CN106143795A - The dismounting of a kind of marine generator group and turnover cabin technique - Google Patents
The dismounting of a kind of marine generator group and turnover cabin technique Download PDFInfo
- Publication number
- CN106143795A CN106143795A CN201510161935.2A CN201510161935A CN106143795A CN 106143795 A CN106143795 A CN 106143795A CN 201510161935 A CN201510161935 A CN 201510161935A CN 106143795 A CN106143795 A CN 106143795A
- Authority
- CN
- China
- Prior art keywords
- generating set
- cabin
- platform
- dismounting
- technique
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Jib Cranes (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
The invention discloses dismounting and the turnover cabin technique of a kind of marine generator group, hang in temporary platform at generating set platform side, and groove steel rail is set in temporary platform, by hoist engine, generating set is drawn to, in temporary platform, then hang out.When entering cabin, inverted repeat goes out cabin step.Use dismounting and the turnover cabin technique of a kind of marine generator group of the present invention, generating set can be made to avoid central station of floating dock or other hinder, it is achieved go out cabin and enter cabin.
Description
Technical field
The present invention relates to shipbuilding technical field, when particularly relating to a kind of marine generator group maintenance, to marine generator group
Remove and turnover cabin technique.
Background technology
The diesel generating set of boats and ships typically grows 5.0~6.5 meters, and wide 2.0~2.5 meters, high 2.2~2.8 meters, weight reaches 20 tons,
Owing to volume and weight is all very huge, therefore, it when installing at the beginning of the new ship of generating set, is all that generating set is passed through
Loop wheel machine hangs in installation.
Chinese patent 201010587075.6 discloses the main diesel generating set of a kind of 50,000 tons of semi-submerged ships and enters cabin technique, this patent master
Openly to disclose a kind of large-scale latent shipowner's diesel generating set and enter cabin technique, reduce the dismounting work to engine room structure and pipe Xi,
Ensure to enter cabin safely and efficiently, it is ensured that the integrality of structure and fitting-out, reduce workload.But this technology but could not solve to work as to send out
Group of motors is because of maintenance or damages the technique needing to change.When this type of large-scale diesel generating set is impaired, need removal maintenance or
When replacing, owing to the top of generating set has been provided with central station of floating dock or other Ship Structures, it is impossible to directly use loop wheel machine to hang out.
Owing to hull ripe is arranged and the electric wiring of complexity, other ships above central station of floating dock or generating set cannot be removed at all
Body structure, realizes hanging and takes.
Content of the invention
In view of the shortcoming of above-mentioned prior art, it is an object of the invention to provide dismounting and the turnover cabin work of a kind of marine generator group
Skill, is used for solving cannot directly hang in prior art to take generating set, it is achieved the problem of replacing.
For achieving the above object and other related purposes, the present invention provides dismounting and the turnover cabin technique of a kind of marine generator group,
It is characterized in that, including following technique.
1) prepare before, going out cabin
1.1st, remove hull portable plate part, formed and hang out passage;
1.2nd, former shipowner's machine is hung out;
1.3rd, piping, the cable being connected with primary group of motors is removed;
1.4th, the checker plate platform around generating set platform is removed;
1.5th, the bolt that generating set is connected is removed with pedestal;
1.6th, lifting up into the temporary platform being connected with generating set platform, temporary platform flushes with generating set place platform;
1.7th, wire rope hoist is installed on generating set platform;
1.8th, prepare to draw, hang rope used by generating set.
2), cabin is gone out
2.1st, use oil pump by generating set jack-up at the prime time of the common base of generating set;
2.2nd, by generating set jack-up to certain height, described height can install auxiliary slider and channel-section steel with under generator footing
Track, then removes oil pump at pedestal, removes damper, then installs auxiliary slider at generating set lower margin, lay
Groove steel rail and auxiliary fixing assembly, slide block is corresponding with groove steel rail, then puts down generating set, makes generating set load-bearing exist
On slide block and channel-section steel;
2.3rd, on the hanger of the stem of generating set, connect the rope of hoist engine, pulled generating set from former base by hoist engine
Move to central station of floating dock lower edge at Zuo, at its stem hanger, then connect the rope of loop wheel machine, continue generating set is dragged to face
Above Shi Pingtai, at the Tailing Lug of generating set, then connect the rope of loop wheel machine;
2.4th, generating set is hung out by loop wheel machine.
3), cabin is entered
Otherwise the 3.1, maintenance or the new generating set changed enter cabin is said process.
As preferably, generating set, before entering cabin, needs afterbody above the installation site of generating set to be provided with one group of fixed pulley,
Hoist engine is made to pull generating set return.
As preferably, in hoist engine installation site, interim stiffening device is set to hull.
As preferably, auxiliary slider embeds in channel-section steel, slidably, smears lubricator between auxiliary slider and channel-section steel.
As preferably, lubricator is butter.
As preferably, groove steel rail extends to temporary platform from generating set installation site.
As described above, the dismounting of a kind of marine generator group of the present invention and turnover cabin technique, generating set can be made to avoid central station of floating dock
Or other hinder, it is achieved go out cabin and enter cabin.
Brief description
Fig. 1 is shown as the dismounting of the marine generator group of the embodiment of the present invention and the scheme schematic diagram of turnover cabin technique.
Piece mark explanation
1-generating set,
2-central station of floating dock,
3-hangs out passage,
4-temporary platform,
5-hoist engine,
6-groove steel rail,
7-oil pump (jack),
8-auxiliary slider,
9-fixed pulley.
Detailed description of the invention
Below by way of specific instantiation, embodiments of the present invention being described, those skilled in the art can be by disclosed by this specification
Content understand other advantages and effect of the present invention easily.The present invention can also be added by additionally different detailed description of the invention
To implement or to apply, the every details in this specification also can be based on different viewpoints and application, in the essence without departing from the present invention
Carry out various modification or change under Shen.
According to Fig. 1, originally execute dismounting and the turnover cabin process program schematic diagram of the marine generator group of example.
The present embodiment is applied to the snow dragon dismounting of number former ship diesel generating set and goes out cabin and new generating set enters cabin. the present embodiment
Technique includes early-stage preparations, requirement, process.
1 display with reference to the accompanying drawings, (rib position is the order of rib to be provided with generating set 1 (rib position 153~rib position 158) in hull cabin
Numbering, refers to the position at longitudinal length rib place for the ship, and rib position is for determining the position along captain direction when design, quite
In the coordinate in ship length direction, or represent with #153~#158), generating set 1 be arranged over central station of floating dock 2, generating set
The without hindrance formation in right side of 1 place platform hangs out passage 3.
Following for going out cabin technique.
1) prepare before, going out cabin
1.1st, tearing plate hull detachable portion open, being formed in (rib position 137~rib position 147) and hang out passage 3, it is each for hanging out passage 3
The temporarily isolating part in layer deck, removes every layer of portable plate, then forms district's obstacle passage, hang out the confirmation of passage 3 size
Principle is with the size of generating set as benchmark, facilitate dismounting and the lifting of more new equipment, hangs out the process of passage 3 formation
In to avoid also needing the part that retains, especially with regard to the part of cable composition as far as possible.
1.2nd, former shipowner's machine is hung out.
1.3rd, piping, the cable being connected with primary group of motors 1 is removed.
1.4th, the checker plate platform around generating set 1 platform is removed.
1.5th, the bolt that generating set 1 is connected is removed with pedestal.
1.6th, lifting up into the temporary platform 4 being connected with generating set platform, temporary platform 4 flushes with generating set 1 place platform.
The size of temporary platform 4 is suitable with the size of the generator in the hull of the present embodiment, temporary platform 4 and generating set 1 platform
Connect, extend to hang out below passage 3.Because the high low dimensional of double bottom platform cannot accurately be learnt, build temporary platform 4
When, lower margin stays puts certain surplus, when being embodied as technique, according to reality height, carries out surplus to lower margin and repaiies
Whole, it is ensured that the flatness of temporary platform.
1.7th, in the range of generating set platform (rib position 131~rib position 133), installation fixes 10 tons of hoist engines 5;It is necessary
When, and corresponding interim stiffening device is set to hull.At groove steel rail 6 when the positioning of hoist engine 5 is to pull generating set 1
On do not have component to be criterion, i.e. hoist engine 5 and generating set the 1st, groove steel rail 6 is linearly distributed.
1.8th, prepare to draw, hang rope used by generating set.
2), cabin is gone out
2.1st, use oil pump (jack) 7 by generating set 1 jack-up at the prime time of the common base of generating set.
2.2nd, by generating set 1 jack-up to certain height, described height with can install under generator footing auxiliary slider 8 and
Groove steel rail 6, then removes oil pump at the pedestal of generating set, removes damper.Then use at generating set lower margin
Auxiliary slider 8 installed by bolt, and laying groove steel track 6 and auxiliary fixing assembly, track extends to temporary platform from generating set
Top.Slide block 8 is corresponding with groove steel rail 6, then lets out lower oil pump (jack) 7, and generating set moves down, and generating set holds
Focusing on slide block and channel-section steel, auxiliary slider 8 is embedded in channel-section steel, and is coated with butter on the contact surface.
2.3rd, on the hanger of the stem of generating set 1, connect the rope of hoist engine 5, pulled generating set by hoist engine 5
1 moves to central station of floating dock 2 lower edge (engine opening #149) at former pedestal, then connects the rope of loop wheel machine at its stem hanger
Rope, continues to be dragged to above temporary platform 4 by generating set, then connects the rope of loop wheel machine at the Tailing Lug of generating set;
2.4th, generating set is hung out by loop wheel machine;
The generating set of replacing is hung in cabin.Following for entering cabin technique.
1st, the pedestal of generating set after positioning freezes and changes, adjusts cushion block, the bolt hole of processing pedestal.
2nd, in the range of generating set platform (#131~#133), installation fixes 10 tons of hoist engines 5.And hull is arranged corresponding
Interim stiffening device.There is no component as criterion on groove steel rail 6 when the positioning of hoist engine 5 is to pull generating set, i.e. roll up
Raise machine 5 to be linearly distributed with generating set the 01st, groove steel rail 6.
3rd, temporary platform 4 hangs in cabin and has good positioning, then laying groove steel track 6 and auxiliary fixing assembly.The chi of temporary platform 4
Very little with the replacing of the present embodiment after the size of generator suitable, temporary platform 4 is placed in and hangs out below passage 3, and and generator
Group platform connects, flushes.The dimension width of groove steel rail 6 with change after generating set on arrange auxiliary slider 8 suitable.
4th, on the bulkhead of the top afterbody (#161) of generating set 1 (#153~#158), one group of fixed pulley 9 is positioned.
5th, at the lower margin of generating set, auxiliary slider is fixed with bolt.
6th, the extraneous circumstance entering cabin is: main frame does not enters cabin, and double bottom hull structural modification terminates.
7th, hang in into cabin so that auxiliary slider 8 drops in channel-section steel, and contact surface smears butter.
8th, connecting the rope of hoist engine 5 on the hanger of the stem of generating set, rope passes through fixed pulley 9 and connects hoist engine 5.
Hoist engine 5 is made to pull generating set 1 to move to left to set installation site (#153~#158).
9th, by hoist engine 5, generating set is drawn to central station of floating dock lower edge (engine opening #149) from temporary platform, then
Extract the rope connecting loop wheel machine at its stem hanger, extract the rope connecting loop wheel machine at the Tailing Lug of generating set, hoist engine
Work on.
10th, when treating that generating set 1 is drawn to set installation site by hoist engine 5, arrange below the pedestal of generating set
Oil pump (jack) 7, then by oil pump (jack) 7 generating set 1 is upwards pushed up to certain altitude (described height with
The auxiliary slider below generator footing and groove steel rail can be removed).
11st, after removing auxiliary slider 8 and groove steel rail 6, unload oil pump (jack) 7, make generating set 1 move down and drop down onto
On the pedestal freezing.Then being fixed on pedestal, the cabin that enters completing generating set is installed.
12nd, temporary platform 4 and auxiliary fixing member thereof are removed.
The principle of above-described embodiment only illustrative present invention and effect thereof, not for the restriction present invention.It any is familiar with this skill
Above-described embodiment all can be modified under the spirit and the scope of the present invention or change by the personage of art.Therefore, such as
All that in art, tool usually intellectual is completed under without departing from disclosed spirit and technological thought etc.
Effect is modified or changes, and must be covered by the claim of the present invention.
Claims (6)
1. the dismounting of a marine generator group and turnover cabin technique, it is characterised in that include following technique,
1) prepare before, going out cabin
1.1st, remove hull portable plate part, formed and hang out passage;
1.2nd, former shipowner's machine is hung out;
1.3rd, piping, the cable being connected with primary group of motors is removed;
1.4th, the checker plate platform around generating set platform is removed;
1.5th, the bolt that generating set is connected is removed with pedestal;
1.6th, lifting up into the temporary platform being connected with generating set platform, temporary platform flushes with generating set place platform;
1.7th, wire rope hoist is installed on generating set platform;
1.8th, prepare to draw, hang rope used by generating set;
2), cabin is gone out
2.1st, use oil pump by generating set jack-up at the prime time of the common base of generating set;
2.2nd, by generating set jack-up to certain height, described height with can install under generator footing auxiliary slider and
Groove steel rail, then removes oil pump at pedestal, removes damper, then installs auxiliary at generating set lower margin sliding
Block, laying groove steel track and auxiliary fixing assembly, slide block is corresponding with groove steel rail, then puts down generating set, makes to send out
Group of motors load-bearing is on slide block and channel-section steel;
2.3rd, on the hanger of the stem of generating set connect hoist engine rope, by hoist engine pull by generating set from
Move to central station of floating dock lower edge at former pedestal, at its stem hanger, then connect the rope of loop wheel machine, continue generating set
It is dragged to above temporary platform, at the Tailing Lug of generating set, then connect the rope of loop wheel machine;
2.4th, generating set is hung out by loop wheel machine;
3), cabin is entered
Otherwise the 3.1, maintenance or the new generating set changed enter cabin is said process.
2. the dismounting of marine generator group according to claim 1 and turnover cabin technique, it is characterised in that generating set is entering
Before cabin, need afterbody above the installation site of generating set to be provided with fixed pulley, make hoist engine pull generating set return.
3. the dismounting of marine generator group according to claim 1 and turnover cabin technique, it is characterised in that install at hoist engine
Position, arranges interim stiffening device to hull.
4. the dismounting of marine generator group according to claim 1 and turnover cabin technique, it is characterised in that auxiliary slider embeds
In channel-section steel, between auxiliary slider and channel-section steel, smear lubricator.
5. the dismounting of marine generator group according to claim 4 and turnover cabin technique, it is characterised in that described lubricator is
Butter.
6. the dismounting of marine generator group according to claim 1 and turnover cabin technique, it is characterised in that groove steel rail is from sending out
Group of motors installation site extends in temporary platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510161935.2A CN106143795B (en) | 2015-04-08 | 2015-04-08 | A kind of dismounting of marine generator group and disengaging cabin technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510161935.2A CN106143795B (en) | 2015-04-08 | 2015-04-08 | A kind of dismounting of marine generator group and disengaging cabin technique |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106143795A true CN106143795A (en) | 2016-11-23 |
CN106143795B CN106143795B (en) | 2018-03-23 |
Family
ID=57335686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510161935.2A Active CN106143795B (en) | 2015-04-08 | 2015-04-08 | A kind of dismounting of marine generator group and disengaging cabin technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106143795B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107472457A (en) * | 2017-08-11 | 2017-12-15 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | A kind of channel design, ship and motor hang out method |
CN108163138A (en) * | 2017-12-25 | 2018-06-15 | 沪东中华造船(集团)有限公司 | It is a kind of to go out cabin method for naval vessel major engine overhaul |
CN111039169A (en) * | 2019-11-15 | 2020-04-21 | 沪东中华造船(集团)有限公司 | Ship equipment module hoisting method |
CN111361704A (en) * | 2020-03-24 | 2020-07-03 | 上海外高桥造船有限公司 | Generator and installation method of generator set |
CN112849362A (en) * | 2021-02-26 | 2021-05-28 | 广州文冲船舶修造有限公司 | Large-area renewing and repairing process for longitudinal wall in ship cabin |
CN113071631A (en) * | 2021-03-25 | 2021-07-06 | 浙江友联修造船有限公司 | Process for enabling generator set of 18-thousand-ton bulk carrier to enter and exit cabin |
CN113581412A (en) * | 2021-09-03 | 2021-11-02 | 上海外高桥造船有限公司 | Method for installing sealed cabin of water glycol unit for dual-fuel bulk cargo ship |
CN115743463A (en) * | 2022-12-08 | 2023-03-07 | 中国船舶集团青岛北海造船有限公司 | Ship washing tower installation method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002145189A (en) * | 2000-11-09 | 2002-05-22 | Aitoku:Kk | Equipment structure in ship |
CN101323350A (en) * | 2008-06-25 | 2008-12-17 | 沪东重机有限公司 | Method and apparatus for detaching shrinkage disk from shaft |
CN102030076A (en) * | 2010-12-14 | 2011-04-27 | 广州中船黄埔造船有限公司 | Cabin entry process for main diesel generating set of 50,000-ton semi-submerged ship |
CN203127989U (en) * | 2012-12-24 | 2013-08-14 | 沪东重机有限公司 | Auxiliary lifting equipment for complete marine heavy medium speed diesel engine |
CN103507914A (en) * | 2013-09-12 | 2014-01-15 | 南通明德重工有限公司 | Installation process for ship body generator set |
KR20140060069A (en) * | 2012-11-09 | 2014-05-19 | 대우조선해양 주식회사 | Moving trolley for maintenance of engine room in vessels and method thereof |
-
2015
- 2015-04-08 CN CN201510161935.2A patent/CN106143795B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002145189A (en) * | 2000-11-09 | 2002-05-22 | Aitoku:Kk | Equipment structure in ship |
CN101323350A (en) * | 2008-06-25 | 2008-12-17 | 沪东重机有限公司 | Method and apparatus for detaching shrinkage disk from shaft |
CN102030076A (en) * | 2010-12-14 | 2011-04-27 | 广州中船黄埔造船有限公司 | Cabin entry process for main diesel generating set of 50,000-ton semi-submerged ship |
KR20140060069A (en) * | 2012-11-09 | 2014-05-19 | 대우조선해양 주식회사 | Moving trolley for maintenance of engine room in vessels and method thereof |
CN203127989U (en) * | 2012-12-24 | 2013-08-14 | 沪东重机有限公司 | Auxiliary lifting equipment for complete marine heavy medium speed diesel engine |
CN103507914A (en) * | 2013-09-12 | 2014-01-15 | 南通明德重工有限公司 | Installation process for ship body generator set |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107472457A (en) * | 2017-08-11 | 2017-12-15 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | A kind of channel design, ship and motor hang out method |
CN107472457B (en) * | 2017-08-11 | 2019-08-13 | 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) | A kind of channel design, ship and motor hang out method |
CN108163138A (en) * | 2017-12-25 | 2018-06-15 | 沪东中华造船(集团)有限公司 | It is a kind of to go out cabin method for naval vessel major engine overhaul |
CN111039169A (en) * | 2019-11-15 | 2020-04-21 | 沪东中华造船(集团)有限公司 | Ship equipment module hoisting method |
CN111361704A (en) * | 2020-03-24 | 2020-07-03 | 上海外高桥造船有限公司 | Generator and installation method of generator set |
CN112849362A (en) * | 2021-02-26 | 2021-05-28 | 广州文冲船舶修造有限公司 | Large-area renewing and repairing process for longitudinal wall in ship cabin |
CN113071631A (en) * | 2021-03-25 | 2021-07-06 | 浙江友联修造船有限公司 | Process for enabling generator set of 18-thousand-ton bulk carrier to enter and exit cabin |
CN113581412A (en) * | 2021-09-03 | 2021-11-02 | 上海外高桥造船有限公司 | Method for installing sealed cabin of water glycol unit for dual-fuel bulk cargo ship |
CN115743463A (en) * | 2022-12-08 | 2023-03-07 | 中国船舶集团青岛北海造船有限公司 | Ship washing tower installation method |
Also Published As
Publication number | Publication date |
---|---|
CN106143795B (en) | 2018-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106143795A (en) | The dismounting of a kind of marine generator group and turnover cabin technique | |
CN102030076B (en) | Cabin entry process for main diesel generating set of 50,000-ton semi-submerged ship | |
CN102582784B (en) | Process for sectionally putting up ship berths or docks | |
CN102381455B (en) | Unilateral positioning method for secondary docking of ship in dock | |
CN103661801B (en) | The installation ancillary system of ocean engineering underwater propeller and installation method | |
CN106892054B (en) | A kind of vehicle passenger ferry host equipment hanging method | |
CN103407552A (en) | Counterweight anchor chain of single point mooring system | |
CN109098692B (en) | Method for installing underwater suspension cluster manifold | |
CN107489103A (en) | Large-span Steel Box Beam tower with suspended cable aids in push construction method | |
CN109972603A (en) | The technique of jacket sectional construction | |
CN203129178U (en) | Ultra-large type immersed tube stranded cable undock system | |
CN105391259B (en) | Large Rotor installation method and device | |
CN103963922A (en) | Installation method for stern deck mooring equipment | |
CN102358406B (en) | Positioning device for secondary pier falling of ship in dock | |
CN113335475A (en) | Deck bottom fixed pulley sliding platform dismantling process | |
CN108590547B (en) | Standpipe installation method | |
CN102213085A (en) | Installation method of vertical pipe of guide pipe rack | |
CN102071652B (en) | Method and device for dragging large-tonnage object ashore | |
CN205239843U (en) | Stack formula installation device of hatch board | |
CN103411028A (en) | Subsea oil and gas pipeline channel non-navigation-closure pipelaying construction method | |
CN106080968A (en) | A kind of ship superstructure non-allowance healing construction technology | |
CN206278228U (en) | Anchoring and mooring system | |
CN108146592A (en) | A kind of large size bulk goods cabin wall cleaning device | |
CN101797966B (en) | Method for refloating deeply-buried cable by utilizing three-meter deeply-buried cable mechanical refloatation anchor | |
CN104802925B (en) | The method for dismounting of ocean platform propeller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |