CN106192874A - Husky dredging method is disturbed in water transfer - Google Patents

Husky dredging method is disturbed in water transfer Download PDF

Info

Publication number
CN106192874A
CN106192874A CN201610666602.XA CN201610666602A CN106192874A CN 106192874 A CN106192874 A CN 106192874A CN 201610666602 A CN201610666602 A CN 201610666602A CN 106192874 A CN106192874 A CN 106192874A
Authority
CN
China
Prior art keywords
river
reinforced concrete
motor
disturbed
sailboat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610666602.XA
Other languages
Chinese (zh)
Inventor
戴罗明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610666602.XA priority Critical patent/CN106192874A/en
Publication of CN106192874A publication Critical patent/CN106192874A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • E02B3/023Removing sediments

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

Husky dredging method is disturbed in the water transfer of the present invention, it is characterized in that: the air exercise reinforced concrete stake of two sides, river, keep at a certain distance away one reinforced concrete stake of construction, fixed 13 motor sailboats of each reinforced concrete piled anchor, motor sailboat arranges along river course length direction, one motor sailboat is set at a certain distance, every motor sailboat is equipped with multiple giants that can wave, bottom giant impact river, silt is made to rise, to strengthen and disturbing sand dynamics, regulation flow cavitation result is at 3,500 4500 cubic meters per seconds, make current with silt flow forward, through a few days sand surfing, by the Altitude control bottom river in the range of setting.The invention has the beneficial effects as follows, time and labour saving, high-efficiency environment friendly, also can increase the income of fisherman's fishing off season.

Description

Husky dredging method is disturbed in water transfer
Technical field
The invention belongs to river improvement method field, relate to a kind of water transfer and disturb husky dredging method.
Background technology
It is known that the Yellow River is the river maximum containing quantity of sand and mud, particularly river, upstream flows to Henan, the domestic section in Shandong After, have a large amount of sedimentation bottom riverbed, make riverbed increase year by year and become hanging river.
Summary of the invention
The present invention is in order to make up the deficiencies in the prior art, it is provided that a kind of saving of work and time, the water transfer of high-efficiency environment friendly disturb husky dredging Dredge method.
The present invention is achieved through the following technical solutions:
Husky dredging method is disturbed in the water transfer of the present invention, it is characterised in that: the air exercise reinforced concrete stake of two sides, river, keep at a certain distance away construction One reinforced concrete stake, each reinforced concrete stake is arranged along river course length direction by 1-3 motor sailboat of steel wire rope grappling, motor sailboat Row, arrange a motor sailboat at a certain distance, and every motor sailboat is equipped with multiple giants, at the bottom of giant impact river Portion, makes silt rise, in order to strengthen sand dynamics of disturbing, and regulation flow cavitation result, at 3500-4500 cubic meters per second, makes current with mud Husky flow forward, through a few days sand surfing, by the Altitude control bottom river in the range of setting.
Giant is swingable to be arranged on motor sailboat.
Reinforced concrete stake diameter 0.8-1 rice, highly 14-15 rice, aerial parts 1 meter, under ground portion 13-14 rice.
The invention has the beneficial effects as follows, time and labour saving, high-efficiency environment friendly, also can increase the income of fisherman's fishing off season.
Accompanying drawing explanation
Fig. 1 is the schematic perspective view of the present invention.
1 river, 2 reinforced concrete stakes, 3 motor sailboats.
Detailed description of the invention
Accompanying drawing is a kind of specific embodiment of the present invention.
Husky dredging method is disturbed in the water transfer of the present invention, and the air exercise reinforced concrete stake 2 of two sides, river 1, keep at a certain distance away construction one Reinforced concrete stake, each reinforced concrete stake is arranged along river course length direction by 1-3 motor sailboat of steel wire rope grappling 3, motor sailboat, Arranging a motor sailboat at a certain distance, every motor sailboat is equipped with multiple giants, bottom giant impact river, Making silt rise, in order to strengthen sand dynamics of disturbing, regulation flow cavitation result, at 3500-4500 cubic meters per second, makes current with silt Flow forward, through a few days sand surfing, by the Altitude control bottom river in the range of setting.
Concrete grammar is, the air exercise reinforced concrete stake of two sides, river, and a reinforced concrete stake built by interval 500-1000 rice, 1-3 motor sailboat of grappling in 1000 meters, motor sailboat arranges along river course length direction, preferably arranges a machine sail every 500 meters Ship, every motor sailboat, equipped with multiple giants, bottom giant impact river, makes silt rise, in order to strengthen and disturb sand Dynamics, regulation flow cavitation result, at 3500-4500 cubic meters per second, makes current flow into the sea with silt, after taking aggregate measures, Through a few days sand surfing, can be by the Altitude control bottom river in the range of setting.Reinforced concrete stake diameter 0.8-1 rice, highly 14-15 rice, aerial parts 1 meter, under ground portion 13-14 rice, aerial parts is for as anchoring pile, for permanent device, can be repeatedly Use.10 giants installed by one motor sailboat, and the jet diameters of giant 19 millimeters, flow 50 liters is per second, range 30 Rice.
The Yellow River annual carrying amount 1,600,000,000 tons, 3-5 water transfer is disturbed husky dredging method and is dredged once.

Claims (3)

1. husky dredging method is disturbed in a water transfer, it is characterised in that: the air exercise reinforced concrete stake of two sides, river, keep at a certain distance away construction one Individual reinforced concrete stake, each reinforced concrete stake is arranged along river course length direction by 1-3 motor sailboat of steel wire rope grappling, motor sailboat Row, arrange a motor sailboat at a certain distance, and every motor sailboat is equipped with multiple giants, at the bottom of giant impact river Portion, makes silt rise, in order to strengthen sand dynamics of disturbing, and regulation flow cavitation result, at 3500-4500 cubic meters per second, makes current with mud Husky flow forward, through a few days sand surfing, by the Altitude control bottom river in the range of setting.
Husky dredging method is disturbed in water transfer the most according to claim 1, it is characterised in that: giant is swingable is arranged on machine sail On ship.
Husky dredging method is disturbed in water transfer the most according to claim 1 and 2, it is characterised in that: reinforced concrete stake diameter 0.8-1 rice, Highly 14-15 rice, aerial parts 1 meter, under ground portion 13-14 rice.
CN201610666602.XA 2016-08-15 2016-08-15 Husky dredging method is disturbed in water transfer Pending CN106192874A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610666602.XA CN106192874A (en) 2016-08-15 2016-08-15 Husky dredging method is disturbed in water transfer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610666602.XA CN106192874A (en) 2016-08-15 2016-08-15 Husky dredging method is disturbed in water transfer

Publications (1)

Publication Number Publication Date
CN106192874A true CN106192874A (en) 2016-12-07

Family

ID=57521420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610666602.XA Pending CN106192874A (en) 2016-08-15 2016-08-15 Husky dredging method is disturbed in water transfer

Country Status (1)

Country Link
CN (1) CN106192874A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002088472A1 (en) * 2001-05-02 2002-11-07 Tom Jacobsen Method for the removal of sediment from sand traps
CN2758332Y (en) * 2004-09-25 2006-02-15 牛长喜 Sludge cleaner for river channel tubulent sand
CN101429773A (en) * 2008-12-05 2009-05-13 郑星昱 Sand disturbance system and method
CN203144962U (en) * 2013-03-22 2013-08-21 华北水利水电学院 Low-power-consumption current guiding type channel sand disturbance dredging system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002088472A1 (en) * 2001-05-02 2002-11-07 Tom Jacobsen Method for the removal of sediment from sand traps
CN2758332Y (en) * 2004-09-25 2006-02-15 牛长喜 Sludge cleaner for river channel tubulent sand
CN101429773A (en) * 2008-12-05 2009-05-13 郑星昱 Sand disturbance system and method
CN203144962U (en) * 2013-03-22 2013-08-21 华北水利水电学院 Low-power-consumption current guiding type channel sand disturbance dredging system

Similar Documents

Publication Publication Date Title
Bruun et al. Natural by-passing of sand at coastal inlets
CN104480914B (en) The fish pass structure that fish pass combines with ship lock and method
CN101581086B (en) Positioning riprapping method for constructing island breakwater of artificial island
CN105667727B (en) A kind of immersed tunnelling method tunnel cube transportation ship formation method
CN101666097B (en) Positioning settlement method of large steel suspension box or sinking well
CN106759407A (en) A kind of method of cofferdam transportation by driving positioning
US11041280B2 (en) Device for a sediment transfer in waters, and also a method for a transfer of sediment in waters
CN103161139B (en) Integrally assembled type flow guiding screen and construction method thereof
CN204491693U (en) Long distance blast system
CN202969343U (en) Diffusion device in discharging thick seawater into sea
CN106192874A (en) Husky dredging method is disturbed in water transfer
CN102561260A (en) Water-permeable waterway improvement spur dike
CN202865812U (en) Flow-isolating structure of ship-lock approach channels
CN207644576U (en) A kind of channel marking ship of anti-floating material winding
CN204097978U (en) A kind of device utilizing jet attracting
CN204875721U (en) Diversion tunnel outlet energy dissipation device
CN1293288A (en) Method for dedicated apparatus for harnessing rivers
CN103437356B (en) A kind of piling mechanism for the narrow shallow water area pile sinking of bundle waterborne
CN102912761B (en) Wind force dredging method for river
CN102877476B (en) Positioning and constructing method of steel cofferdam
CN206486866U (en) A kind of waterway revetment wave absorption pilotage device
CN203049534U (en) Integral assembly type river diversion screen
CN203346942U (en) Dredging system of excavated basin
CN102758555B (en) Safety device for crossing tower and anchor tower of power transmission line
CN207814644U (en) Submarine pipeline pipe crimping laying apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication