CN106125584B - charging column control system - Google Patents

charging column control system Download PDF

Info

Publication number
CN106125584B
CN106125584B CN201610739943.5A CN201610739943A CN106125584B CN 106125584 B CN106125584 B CN 106125584B CN 201610739943 A CN201610739943 A CN 201610739943A CN 106125584 B CN106125584 B CN 106125584B
Authority
CN
China
Prior art keywords
unit
charging
charging column
module
machine operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610739943.5A
Other languages
Chinese (zh)
Other versions
CN106125584A (en
Inventor
蒋涛
沈亮
秦奋
俞伟勇
胡伟
雒震
姚海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU KAIDA ELECTRIC POWER CONSTRUCTION Co Ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
HANGZHOU KAIDA ELECTRIC POWER CONSTRUCTION Co Ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU KAIDA ELECTRIC POWER CONSTRUCTION Co Ltd, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical HANGZHOU KAIDA ELECTRIC POWER CONSTRUCTION Co Ltd
Priority to CN201610739943.5A priority Critical patent/CN106125584B/en
Publication of CN106125584A publication Critical patent/CN106125584A/en
Application granted granted Critical
Publication of CN106125584B publication Critical patent/CN106125584B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses a kind of charging column control systems, including:First man-machine operation module, is set to monitoring center;Second human-machine operation module, sensor group, sensor group include the sensor of several included big dipper modules, video acquisition module, be may be contained on charging column;Central processing unit, it is set on charging column, including is connected to analysis module, the marking unit of sensor group and video acquisition module, the converting unit for being connected to charging scheme generation module and marking unit, the data call unit for being connected to the first man-machine operation module, the first human-machine operation receiving unit for being connected to the first man-machine operation module, the second human-machine operation receiving unit, administrative unit, the execution unit for being connected to the second human-machine operation module;Analysis module;Charging scheme generation module on charging column and is connected to execution unit, the second human-machine operation receiving unit and converting unit.The control of such charging column control system extends the service life of charging column.

Description

Charging column control system
Technical field
The present invention relates to technical field of electric equipment, more particularly to a kind of charging column control system.
Background technology
With the enhancing of people's environmental consciousness, electric vehicle is more and more widely used, charging column be it is a kind of more The common device for electric vehicle power supply.
Currently, people when charging to charging column, are usually judged by people oneself and are inputted charge requirement, however, this Kind judges may be not accurate enough, and supply and demand mismatches, and to be easy to cause the damage of charging column, can not ensure charging column uses the longevity Life.
Therefore, the service life for how extending charging column, is a technical problem that technical personnel in the field need to solve at present.
Invention content
In view of this, the object of the present invention is to provide a kind of charging column control system, the service life of charging column is extended.
To achieve the above object, the present invention provides the following technical solutions:
A kind of charging column control system, including:
It is inputted for log-on message, control command and data call instruction and the control command is sent to centre The the first man-machine operation module for managing device, is set to monitoring center;
It is sent to for log-on message and charge requirement information input and by the charge requirement by big dipper module described Second human-machine operation module of central processing unit, is set on charging column;
Supplemental characteristic for acquiring the power condition inside the charging column ambient enviroment and the charging column will simultaneously be adopted The supplemental characteristic collected is sent to the sensor group of the monitoring center, and the sensor group includes several included north The sensor for the module that struggles against, is set on the charging column;
The video data is simultaneously sent to the prison by acquisition for carrying out the charging column ambient enviroment video data The video acquisition module at control center is set on the charging column;
Central processing unit is set on the charging column, including be used to receive the supplemental characteristic and the video data, And it is stored up database is sent to after the supplemental characteristic of reception and the corresponding Big Dipper information flag of the video data The marking unit for depositing and being sent to after label analysis module is connected to the analysis module, the sensor group and described Video acquisition module;For the supplemental characteristic and the video data change data format of completing label to be sent to charging The converting unit of schemes generation module is connected to the charging scheme generation module and the marking unit;For according to The data call unit of corresponding data is called in data call order in the database, is connected to the first human-machine operation mould Block;For receive the control command and be sent to specified module according to preset algorithm, by the control command according to not The first human-machine operation receiving unit being stored in after same identity information classification in the database, it is man-machine to be connected to described first Operation module and other modules or unit for needing to send the control command;Letter for receiving the charge requirement Cease and be transmitted to the charging scheme generation module, the information of the charge requirement is classified according to account information after be stored in institute The second human-machine operation receiving unit in database is stated, the second human-machine operation module is connected to;For user's registration, permission The administrative unit of management and password modification;Execution unit for the charging scheme for executing the charging scheme generation module;
The analysis module for analyzing the supplemental characteristic and the video data that receive;
For generating charging scheme according to the information of the central processing unit of reception and charging scheme is fed back to institute The charging scheme generation module for stating execution unit on the charging column and is connected to the execution unit, described Two human-machine operation receiving units and the converting unit.
Preferably, the charging scheme generation module includes:
Various charging column physical models are generated for receiving the transformed data of the converting unit and the control command Charging column physical model construction unit, be connected to the converting unit, the first human-machine operation receiving unit;
For receiving the charge requirement and driving the model parameter of the corresponding charging column physical model of the charge requirement Variation, the position for changing transfering node, direction setting make the movement of charging column physical model, for being ordered according to the control The simulation analysis unit for enabling the decomposition, cutting, amplification and the diminution that carry out charging column physical model, is connected to the described second man-machine behaviour Make receiving unit, the charging column physical model construction unit, the first human-machine operation receiving unit;
For excellent by the way that obtained implementing result is fed back to charging scheme after cycle execution optimization algorithm or optimization method The virtual actuator for changing unit is connected to the charging scheme optimization unit;
For extracting implementing result and being sent to that virtual-sensor and prioritization scheme output unit, interior to be equipped with charging scheme excellent The charging scheme for changing algorithm and optimization method optimizes unit, be connected to the virtual-sensor, the simulation analysis unit, The charging column physical model construction unit;
It corresponding result or information are directly acquired, receives implementing result for being inserted into charging column physical model and shows automatically The virtual-sensor of registration evidence;
For exporting charging scheme to the prioritization scheme output unit of the central processing unit, it is connected to and described executes list Member.
Preferably, the analysis module includes:
Point that assessment prediction for carrying out charging column situation according to the supplemental characteristic received is analyzed and will be obtained Analysis result is sent to the forecast analysis unit that designated equipment and the specified database are stored, and is connected to the label Unit;
For the typical charging column related data of store various types and corresponding security risk model, by the supplemental characteristic with Storage data carry out similar degree comparison and are sent to specified set after comparison result is carried out ascending or descending order sequence according to similarity Standby expert's assessment unit, is connected to the marking unit.
Preferably, the forecast analysis unit includes:
Monitoring data are generated for monitoring the supplemental characteristic that receives and draw the chart drawing unit of curve graph;
The curve graph of drafting and former measured curve are compared and analyzed and are predicted, output analysis prediction result to score Unit is analysed, the chart drawing unit is connected to.
Preferably, the described first man-machine operation module includes that picture input unit, voice-input unit and word input are single Member.
Preferably, the voice-input unit is using microphone, and the text entry unit includes handwriting pad and keyboard, The picture input unit includes scanner and camera.
Preferably, further include for receiving the supplemental characteristic and being freezed, heat, alarm in the central processing unit The control unit of control, described control unit connect the sensor group, refrigeration module, heating module and alarm module.
Preferably, the alarm module includes:
The audio alert unit of audio alert is sent out for receiving the order that the central processing unit is sent;
For receiving order that the central processing unit is sent and sending early warning short message to the short message of specified mobile terminal Edit transmission unit.
Preferably, the refrigeration module includes cooling coil and and the charging of the charging column circuit board bottom surface The radiator fan of column circuit board upper surface, the heating module include the heating layer for being wrapped in charging outer surface, heating layer and institute It states and heat-preservation cotton layer is set between charging column.
Preferably, further include display screen, may be contained within the monitoring center and be connected to the central processing unit.
Charging column control system provided by the invention passes through the first man-machine operation module, the second human-machine operation module, sensing The setting of device group, video acquisition module, central processing unit, analysis module and charging scheme generation module, can be to charging column Situation monitor and analyze in real time, and the output of each charging scheme realizes analogue simulation and optimization, prolongs significantly The service life of charging column is grown.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the annexation figure of the specific embodiment one of charging column control system provided by the present invention;
Fig. 2 is the annexation figure of the specific embodiment two of charging column control system provided by the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Core of the invention is to provide a kind of charging column control system, extends the service life of charging column.
It please refers to Fig.1 and Fig. 2, Fig. 1 closes for the connection of the specific embodiment one of charging column control system provided by the present invention System's figure;Fig. 2 is the annexation figure of the specific embodiment two of charging column control system provided by the present invention.
In a kind of specific embodiment of charging column control system provided by the present invention, including:
First man-machine operation module 1 for log-on message, control command and data call instruction input and orders control Order is sent to central processing unit 6, and the first man-machine operation module 1 is set to monitoring center, wherein the log-on message person that refers to O&M Log-on message, the first man-machine operation module 1 is the module that is operated of O&M person, and control command includes expense order and each Startup order of a module etc..
Charge requirement for log-on message and charge requirement information input and is passed through the Big Dipper by the second human-machine operation module 2 Module is sent to central processing unit 6, and the second human-machine operation module 2 is set on charging column, wherein log-on message refers to user Log-on message.
Sensor group 4 is made of the sensor of several included big dipper modules, for acquiring charging column ambient enviroment and charging The supplemental characteristic of power condition inside column, and collected supplemental characteristic is sent to monitoring center, sensor group 4 is set to On charging column, wherein the supplemental characteristic of charging column ambient enviroment include temperature around charging column, ambient humidity and its His supplemental characteristic, the supplemental characteristic of the power condition inside charging column include arcing conditions inside charging column, electric current, voltage, Drain conditions, short-circuit conditions, load condition, contact resistance heat condition and other parameters data.
Video data is simultaneously sent to by video acquisition module 3, acquisition for carrying out charging column ambient enviroment video data Monitoring center, video acquisition module 3 are arranged on charging column.
Central processing unit 6 is arranged on charging column, and central processing unit 6 includes:
Believe for receiving supplemental characteristic and video data, and by the supplemental characteristic of reception and the corresponding Big Dipper of video data The marking unit that database 5 is stored and is sent to analysis module 7 after label is sent to after breath label, marking unit connects It is connected to analysis module 7, sensor group 4 and video acquisition module 3;
For the supplemental characteristic and video data change data format of completing label to be sent to charging scheme generation module 8 Converting unit, converting unit is connected to charging scheme generation module 8 and marking unit;
Data call unit for calling corresponding data in database 5 according to data call order, data call list Member is connected to the first man-machine operation module 1;
For receiving control command and being sent to specified module and by control command according to difference according to preset algorithm Identity information classification after be stored in the first human-machine operation receiving unit in database 5, the first human-machine operation receiving unit connects It is connected to the first man-machine operation module 1 and other modules or unit for needing to send control command;
For receiving charge requirement information and being transmitted to charging scheme generation module 8 and by charge requirement information according to account The second human-machine operation receiving unit being stored in after the information classification of family in database 5, the second human-machine operation receiving unit are connected to Second human-machine operation module 2;
Administrative unit for the modification of user's registration, rights management and password;
Execution unit for the charging scheme for executing charging scheme generation module 8.
Analysis module 7, for analyze the supplemental characteristic and video data that receive, to obtain the intuitive of charging column or not true Fixed status information.
Charging scheme generation module 8, charging scheme generation module 8 are set on charging column, are connected to execution unit, the second people Machine operates receiving unit and converting unit, and charging scheme generation module 8 is used to be generated according to the information of the central processing unit 6 of reception Charging scheme and charging scheme is fed back into execution unit.
Such charging column control system by the first man-machine operation module 1, the second human-machine operation module 2, sensor group 4, The setting of video acquisition module 3, central processing unit 6, analysis module 7 and charging scheme generation module 8, can be to charging column feelings Condition monitor and analyze in real time, and the output of each charging scheme realizes analogue simulation and optimization, greatly prolongs The service life of charging column.
In above-described embodiment, charging scheme generation module 8 can specifically include:
Charging column physical model construction unit 10, charging column physical model construction unit 10 are connected to converting unit, first Human-machine operation receiving unit, charging column physical model construction unit 10 are ordered for receiving the transformed data of converting unit and control It enables and generates various charging column physical models;
Simulation analysis unit 9, simulation analysis unit 9 are connected to the second human-machine operation receiving unit, charging column physical model Construction unit 10, the first human-machine operation receiving unit, simulation analysis unit 9 is for receiving charge requirement and driving charge requirement pair The model parameter for the charging column physical model answered changes, and is closed being established with each element in charging column physical model construction unit 10 After system, model parameter can be changed in specified range, so as to driving simulation analysis method for different Model parameter carries out calculating solution;It is arranged for changing position, the direction of transfering node, charging column physical model is made to move;With In the decomposition, cutting, amplification and the diminution that carry out charging column physical model according to control command;
Virtual actuator, by the way that obtained implementing result is fed back to charging after cycle execution optimization algorithm or optimization method Scheme optimization unit 11 is connected to charging scheme optimization unit 11;
Charging scheme optimizes unit 11, is connected to virtual-sensor 12, simulation analysis unit 9, charging column physical model structure Unit 10 is built, charging scheme, which optimizes, is equipped with charging scheme optimization algorithm and optimization method in unit 11, charging scheme optimizes unit 11 extraction implementing results are simultaneously sent to virtual-sensor 12 and prioritization scheme output unit;
Virtual-sensor 12 directly acquires corresponding result or information, reception are held for being inserted into charging column physical model Row result and automatic display data are logic unit;
Prioritization scheme output unit, is connected to execution unit, and prioritization scheme output module exports charging scheme to centre Device 6 is managed, execution unit is made to carry out the execution of charging scheme according to preset algorithm.
By the cooperation between above-mentioned each unit, can in real time be built according to each charge requirement and environmental characteristic Mould advantageously ensures that the reliability of power supply, extends the service life of charging column.
In above-mentioned each embodiment, analysis module 7 can specifically include:
Forecast analysis unit 14, is connected to marking unit, and forecast analysis unit 14 is used for according to the sensor group 4 received Supplemental characteristic carry out the assessment prediction analysis of charging column situation, and obtained analysis result is sent to designated equipment and is referred to Fixed database 5 is stored, wherein designated equipment may include display screen 17, specified mobile terminal etc.;
Expert's assessment unit 16, is connected to marking unit, for the typical charging column related data of store various types and accordingly Security risk model, the supplemental characteristic of the sensor group 4 for will receive carries out similar degree comparison with storage data, and will After comparison result carries out ascending or descending order sequence according to similarity, it is sent to designated equipment, is specifically as follows display screen 17.
Such analysis module 7 can obtain the information that can directly obtain by forecast analysis unit 14, be commented by expert Estimate unit 16 and obtains required information through analysis.Certainly, the set-up mode of analysis module 7 is without being limited thereto.
In above-mentioned each embodiment, forecast analysis unit 14 can specifically include:
Chart drawing unit, for monitoring the supplemental characteristic received generation monitoring data and drawing curve graph, specifically, Chart drawing unit can according to the monitoring data of input, generate at any time, the tau-effect of spatial variations curve, that is, tense it is bent Line and three-dimensional effect curve, tense curve show the change of the raw process parameter data or dynamic parameter data of each monitoring point at any time Change situation, three-dimensional effect curve highlights the monitoring result of same time different measuring points with the changing rule for opening monitoring location;
Comparative analysis unit, is connected to chart drawing unit, can carry out the curve graph of drafting and former measured curve pair Than analyzing and predicting, output analysis prediction result.
The accuracy of such forecast analysis unit 14 is higher, and real-time is preferable.Certainly, the setting side of forecast analysis unit 14 Formula is without being limited thereto.
In above-mentioned each embodiment, the first man-machine operation module 1 can specifically include picture input unit, voice input list Member and text entry unit greatly facilitate use, and the input of each control command is equal using the input mode of various modes On the one hand included authentication information ensure that the limitation of system control authority, on the other hand make the defeated of each control command Enter to all have trackability.Certainly, can also there was only one or two kinds of input unit in the first man-machine operation module 1.
Specifically, microphone may be used in voice-input unit, and handwriting pad and keyboard may be used in text entry unit, figure Scanner and camera may be used in piece input unit, and setting is simple, convenient for taking.Certainly, the setting side of each input unit Formula is without being limited thereto.
Can also include in above-mentioned each embodiment, in central processing unit 6 for receiving sensor group 4 supplemental characteristic simultaneously Freezed, heated, the control unit of controlling alarm, control unit connects sensor group 4, refrigeration module 13, heating module 15 With alarm module 18.
In above-mentioned each embodiment, alarm module 18 can specifically include:
Audio alert unit, the order for receiving the transmission of central processing unit 6 send out audio alert;
Short message editing transmission unit, order for receiving the transmission of central processing unit 6 simultaneously send early warning short message to specified Mobile terminal, wherein early warning short message may include that charging column type number, charging column position and moment sensor group 4 are examined The supplemental characteristic measured.
In above-mentioned each embodiment, refrigeration module 13 may include charging column circuit board bottom surface cooling coil and and The radiator fan of charging column circuit board upper surface, heating module 15 may include the heating layer for being wrapped in charging outer surface, In, heat-preservation cotton layer is set between heating layer and charging column, and to avoid overheat, setting is convenient.Certainly, refrigeration module 13 and heating mould The set-up mode of block 15 is without being limited thereto.
In above-mentioned each embodiment, charging column control system can also include display screen 17, may be contained within monitoring center and It is connected to central processing unit 6, display is specifically as follows two, and one of display can be used for being monitored video, prison The broadcasting of mapping piece and monitoring data is additionally operable to the various data of display human-machine operation module input and entire monitoring process Middle need data to be shown, and the two-dimensional result figure based on the data output characterization building deformation detected, three-dimensional result Figure, can specifically connect forecast analysis unit 14, expert's assessment unit 16 and data call unit;Another display screen 17 can For carrying out the display of constructed charging column physical model.
Each embodiment is described by the way of progressive in this specification, the highlights of each of the examples are with other The difference of embodiment, just to refer each other for identical similar portion between each embodiment.
Charging column control system provided by the present invention is described in detail above.Specific case used herein Principle and implementation of the present invention are described, and the explanation of above example is only intended to help to understand side of the invention Method and its core concept.It should be pointed out that for those skilled in the art, not departing from the principle of the invention Under the premise of, it can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the claims in the present invention In protection domain.

Claims (10)

1. a kind of charging column control system, which is characterized in that including:
It is inputted for log-on message, control command and data call instruction and the control command is sent to central processing unit The first man-machine operation module, be set to monitoring center;
It is sent to the center for log-on message and charge requirement information input and by the charge requirement by big dipper module Second human-machine operation module of processor, is set on charging column;
Supplemental characteristic for acquiring the power condition inside the charging column ambient enviroment and the charging column will simultaneously collect The supplemental characteristic be sent to the sensor group of the monitoring center, the sensor group includes several carrying the Big Dipper mould The sensor of block is set on the charging column;
The video data is simultaneously sent in the monitoring by acquisition for carrying out the charging column ambient enviroment video data The video acquisition module of the heart is set on the charging column;
Central processing unit is set on the charging column, and the central processing unit includes marking unit, converting unit, data tune With unit, the first human-machine operation receiving unit, the second human-machine operation receiving unit, administrative unit and execution unit;The label Unit is for receiving the supplemental characteristic and the video data and using the supplemental characteristic of reception and the video data It is sent to database after corresponding Big Dipper information flag and is stored and be sent to after label analysis module, the label is single Member is connected to the analysis module, the sensor group and the video acquisition module;The converting unit will be for that will complete The supplemental characteristic and the video data change data format of label are sent to charging scheme generation module, and the conversion is single Member is connected to the charging scheme generation module and the marking unit;The data call unit is used for according to the data tune Corresponding data, the data call unit is called to be connected to the described first man-machine operation module in the database with order; The first human-machine operation receiving unit for receive the control command and according to preset algorithm be sent to specified module, By the control command according to being stored in the database after different identity information classification, first human-machine operation receives Unit is connected to the described first man-machine operation module and other modules or unit for needing to send the control command;Institute State the second human-machine operation receiving unit for receive the charge requirement information and be transmitted to the charging scheme generation module, It is stored in after the information of the charge requirement is classified according to account information in the database, second human-machine operation receives Unit is connected to the second human-machine operation module;The administrative unit is for user's registration, rights management and password modification;Institute State charging scheme of the execution unit for executing the charging scheme generation module;
The analysis module for analyzing the supplemental characteristic and the video data that receive;
For generating charging scheme according to the information of the central processing unit of reception and charging scheme is fed back to described hold The charging scheme generation module of row unit on the charging column and is connected to the execution unit, second people Machine operates receiving unit and the converting unit.
2. charging column control system according to claim 1, which is characterized in that the charging scheme generation module includes:
Filling for various charging column physical models is generated for receiving the transformed data of the converting unit and the control command Electric column physical model construction unit is connected to the converting unit, the first human-machine operation receiving unit;
For receive the charge requirement and drive the model parameter of the corresponding charging column physical model of the charge requirement to change, It is arranged for changing position, the direction of transfering node, makes the movement of charging column physical model, for being carried out according to the control command The simulation analysis unit of decomposition, cutting, amplification and the diminution of charging column physical model is connected to second human-machine operation and receives Unit, the charging column physical model construction unit, the first human-machine operation receiving unit;
For single by the way that obtained implementing result is fed back to charging scheme optimization after cycle execution optimization algorithm or optimization method The virtual actuator of member is connected to the charging scheme optimization unit;
For extracting implementing result and being sent to virtual-sensor and prioritization scheme output unit, interior be equipped with charging scheme optimization and calculate The charging scheme of method and optimization method optimizes unit, is connected to the virtual-sensor, the simulation analysis unit, described Charging column physical model construction unit;
Corresponding result or information are directly acquired, implementing result is received and shows number automatically for being inserted into charging column physical model According to the virtual-sensor;
For exporting charging scheme to the prioritization scheme output unit of the central processing unit, it is connected to the execution unit.
3. charging column control system according to claim 2, which is characterized in that the analysis module includes:
The analysis knot that assessment prediction for carrying out charging column situation according to the supplemental characteristic received is analyzed and will be obtained Fruit is sent to the forecast analysis unit that designated equipment and the specified database are stored, and it is single to be connected to the label Member;
For the typical charging column related data of store various types and corresponding security risk model, by the supplemental characteristic and storage Data carry out similar degree comparison and are sent to designated equipment after comparison result is carried out ascending or descending order sequence according to similarity Expert's assessment unit is connected to the marking unit.
4. charging column control system according to claim 3, which is characterized in that the forecast analysis unit includes:
Monitoring data are generated for monitoring the supplemental characteristic that receives and draw the chart drawing unit of curve graph;
The curve graph of drafting and former measured curve are compared and analyzed and predicted, the comparative analysis list of output analysis prediction result Member is connected to the chart drawing unit.
5. charging column control system according to claim 4, which is characterized in that the first man-machine operation module includes figure Piece input unit, voice-input unit and text entry unit.
6. charging column control system according to claim 5, which is characterized in that the voice-input unit is using Mike Wind, the text entry unit include handwriting pad and keyboard, and the picture input unit includes scanner and camera.
7. according to the charging column control system described in claim 1 to 6 any one, which is characterized in that the central processing unit In further include for receiving the supplemental characteristic and being freezed, heat, the control unit of controlling alarm, described control unit connects Connect the sensor group, refrigeration module, heating module and alarm module.
8. charging column control system according to claim 7, which is characterized in that the alarm module includes:
The audio alert unit of audio alert is sent out for receiving the order that the central processing unit is sent;
For receiving order that the central processing unit is sent and sending early warning short message to the short message editing of specified mobile terminal Transmission unit.
9. charging column control system according to claim 8, which is characterized in that the refrigeration module includes the charging column The cooling coil of circuit board bottom surface and and charging column circuit board upper surface radiator fan, the heating module includes It is wrapped in the heating layer of charging outer surface, heat-preservation cotton layer is set between heating layer and the charging column.
10. charging column control system according to claim 9, which is characterized in that further include display screen, may be contained within described Monitoring center and it is connected to the central processing unit.
CN201610739943.5A 2016-08-26 2016-08-26 charging column control system Active CN106125584B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610739943.5A CN106125584B (en) 2016-08-26 2016-08-26 charging column control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610739943.5A CN106125584B (en) 2016-08-26 2016-08-26 charging column control system

Publications (2)

Publication Number Publication Date
CN106125584A CN106125584A (en) 2016-11-16
CN106125584B true CN106125584B (en) 2018-09-28

Family

ID=57271801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610739943.5A Active CN106125584B (en) 2016-08-26 2016-08-26 charging column control system

Country Status (1)

Country Link
CN (1) CN106125584B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106740236B (en) * 2017-02-06 2019-07-26 山东鲁能智能技术有限公司 A kind of system and method for charging equipment of electric automobile charging security control

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101475632B1 (en) * 2013-12-20 2014-12-22 엘에스산전 주식회사 Method for playing operating record data of ems
CN104393656B (en) * 2014-12-12 2017-05-10 国家电网公司 Intelligent alternating current charging pile and charging method of electric automobile
CN205017033U (en) * 2015-07-27 2016-02-03 南方科技大学 Safe electric pile that fills
CN105034842A (en) * 2015-08-09 2015-11-11 安徽普为智能科技有限责任公司 Charging positioning system of alternating current charging pile
CN205407344U (en) * 2016-03-07 2016-07-27 武汉中楚珞珈科技有限公司 Agreement self -adaptation electric automobile direct current fills electric pile system

Also Published As

Publication number Publication date
CN106125584A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
US20110257804A1 (en) Administration of Power Environments
US20120166007A1 (en) Method and system for integral energy management of buildings
CN104025516A (en) Systems and methods of remote communication
CN108401013A (en) A kind of smart home Internet of Things communication device
CN106506213A (en) A kind of internet of things equipment visualization interface display packing and system
JP6400834B2 (en) RECOMMENDATION DEVICE, RECOMMENDATION DETERMINING METHOD, AND COMPUTER PROGRAM
KR20200055828A (en) Artificial Intelligence Platform Service System and Method
CN114896751A (en) Equipment operation management method, device and equipment, and storage medium
CN208297993U (en) The power computer room data collection system of data center
CN106125584B (en) charging column control system
CN113723184A (en) Scene recognition system, method and device based on intelligent gateway and intelligent gateway
CN106355692A (en) Optimized life style-based community management system
CN111628986A (en) Interactive data processing method, system, device, computer equipment and storage medium
KR20230089652A (en) System for non-intrusive load monitoring of electronic device and method thereof
CN113467965A (en) Data processing method and device, electronic equipment and computer readable storage medium
CN103577302A (en) Electronic equipment and monitoring method thereof
CN108776450A (en) Sweeping robot service system and computer readable storage medium
JP2017108259A (en) Appliance control system and appliance control method
CN106394279B (en) A kind of electronic control system of electric vehicle
CN206648681U (en) Mobile phone alarm device for temperature and humidity of chicken house
CN114387391A (en) Safety monitoring method and device for transformer substation equipment, computer equipment and medium
CN103869798A (en) Intelligent room management system and method based on wireless communication
JP2018186413A (en) Information processing system, information processing unit, information processing method, and program
Hannah Examining the Concept of Smart Home Technologies (IoT Systems)
CN111800437A (en) Artificial intelligence's safety network system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant