CN106126260A - A kind of delayed data loading method and device - Google Patents

A kind of delayed data loading method and device Download PDF

Info

Publication number
CN106126260A
CN106126260A CN201610513519.9A CN201610513519A CN106126260A CN 106126260 A CN106126260 A CN 106126260A CN 201610513519 A CN201610513519 A CN 201610513519A CN 106126260 A CN106126260 A CN 106126260A
Authority
CN
China
Prior art keywords
message
data loading
last
placement
message queue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610513519.9A
Other languages
Chinese (zh)
Inventor
唐沃源
谈应奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Yunzhijia Network Co Ltd
Original Assignee
Shenzhen Yunzhijia Network Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Yunzhijia Network Co Ltd filed Critical Shenzhen Yunzhijia Network Co Ltd
Priority to CN201610513519.9A priority Critical patent/CN106126260A/en
Publication of CN106126260A publication Critical patent/CN106126260A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/445Program loading or initiating
    • G06F9/44505Configuring for program initiating, e.g. using registry, configuration files
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/451Execution arrangements for user interfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Human Computer Interaction (AREA)
  • Telephone Function (AREA)

Abstract

The invention discloses a kind of delayed data loading method and device, wherein, the method includes: being placed into the last of View message queue by placing message, described placement message includes data loading messages;Perform described placement message, so that described data loading messages is placed into the last of main thread message queue.Compared with prior art, data loading messages is placed into the last of main thread message queue by above-mentioned steps by the application, and other message comprised in main thread message queue include View initial message, thus, after the View initial message that can comprise in main thread has performed, data loading messages is performed again after i.e. corresponding A pp interface has started, load the required data loaded in this App interface, thus avoid data and load the impact that App interface is started, improve the toggle speed at App interface.

