CN106156957A - A kind of business risk appraisal procedure based on weight and system - Google Patents

A kind of business risk appraisal procedure based on weight and system Download PDF

Info

Publication number
CN106156957A
CN106156957A CN201610770871.0A CN201610770871A CN106156957A CN 106156957 A CN106156957 A CN 106156957A CN 201610770871 A CN201610770871 A CN 201610770871A CN 106156957 A CN106156957 A CN 106156957A
Authority
CN
China
Prior art keywords
risk
information
prime
light breeze
risk information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610770871.0A
Other languages
Chinese (zh)
Inventor
田振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadi Computer Group Co Ltd
Original Assignee
Huadi Computer Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadi Computer Group Co Ltd filed Critical Huadi Computer Group Co Ltd
Priority to CN201610770871.0A priority Critical patent/CN106156957A/en
Publication of CN106156957A publication Critical patent/CN106156957A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of business risk appraisal procedure based on weight, method includes: gather business risk information, with reference to enterprise's comprehensive budget index, classifies business risk information, respectively prime risk information and light breeze danger information;Determine each prime risk information weight for company's total benefit;By two dimensions, the light breeze danger in business risk information is carried out the evaluation that quantizes according to the trade or business evaluation criterion that each light breeze danger is corresponding respectively, and the product of two dimension figure of merit is the integrated level of light breeze danger;By the product of enterprise's light breeze danger integrated level Yu light breeze danger weight, for the comprehensive proportion grade of light breeze danger information;The comprehensive proportion grade of all light breeze danger each for enterprise prime risk comprised is weighted averagely, for the integrated level of enterprise's prime risk;By the product of enterprise's prime risk integrated level Yu prime risk weight, for the comprehensive proportion grade of prime risk information.

Description

A kind of business risk appraisal procedure based on weight and system
Technical field
The present invention relates to risk assessment, more particularly, to a kind of business risk appraisal procedure based on weight and system.
Background technology
In order to instruct enterprise to carry out EWRM work, improve enterprise management further, strengthen competition among enterprises Power, promotes enterprise's stable development, and State-owned Assets Supervision requires that central enterprise carries out EWRM work, builds risk management System.Business risk evaluation work is divided into Risk Identification, risk analysis, three steps of risk assessment.And require enterprise pair The every operational control of risk management initial information and enterprise and the important service flow process thereof collected carry out risk assessment.
Although the most commonly used methods of risk assessment is through practice in recent years relative maturity.According to being for many years Different enterprises make the experience of risk Management Advisory Services, current methods of risk assessment the application of enterprise there is also following deficiency it Place: including: initial information collection work is implemented not in place;The professional judgement ability of different personnel is not taken into account during risk assessment; Evaluation criterion excessively macroscopic view causes risk marking inaccurate;Risk assessment processes does not takes into full account that enterprise's multiple target is with multifactorial Dependency;Risk coordinate diagram can not reflect the excessive risk influence degree to operations objective of enterprise intuitively.
Summary of the invention
In order to solve the problems referred to above, the invention provides a kind of business risk appraisal procedure based on weight, described method Including:
Gather business risk information, with reference to enterprise's comprehensive budget index, described business risk information is classified, will enterprise Industry risk information is divided into two-stage, respectively prime risk information and light breeze danger information;Described prime risk information is by crucial wind Danger information decomposition is corresponding multiple light breeze dangers information;By prime risk information is compared to each other, sets up matrix and sentence Disconnected scale, determines each prime risk information weight for company's total benefit;
By the light breeze danger in described business risk information respectively according to the trade or business evaluation that each light breeze danger is corresponding Standard carries out, by two dimensions, the evaluation that quantizes, dimension be risk to corresponding service or the influence degree of operations objective, Figure of merit scope is 1 to 5;Another dimension is the probability that risk occurs, and figure of merit scope is 1 to 5;Said two is tieed up The integrated level that product is described light breeze danger of degree figure of merit;
Determine that light breeze danger is in affiliated prime risk according to light breeze danger relative to the significance level of affiliated prime risk Weight, all light breeze dangers weight sum that each prime risk comprises is 1;
By the product of described enterprise's light breeze danger integrated level Yu described light breeze danger weight, for described light breeze danger information Comprehensive proportion grade;
The comprehensive proportion grade of all light breeze danger described each prime risk comprised is weighted averagely, for one-level The integrated level of risk;By the product of prime risk integrated level Yu prime risk weight, combining for described prime risk information Composition and division in a proportion weight grade;
Set up the light breeze danger integrated level 25 grid X-Y scheme in described business risk information;
Set up the prime risk comprehensive proportion grade pie chart in described business risk information;
Scheme and pie chart by analyzing described 25 grid two grades, determine described enterprise emphasis risk information.
Preferably, described enterprise prime risk information for the determination of company's total benefit weight, including:
1 prime risk information front to described enterprise prime risk information and rear 1 prime risk information two-by-two than Relatively, and described judgement scale carrying out assignment, described judgement scale assigned result scope is 0 to 9;Described rear 1 prime risk Information and front 1 prime risk information are the inverse of described front 1 prime risk information and rear 1 prime risk information assignment; When described prime risk information is n item, described judgement scale assigned result is n*n rank matrixes;
Calculate the sum of the described n*n rank every string of matrix, and calculate the summation of described n column matrix;Wherein said n-th column matrix And the ratio of summation with described matrix, be the weight of the n-th prime risk item of information.
Preferably, described n prime risk item of information weight sum is 1.
Preferably, by the light breeze danger in described business risk information respectively according to business or the warp of each light breeze danger correspondence Battalion's evaluation criterion is included by the evaluation that carries out quantizing of two dimensions:
Wherein the influence degree evaluation to described risk includes, by light breeze danger to corresponding service or operations objective Influence degree sets qualitative or quantitative evaluation criterion, is evaluated the influence degree of described risk;Evaluate score value and be institute State the influence degree evaluation result of risk;
Wherein the probability evaluation to described risk includes, by probability is set qualitative or quantitative evaluation criterion, The probability of described risk is evaluated;Evaluate score value and be the probability evaluation result of described risk.
Based on another embodiment of the present invention, the present invention proposes a kind of business risk based on weight assessment system, institute The system of stating includes,
Business risk information unit, is used for gathering business risk information, with reference to enterprise's comprehensive budget index, to described enterprise Risk information is classified, and business risk information is divided into two-stage, respectively prime risk information and light breeze danger information;Described Prime risk information is corresponding multiple light breeze dangers information by key risk information decomposition;By prime risk information is carried out It is compared to each other, sets up matrix and judge scale, determine each prime risk information weight for company's total benefit;
Enterprise's light breeze danger assignment unit, by the light breeze danger in described business risk information respectively according to each light breeze danger Corresponding trade or business evaluation criterion carries out, by two dimensions, the evaluation that quantizes, and a dimension is that light breeze danger is to corresponding industry Business or the influence degree of operations objective, figure of merit scope is 1 to 5;Another dimension is the probability that risk occurs, and evaluates number Value scope is 1 to 5;The product of said two dimension figure of merit is the integrated level of described light breeze danger;
Determine that light breeze danger is in affiliated prime risk according to light breeze danger relative to the significance level of affiliated prime risk Weight, all light breeze dangers weight sum that each prime risk comprises is 1;
By the product of described enterprise's light breeze danger integrated level Yu described light breeze danger weight, for described light breeze danger information Comprehensive proportion grade;
The comprehensive proportion grade of all light breeze danger described each prime risk comprised is weighted averagely, for one-level The integrated level of risk;By the product of prime risk integrated level Yu prime risk weight, combining for described prime risk information Composition and division in a proportion weight grade;
Enterprise's light breeze danger image conversion unit, sets up light breeze danger integrated level 25 grid in described business risk information X-Y scheme;Set up the prime risk comprehensive proportion grade pie chart in described business risk information;
Enterprise's emphasis risk analysis unit, schemes and pie chart by analyzing described 25 grid two grades, determines described enterprise weight Point risk information.
Preferably, described enterprise prime risk information for the determination of company's total benefit weight, including:
1 prime risk information front to described enterprise prime risk information and rear 1 prime risk information two-by-two than Relatively, and described judgement scale carrying out assignment, described judgement scale assigned result scope is 0 to 9;Described rear 1 prime risk Information and front 1 prime risk information are the inverse of described front 1 prime risk information and rear 1 prime risk information assignment; When described prime risk information is n item, described judgement scale assigned result is n*n rank matrixes;
Calculate the sum of the described n*n rank every string of matrix, and calculate the summation of described n column matrix;Wherein said n-th column matrix And the ratio of summation with described matrix, be the weight of the n-th prime risk item of information.
Preferably, described n prime risk item of information weight sum is 1.
Preferably, by the light breeze danger in described business risk information respectively according to business or the warp of each light breeze danger correspondence Battalion's evaluation criterion is included by the evaluation that carries out quantizing of two dimensions:
Wherein the influence degree evaluation to described risk includes, by light breeze danger to corresponding service or operations objective Influence degree sets qualitative or quantitative evaluation criterion, is evaluated the influence degree of described risk;Evaluate score value and be institute State the influence degree evaluation result of risk;
Wherein the probability evaluation to described risk includes, by probability is set qualitative or quantitative evaluation criterion, The probability of described risk is evaluated;Evaluate score value and be the probability evaluation result of described risk.
The technical scheme that the application proposes, combines comprehensive budget, is referred to by comprehensive budget with Enterprise-Wide Total Risk Management Business risk information, as the foundation of classification of risks, is divided into prime risk, light breeze danger, calculates one simultaneously by the result that mark decomposes The level risk weight to company's overall goal, makes enterprise operation target fully be combined with classification of risks, risk assessment standard, this Shen Please the light breeze danger in business risk information was passed through according to the trade or business evaluation criterion that each light breeze danger is corresponding respectively Two dimensions carry out quantizing and evaluate to improve the degree of accuracy of risk assessment marking work.The application take into account in operation and management Multi-objects and multi-layers, multifactorial complication system relation.The scheme that the application proposes can draw risk collection of illustrative plates, and the application will The diagram of risk evaluation result is to add the design of pie chart on the basis of original grid collection of illustrative plates, makes business risk coordinate diagram energy Intuitively see the influence degree reflecting corporate level material risk to company's integrated operation target.
Accompanying drawing explanation
By reference to the following drawings, the illustrative embodiments of the present invention can be more fully understood by:
Fig. 1 is a kind of based on weight the business risk appraisal procedure flow chart according to embodiment of the present invention;
Fig. 2 is to assess system construction drawing according to a kind of business risk based on weight of embodiment of the present invention;
Fig. 3 is according to embodiment of the present invention enterprise prime risk schematic diagram;And
Fig. 4 is the comprehensive proportion grade pie chart of the prime risk in business risk information.
Detailed description of the invention
With reference now to accompanying drawing, introduce the illustrative embodiments of the present invention, but, the present invention can be by many different shapes Formula is implemented, and is not limited to embodiment described herein, it is provided that these embodiments are at large and fully disclose The present invention, and the scope of the present invention is fully passed on to person of ordinary skill in the field.For representing showing in the accompanying drawings Term in example embodiment is not limitation of the invention.In the accompanying drawings, identical cells/elements uses identical attached Figure labelling.
Except as otherwise noted, person of ordinary skill in the field is had by term used herein (including scientific and technical terminology) Common understand implication.Further it will be understood that the term limited with normally used dictionary, it should it is understood to and it The linguistic context of association area has consistent implication, and is not construed as Utopian or the most formal meaning.
Fig. 1 is a kind of based on weight the business risk appraisal procedure flow chart according to embodiment of the present invention.Such as Fig. 1 institute Showing method 100, business risk information, by decomposing enterprise's comprehensive budget index, is divided into prime risk and light breeze by the present invention Danger, and pass through the analytic hierarchy process (AHP) first order calculation risk weight relative to company's overall goal.The present invention focuses on risk information Collect and analyze.Corresponding service or the influence degree of operations objective, risk are occurred by the present invention by light breeze danger by risk Probability carries out assignment, it is thus achieved that the integrated level of light breeze danger.The integrated level of light breeze danger and light breeze danger are corresponding to affiliated The product of the weight of prime risk, for the comprehensive proportion grade of light breeze danger evaluation.The present invention is according to light breeze danger integrated level Result establishment corporate risk collection of illustrative plates.
Method 100 is initiated from 110, by step 110, gathers business risk information, with reference to enterprise's comprehensive budget index, right Business risk information is classified, and business risk information is divided into two-stage, respectively prime risk information and light breeze danger information. Prime risk information is corresponding multiple light breeze dangers information by key risk information decomposition.By prime risk information is carried out It is compared to each other, sets up matrix and judge scale, determine each prime risk information weight for company's total benefit.
Preferably, the present invention utilizes two grades of operations objective conducts that enterprise sets when carrying out year comprehensive budget index decomposition Enterprise's prime risk, the basis of this programme risk classification is the decomposition result of enterprise's comprehensive budget index.For modernization For enterprise, comprehensive budget is the work that enterprise must do every year.Comprehensive Budget Management can make enterprise under the guidance of strategic objective, Following business activities and corresponding financial result are carried out prediction abundant, comprehensive and prepare, clearly and quantify the operation of enterprise Target, the management of specification enterprise control, implement the responsibility of each responsibility center, responsibility and right the most at different levels, clear and definite examination standard, for enterprise The realization of strategic objective provides guarantee.It may be said that the process of Comprehensive Budget Management, it is simply that strategic objective is decomposed, implements, is controlled With the process realized.The Comprehensive Budget Management method that enterprise is commonly used at present is comprehensive budget pipe based on Balanced scorecard Reason, is around enterprise vision and strategic objective, from finance, client, learn and grow up, internal run four in terms of structure budget refer to Mark system, it is contemplated that balance between the balance between financial index and non-financial target, long term object and short-term goal, outer Portion and the balance etc. of the internal balance of balance, result and process, level of control and financial index.Enterprise is based on equilbristat at present The practice widely followed dividing card comprehensive budget is that benefit goal total for enterprise is decomposed into income function type and the big class of management function type two Multinomial functional module, then divides budget target by the four dimensions of Balanced scorecard inside each functional module again.We Case advises that enterprise can be combined Controlling Inner Enterprise industry when dividing functional module in terms of service value chain supports two with management Business dividing condition decomposes the benefit goal (Fig. 1 is not shown, refers to Fig. 3) that enterprise is total.Preferably, concrete business is true with management module After Ding, then it is that each business module is divided the sub-risk of each business module, each business module by each business module functional department Being prime risk information, the sub-risk of each business module is light breeze danger information.As shown in table 1, enterprise's prime risk Information is strategy, tissue, finance, human resources, corporate culture, research and develop, purchase, produce, stock, sale etc..Prime risk is believed The sub-risk of breath, such as the sub-risk industrial structure under prime risk Information strategy, company governance, decision-making, group management and control, business mould Formula, business cooperation, new business exploitation etc. are light breeze danger information.
Table 1
Preferably, enterprise's prime risk information is arranged weight.1 prime risk information front to enterprise's prime risk information Compare two-by-two with rear 1 prime risk information, and to judging that scale carries out assignment, it is judged that scale assigned result scope is 0 To 9.Rear 1 prime risk information and front 1 prime risk information are described front 1 prime risk information and rear 1 force one wind The inverse of danger information assignment.When prime risk information is n item, described judgement scale assigned result is n*n rank matrixes.The present invention adopts Use 1-9 scaling law.Scale illustrates such as table 2.
Table 2
The present invention, by comparing two-by-two, simulates enterprise's prime risk information judged result matrix, such as table 3.
Table 3
Calculate the sum of the described n*n rank every string of matrix, and calculate the summation of n column matrix, in table 3,
Matrix summation is 158.4.Wherein the n-th column matrix and be shown in Table 4.
Table 4
Calculate each prime risk information weight for company's total benefit, each column matrix and with the summation of matrix Ratio, is the weight of the n-th prime risk item of information.It is shown in Table 5.
Table 5
Step 120, it is preferable that by the light breeze danger in business risk information respectively according to the business that each light breeze danger is corresponding Or business valuation standard carries out, by two dimensions, the evaluation that quantizes, a dimension is the influence degree of risk, figure of merit model Enclose is 1 to 5.One dimension is the probability that risk occurs, and figure of merit scope is 1 to 5.The product of two dimension figure of merit Integrated level for light breeze danger.By enterprise's light breeze danger integrated level and light breeze danger taking advantage of in affiliated prime risk weight Long-pending, for the comprehensive proportion grade of light breeze danger information.Preferably, wherein the influence degree evaluation to risk includes, by two grades Risk sets qualitative or quantitative evaluation criterion to the influence degree of corresponding service or operations objective, enters the influence degree of risk Row is evaluated.Evaluate the influence degree evaluation result that score value is risk.Wherein the probability evaluation to risk includes, by possible Property set qualitative or quantitative evaluation criterion, the probability of risk is evaluated;Evaluate the probability evaluation that score value is risk Result.
Table 6 is the explanation of risk possibility occurrence figure of merit, and wherein method for quantitatively evaluating is a kind, and qualitative method is divided into two Kind of evaluation methodology, qualitative evaluating method 1 describes the qualitative method of for word, and qualitative evaluating method 2 describes two determine for word Property method.
Table 6
Table 7 is that corresponding service or operations objective influence degree figure of merit are illustrated, with Human Resource Risk by light breeze danger As a example by evaluation criterion.Wherein qualitative method 1 is the general qualitative method described, and quantitative approach 2 is professional and technical personnel's specialty Rejoin one's unit rate, Key Personnel training rate, employee demission rate, the evaluation methodology of four desired values of performance objective delivery rate.
Table 7
Step 130, sets up the light breeze danger integrated level 25 grid X-Y scheme in business risk information.And set up enterprise Prime risk comprehensive proportion grade pie chart in risk information.
The product of two dimension figure of merit is the integrated level of light breeze danger.By enterprise's light breeze danger integrated level and two The product of level Risk rated ratio, for the comprehensive proportion grade of light breeze danger information.The light breeze danger set up in business risk information is combined Close grade 25 grid X-Y scheme, such as table 8.
Table 8
As shown in table 8, coordinate falls at the material risk that risk information is company in I region, upper right side, needs the height of company Degree is paid close attention to, and needs preferentially to configure corporate resource, preferentially manages.The risk in middle II region that falls is the important wind of company Danger, needs paying close attention to of company, and by taking effective accusing of the measure inside to change the feature of risk.Fall at lower left III The risk in region, company is typically chosen and the mode such as undertakes to accept the generation of risk.
Utilize table 5 enterprise prime risk information weights, set up the comprehensive proportion of the prime risk in business risk information Grade pie chart, such as Fig. 4.
Step 140, analyzes 25 grid light breeze danger scattergram and pie charts, determines enterprise's emphasis risk information.The present invention The impact on company's integrated operation target of enterprise's prime risk information can be reacted intuitively from Fig. 4.
Fig. 2 is to assess system construction drawing according to a kind of business risk based on weight of another embodiment of the present invention.System 200 include, business risk information unit 210, are used for gathering business risk information, with reference to enterprise's comprehensive budget index, to enterprise Risk information is classified, and business risk information is divided into two-stage, respectively prime risk information and light breeze danger information.One-level Risk information is corresponding multiple light breeze dangers information by key risk information decomposition.By prime risk information is carried out mutually Relatively, set up matrix and judge scale, determine each prime risk information weight for company's total benefit;Enterprise's light breeze danger assignment Unit 220, by the light breeze danger in business risk information respectively according to the trade or business evaluation criterion that each light breeze danger is corresponding Carrying out, by two dimensions, the evaluation that quantizes, a dimension is that light breeze is dangerous to corresponding service or the influence degree of operations objective, Figure of merit scope is 1 to 5.Another dimension is the probability that risk occurs, and figure of merit scope is 1 to 5.Two dimensions are commented The product of valence mumber value is the integrated level of light breeze danger.Enterprise's light breeze danger integrated level is accounted for place force one wind with light breeze danger The product of danger weight, for the comprehensive proportion grade of light breeze danger information.Enterprise's light breeze danger image conversion unit 230, sets up enterprise Light breeze danger integrated level 25 grid X-Y scheme in risk information;Set up the comprehensive proportion of the prime risk in business risk information Grade pie chart.Enterprise's emphasis risk analysis unit 240, schemes and pie chart by analyzing 25 grid two grades, determines enterprise's emphasis wind Danger information.
Preferably, enterprise's prime risk information for the determination of company's total benefit weight, including:
1 prime risk information front to enterprise's prime risk information compares two-by-two with rear 1 prime risk information, and To judging that scale carries out assignment, it is judged that scale assigned result scope is 0 to 9;Rear 1 prime risk information and front 1 force one wind Danger information is the inverse of front 1 prime risk information and rear 1 prime risk information assignment;When prime risk information is n item, sentence Disconnected scale assigned result is n*n rank matrixes;
Calculate the sum of the n*n rank every string of matrix, and calculate the summation of n column matrix;Wherein the n-th column matrix and with matrix The ratio of summation, is the weight of the n-th prime risk item of information.
Preferably, n prime risk item of information weight sum is 1.
Preferably, the light breeze danger in business risk information is commented according to the trade or business that each light breeze danger is corresponding respectively Price card standard is included by the evaluation that carries out quantizing of two dimensions:
Wherein the influence degree evaluation to risk includes, by influence degree is set qualitative or quantitative evaluation criterion, The influence degree of risk is evaluated;Evaluate the influence degree evaluation result that score value is risk;
Wherein the probability evaluation to risk includes, by probability is set qualitative or quantitative evaluation criterion, to wind The probability of danger is evaluated;Evaluate the probability evaluation result that score value is risk.
Fig. 3 is according to embodiment of the present invention enterprise prime risk schematic diagram.This programme advises that enterprise is dividing function mould Can supporting to be combined in terms of two Controlling Inner Enterprise delineation of activities situation with management from service value chain during block, to decompose enterprise total Benefit goal.Preferably, after concrete business determines with management module, then it is that each business module is by each business module functional department Dividing the sub-risk of each business module, each business module is prime risk information, and the sub-risk of each business module is Light breeze danger information.As shown in table 3, enterprise's prime risk information is strategy, tissue, finance, human resources, corporate culture, grinds Send out, purchase, produce, stock, sale etc..
The technical scheme that the application proposes, combines comprehensive budget, is referred to by comprehensive budget with Enterprise-Wide Total Risk Management Business risk information, as the foundation of classification of risks, is divided into prime risk, light breeze danger, calculates one simultaneously by the result that mark decomposes The level risk weight to company's overall goal, makes enterprise operation target fully be combined with classification of risks, risk assessment standard, this Shen Please the light breeze danger in business risk information is passed through two according to the trade or business evaluation criterion that each light breeze danger is corresponding respectively Individual dimension carries out quantizing and evaluates to improve the degree of accuracy of risk assessment marking work.The application take into account in operation and management many Target, complication system relation multi-level, multifactorial.The scheme that the application proposes can draw risk collection of illustrative plates, and the application is by wind The diagram of danger assessment result is to add the design of pie chart on the basis of original grid collection of illustrative plates, makes business risk coordinate diagram energy straight Viewing reflects the corporate level material risk influence degree to company's integrated operation target.
By describing the present invention with reference to a small amount of embodiment.But, known in those skilled in the art, as Subsidiary Patent right requirement is limited, except the present invention other embodiment disclosed above falls equally the present invention's In the range of.
Normally, all terms used in the claims are all solved in the usual implication of technical field according to them Release, unless additionally defined clearly wherein.All of reference " one/described/be somebody's turn to do [device, assembly etc.] " is all opened ground It is construed at least one example in described device, assembly etc., unless otherwise expressly specified.Any method disclosed herein Step all need not be run, unless explicitly stated otherwise with disclosed order accurately.

Claims (8)

1. a business risk appraisal procedure based on weight, described method includes:
Gather business risk information, with reference to enterprise's comprehensive budget index, described business risk information is classified, by enterprise's wind Danger information is divided into two-stage, respectively prime risk information and light breeze danger information;Described prime risk information presses key risk letter Breath is decomposed into multiple light breeze dangers information of correspondence;By prime risk information is compared to each other, sets up matrix and judge mark Degree, determines each prime risk information weight for company's total benefit;By the light breeze danger in described business risk information respectively Carrying out, by two dimensions, the evaluation that quantizes according to the trade or business evaluation criterion that each light breeze danger is corresponding, a dimension is wind The influence degree of danger, figure of merit scope is 1 to 5;Another dimension is the probability that risk occurs, and figure of merit scope is 1 To 5;The product of said two dimension figure of merit is the integrated level of described light breeze danger;According to light breeze danger relative to affiliated The significance level of prime risk determines light breeze danger weight in affiliated prime risk;By the most comprehensive for described enterprise light breeze danger etc. Level and the product of described light breeze danger weight, for the comprehensive proportion grade of described light breeze danger information;
The comprehensive proportion grade of all light breeze danger described each prime risk comprised is weighted averagely, for prime risk Integrated level;By the product of prime risk integrated level Yu prime risk weight, for described prime risk information comprehensively than Weight grade;
Set up the light breeze danger integrated level 25 grid X-Y scheme in described business risk information;
Set up the prime risk comprehensive proportion grade pie chart in described business risk information;
Scheme and pie chart by analyzing described 25 grid two grades, determine described enterprise emphasis risk information.
Method the most according to claim 1, described enterprise prime risk information is for the determination of company's total benefit weight, bag Include:
1 prime risk information front to described enterprise prime risk information compares two-by-two with rear 1 prime risk information, and Described judgement scale carries out assignment, and described judgement scale assigned result scope is 0 to 9;Described rear 1 prime risk information with Front 1 prime risk information is the inverse of described front 1 prime risk information and rear 1 prime risk information assignment;Described one When level risk information is n item, described judgement scale assigned result is n*n rank matrixes;
Calculate the sum of the described n*n rank every string of matrix, and calculate the summation of described n column matrix;The sum of wherein said n-th column matrix With the ratio of the summation of described matrix, it is the weight of the n-th prime risk item of information.
Method the most according to claim 2, described n prime risk item of information weight sum is 1.
Method the most according to claim 1, by the light breeze danger in described business risk information respectively according to each light breeze Trade or business evaluation criterion corresponding to danger is included by the evaluation that carries out quantizing of two dimensions:
Wherein the influence degree evaluation to described risk includes, by light breeze danger corresponding to corresponding service or operations objective Influence degree sets qualitative or quantitative evaluation criterion, is evaluated the influence degree of described risk;Evaluate score value and be institute State the influence degree evaluation result of risk;
Wherein the probability evaluation to described risk includes, by light breeze danger possibility occurrence is set qualitative or quantitative commenting Price card is accurate, is evaluated the probability of described risk;Evaluate score value and be the probability evaluation result of described risk.
5. business risk based on a weight assessment system, described system includes,
Business risk information unit, is used for gathering business risk information, with reference to enterprise's comprehensive budget index, to described business risk Information is classified, and business risk information is divided into two-stage, respectively prime risk information and light breeze danger information;Described one-level Risk information is corresponding multiple light breeze dangers information by key risk information decomposition;By prime risk information is carried out mutually Relatively, set up matrix and judge scale, determine each prime risk information weight for company's total benefit;
Enterprise's light breeze danger assignment unit is corresponding according to each light breeze danger respectively by the light breeze danger in described business risk information Trade or business evaluation criterion carry out, by two dimensions, the evaluation that quantizes, a dimension is that risk is to corresponding service or operation The influence degree of target, figure of merit scope is 1 to 5;Another dimension is the probability that risk occurs, and figure of merit scope is 1 to 5;The product of said two dimension figure of merit is the integrated level of described light breeze danger;According to light breeze danger relative to institute The significance level belonging to prime risk determines light breeze danger weight in affiliated prime risk;By comprehensive for described enterprise light breeze danger Grade and the product of described light breeze danger weight, for the comprehensive proportion grade of described light breeze danger information;
The comprehensive proportion grade of all light breeze danger described each prime risk comprised is weighted averagely, for prime risk Integrated level;By the product of prime risk integrated level Yu prime risk weight, for described prime risk information comprehensively than Weight grade;
Enterprise's light breeze danger image conversion unit, sets up the light breeze danger integrated level 25 grid two dimension in described business risk information Figure;Set up the prime risk comprehensive proportion grade pie chart in described business risk information;
Enterprise's emphasis risk analysis unit, schemes and pie chart by analyzing described 25 grid two grades, determines described enterprise emphasis wind Danger information.
System the most according to claim 5, described enterprise prime risk information is for the determination of company's total benefit weight, bag Include:
1 prime risk information front to described enterprise prime risk information compares two-by-two with rear 1 prime risk information, and Described judgement scale carries out assignment, and described judgement scale assigned result scope is 0 to 9;Described rear 1 prime risk information with Front 1 prime risk information is the inverse of described front 1 prime risk information and rear 1 prime risk information assignment;Described one When level risk information is n item, described judgement scale assigned result is n*n rank matrixes;
Calculate the sum of the described n*n rank every string of matrix, and calculate the summation of described n column matrix;The sum of wherein said n-th column matrix With the ratio of the summation of described matrix, it is the weight of the n-th prime risk item of information.
System the most according to claim 5, described n prime risk item of information weight sum is 1.
System the most according to claim 5, by the light breeze danger in described business risk information respectively according to each light breeze Trade or business evaluation criterion corresponding to danger is included by the evaluation that carries out quantizing of two dimensions:
Wherein the influence degree evaluation to described risk includes, by dangerous on corresponding service or the impact of operations objective on light breeze Degree sets qualitative or quantitative evaluation criterion, is evaluated the influence degree of described risk;Evaluate score value and be described wind The influence degree evaluation result of danger;
Wherein the probability evaluation to described risk includes, by light breeze danger possibility occurrence is set qualitative or quantitative commenting Price card is accurate, is evaluated the probability of described risk;Evaluate score value and be the probability evaluation result of described risk.
CN201610770871.0A 2016-08-30 2016-08-30 A kind of business risk appraisal procedure based on weight and system Pending CN106156957A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610770871.0A CN106156957A (en) 2016-08-30 2016-08-30 A kind of business risk appraisal procedure based on weight and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610770871.0A CN106156957A (en) 2016-08-30 2016-08-30 A kind of business risk appraisal procedure based on weight and system

Publications (1)

Publication Number Publication Date
CN106156957A true CN106156957A (en) 2016-11-23

Family

ID=57344705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610770871.0A Pending CN106156957A (en) 2016-08-30 2016-08-30 A kind of business risk appraisal procedure based on weight and system

Country Status (1)

Country Link
CN (1) CN106156957A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107844914A (en) * 2017-11-27 2018-03-27 安徽经邦软件技术有限公司 Risk management and control system and implementation method based on group management
CN107909235A (en) * 2017-09-25 2018-04-13 平安科技(深圳)有限公司 Supplier's stability assessment method and application server
CN108062639A (en) * 2018-02-23 2018-05-22 大连火眼征信管理有限公司 A kind of Risk Propagation Model and the algorithm suitable for the model
CN108197621A (en) * 2017-12-28 2018-06-22 北京金堤科技有限公司 Company information acquisition methods and system and information processing method and system
CN108846592A (en) * 2018-07-11 2018-11-20 北京神州泰岳软件股份有限公司 A kind of valuation of enterprise report-generating method and device based on big data
CN110598979A (en) * 2019-05-30 2019-12-20 湖北兴业华德威安全信息技术股份有限公司 Method for calculating safety risk level of firework and firecracker operation and storage enterprise
CN110852600A (en) * 2019-11-07 2020-02-28 江苏税软软件科技有限公司 Method for evaluating dynamic risk of market subject
CN111046251A (en) * 2018-10-15 2020-04-21 普天信息技术有限公司 Information matching method and system
CN111709639A (en) * 2020-06-14 2020-09-25 湖南三湘银行股份有限公司 Grading method suitable for heavy machinery manufacturing enterprises of bank system
CN112561337A (en) * 2020-12-16 2021-03-26 北京明略软件***有限公司 Method and device for determining object type
CN113706013A (en) * 2021-08-27 2021-11-26 上海见兴信息科技有限公司 Labor relation contradiction risk analysis method combining financial technical indexes
CN113723828A (en) * 2021-08-31 2021-11-30 金恒智控管理咨询集团股份有限公司 Internal control investigation and evaluation system based on enterprise internal control flow key points and professional judgment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103577942A (en) * 2013-11-27 2014-02-12 中国水利水电科学研究院 Decision support system and method for coordinated development of water resources and economy
CN105046407A (en) * 2015-06-25 2015-11-11 国家电网公司 Risk assessment method for power grid and user bidirectional interactive service operation mode

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103577942A (en) * 2013-11-27 2014-02-12 中国水利水电科学研究院 Decision support system and method for coordinated development of water resources and economy
CN105046407A (en) * 2015-06-25 2015-11-11 国家电网公司 Risk assessment method for power grid and user bidirectional interactive service operation mode

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王征: "国内高新技术企业欧盟本土化经营风险识别研究", 《中国优秀硕士学位论文全文数据库》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909235A (en) * 2017-09-25 2018-04-13 平安科技(深圳)有限公司 Supplier's stability assessment method and application server
CN107844914B (en) * 2017-11-27 2021-11-16 安徽经邦软件技术有限公司 Risk management and control system based on group management and implementation method
CN107844914A (en) * 2017-11-27 2018-03-27 安徽经邦软件技术有限公司 Risk management and control system and implementation method based on group management
CN108197621A (en) * 2017-12-28 2018-06-22 北京金堤科技有限公司 Company information acquisition methods and system and information processing method and system
CN108062639A (en) * 2018-02-23 2018-05-22 大连火眼征信管理有限公司 A kind of Risk Propagation Model and the algorithm suitable for the model
CN108846592A (en) * 2018-07-11 2018-11-20 北京神州泰岳软件股份有限公司 A kind of valuation of enterprise report-generating method and device based on big data
CN111046251A (en) * 2018-10-15 2020-04-21 普天信息技术有限公司 Information matching method and system
CN110598979A (en) * 2019-05-30 2019-12-20 湖北兴业华德威安全信息技术股份有限公司 Method for calculating safety risk level of firework and firecracker operation and storage enterprise
CN110852600A (en) * 2019-11-07 2020-02-28 江苏税软软件科技有限公司 Method for evaluating dynamic risk of market subject
CN111709639A (en) * 2020-06-14 2020-09-25 湖南三湘银行股份有限公司 Grading method suitable for heavy machinery manufacturing enterprises of bank system
CN112561337A (en) * 2020-12-16 2021-03-26 北京明略软件***有限公司 Method and device for determining object type
CN113706013A (en) * 2021-08-27 2021-11-26 上海见兴信息科技有限公司 Labor relation contradiction risk analysis method combining financial technical indexes
CN113706013B (en) * 2021-08-27 2023-12-29 上海见兴信息科技有限公司 Labor relation contradiction risk analysis method combined with financial technical index
CN113723828A (en) * 2021-08-31 2021-11-30 金恒智控管理咨询集团股份有限公司 Internal control investigation and evaluation system based on enterprise internal control flow key points and professional judgment

Similar Documents

Publication Publication Date Title
CN106156957A (en) A kind of business risk appraisal procedure based on weight and system
Avineri et al. Transportation projects selection process using fuzzy sets theory
Adnan Aziz et al. Predicting corporate bankruptcy: where we stand?
CN109190954A (en) Method based on real-time electricity consumption data assessment enterprise production and operation management risk
CN106779755A (en) A kind of network electric business borrows or lends money methods of risk assessment and model
CN110415111A (en) Merge the method for logistic regression credit examination & approval with expert features based on user data
CN110322089A (en) Enterprise Credit Risk Evaluation method and its system
Cook et al. A data envelopment approach to measuring efficiency: Case analysis of highway maintenance patrols
Jayaraman et al. Performance evaluation of banks in India a Shannon-DEA approach
CN107705011A (en) Electricity market risk management system and method
CN105719080A (en) Power grid enterprise main network infrastructure construction investment benefit quantitative evaluation method
Yildiz et al. Construction of Multi Dimensional Performance Measurement Model in Business Organizations: An Empirical Study.
Irac et al. Euro area structural convergence? A multi-criterion cluster analysis
Sun et al. Study on the effectiveness of point-factor job evaluation system in operation position
CN109685133A (en) The data classification method of prediction model low cost, high discrimination based on building
Andriati et al. Indonesian provinces SDGs composite index: Lampung Province analysis
CN107292433A (en) Stock exchange behavior Forecasting Methodology based on double cluster results and naive Bayesian and AdaBoost
CN110866694A (en) Power grid construction project financial evaluation system and method
Majdáková et al. Prediction by financial and economic analysis in the conditions of forest enterprises.
CN110135718A (en) Comprehensive urban safety production method for situation assessment and system
CN109544337A (en) A kind of equity estimation method
KR20130083053A (en) Warning system for bad project of overseas constructions
CN104572900A (en) Trait characteristic selection method for crop breeding evaluation
Kurakova et al. The system of measurable indicators for scientific and technological development of the Russian Federation: methodology and design
CN113627705A (en) Safety city evaluation system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123