CN106121649A CN201610742454.5A CN201610742454A CN106121649A CN 106121649 A CN106121649 A CN 106121649A CN 201610742454 A CN201610742454 A CN 201610742454A CN 106121649 A CN106121649 A CN 106121649A
Authority
CN
China
Prior art keywords
ore
remained
rooming
new
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610742454.5A
Other languages
Chinese (zh)
Inventor
张奇
程永民
徐坤明
董峻岭
张合国
高远
向永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG JINLING MINING CO Ltd
Original Assignee
SHANDONG JINLING MINING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG JINLING MINING CO Ltd filed Critical SHANDONG JINLING MINING CO Ltd
Priority to CN201610742454.5A priority Critical patent/CN106121649A/en
Publication of CN106121649A publication Critical patent/CN106121649A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The present invention relates to the stoping method of a kind of remained ore using block chambering method rooming, belong to mining engineering technical field, first construct at tunnel in rock tunnel, exploiting field or post, construction ramp is to depositing gallery back production level height downwards;Then construct gallery in new post, from the beginning of gallery in new post, be perpendicular to former drilling drift direction and construct a plurality of new discharging tunnel to former drilling drift bottom;Corresponding former drilling drift, in Drilling big gun hole, new discharging tunnel top, then carries out charge explosion, beats with dead zone, form out mine mouth, ore removal in new discharging tunnel, and retrusive falls ore deposit rooming remained ore.The present invention can remained ore in back production deep hole mineral building, improve the rate of extraction of mineral building, effectively reduce ore resource loss, extend mine life, improve Business Economic Benefit.

Description

Use the stoping method of the remained ore of block chambering method rooming
Technical field
The present invention relates to the stoping method of a kind of remained ore using block chambering method rooming, belong to mining engineering Technical field.
Background technology
At present, due to block chambering method production ore, to have mining cost low, and ventilation condition is good, job safety, and ore removal is imitated Rate advantages of higher is widely used, but there is also some problems in mineral building exploitation process, and one is the open wiring quilt of ore removal route Deep hole blasting destroys, and the funnel bottom formed after making explosion expands, and back production line retreats, and scraper function is dug the Ore of dress and reduced;Two Being that polycrystalline substance is arranged unreasonable, explosive funnel can not farthest reclaim Ore;Three is that surrounding rock structure crushes, ore removal route Roof fall or wall caving, decrease ore removal funnel.These problems all can cause after deep hole blasting, there are about about 15% in mineral building Ore cannot extraction, formed mineral building deposit gallery, cause the permanent loss of ore resource, reduce the mineral building rate of extraction.
Summary of the invention
According to above deficiency of the prior art, the problem to be solved in the present invention is: offer one can back production deep hole ore deposit Remained ore in room, improves the rate of extraction of mineral building, effectively reduces ore resource loss, extends mine life, improves enterprise The stoping method of the remained ore using block chambering method rooming of industry economic benefit.
The technical solution adopted for the present invention to solve the technical problems is:
The stoping method of the described remained ore using block chambering method rooming, comprises the following steps:
1) constructing at tunnel in rock tunnel, exploiting field or post, construction ramp is to depositing gallery back production level height downwards;
2) after gallery back production level height is deposited in arrival, gallery in new post of constructing;
3) from the beginning of gallery in new post, it is perpendicular to former drilling drift direction and constructs a plurality of new discharging tunnel to former drilling drift Bottom;
4) corresponding former drilling drift is in Drilling big gun hole, new discharging tunnel top, then carries out charge explosion, beats with dead zone, Form out mine mouth, ore removal in new discharging tunnel, retrusive falls ore deposit rooming remained ore, until in new discharging tunnel again Secondary possess Drilling big gun hole execution conditions after, stop ore removal;
5), after again possessing execution conditions, step 4 is repeated) until remained ore back production is complete.
When carrying out remained ore back production, owing to transporting, promoting, ventilating, the system such as draining have been provided with, particularly deep hole Explosion is complete, and the mining needed for rooming is artificial, material, power cost etc. have been put into, and makes full use of existing engineering, Only need to construct a small amount of back production engineering, just the remained ore in mineral building can be reclaimed, substantially increase the rate of extraction of Ore, energy Enough reductions overall digging ratio and explosion unit consumption, reduce further mining cost.
The most preferably, step 1) the front back production judging whether to carry out remained ore.Guarantee the safety of back production Property.
The most preferably, the horizontal absolute altitude of gallery back production level height is deposited less than former drilling drift horizontal absolute altitude 3.5m- 4.5m.Back production is facilitated to construct.
The most preferably, the gradient of ramp is 8 °~10 °.Easy construction.
The most preferably, new discharging tunnel and former discharging tunnel interlaced arrangement.
The most preferably, 7655 rock drills are used to carry out driling explosion during driling explosion.At remained ore recycling engineering Middle employing 7655 rock drill shallow bore hole falls ore deposit, the mode of drawing back Ore.
The most preferably, the bar number of the several length according to former drilling drift of new discharging tunnel bar and former discharging tunnel is true Fixed, generally many than the bar number of former discharging tunnel one or few one.
The present invention is had the beneficial effect that
1, the stoping method of the remained ore of employing block chambering method rooming of the present invention can be by mineral building Remained ore reclaim, ore recovery rate can improve 10%, and production ore radix becomes big, reduces overall digging ratio, fall Low explosion unit consumption, reduces mining cost.
2, the stoping method of the remained ore of employing block chambering method rooming of the present invention can effectively reduce The loss of ore resource, extends the length of service in mine, both reaches increase the performance of enterprises and maintain the purpose of business stability, simultaneously Increase taxes income to country.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the A-A view of Fig. 1 of the present invention;
Wherein, 1, former discharging tunnel;2, former drilling drift;3, new discharging tunnel;4, ramp;5, gallery in new post;6、 Big gun hole;7, mineral building remained ore.
Detailed description of the invention
Below in conjunction with the accompanying drawings embodiments of the invention are described further:
As shown in Figure 1-2, the stoping method of the remained ore of employing block chambering method rooming of the present invention, bag Include following steps:
1) judge whether to carry out the back production of remained ore, if back production can be carried out, then from rock tunnel, exploiting field or post Constructing at interior tunnel, construction ramp 4 is to depositing gallery back production level height downwards, the described level mark depositing gallery back production level height Height is in former drilling drift 2 horizontal absolute altitude 3.5m-4.5m, and the gradient of ramp 4 is 8 °~10 °;
2) after gallery back production level height is deposited in arrival, gallery 5 in new post of constructing;
3) from the beginning of gallery 5 in new post, it is perpendicular to former drilling drift 2 direction and constructs a plurality of new discharging tunnel 3 to former rock drilling Bottom, tunnel 2, described new discharging tunnel 3 and former discharging tunnel 1 interlaced arrangement;Described new discharging tunnel 3 is several according to former The length of drilling drift 2 and the bar number of former discharging tunnel 1 determine.
4) corresponding former drilling drift 2 uses 7655 rock drill Drilling big gun holes 6 at new discharging tunnel 3 top, then fills Medicine explosion, beats with dead zone, forms out mine mouth, ore removal in new discharging tunnel 3, and retrusive falls ore deposit rooming remained ore 7, Until after again possessing Drilling big gun hole execution conditions in new discharging tunnel 3, stopping ore removal;
5), after again possessing execution conditions, step 4 is repeated) until remained ore back production is complete.
Specific embodiment:
North gold calls mineral deposit 520 district, north buried depth-350m~-310m level together, and top board is limestone, and base plate is diabase, locally Skarns, Structure of mine rock consolidates.Mineral building uses block chambering method back production, and the long 36m of mineral building, wide 24m, polycrystalline substance is upper dish ore removal The flat-bottom structure of route.Ore removal, transport, promote and utilize existing production system, make full use of existing engineering, reduce newly-increased engineering Input.
First one-10 ° of slope of parallel former rock drilling road centerline direction construction at rock tunnel ,-350m level 515 district Road is to gallery in-353.5m level, and new 523 posts of constructing.In-353.5m horizontal columns in gallery, it is perpendicular to former rock drilling road side To a plurality of new discharging tunnel of constructing to 520 former drilling drifts, new discharging tunnel and former discharging tunnel interlaced arrangement.In new ore removal lane Use 7655 rock drill Drilling big gun holes in road, then carry out charge explosion, beat with dead zone, form out mine mouth, in new ore removal lane Ore removal in road, retrusive falls ore deposit rooming remained ore, until stopping ore removal after again possessing construction shallow bore hole condition.Under carrying out The operations such as the rock drilling of one circulation, explosion, ore removal, circulate, successively until retrogressing ore removal, to ore pillar limit, deposits gallery stoping operation complete.
Remained ore in mineral building can be reclaimed by the present invention, improves ore recovery rate, reduces overall digging ratio, Reduce explosion unit consumption, reduce mining cost, it is possible to effectively reduce the loss of ore resource, extend the length of service in mine, The performance of enterprises can be increased.
The present invention is not limited in above-mentioned detailed description of the invention, and those of ordinary skill in the art are in the essential scope of the present invention The change inside made, retrofit, add or replace, also should belong to protection scope of the present invention.

Claims (7)

1. the stoping method of the remained ore using block chambering method rooming, it is characterised in that comprise the following steps:
1) constructing at tunnel in rock tunnel, exploiting field or post, ramp (4) of constructing downwards is to depositing gallery back production level height;
2) after gallery back production level height is deposited in arrival, gallery (5) in new post of constructing;
3) from the beginning of gallery (5) in new post, it is perpendicular to former drilling drift (2) direction and constructs a plurality of new discharging tunnel (3) to former chisel Rock gangway road (2) bottom;
4) corresponding former drilling drift (2) is at Drilling big gun hole, new discharging tunnel (3) top (6), then carries out charge explosion, with dead zone Beat thoroughly, form out mine mouth, ore removal in new discharging tunnel (3), retrusive falls ore deposit rooming remained ore (7), until newly After again possessing Drilling big gun hole execution conditions in discharging tunnel (3), stop ore removal;
5), after again possessing execution conditions, step 4 is repeated) until remained ore back production is complete.
The stoping method of the remained ore of employing block chambering method rooming the most according to claim 1, its feature exists In: described step 1) the front back production judging whether to carry out remained ore.
The stoping method of the remained ore of employing block chambering method rooming the most according to claim 1, its feature exists In: the described horizontal absolute altitude depositing gallery back production level height is less than former drilling drift (2) horizontal absolute altitude 3.5m-4.5m.
The stoping method of the remained ore of employing block chambering method rooming the most according to claim 1, its feature exists In: the gradient of described ramp (4) is 8 °~10 °.
The stoping method of the remained ore of employing block chambering method rooming the most according to claim 1, its feature exists In: described new discharging tunnel (3) and former discharging tunnel (1) interlaced arrangement.
The stoping method of the remained ore of employing block chambering method rooming the most according to claim 1, its feature exists In: use 7655 rock drills to carry out driling explosion during described driling explosion.
The stoping method of the remained ore of employing block chambering method rooming the most according to claim 1, its feature exists In: the bar number of the several length according to former drilling drift (2) of described new discharging tunnel (3) bar and former discharging tunnel (1) determines.
CN201610742454.5A 2016-08-29 2016-08-29 Use the stoping method of the remained ore of block chambering method rooming Pending CN106121649A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610742454.5A CN106121649A (en) 2016-08-29 2016-08-29 Use the stoping method of the remained ore of block chambering method rooming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610742454.5A CN106121649A (en) 2016-08-29 2016-08-29 Use the stoping method of the remained ore of block chambering method rooming

Publications (1)

Publication Number Publication Date
CN106121649A true CN106121649A (en) 2016-11-16

Family

ID=57271828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610742454.5A Pending CN106121649A (en) 2016-08-29 2016-08-29 Use the stoping method of the remained ore of block chambering method rooming

Country Status (1)

Country Link
CN (1) CN106121649A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625857A (en) * 2018-06-15 2018-10-09 甘肃酒钢集团宏兴钢铁股份有限公司 Single duplex closes drilling drift arrangement and stoping method
CN113047838A (en) * 2021-06-02 2021-06-29 北京科技大学 Fine and safe stoping method for mining stagnant and retained gallery ore by subsection or stage open stope method
CN113216963A (en) * 2021-05-18 2021-08-06 中钢集团马鞍山矿山研究总院股份有限公司 Stoping method for gallery ore in transition mining by caving method to filling method
CN114263460A (en) * 2021-12-06 2022-04-01 山东金岭矿业股份有限公司 Method for stoping mountainside type tailing pond
CN117684973A (en) * 2024-01-31 2024-03-12 北京科技大学 Auxiliary air bag recycling device and method for ore deposit of ore deposit hopper

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101328809A (en) * 2008-06-25 2008-12-24 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Non-bottom pillar deep hole falling-back type mining method
CN101403304A (en) * 2008-10-30 2009-04-08 昆明理工大学 Large dead zone residual ore recovery method
CN101943008A (en) * 2010-08-26 2011-01-12 中国瑞林工程技术有限公司 Pillar reinforcement method of reclaim residual mine
CN103114854A (en) * 2013-02-18 2013-05-22 中南大学 Pillar robbing method of reconstructed artificial stud
CN104100268A (en) * 2013-04-08 2014-10-15 彭康 Seesaw-type timbering roof building remaining ore extraction method
CN104895566A (en) * 2015-06-15 2015-09-09 武汉科技大学 Mining method with residual ore recovery function
US20160123096A1 (en) * 2014-11-03 2016-05-05 Baker Hughes Incorporated In-situ mining of ores from subsurface formations

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101328809A (en) * 2008-06-25 2008-12-24 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Non-bottom pillar deep hole falling-back type mining method
CN101403304A (en) * 2008-10-30 2009-04-08 昆明理工大学 Large dead zone residual ore recovery method
CN101943008A (en) * 2010-08-26 2011-01-12 中国瑞林工程技术有限公司 Pillar reinforcement method of reclaim residual mine
CN103114854A (en) * 2013-02-18 2013-05-22 中南大学 Pillar robbing method of reconstructed artificial stud
CN104100268A (en) * 2013-04-08 2014-10-15 彭康 Seesaw-type timbering roof building remaining ore extraction method
US20160123096A1 (en) * 2014-11-03 2016-05-05 Baker Hughes Incorporated In-situ mining of ores from subsurface formations
CN104895566A (en) * 2015-06-15 2015-09-09 武汉科技大学 Mining method with residual ore recovery function

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张奇等: "深孔矿房存窿矿石的回收技术", 《现代矿业》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625857A (en) * 2018-06-15 2018-10-09 甘肃酒钢集团宏兴钢铁股份有限公司 Single duplex closes drilling drift arrangement and stoping method
CN108625857B (en) * 2018-06-15 2024-02-02 甘肃酒钢集团宏兴钢铁股份有限公司 Single-double combined rock drilling roadway arrangement structure and stoping method
CN113216963A (en) * 2021-05-18 2021-08-06 中钢集团马鞍山矿山研究总院股份有限公司 Stoping method for gallery ore in transition mining by caving method to filling method
CN113216963B (en) * 2021-05-18 2022-05-27 中钢集团马鞍山矿山研究总院股份有限公司 Stoping method for gallery ore in transition mining by caving method to filling method
CN113047838A (en) * 2021-06-02 2021-06-29 北京科技大学 Fine and safe stoping method for mining stagnant and retained gallery ore by subsection or stage open stope method
CN114263460A (en) * 2021-12-06 2022-04-01 山东金岭矿业股份有限公司 Method for stoping mountainside type tailing pond
CN114263460B (en) * 2021-12-06 2023-11-17 山东金岭矿业股份有限公司 Stoping method for mountain-side tailing pond
CN117684973A (en) * 2024-01-31 2024-03-12 北京科技大学 Auxiliary air bag recycling device and method for ore deposit of ore deposit hopper
CN117684973B (en) * 2024-01-31 2024-04-09 北京科技大学 Auxiliary air bag recycling device and method for ore deposit of ore deposit hopper

Similar Documents

Publication Publication Date Title
CN108661646B (en) False roof pillar type shrinkage and post filling mining method
CN108612530B (en) Mining method for hanging wall surrounding rock crushing inclined medium-thickness ore body
CN103089266B (en) Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN100554642C (en) A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining
CN103590831B (en) A kind of gentle dip is thin-the novel mining methods of middle thickness orebody
CN102562065B (en) Sublevel open-stop and delayed filling mining method
CN106121649A (en) Use the stoping method of the remained ore of block chambering method rooming
CN102704934B (en) High-yield and low-cost subsequent filling mining method for underground mine
CN203452793U (en) Room structure of shallow-hole shrinkage mining method for mining near-surface thick, large and more oblique ore body
CN109630115B (en) Sublevel open stope subsequent filling mining method for gently inclined medium-thickness ore body
CN111550244B (en) Mining method for layered strips of gently inclined ore body
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN102953733A (en) Central outside-vein house pillar type combined crosscut two-end inside-vein continuous segment filling mining method
CN110714760B (en) Mining method for coal-aluminum symbiotic layered induction collaborative mining
CN106499396B (en) Medium-thickness slowly-inclined waste rock-containing interlayer ore body room-column mining method
CN112796758A (en) High-segmentation non-cutting raise broaching and medium-length hole stage open stoping subsequent filling mining method
CN110656939B (en) Large-stage efficient mining method for steeply inclined medium-thickness ore body meeting water argillization surrounding rock
CN104100270A (en) Trackless mining method for gently inclined ore vein
CN101403304A (en) Large dead zone residual ore recovery method
CN102979526B (en) Building process of ore removal trench by adopting filling method in medium-length hole sublevel mining
CN201474347U (en) Sublevel mining room
CN109505606B (en) Pre-roof-control mechanized sublevel open stoping subsequent filling mining method
CN103982186B (en) The vertical Inclined strips sublevel caving of oper cylinler retrusive
CN111852478B (en) Thick, large and stable ore body filling mining method with H-shaped stud structure
CN104612692B (en) Formation continuous filling mining method followed by segmentation ore caving polycrystalline substance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication