CN106167163B - A kind of circulatory system and method for four pusher furnace of atmosphere protection - Google Patents
A kind of circulatory system and method for four pusher furnace of atmosphere protection Download PDFInfo
- Publication number
- CN106167163B CN106167163B CN201610571938.8A CN201610571938A CN106167163B CN 106167163 B CN106167163 B CN 106167163B CN 201610571938 A CN201610571938 A CN 201610571938A CN 106167163 B CN106167163 B CN 106167163B
- Authority
- CN
- China
- Prior art keywords
- push plate
- platform
- cabin
- pushed
- transfer chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G37/00—Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Tunnel Furnaces (AREA)
Abstract
The invention discloses a kind of circulatory system of four pusher furnace of atmosphere protection, including four pusher furnaces, the entrance of four pusher furnaces is provided with transfer chamber, and transfer chamber is docked with cleaning cabin, and cleaning cabin includes four push plate positions in two column arrangement of two rows;Horizontal to send platform include four push plate positions being set side by side, and the temporary storage platform includes two push plate positions being arranged in juxtaposition.The present invention further correspondingly discloses a kind of round-robin method, including S01, push plate is pushed into temporary storage platform from conveying roller line;S02, by temporary storage platform and the horizontal push plate sent on platform at the same be pushed into cleaning cabin in;S03, cleaning cabin inner pushing plate is pushed into transfer chamber, is arranged in juxtaposition four in transfer chamber push plates, and be pushed into four pusher furnaces simultaneously;S04, four push plates of four pusher furnaces are pushed out in the transfer chamber in exit, then be pushed into cleaning cabin, finally the push plate cleaned in cabin is pushed out on conveying roller line.The circulatory system and method for the invention all has the advantages that improving production efficiency.
Description
Technical field
The invention mainly relates to sintering technology fields, refer in particular to the circulatory system and method for a kind of four pusher furnace of atmosphere protection.
Background technique
Along with the rapid development of new energy industry, lithium battery industry becomes hot spot now, and lithium battery material is
Determine the key factor of its performance.The demand of lithium battery material increased dramatically, and be badly in need of efficient large-scale industrial production.It pushes away
Slab furnace is common continous way agglomerating plant in a kind of lithium battery material preparation field.Existing lithium battery material seals pusher furnace master
It will be based on single push plate and double pusher furnaces, it has recently also been proposed that three sealing pusher furnaces, but always there are no proposed that four pushed away
The sealing pusher furnace of plate.In order to meet the new energy market demand, the yield of pusher furnace production lithium battery material is improved, to reduce
Associated production cost, therefore, four push plate atmosphere protection pusher furnaces have the huge market demand.
Equipment is brought to the four pusher furnace circulatory systems of exploitation in order to solve traditional pusher furnace circulatory system control method at present
The difficulty of manufacture processing, assembly, transport and occupied area develops one kind and is applied to four pusher furnace circulatory system control methods, energy
Enough evade those difficulties, greatly enhances the reliability and stability of the pusher furnace circulatory system.
Traditional pusher furnace circulatory system control method successively send push plate from outer circulation line simply by oil cylinder to entrance is horizontal
Frame, entrance cleaning cabin, inlet transforms cabin, furnace body, outlet transition cabin, outlet cleaning cabin and outlet is horizontal send frame mobile, finally return that
Onto outer circulation line.Each station oil cylinder only carries out push plate movement in a cycle period.Traditional pusher furnace circulation
Control system is simple, but causes pusher furnace circulatory system device structure huge, to device fabrication, assembles and copy mechanically promotion difficulty,
And keep workshop utilization efficiency very low.Therefore, large-scale four push plate atmosphere can not be applied to based on traditional pusher furnace circulatory system to protect
Pusher furnace is protected, the production requirement for making pusher furnace production capacity be unable to satisfy existing customer to equipment causes pusher furnace gradually by roller furnace
Substitution.And pusher furnace has some exclusive advantages such as: equipment maturation failure rate is low, product sintering one is straightforward good, required matches
Set manual labor is few, equipment energy consumption is low, also gradually becomes development bottleneck by production capacity limitation.
Summary of the invention
The technical problem to be solved in the present invention is that, for technical problem of the existing technology, the present invention provides one
The circulatory system of small four pusher furnace of atmosphere protection of kind high production efficiency, occupied area, and a kind of high production efficiency is accordingly provided
Four pusher furnace of atmosphere protection round-robin method.
In order to solve the above technical problems, technical solution proposed by the present invention are as follows:
A kind of circulatory system of four pusher furnace of atmosphere protection, including four pusher furnaces, two cleaning cabins, two it is horizontal send platform,
Two temporary storage platforms and a conveying roller line, the entrance of four pusher furnace are provided with transfer chamber, and the transfer chamber includes
It four push plate positions arranged side by side and is connected to each other with four delivery tracks of four pusher furnace;The four pusher furnaces entrance
Transfer chamber dock with cleaning cabin, and the cleaning cabin includes the four push plate positions arranged in two column of two rows, in the transfer chamber
Four push plate positions are then arranged in juxtaposition with a column push plate position in cleaning cabin;It is described that horizontal to send platform include four push plates being set side by side
Position, the temporary storage platform include two push plate positions being arranged in juxtaposition, the adjacent push plate position of the horizontal two of them for sending platform with
Temporary storage platform be arranged side by side after with the cleaning cabin side-by-side docking, by for simultaneously side by side between the adjacent push plate position of another two
The conveying roller line for conveying two push plates is connected to each other.
As a further improvement of the above technical scheme:
Horizontal send is provided on platform, cleaning cabin, temporary storage platform and transfer chamber for push plate to be pushed into next work
The propulsion assembly of position.
The propulsion assembly is telescopic oil cylinder or telescopic cylinder.
It is provided with scoreboard component in the transfer chamber of four pusher furnace inlet, for will linearly arrange in transfer chamber
Push plate be divided into two groups and be aligned with the delivery track of four pusher furnaces.
The cleaning cabin of four pusher furnace inlet and the temporary storage platform horizontal send platform successively to dock;Four push plate
It is successively docked with the platform sidewards, temporary storage platform in cleaning cabin at outlet of still.
The interface that the cleaning cabin is docked with transfer chamber is provided with inner gate, and another interface is provided with flood tide gate, institute
Stating inner gate and flood tide gate mutual cooperation makes to seal in cleaning cabin to carry out washing and cleaning operation.
The invention also discloses a kind of round-robin method of circulatory system based on four pusher furnace of atmosphere protection as described above,
The following steps are included:
Push plate is sent platform to be pushed into temporary storage platform by S01, beginning from conveying roller line through four the horizontal of pusher furnace inlet;
S02, by two push plates in temporary storage platform and horizontal two push plate positions being arranged side by side on platform with temporary storage platform are sent
On push plate simultaneously be pushed into cleaning cabin in, complete washing and cleaning operation;
S03, cleaning cabin inner pushing plate is divided into two column, is pushed in turn to transfer chamber, makes four push plates in transfer chamber simultaneously
Column arrangement, and four push plates are pushed on four delivery tracks being arranged in juxtaposition of four pusher furnaces simultaneously;
S04, four push plates on four delivery tracks of four pusher furnaces are pushed out in the transfer chamber in exit, and are divided to two
Group is pushed in turn in cleaning cabin in two column arrangement of two rows, then by the push plate cleaned in cabin while being pushed out to temporary storage platform and horizontal sending
On platform, then platform is sent successively to be pushed out on conveying roller line through horizontal.
As a further improvement of the above technical scheme:
The detailed process of the step S01 are as follows: be pushed by two push plates being set side by side on the conveying roller line
Four pusher furnace inlet are horizontal when sending on the push plate position being arranged side by side on platform with cleaning cabin, at the same by it is horizontal send on platform with cleaning cabin
The push plate on two push plate positions being arranged side by side is pushed into temporary storage platform.
The detailed process of the step S03 are as follows: push away two push plates cleaned on push plate position arranged side by side with transfer chamber in cabin
Enter to transfer chamber, while another two push plate in cabin will be cleaned and be pushed on two push plate positions arranged side by side with transfer chamber, then be pushed into
To transfer chamber, and it is arranged in parallel at four push plates in transfer chamber on four push plate positions.
The detailed process of the step S04 are as follows:
S41, four push plates on four delivery tracks of four pusher furnaces are pushed out in the transfer chamber in exit;
S42, it will be pushed into the adjacent two pieces of push plates in cleaning cabin in transfer chamber and be arranged in juxtaposition in cleaning cabin with transfer chamber
On push plate position, then it is pushed on the cleaning another column push plate in cabin position;Two pieces of push plates another in transfer chamber are pushed into cleaning cabin simultaneously
On the push plate position being arranged in juxtaposition with transfer chamber;
S43, it will clean and be pushed into temporary storage platform simultaneously in four push plates of two column arrangement of two rows in cabin and horizontal send on platform
On the push plate position being arranged in juxtaposition with cleaning cabin;
S44, by the horizontal push plate sent on platform be pushed into it is horizontal send on platform another two push plate position, while will be in temporary storage platform
Push plate be pushed into it is horizontal send on platform, then the horizontal push plate sent on platform is successively pushed out on conveying roller line.
Compared with the prior art, the advantages of the present invention are as follows:
The circulatory system of four pusher furnace of atmosphere protection of the invention, due to using four pusher furnaces and matched entrance cabin
Position forms the four push plate circulatory systems, substantially increases production efficiency;Simultaneously to the rational deployment of each freight space, greatly reduces and follow
The area occupied of loop system.The round-robin method of four pusher furnace of atmosphere protection of the invention, what is promoted simultaneously using double push plates
On the basis of, while making to cooperate linkage between each station, substantially increase production efficiency.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is push plate circulation figure of the invention.
Figure label indicates: 1, conveying roller line;2, entrance is horizontal send platform;3, entrance temporary storage platform;4, entrance cleans cabin;5,
Inlet transforms cabin;51, the first scoreboard component;6, four pusher furnace;7, outlet transition cabin;71, the second scoreboard component;8, outlet cleaning
Cabin;9, temporary storage platform is exported;10, outlet is horizontal send platform;11, flood tide gate;12, inner gate;101, the first propelling cylinder;102,
Two propelling cylinders;103, third propelling cylinder;104, the 4th propelling cylinder;105, the 5th propelling cylinder;106, the 6th oil is promoted
Cylinder;107, the 7th propelling cylinder;108, the 8th propelling cylinder;109, the 9th propelling cylinder;110, the tenth propelling cylinder.
Specific embodiment
Below in conjunction with Figure of description and specific embodiment, the invention will be further described.
As depicted in figs. 1 and 2, the circulatory system of four pusher furnace of atmosphere protection of the present embodiment, including four pusher furnaces 6, enter
Mouth, which cleans cabin 4, cabin 8 is cleaned in outlet, entrance is horizontal send platform 2, outlet are horizontal send platform 10, entrance temporary storage platform 3, export temporary storage platform
9 and conveying roller line 1, the entrance of four pusher furnaces 6 is provided with inlet transforms cabin 5, and outlet is provided with outlet transition cabin 7, inlet transforms
Cabin 5 and outlet transition cabin 7 include four push plate positions arranged side by side and are connected to each other with four delivery tracks of four pusher furnaces 6;
Inlet transforms cabin 5 is docked with entrance cleaning cabin 4, and outlet cleaning cabin 8 is docked with outlet cleaning cabin 8, and it is clear that entrance cleans cabin 4 and outlet
Washing of tanks 8 includes four push plate positions, is arranged in two column of two rows, as shown in Figure 1, being laterally row, vertical is column, and wherein entrance cleans
Cabin 4 and outlet cleaning cabin 8 in wherein a column push plate position be arranged in juxtaposition with the push plate position in corresponding transfer chamber it is (vertical in same
On straight line);Entrance is horizontal to send platform 2 and outlet are horizontal to send platform 10 including four push plate positions being set side by side, two of them push plate
Position is located on conveying roller line 1, i.e., entrance is horizontal send platform 2 and outlet horizontal send to be docked between platform 10 by conveying roller line 1, enters
The horizontal another two for sending platform 2 of mouth is pushed away and is docked after bottle position is then arranged side by side with entrance temporary storage platform 3 with entrance cleaning cabin 4, and outlet is horizontal
It send the another two of platform 10 to push away after bottle position is then arranged side by side with outlet temporary storage platform 9 to dock with outlet cleaning cabin 8, wherein entrance is temporary
It deposits platform 3 and outlet temporary storage platform 9 includes at least two push plate positions being arranged in juxtaposition.Four pusher furnace of atmosphere protection of the invention
The circulatory system be able to carry out four due to being matched using corresponding with the entrance freight space of four pusher furnace 6 of atmosphere protection and push away
Plate operation simultaneously, substantially increases production efficiency;In addition, the reasonable Arrangement more than passing through between each platform and freight space, it can
Greatly reduce the area occupied of system.
In the present embodiment, entrance is horizontal to send platform 2, entrance cleaning cabin 4, entrance temporary storage platform 3, inlet transforms cabin 5, outlet horizontal
Send platform 10, outlet cleaning cabin 8, outlet temporary storage platform 9, outlet transition cabin 7, outlet it is horizontal send be provided on platform 10 for will
Push plate is pushed into the propulsion assembly of next station, including for realizing the first mobile propelling cylinder 101 of push plate on conveying roller line 1,
For realizing horizontal the second propelling cylinder 102 for sending push plate on platform 2 mobile of entrance, for sending 2 push plate of platform to be pushed into for entrance is horizontal
To entrance temporary storage platform 3 or the third propelling cylinder 103 in entrance cleaning cabin 4;For by entrance cleaning cabin 4 push plate be pushed into
4th propelling cylinder 104 of mouth transfer chamber 5, the 5th propelling cylinder 105 for realizing entrance cleaning 4 inner pushing plate of cabin movement, use
In push plate on inlet transforms cabin 5 to be pushed into the 6th propelling cylinder 106 of four pusher furnaces 6, is used for the push plate in outlet transition cabin 7
It is pushed into the 7th propelling cylinder 107 in outlet cleaning cabin 8, is pushed into export for will export push plate on cleaning cabin 8 and horizontal send platform
10 and outlet temporary storage platform 9 the 8th propelling cylinder 108, for that will export horizontal two push plates on platform 10 is sent to be pushed into another two
9th propelling cylinder 109 of push plate position and outlet is pushed into for push plate in temporary storage platform 9 will to be exported horizontal send on platform 10
Tenth propelling cylinder 110;Wherein propulsion assembly may be telescopic cylinder.By the setting of the above propulsion assembly, can guarantee
Push plate orderly circulates on each station, while structure is simple, is easily achieved.
In the present embodiment, the entrance of four pusher furnaces, 6 inlet cleaning cabin 4 and entrance temporary storage platform 3, entrance is horizontal send platform 2
Successively dock;Four pusher furnaces, 6 exit outlet cleaning cabin 8 with export it is horizontal send platform 10, export temporary storage platform 9 successively dock.
It is provided with the first scoreboard component 51 in the inlet transforms cabin 5 of other four pusher furnaces, 6 inlet, for that will be in inlet transforms cabin 5
The push plate linearly arranged is divided into two groups and is aligned with the delivery track of four pusher furnaces 6;In addition is provided on outlet transition cabin 7
Quarter stuff component 71, for separating push plate with the intracorporal push plate of four pusher furnaces, 6 furnace, wherein 51 He of the first scoreboard component
Second scoreboard component 71 is telescopic oil cylinder or telescopic cylinder.
In the present embodiment, the interface and outlet that entrance cleaning cabin 4 is docked with inlet transforms cabin 5 clean cabin 8 and go out to make a slip of the tongue
It crosses at 7 docking of cabin and is provided with inner gate 12, another interface is then correspondingly provided with flood tide gate 11, inner gate 12 and flood tide gate 11
Mutual cooperation, which makes to clean in cabin, to be sealed to carry out washing and cleaning operation.
The invention also discloses a kind of round-robin method of circulatory system based on four pusher furnace of atmosphere protection as described above,
The following steps are included:
Push plate is sent platform to be pushed into temporary storage platform by S01, beginning from conveying roller line 1 through the horizontal of four pusher furnaces, 6 inlet;
S02, by two push plates in temporary storage platform and horizontal two push plate positions being arranged side by side on platform with temporary storage platform are sent
On push plate simultaneously be pushed into cleaning cabin in, complete washing and cleaning operation;
S03, cleaning cabin inner pushing plate is divided into two column, is pushed in turn to transfer chamber, makes four push plates in transfer chamber simultaneously
Column arrangement, and four push plates are pushed on four delivery tracks being arranged in juxtaposition of four pusher furnaces 6 simultaneously;
S04, four push plates on four delivery tracks of four pusher furnaces 6 are pushed out in the transfer chamber in exit, and point
Two groups are pushed in turn in cleaning cabin to be pushed out to temporary storage platform and cross simultaneously in two column arrangement of two rows, then by the push plate cleaned in cabin
It send on platform, then send platform to be successively pushed out on conveying roller line 1 through horizontal.
The round-robin method of four pusher furnace of atmosphere protection of the invention, on the basis of being promoted simultaneously using double push plates, together
When make to cooperate linkage between each station, upper and lower station links simultaneously, can guarantee four pusher furnaces 6 simultaneously there are four push plate entrance,
Substantially increase production efficiency;The setting of temporary storage platform makes push plate four entered in cleaning cabin every time, is further ensured that
Production efficiency.
In the present embodiment, the detailed process of step S01 are as follows: pushed away by two push plates being set side by side on conveying roller line 1
When entering to four pusher furnaces, 6 inlet is horizontal to send on platform on the push plate position that is arranged side by side of cleaning cabin, at the same by it is horizontal send on platform with
The push plate on two push plate positions that cleaning cabin is arranged side by side is pushed into temporary storage platform.
In the present embodiment, the detailed process of step S03 are as follows: two on push plate position arranged side by side with transfer chamber in cabin will be cleaned
Push plate is pushed into transfer chamber, while will be cleaned another two push plate in cabin and being pushed on two push plate positions arranged side by side with transfer chamber,
It is pushed into transfer chamber again, and is arranged in parallel at four push plates in transfer chamber on four push plate positions.
In the present embodiment, the detailed process of step S04 are as follows:
S41, four push plates on four delivery tracks of four pusher furnaces 6 are pushed out in the transfer chamber in exit;
S42, it will be pushed into the adjacent two pieces of push plates in cleaning cabin in transfer chamber and be arranged in juxtaposition in cleaning cabin with transfer chamber
On push plate position, then it is pushed on the cleaning another column push plate in cabin position;Two pieces of push plates another in transfer chamber are pushed into cleaning cabin simultaneously
On the push plate position being arranged in juxtaposition with transfer chamber;
S43, it will clean and be pushed into temporary storage platform simultaneously in four push plates of two column arrangement of two rows in cabin and horizontal send on platform
On the push plate position being arranged in juxtaposition with cleaning cabin;
S44, by the horizontal push plate sent on platform be pushed into it is horizontal send on platform another two push plate position, while will be in temporary storage platform
Push plate be pushed into it is horizontal send on platform, then the horizontal push plate sent on platform is successively pushed out on conveying roller line 1.
Specific method process are as follows: the 1 first row push plate of conveying roller line by the second propelling cylinder 102 be pushed into entrance it is horizontal send it is flat
After platform 2, the second propelling cylinder 102 retracts original position;First propelling cylinder 101 is by second row push plate to the first row push plate before
Position, while first row push plate is sent in entrance temporary storage platform 3 by third propelling cylinder 103, third propelling cylinder 103 is retracted;
Then first row push plate corresponding on conveying roller line 1 is shifted onto entrance is horizontal to be sent on platform 2 by the second propelling cylinder 102 simultaneously, and second
Propelling cylinder 102 is retracted;
Entrance clean cabin 4 flood tide gate 11 open, third propelling cylinder 103 by entrance temporary storage platform 3 and entrance it is horizontal send it is flat
Four pieces of push plates on platform 2 are pushed into entrance cleaning cabin 4 simultaneously, and then flood tide gate 11 is closed, and entrance cleans the start-up operation displacement of cabin 4
Gas;
The inner gate 12 that entrance cleans cabin 4 is opened, and the 4th propelling cylinder 104 promotes front-seat push plate in inlet transforms cabin 5,
Entrance is cleaned right column push plate in cabin 4 and shifts left column position by the 5th propelling cylinder 105 later, then is pushed away by the 4th propelling cylinder 104
Plate shifts final position onto, and entrance inner gate 12 is closed;
Connected four pieces of push plates are divided into two groups by the first scoreboard oil cylinder, and corresponding with the intracorporal delivery track position of furnace, right
Four the 6th propelling cylinders 106 answered are by four pieces of push plates while being sent into furnace body;
Second scoreboard oil cylinder separates first row push plate with the intracorporal push plate of furnace, the outlet cleaning corresponding inner gate 12 in cabin 8
Open, the 7th propelling cylinder 107 by four pieces of push plates preceding two pieces of push plates push-in outlet clear the ship in, the 8th propelling cylinder 108 will
Left column push plate is pushed ahead to right column position in cleaning cabin, and remaining two pieces of push plates are pushed into out by the 7th propelling cylinder 107 at this time
In mouth cleaning cabin 8, outlet inner gate 12 is closed;
The outlet cleaning corresponding flood tide gate 11 in cabin 8 is opened, and it is horizontal that four pieces of push plates are shifted onto outlet by the 8th propelling cylinder 108 simultaneously
Platform 10 and outlet temporary storage platform 9 are sent, the outlet cleaning corresponding flood tide gate 11 in cabin 8 is closed;
9th propelling cylinder 109 will export it is horizontal send push plate on platform 10 to be sent on conveying roller line 1, export temporary storage platform 9 on
Push plate again by the tenth propelling cylinder 110 push to export it is horizontal send platform 10, be just engaged togather with initial step at this time so that
It exports the horizontal push plate for sending platform 10 and is just fed again into conveying roller line 1.
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment,
All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention should be regarded as protection of the invention
Range.
Claims (5)
1. a kind of circulatory system of four pusher furnace of atmosphere protection, which is characterized in that including four pusher furnaces (6), two cleanings cabins, two
It is a it is horizontal send platform, two temporary storage platforms and a conveying roller line (1), the entrance of four pusher furnace (6) is provided with transition
Cabin, the transfer chamber include four push plate positions arranged side by side and are connected to each other with four delivery tracks of four pusher furnace (6);
The transfer chamber of four pusher furnace (6) entrance is docked with cleaning cabin, and the cleaning cabin includes four in two column arrangement of two rows
A push plate position, four push plate positions in the transfer chamber are then arranged in juxtaposition with a column push plate position in cleaning cabin;It is described horizontal to send platform
The push plate position being set side by side including four, the temporary storage platform include two push plate positions being arranged in juxtaposition, the horizontal platform that send
The adjacent push plate position of two of them and temporary storage platform be arranged side by side after with the cleaning cabin side-by-side docking, the adjacent push plate of another two
By for the conveying roller line (1) of two push plates of conveying to be connected to each other side by side simultaneously between position;Four pusher furnace (6) inlet
Cleaning cabin and the temporary storage platform horizontal send platform successively to dock;It horizontal is sent with described in the cleaning cabin in four pusher furnace (6) exit
Platform, temporary storage platform are successively docked;It is provided with scoreboard component in the transfer chamber of four pusher furnace (6) inlet, is used for mistake
The push plate linearly arranged in cabin is crossed to be divided into two groups and be aligned with the delivery track of four pusher furnaces (6);The cleaning cabin and mistake
Cross cabin docking interface be provided with inner gate (12), another interface is provided with flood tide gate (11), the inner gate (12) with
Flood tide gate (11) mutual cooperation, which makes to clean in cabin, to be sealed to carry out washing and cleaning operation.
2. the circulatory system of four pusher furnace of atmosphere protection according to claim 1, which is characterized in that it is described it is horizontal send platform,
The propulsion assembly for push plate to be pushed into next station is provided on cleaning cabin, temporary storage platform and transfer chamber.
3. the circulatory system of four pusher furnace of atmosphere protection according to claim 2, which is characterized in that the propulsion assembly is
Telescopic oil cylinder or telescopic cylinder.
4. a kind of circulation side based on the circulatory system of four pusher furnace of atmosphere protection described in any one of claims 1 to 3
Method, which comprises the following steps:
Push plate is sent platform to be pushed into temporary storage platform by S01, beginning from conveying roller line (1) through the horizontal of four pusher furnaces (6) inlet;
S02, it by two push plates in temporary storage platform and horizontal send on two push plate positions being arranged side by side on platform with temporary storage platform
Push plate is pushed into simultaneously in cleaning cabin, completes washing and cleaning operation;
S03, cleaning cabin inner pushing plate is divided into two column, is pushed in turn to transfer chamber, makes four push plate cloth arranged side by side in transfer chamber
It sets, and four push plates is pushed on four delivery tracks being arranged in juxtaposition of four pusher furnaces (6) simultaneously;
S04, four push plates on four delivery tracks of four pusher furnaces (6) are pushed out in the transfer chamber in exit, and are divided to two
Group is pushed in turn in cleaning cabin in two column arrangement of two rows, then by the push plate cleaned in cabin while being pushed out to temporary storage platform and horizontal sending
On platform, then platform is sent successively to be pushed out on conveying roller line (1) through horizontal;
The detailed process of the step S01 are as follows: two push plates being set side by side on the conveying roller line (1) are being pushed into four
Pusher furnace (6) inlet is horizontal when sending on the push plate position being arranged side by side on platform with cleaning cabin, at the same by it is horizontal send on platform with cleaning
The push plate on two push plate positions that cabin is arranged side by side is pushed into temporary storage platform;
The detailed process of the step S03 are as follows: be pushed into two push plates cleaned on push plate position arranged side by side with transfer chamber in cabin
In transfer chamber, while another two push plate in cabin will be cleaned and be pushed on two push plate positions arranged side by side with transfer chamber, then be pushed into
It crosses in cabin, and is arranged in parallel at four push plates in transfer chamber on four push plate positions.
5. the round-robin method of the circulatory system of four pusher furnace of atmosphere protection according to claim 4, which is characterized in that described
The detailed process of step S04 are as follows:
S41, four push plates on four delivery tracks of four pusher furnaces (6) are pushed out in the transfer chamber in exit;
S42, two pieces of push plates adjacent with cleaning cabin in transfer chamber are pushed into the push plate being arranged in juxtaposition in cleaning cabin with transfer chamber
On position, then it is pushed on the cleaning another column push plate in cabin position;Simultaneously by two pieces of push plates another in transfer chamber be pushed into cleaning cabin in and mistake
It crosses on the push plate position that cabin is arranged in juxtaposition;
S43, will clean in cabin in four push plates of two column arrangement of two rows be pushed into simultaneously temporary storage platform and it is horizontal send on platform with it is clear
On the push plate position that washing of tanks is arranged in juxtaposition;
S44, by the horizontal push plate sent on platform be pushed into it is horizontal send on platform another two push plate position, while by the push plate in temporary storage platform
Be pushed into it is horizontal send on platform, then the horizontal push plate sent on platform is successively pushed out on conveying roller line (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610571938.8A CN106167163B (en) | 2016-07-20 | 2016-07-20 | A kind of circulatory system and method for four pusher furnace of atmosphere protection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610571938.8A CN106167163B (en) | 2016-07-20 | 2016-07-20 | A kind of circulatory system and method for four pusher furnace of atmosphere protection |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106167163A CN106167163A (en) | 2016-11-30 |
CN106167163B true CN106167163B (en) | 2019-06-11 |
Family
ID=58065376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610571938.8A Active CN106167163B (en) | 2016-07-20 | 2016-07-20 | A kind of circulatory system and method for four pusher furnace of atmosphere protection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106167163B (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB354717A (en) * | 1930-04-07 | 1931-08-07 | Scovill Manufacturing Co | Improvements in and relating to billet heating furnaces |
DE2446566A1 (en) * | 1973-10-12 | 1975-04-17 | Metallurgie Francaise | SINTER FURNACE |
CN2627437Y (en) * | 2003-04-07 | 2004-07-21 | 张贵洲 | Continuous push-plate kiln with silicon-molybdenum rod and hydrogen-nitrogen protection |
CN201935555U (en) * | 2011-03-02 | 2011-08-17 | 湖南摩根海容新材料有限责任公司 | Tunnel-type kiln |
CN202329090U (en) * | 2011-11-16 | 2012-07-11 | 宜兴市前锦炉业设备有限公司 | Special hydrogen push-palate furnace for LED (light-emitting diode) fluorescent material |
CN203375835U (en) * | 2013-05-30 | 2014-01-01 | 苏州博涛机电设备有限公司 | Pushing plate furnace cutting-off mechanism |
CN203605735U (en) * | 2013-11-14 | 2014-05-21 | 湖南红太阳光电科技有限公司 | Industry pushing plate kiln circulation feeding device |
CN203699242U (en) * | 2013-12-04 | 2014-07-09 | 楚天科技股份有限公司 | Material conveying platform and freeze-drying line mobile type material feeding and discharging system |
CN203771985U (en) * | 2014-03-24 | 2014-08-13 | 中国电子科技集团公司第四十八研究所 | Double push plate type protective atmosphere sintering kiln |
CN204063920U (en) * | 2014-07-16 | 2014-12-31 | 衢州奥仕特照明有限公司 | A kind of kiln push plate pipeline |
CN204787777U (en) * | 2015-05-25 | 2015-11-18 | 天津华夏泓源实业有限公司 | Lithium battery powder material sintering is with full -automatic pair of push pedal resistance furnace |
CN105444565A (en) * | 2015-12-04 | 2016-03-30 | 中国电子科技集团公司第四十八研究所 | Transition sealed cabin applied to atmosphere protection roller kiln |
-
2016
- 2016-07-20 CN CN201610571938.8A patent/CN106167163B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB354717A (en) * | 1930-04-07 | 1931-08-07 | Scovill Manufacturing Co | Improvements in and relating to billet heating furnaces |
DE2446566A1 (en) * | 1973-10-12 | 1975-04-17 | Metallurgie Francaise | SINTER FURNACE |
CN2627437Y (en) * | 2003-04-07 | 2004-07-21 | 张贵洲 | Continuous push-plate kiln with silicon-molybdenum rod and hydrogen-nitrogen protection |
CN201935555U (en) * | 2011-03-02 | 2011-08-17 | 湖南摩根海容新材料有限责任公司 | Tunnel-type kiln |
CN202329090U (en) * | 2011-11-16 | 2012-07-11 | 宜兴市前锦炉业设备有限公司 | Special hydrogen push-palate furnace for LED (light-emitting diode) fluorescent material |
CN203375835U (en) * | 2013-05-30 | 2014-01-01 | 苏州博涛机电设备有限公司 | Pushing plate furnace cutting-off mechanism |
CN203605735U (en) * | 2013-11-14 | 2014-05-21 | 湖南红太阳光电科技有限公司 | Industry pushing plate kiln circulation feeding device |
CN203699242U (en) * | 2013-12-04 | 2014-07-09 | 楚天科技股份有限公司 | Material conveying platform and freeze-drying line mobile type material feeding and discharging system |
CN203771985U (en) * | 2014-03-24 | 2014-08-13 | 中国电子科技集团公司第四十八研究所 | Double push plate type protective atmosphere sintering kiln |
CN204063920U (en) * | 2014-07-16 | 2014-12-31 | 衢州奥仕特照明有限公司 | A kind of kiln push plate pipeline |
CN204787777U (en) * | 2015-05-25 | 2015-11-18 | 天津华夏泓源实业有限公司 | Lithium battery powder material sintering is with full -automatic pair of push pedal resistance furnace |
CN105444565A (en) * | 2015-12-04 | 2016-03-30 | 中国电子科技集团公司第四十八研究所 | Transition sealed cabin applied to atmosphere protection roller kiln |
Also Published As
Publication number | Publication date |
---|---|
CN106167163A (en) | 2016-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102534539B (en) | Double-plate or double-side film coating system | |
CN106207271B (en) | Lithium ion battery baking and liquid injection system and method | |
CN105217204B (en) | Integrated processing system is matched somebody with somebody in one kind storage | |
CN101892336A (en) | Coal-gas recovering process and device of charging, equalizing and bleeding of blast furnace | |
CN102337364A (en) | Device for recovering coal gas in equalizing and relieving process of furnace top of blast furnace | |
CN205062095U (en) | Blast furnace furnace roof material jar diffuses gas purifying, recovery system | |
CN103112720A (en) | High pressure conveyance gas recovery method | |
CN106167163B (en) | A kind of circulatory system and method for four pusher furnace of atmosphere protection | |
CN104610997A (en) | Rubber cracking and refining equipment and method | |
CN108165693A (en) | Coupling method and system for charging bucket pressure-equalizing gas recovery and blast furnace gas dry dust removal | |
CN105837060B (en) | The production equipment of continuous automatic production half tempered planar vacuum glass can be achieved | |
CN204727907U (en) | Drum process slag whole process treatment system | |
AU2007237233B2 (en) | Apparatus and method for conveying electrodeposited metal sheets | |
CN105059877B (en) | A kind of cover plate conveying mechanism | |
CN107702546B (en) | Sinter continuous cooling system | |
CN203740565U (en) | Material batched overturning and tightening mechanism | |
CN205771788U (en) | A kind of battery turnover mechanism | |
CN102382975B (en) | Reduction roasting system of iron ore | |
CN104560069A (en) | Coke quenching method and device for red cokes | |
CN106965990A (en) | Frame bottle feeding device of infusion bottle container loader | |
CN106315116B (en) | A kind of method of aluminium anode carbon block conveying | |
CN204198755U (en) | Coal injection nitrogen gas recovery device | |
CN206886060U (en) | One kind vacuumizes revolution detection line | |
CN105383845B (en) | A kind of depositing of sintered article raw material storehouse warehouse entry stacks transportation system | |
CN104016140A (en) | Return-type material taking system and material stacking and taking method for bridge-type roller material taking machines of raw material storage yard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201203 Address after: 410000, 1 / F, microelectronic equipment center building, 1025 xinkaipu Road, Tianxin District, Changsha City, Hunan Province Patentee after: Hunan ShuoKe thermal Intelligent Equipment Co.,Ltd. Address before: 410111, No. 1025, paving road, Tianxin District, Hunan, Changsha Patentee before: FORTY-EIGHTH RESEARCH INSTITUTE OF CHINA ELECTRONICS TECHNOLOGY Group Corp. |
|