and is transported to High district construction material 13, is provided with body 15 between adjacent tower crane 12, moves thing conversion basket 8 for interim placement, it is achieved two tower cranes The conversion of construction material transport between 12.

Claims (10)

1. a tower crane relay handling Shelf device, including body (15), it is characterised in that: described body (15) includes moving Dynamic basis (1), steel pipe post (5) and square steel tube crossbeam (6), described removable basis (1) is fixed on ground (4), described can (1) upper end, mobile basis is provided with pre-embedded bolt (2), and described steel pipe post (5) is arranged on (1) upper end, removable basis, described steel Tube column (5) interior lower end is provided with spring (26), and described spring (26) top is provided with circular steel plate, is used for transmitting upper pressure, Described square steel tube crossbeam (6) lower end is respectively provided on two sides with bearing (16), described bearing (16) diameter and steel pipe post (5) diameter phase Correspondence, described bearing (16) lower end is provided with round steel pipe (17), and described round steel pipe (17) diameter is less than steel pipe post (5) diameter, institute State square steel tube crossbeam (6) to be arranged on steel pipe post (5) by round steel pipe (17), and round steel pipe (17) is pressed in steel pipe post (5) On interior circular steel plate, described square steel tube crossbeam (6) upper end is used for placing shifting thing conversion basket (8).
A kind of tower crane relay handling Shelf device the most according to claim 1, it is characterised in that: described removable basis (1) it is prismatic table shape concrete, and removable basis (1) middle part is provided with hole, is used for inserting anchor pole (3), can by anchor pole (3) Mobile basis (1) is fixed on ground (4).
A kind of tower crane relay handling Shelf device the most according to claim 1, it is characterised in that: described pre-embedded bolt (2) being made up of steel plate (18) and four bolts (19), described steel plate (18) middle part is provided with hole, and described steel plate (18) is arranged on can (1) upper end, mobile basis, described bolt (19) lower end is arranged in removable basis (1) through steel plate (18), upper end is arranged on Removable basis (1) outside.
A kind of tower crane relay handling Shelf device the most according to claim 1, it is characterised in that: described square steel tube crossbeam (6) it is folded upward at for square steel of remaining silent, two ends.
A kind of tower crane relay handling Shelf device the most according to claim 1, it is characterised in that: described square steel tube crossbeam (6) when shifting thing conversion basket (8) are placed above, round steel pipe (17) compression spring (26), bearing (16) docks with steel pipe post (5), Born load is passed to steel pipe post (5), it is achieved after first damping, transmit load.
A kind of tower crane relay handling Shelf device the most according to claim 1, it is characterised in that: adjacent steel tube column (5) it is respectively equipped with adjustable tie-beam (7) between, is used for strengthening the stability in the large of body (15).
A kind of tower crane relay handling Shelf device the most according to claim 6, it is characterised in that: described adjustable tie-beam (7) including steel pipe (20) and L-shaped rod member (21), described steel pipe (20) both sides are provided with female thread, for L-shaped rod member (21) even Connecing, described L-shaped rod member (21) one end is provided with screw thread and fastener for connection, the other end insert the connection end that steel pipe post (5) side is arranged Device (22), described connection end device (22) uses round steel pipe to be welded on steel pipe post (5) side.
8. according to a kind of tower crane relay handling Shelf device described in claim 6 or 7, it is characterised in that: described adjustable company Connect and be provided with, in the middle of beam (7), the cross handle (23) that short round steel is welded into, be used for rotating adjustable tie-beam (7), degree of tightness or adjustment Tie-beam.
A kind of tower crane relay handling Shelf device the most according to claim 1, it is characterised in that: described shifting thing conversion basket (8) lower end is provided with two elongated square steel girders (24) of remaining silent, for the overall weight of hanging basket is delivered to body (15) top On square steel tube crossbeam (6), between described two square steel girders (24), it is provided with some square steel secondary beams of remaining silent, described two square steel masters Beam (24) upper end is provided with some round steel grids, in order to place construction material.
A kind of tower crane relay handling Shelf device the most according to claim 9, it is characterised in that square steel of remaining silent described in: Girder (24) is provided with lifting-point device, and described lifting-point device is portal trestle (25), and described portal trestle (25) is welded on remains silent Being welded with some round steel grids inside square steel girder top, column, described portal trestle (25) is arranged over hoist cable (9), is used for It is connected with lifting lifting beam (10).
CN201610692431.8A 2016-08-18 2016-08-18 A kind of tower crane relay handling Shelf device Active CN106193102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610692431.8A CN106193102B (en) 2016-08-18 2016-08-18 A kind of tower crane relay handling Shelf device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610692431.8A CN106193102B (en) 2016-08-18 2016-08-18 A kind of tower crane relay handling Shelf device

Publications (2)

Publication Number Publication Date
CN106193102A true CN106193102A (en) 2016-12-07
CN106193102B CN106193102B (en) 2018-04-17

Family

ID=57522989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610692431.8A Active CN106193102B (en) 2016-08-18 2016-08-18 A kind of tower crane relay handling Shelf device

Country Status (1)

Country Link
CN (1) CN106193102B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723062A (en) * 2019-01-18 2019-05-07 济南轨道交通集团有限公司 Heave-load device hanging apparatus and hanging method based on proximity deep foundation pit construction environment
CN113120763A (en) * 2020-01-15 2021-07-16 广东博智林机器人有限公司 Material transferring method and system of tower crane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002266426A (en) * 2001-03-08 2002-09-18 Sumitomo Metal Ind Ltd Junction of steel pipe column and steel beam and method of making junction
CN105002925A (en) * 2015-08-04 2015-10-28 上海建工五建集团有限公司 Tower crane assembling type steel structure transferring layer and construction method for same
CN105484285A (en) * 2015-11-27 2016-04-13 中国一冶集团有限公司 Spliced steel pipe concrete column type high bearing platform tower crane foundation structure and construction method
CN105735473A (en) * 2016-04-16 2016-07-06 宁波邦达智能停车设备股份有限公司 Building framework
CN206034479U (en) * 2016-08-18 2017-03-22 上海二十冶建设有限公司 Tower crane relay handling supporter device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002266426A (en) * 2001-03-08 2002-09-18 Sumitomo Metal Ind Ltd Junction of steel pipe column and steel beam and method of making junction
CN105002925A (en) * 2015-08-04 2015-10-28 上海建工五建集团有限公司 Tower crane assembling type steel structure transferring layer and construction method for same
CN105484285A (en) * 2015-11-27 2016-04-13 中国一冶集团有限公司 Spliced steel pipe concrete column type high bearing platform tower crane foundation structure and construction method
CN105735473A (en) * 2016-04-16 2016-07-06 宁波邦达智能停车设备股份有限公司 Building framework
CN206034479U (en) * 2016-08-18 2017-03-22 上海二十冶建设有限公司 Tower crane relay handling supporter device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723062A (en) * 2019-01-18 2019-05-07 济南轨道交通集团有限公司 Heave-load device hanging apparatus and hanging method based on proximity deep foundation pit construction environment
CN113120763A (en) * 2020-01-15 2021-07-16 广东博智林机器人有限公司 Material transferring method and system of tower crane

Also Published As

Publication number Publication date
CN106193102B (en) 2018-04-17

Similar Documents

Publication Publication Date Title
US20200157833A1 (en) Method and apparatus for erecting tower with hydraulic cylinders
CN103993728B (en) A kind of assembling shaped steel is encorbelmented protection canopy
CN206034479U (en) Tower crane relay handling supporter device
CN203845689U (en) Indoor assembled large-scale equipment hoisting device
CN103043543B (en) Device for reinforcing tower crane in coastal zone
CN103352576A (en) Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN105293322A (en) Lifting method of rolling mill housings
CN204198225U (en) A kind of suspension bracket of lifting for prefabricated U-shaped aqueduct and device
CN106193102A (en) A kind of tower crane relay handling Shelf device
CN110656723B (en) Rail support for sliding construction of cylindrical arch shell roof
CN202658590U (en) Integral assembled drilling platform
CN203006792U (en) Single-attachment-point tower crane wall attaching device
CN202785387U (en) Indoor cantilever crane
CN102372228B (en) Translational installation method for large-span crane beam
CN109484972B (en) Assembled gantry crane
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN202369321U (en) Vibration isolating support hoist
CN103362315B (en) Hanger for integral hoisting of pipeline and construction method thereof
CN206844181U (en) Monoblock type granular media jumbo bag preloading device
CN205400216U (en) Steel construction silo flip -chip construction auxiliary device
CN201507118U (en) Large-volume concrete hopper for construction of high-rise building or multi-storey basement
CN107840244A (en) Four limbs side column bilayer shoulder beam supporting construction
CN210503783U (en) Device is put to pipeline for civil engineering
CN203273033U (en) Multifunctional piping support structure
CN206784593U (en) A kind of steel construction coupled column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190709

Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee after: China Twenty Metallurgical Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.

Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Patentee before: Shanghai twenty Metallurgical Construction Co., Ltd.