Description

A kind of delayed data loading method and device
Technical field
The present invention relates to start-up technique field, APP interface, more particularly, it relates to a kind of delayed data loading method and dress Put.
Background technology
The startup of Android App and the startup at interface, typically can be along with the initialization of View and the acquisition of data.
But, when the data volume involved by interface is relatively large for App, interface spends during starting Time is the most long, and this time will be embodied directly on the toggle speed at interface, causes the toggle speed at interface relatively Slowly.
Therefore, if prior art existing the data volume involved by App interface cause the startup speed at this interface compared with conference Spend slower problem.
Summary of the invention
It is an object of the invention to provide a kind of delayed data loading method and device, to solve present in prior art such as Really the data volume involved by App interface causes the slower problem of the toggle speed at this interface compared with conference.
To achieve these goals, the present invention provides following technical scheme:
A kind of delayed data loading method, including:
Being placed into the last of View message queue by placing message, described placement message includes data loading messages;
Perform described placement message, so that described data loading messages is placed into the last of main thread message queue.
Preferably, it is placed into the last of View message queue by placing message, including:
Described placement message is placed into the last of View message queue by the Post () method utilizing DecorView.
Preferably, perform described placement message, including:
Described placement message is performed in perform Traversals () method.
Preferably, described data loading messages is placed into main thread message queue last after, also include:
Place after described data loading messages and preset call back function.
A kind of data delay charger, including:
First placement module, for being placed into the last of View message queue by placing message, described placement message comprises There is data loading messages;
Perform module, be used for performing described placement message, described data loading messages to be placed into main thread message team Arrange is last.
Preferably, described first placement module includes:
Placement unit, for utilizing the Post () method of DecorView that described placement message is placed into View message team Arrange is last.
Preferably, described execution module includes:
Performance element, for performing described placement message in perform Traversals () method.
Preferably, also include:
Second placement module, presets call back function for placing after described data loading messages.
A kind of delayed data loading method of present invention offer and device, wherein, the method includes: will place message and place Last to View message queue, described placement message includes data loading messages;Perform described placement message, with by described Data loading messages is placed into the last of main thread message queue.Compared with prior art, passing through above-mentioned steps in the application will Data loading messages is placed into the last of main thread message queue, and other message comprised in main thread message queue include View initial message, thus, it is possible to after the View initial message comprised in main thread has performed, i.e. corresponding A pp circle Face performs data loading messages after having started again, loads the required data loaded in this App interface, thus avoids data and load The impact starting App interface, improves the toggle speed at App interface.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only this Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to The accompanying drawing provided obtains other accompanying drawing.
The flow chart of a kind of delayed data loading method that Fig. 1 provides for the embodiment of the present invention;
The boundary having in Android develops in a kind of delayed data loading method that Fig. 2 provides for the embodiment of the present invention Face renders readjustment schematic diagram;
The structural representation of a kind of data delay charger that Fig. 3 provides for the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Refer to Fig. 1, it illustrates the flow chart of a kind of delayed data loading method that the embodiment of the present invention provides, permissible Comprise the following steps:
S11: be placed into the last of View message queue by placing message, places message and includes data loading messages.
It should be noted that the message comprised in View message queue is in the start-up course of App interface involved View initial message and data loading messages, wherein, View initial message is and realizes View by performing these message Initialization, and then display App interface, and data loading messages is the acquisition realizing data by performing this message, for App Use.
The generally message in View message queue need to be sent in main thread message queue, so that main thread is to relevant Message performs.By the placement comprising data loading messages message is placed into the last of View message queue, it is possible to protect Demonstrate,prove this placement message to be finally performed, namely make the data loading messages comprised in placement message be placed to main thread message Queue last.
S12: perform to place message, so that data loading messages is placed into the last of main thread message queue.
Placement message is and data loading messages is placed into the message that main thread message queue is last, therefore, performs to put Put the process of message to be data loading messages is put into the process that main thread message queue is last.Thereby, it is possible to make data Loading messages performs after other message have all performed again, namely has performed at View initial message and completed interface Startup after perform again, thus strictly distinguished interface render the loading with data, refined the life cycle at interface, it is to avoid Interface is rendered and to impact by the loading of data.
Compared with prior art, data loading messages is placed into main thread message queue by above-mentioned steps by the application Last, and other message comprised in main thread message queue include View initial message, thus, it is possible in main thread After the View initial message comprised has performed, after i.e. corresponding A pp interface has started, perform data loading messages again, load The required data loaded in this App interface, thus avoid data and load the impact that App interface is started, improve App interface Toggle speed.
It should be noted that need from data base or configuration file for data or be the App obtained from network Interface, the above-mentioned steps that the present invention provides is actually the suitable data load(ing) point of searching, to reach first to render interface, reloads The purpose of data.
Specifically, in Android develops, there is interface as shown in Figure 2 and render readjustment, including onCreate () side Method, onResume () method etc..At these in the readjustment of the life cycle of interface element, it is possible to achieve the loading of data, enter And realize the initialization of interface and data, complete the startup at interface.But, onCreate () method carries out the loading of data Or the startup of asynchronous thread all needs to consume CPU time, and the code that these part data load can't affect boundary Rendering of face, but occur in during interface renders together with but initializing with View, and then it is white to cause interface to start the time White increase.
Inventor finds, there is also some sides not being declared out after the method calls such as onCreate () method Method is used as the process (i.e. other funs in figure) that interface renders, it is thereby possible to select right in method in this section Data load and carry out relevant setting.
Before the onCreate () method call of Activity, attach () method can be called, in attach () method A PhoneWindow can be created the when of calling, this PhoneWindow has individual DecorView, this DecorView Being a View of all Activity bottoms, class is FrameLayout, and it has all characteristics of View, and can be OnCreate () method is initialised.
The onCreate () method of Activity has done a lot of initialized operation, including PhoneWindow/ DecorView/StartingView/setContentView etc., but to be really set to show then Resume () when, But these are transparent to developer, specifically can see the handleResumeActivity () side of ActivityThread Method, the other funs that the method is contained in Fig. 2, adjusts back it except calling the onResume () of Activity in this method Outward, ViewRootImpl/ThreadedRenderer etc. also it is initialized.Wherein, ViewRootImpl upon initialization, DecorView is set to the value of the root object of oneself, therefore show that above described DecorView is the interface bottom The conclusion of View.
Owing to View can maintain the message queue oneself sent rendering when, i.e. View message queue, but It is that this message queue is eventually performed acquired in the Looper of main thread and at main thread, so, if data are added Carrying message and be placed into after View rendered, that just can wait View to render and perform this message afterwards.And DecorView is The View of the interface bottom, therefore, it can that the placement message including data loading messages is placed into DecorView corresponding View message queue last.
Wherein it is possible to be placed into the last of View message queue by the post () method of DecorView by placing message, I.e. itself is preferably placed into the last of View message queue by placing message, may include that the Post utilizing DecorView () method is placed into the last of View message queue by placing message.The post () method of DecorView can call self The Handler.post () method of one variables A ttachInfo, and AttachInfo is in ViewRootImpl, namely HandleResumeActivity () method is carried out initialized, and the Looper of its Handler object is main thread Looper.Accordingly, because in onCreate () method, DecorView is initialized, but AttachInfo is also the most initial Change, so can directly skip AttachInfo placing by the post () method of DecorView in onCreate () method Message is placed into the last of the View message queue of DecorView.
In a kind of delayed data loading method that the embodiment of the present invention provides, perform to place message, may include that
Perform Traversals () method performs place message.
Message in View message queue can be held in the performTraversals () method of ViewRootImpl OK, wherein, performTraversals () method is responsible for the drafting of each frame of View in fact, so having only at this Data loading messages is placed into the last of main thread message queue by the execution of method, after i.e. having performed the method, performs number again According to loading messages, so that it may ensure to have rendered at View to perform data loading messages afterwards.
It should be noted that when ViewRootImpl performs performTraversals () method for the first time, can perform The initialization logic of Egl, then can re-execute performTraversals () method, therefore, eventually in second time Data loading messages is performed after calling the method;That is, in order to data loading messages will not be performed for the first time Consumed after performTraversals () method, this message can be again added in View message queue, pass through Pack the shell of one layer of Runnable again, reach after second time performs performTraversal () method, to perform data loading and disappear Breath.
In a kind of delayed data loading method that the embodiment of the present invention provides, data loading messages is placed into main thread and disappears Breath queue last after, it is also possible to including:
Place after data loading messages and preset call back function.
It should be noted that this default call back function can be an interface of definition, this interface has one and adds The method carrying data, then realizes this interface loading data in the Activity need delay loading, finally adds in data Carry in message and call this function.Can also be a self-defining function of the Activity needing delay loading equally, As long as calling this function in data loading messages.
Because this function has carried out in above-described embodiment the packaging of twice message dilivery, and this process is to fix not Become, so after plus this invoked procedure (i.e. plus presetting call back function), developer has only to focus on this letter How loading data in number, and need not rewrite and understand this process, improve the work efficiency of developer.
Corresponding with above-described embodiment, the embodiment of the present invention additionally provides a kind of data delay charger, such as Fig. 3 institute Show, may include that
First placement module 11, for being placed into the last of View message queue by placing message, places message and includes Data loading messages;
Perform module 12, be used for performing placing message, data loading messages is placed into main thread message queue After.
In a kind of data delay charger that the embodiment of the present invention provides, the first placement module may include that
Placement unit, for utilizing the Post () method of DecorView to be placed into View message queue by placing message Finally.
In a kind of data delay charger that the embodiment of the present invention provides, perform module and may include that
Performance element, for performing placement message in perform Traversals () method.
In a kind of data delay charger that the embodiment of the present invention provides, it is also possible to including:
Second placement module, presets call back function for placing after data loading messages.
It should be noted that the explanation of relevant portion please in a kind of data delay charger of embodiment of the present invention offer See the detailed description of corresponding part in a kind of delayed data loading method that the embodiment of the present invention provides, do not repeat them here.
Described above to the disclosed embodiments, makes those skilled in the art be capable of or uses the present invention.To this The multiple amendment of a little embodiments will be apparent from for a person skilled in the art, and generic principles defined herein can With without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention will not be limited It is formed on the embodiments shown herein, and is to fit to consistent with principles disclosed herein and features of novelty the widest Scope.

Claims (8)

1. a delayed data loading method, it is characterised in that including:
Being placed into the last of View message queue by placing message, described placement message includes data loading messages;
Perform described placement message, so that described data loading messages is placed into the last of main thread message queue.
Method the most according to claim 1, it is characterised in that be placed into the last of View message queue by placing message, Including:
Described placement message is placed into the last of View message queue by the Post () method utilizing DecorView.
Method the most according to claim 2, it is characterised in that perform described placement message, including:
Described placement message is performed in perform Traversals () method.
4. according to the method described in any one of claims 1 to 3, it is characterised in that described data loading messages is placed into master Thread message queue last after, also include:
Place after described data loading messages and preset call back function.
5. a data delay charger, it is characterised in that including:
First placement module, for being placed into the last of View message queue by placing message, described placement message includes number According to loading messages;
Perform module, be used for performing described placement message, so that described data loading messages is placed into main thread message queue Finally.
Device the most according to claim 5, it is characterised in that described first placement module includes:
Placement unit, for utilizing the Post () method of DecorView that described placement message is placed into View message queue Finally.
Device the most according to claim 6, it is characterised in that described execution module includes:
Performance element, for performing described placement message in perform Traversals () method.
8. according to the device described in any one of claim 5 to 7, it is characterised in that also include:
Second placement module, presets call back function for placing after described data loading messages.
CN201610513519.9A 2016-07-01 2016-07-01 A kind of delayed data loading method and device Pending CN106126260A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610513519.9A CN106126260A (en) 2016-07-01 2016-07-01 A kind of delayed data loading method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610513519.9A CN106126260A (en) 2016-07-01 2016-07-01 A kind of delayed data loading method and device

Publications (1)

Publication Number Publication Date
CN106126260A true CN106126260A (en) 2016-11-16

Family

ID=57468139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610513519.9A Pending CN106126260A (en) 2016-07-01 2016-07-01 A kind of delayed data loading method and device

Country Status (1)

Country Link
CN (1) CN106126260A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108694066A (en) * 2018-05-09 2018-10-23 北京酷我科技有限公司 A kind of method that tableView delays refresh
CN109117203A (en) * 2018-07-13 2019-01-01 广州小鹏汽车科技有限公司 A kind of Android APP starting velocity optimization method and system
CN109359256A (en) * 2018-09-29 2019-02-19 北京城市网邻信息技术有限公司 Page loading method, device, equipment and storage medium
CN110020275A (en) * 2017-08-22 2019-07-16 武汉斗鱼网络科技有限公司 Present panel loading method and system in a kind of live streaming

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104090787A (en) * 2014-06-25 2014-10-08 可牛网络技术(北京)有限公司 Starting method and starting device for home page of application software
US20140380313A1 (en) * 2013-06-04 2014-12-25 Tencent Technology (Shenzhen) Company Limited Method and device for loading android virtual machine application

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140380313A1 (en) * 2013-06-04 2014-12-25 Tencent Technology (Shenzhen) Company Limited Method and device for loading android virtual machine application
CN104090787A (en) * 2014-06-25 2014-10-08 可牛网络技术(北京)有限公司 Starting method and starting device for home page of application software

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
GRACKER: "《简书:https://www.jianshu.com/p/45fab958e1d1》", 19 March 2016 *
ZRZ05: "《csdn:https://blog.csdn.net/square_l/article/details/17681885》", 30 December 2013 *
程序园网: "《程序园网:http://www.phperz.com/article/16/0115/183402.html,以及其他公开的网站》", 15 January 2016 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110020275A (en) * 2017-08-22 2019-07-16 武汉斗鱼网络科技有限公司 Present panel loading method and system in a kind of live streaming
CN108694066A (en) * 2018-05-09 2018-10-23 北京酷我科技有限公司 A kind of method that tableView delays refresh
CN108694066B (en) * 2018-05-09 2021-04-27 北京酷我科技有限公司 TableView delayed refreshing method
CN109117203A (en) * 2018-07-13 2019-01-01 广州小鹏汽车科技有限公司 A kind of Android APP starting velocity optimization method and system
CN109359256A (en) * 2018-09-29 2019-02-19 北京城市网邻信息技术有限公司 Page loading method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN106126260A (en) A kind of delayed data loading method and device
US8468514B2 (en) System and method for updating unified extensible firmware interface setting information
CN110502340A (en) A kind of resource dynamic regulation method, device, equipment and storage medium
CN102880477B (en) A kind of method realizing computer starting and computer
CN104239131B (en) A kind of method and device for closing application program
CN104572054B (en) A kind of capacity calling method and equipment
CN109582385A (en) Application program launching method and device, storage medium and electronic equipment
CN111767090A (en) Method and device for starting small program, electronic equipment and storage medium
CN106775699A (en) The method that UI is updated in asynchronous thread
CN108809683A (en) Dispose the method and device of cloud application system
CN106502962A (en) The method of the operation of control process device core in electronic installation and electronic installation
WO2019136837A1 (en) Intelligent load system, method and device, and storage medium
CN113961346A (en) Data cache management and scheduling method and device, electronic equipment and storage medium
TW201826102A (en) Execution of multiple applications on a device
CN104573110B (en) The Dynamic Display method and device of figure in a kind of browser
CN110175101A (en) A kind of exception catching method, apparatus and terminal
CN113268286A (en) Application starting method and device, projection equipment and storage medium
CN112835639B (en) Hook realization method, device, equipment, medium and product
CN113805954B (en) Screen saver display method, electronic device and computer storage medium
CN106775879B (en) VR application installation-free method and system based on android system client
CN106874020A (en) Start the method and device of plug-in unit
CN107025126B (en) Resource scheduling method, NFVO and system
CN110045997B (en) Object initialization method, device, equipment and storage medium of basic function module
CN104392408A (en) Image display system and method
CN110895473A (en) Self-starting keep-alive system and method based on android mobile device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication