CN106120847A - Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process - Google Patents

Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process Download PDF

Info

Publication number
CN106120847A
CN106120847A CN201610598142.1A CN201610598142A CN106120847A CN 106120847 A CN106120847 A CN 106120847A CN 201610598142 A CN201610598142 A CN 201610598142A CN 106120847 A CN106120847 A CN 106120847A
Authority
CN
China
Prior art keywords
anchoring bolts
embedded anchoring
mounting process
condensation photovoltaic
steel mesh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610598142.1A
Other languages
Chinese (zh)
Inventor
王永向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU POLYMERIZATION TECHNOLOGY Co Ltd
Original Assignee
CHENGDU POLYMERIZATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU POLYMERIZATION TECHNOLOGY Co Ltd filed Critical CHENGDU POLYMERIZATION TECHNOLOGY Co Ltd
Priority to CN201610598142.1A priority Critical patent/CN106120847A/en
Publication of CN106120847A publication Critical patent/CN106120847A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Photovoltaic Devices (AREA)

Abstract

The present invention relates to condensation photovoltaic pedestal and reinforce pre-embedded anchoring bolts mounting process, belong to solar energy generation technology field, be routed to condensation photovoltaic base bottom including by steel mesh level;Lead screw lower end securing plate being fixed on pre-embedded anchoring bolts body;The fixation hook of pre-embedded anchoring bolts body lower end is caught on steel mesh;Adjusting pre-embedded anchoring bolts makes securing plate towards four processing steps of positive east-west direction, when this pre-embedded anchoring bolts mounting process pulls pedestal in light gathering photovoltaic power generating system running, do not result in the power of pullling to the destruction at pedestal upper surface and pre-embedded anchoring bolts, the safety of whole light gathering photovoltaic power generating system has been effectively ensured.

Description

Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process
Technical field
The present invention relates to condensation photovoltaic pedestal and reinforce pre-embedded anchoring bolts mounting process, belong to solar energy generation technology field.
Background technology
Sunray is converged on condensation photovoltaic battery chip by light gathering photovoltaic power generating system mainly by lens, thus Reach the purpose of generating.Pre-embedded anchoring bolts is to connect light gathering photovoltaic power generating system pedestal and light gathering photovoltaic power generating system support The bridge of (including concentrating photovoltaic assembly), plays very important effect in light gathering photovoltaic power generating system running.When poly- Operationally, the center of gravity of light gathering photovoltaic power generating system can change, particularly light photovoltaic generating system along with the rotation of the sun At east-west direction, pre-embedded anchoring bolts can be reached by and pull pedestal, will start base-plates surface slowly to destroy in the course of time, Also result in the pre-embedded anchoring bolts contacted with condensation photovoltaic support simultaneously and cause damage.
Summary of the invention
The invention provides condensation photovoltaic pedestal and reinforce pre-embedded anchoring bolts mounting process, this pre-embedded anchoring bolts erector To be solved technical problem is that of skill overcomes the deficiencies in the prior art.
In order to realize above-mentioned technical purpose, the present invention adopts the technical scheme that: condensation photovoltaic pedestal reinforces pre-buried lower margin Bolt mounting process, is characterized in that, it includes steel mesh level is routed to condensation photovoltaic base bottom;Securing plate is fixed on pre- Lead screw lower end on buried foot bolt body;The fixation hook of pre-embedded anchoring bolts body lower end is caught on steel mesh;Adjust pre-buried Foundation bolt makes securing plate towards four processing steps of positive east-west direction.
Steel mesh level is routed to condensation photovoltaic base bottom by described mounting process personnel, and by tied silk by steel mesh infall It is fixed up.
Securing plate is fixed on the lead screw lower end on pre-embedded anchoring bolts body by described mounting process personnel.
The fixation hook of pre-embedded anchoring bolts body lower end is caught on steel mesh by described mounting process personnel.
Described mounting process personnel adjust pre-embedded anchoring bolts makes securing plate towards positive east-west direction.
Advantages of the present invention and good effect be: this pre-embedded anchoring bolts mounting process runs at light gathering photovoltaic power generating system During when pullling pedestal, do not result in the power of pullling to the destruction at pedestal upper surface and pre-embedded anchoring bolts, be effectively ensured The safety of whole light gathering photovoltaic power generating system.
Accompanying drawing explanation
Fig. 1 is that condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process schematic diagram.
Wherein: 1, pre-embedded anchoring bolts body, 2, lead screw, 3, fixation hook, 4, securing plate, 5, steel mesh.
Detailed description of the invention
The present invention is further illustrated below in conjunction with the accompanying drawings.
Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process, as it is shown in figure 1, include being routed to steel mesh 5 level Condensation photovoltaic base bottom;Lead screw 2 lower end that securing plate 4 is fixed on pre-embedded anchoring bolts body 1;By pre-buried lower margin spiral shell The fixation hook 3 of bolt body 1 lower end catches on steel mesh;Adjusting pre-embedded anchoring bolts makes securing plate 4 towards four technique steps of positive east-west direction Suddenly, fixation hook 3 is laid immediately on below the steel mesh of light gathering photovoltaic power generating system pedestal, when light gathering photovoltaic power generating system running In, the normal operation of light gathering photovoltaic power generating system, securing plate 4 side of being is ensured by the pulling force of steel mesh and the own wt of pedestal Shape plate, the power of pullling that light gathering photovoltaic power generating system operating is brought is generally uniformly dispersed in securing plate 4, thus is effectively ensured Power of pullling is to will not be destroyed at pedestal upper surface and pre-embedded anchoring bolts.
When mounted, first pre-embedded anchoring bolts is positioned over below steel mesh and together with being closely against with steel mesh, will simultaneously Securing plate is placed at the bolt body being connected with lead screw, complete mixed earth to be loaded and etc. to be solidified after, then by condensation photovoltaic Ring flange bottom electricity generation system photovoltaic bracket is enclosed within the lead screw of pre-embedded anchoring bolts, is finally screwed in lead screw by nut ?.
In the present invention, as becoming row embodiment, the angle of bolt body and fixation hook can be less than 90 degree, therefore the present invention Rights protection scope limits in the range of standard with claims.

Claims (5)

1. condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process, it is characterized in that, it includes being routed to gather by steel mesh level Light photovoltaic base bottom;Lead screw lower end securing plate being fixed on pre-embedded anchoring bolts body;By pre-embedded anchoring bolts originally The fixation hook of body lower end catches on steel mesh;Adjusting pre-embedded anchoring bolts makes securing plate towards four processing steps of positive east-west direction.
Condensation photovoltaic pedestal the most according to claim 1 reinforces pre-embedded anchoring bolts mounting process, it is characterized in that described peace Steel mesh level is routed to condensation photovoltaic base bottom by dress technologist, and is fixed up by steel mesh infall by tied silk.
Condensation photovoltaic pedestal the most according to claim 1 reinforces pre-embedded anchoring bolts mounting process, it is characterized in that described peace Securing plate is fixed on the lead screw lower end on pre-embedded anchoring bolts body by dress technologist.
Condensation photovoltaic pedestal the most according to claim 1 reinforces pre-embedded anchoring bolts mounting process, it is characterized in that described peace The fixation hook of pre-embedded anchoring bolts body lower end is caught on steel mesh by dress technologist.
Condensation photovoltaic pedestal the most according to claim 1 reinforces pre-embedded anchoring bolts mounting process, it is characterized in that described peace Dress technologist adjusts pre-embedded anchoring bolts makes securing plate towards positive east-west direction.
CN201610598142.1A 2016-07-27 2016-07-27 Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process Pending CN106120847A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610598142.1A CN106120847A (en) 2016-07-27 2016-07-27 Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610598142.1A CN106120847A (en) 2016-07-27 2016-07-27 Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process

Publications (1)

Publication Number Publication Date
CN106120847A true CN106120847A (en) 2016-11-16

Family

ID=57290384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610598142.1A Pending CN106120847A (en) 2016-07-27 2016-07-27 Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process

Country Status (1)

Country Link
CN (1) CN106120847A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619173A (en) * 2012-04-25 2012-08-01 中铁大桥局集团第五工程有限公司 Construction method of large bridge steel guardrail concrete base
JP5553947B1 (en) * 2014-02-26 2014-07-23 グリーンリバー株式会社 Installation method of solar panel support column by cast-in percussion method
CN204023791U (en) * 2014-08-22 2014-12-17 中国十七冶集团有限公司 Embedding anchor bolts device
CN204717248U (en) * 2015-06-03 2015-10-21 马鞍山聚力科技有限公司 A kind of fixed hydraulic breaker base locking device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619173A (en) * 2012-04-25 2012-08-01 中铁大桥局集团第五工程有限公司 Construction method of large bridge steel guardrail concrete base
JP5553947B1 (en) * 2014-02-26 2014-07-23 グリーンリバー株式会社 Installation method of solar panel support column by cast-in percussion method
CN204023791U (en) * 2014-08-22 2014-12-17 中国十七冶集团有限公司 Embedding anchor bolts device
CN204717248U (en) * 2015-06-03 2015-10-21 马鞍山聚力科技有限公司 A kind of fixed hydraulic breaker base locking device

Similar Documents

Publication Publication Date Title
CN206478023U (en) Solar-electricity fan
CN206379917U (en) A kind of solar photovoltaic bracket device for being easy to angular adjustment
CN208564859U (en) A kind of intelligent wind power generating equipment
CN110336524A (en) A kind of photovoltaic panel assembly border structure being easily installed
CN105937482A (en) Wind energy and solar energy integrated power generation device with lightning arrester
CN106120847A (en) Condensation photovoltaic pedestal reinforces pre-embedded anchoring bolts mounting process
CN206698362U (en) A kind of Portable Monitoring Set
CN203386774U (en) Adjustable photovoltaic bracket
CN107040192A (en) A kind of adjustable angle and solar panel easy for installation
CN106015846A (en) Base reinforcement built-in foundation bolt for concentrating photovoltaic power generation system
CN206759374U (en) A kind of novel foundation stake adjustable photovoltaic support
CN205822231U (en) A kind of light gathering photovoltaic power generating system pedestal pre-embedded anchoring bolts
CN205453612U (en) Unipolar angle modulation support
CN208158511U (en) A kind of base support for installing solar panels
CN208042544U (en) A kind of solar panels suitable for liftable rotation adjusting between high mountain gorge
CN211296628U (en) Photovoltaic power station for photovoltaic power generation
CN208363777U (en) A kind of cross-arm installation auxiliary device
CN106054942A (en) Solar photovoltaic power generation control device
CN106150173A (en) A kind of solar energy electric pole
CN105939140A (en) Turnover solar cell panel with wind power generation
CN206640531U (en) Solar energy kinetic hydraulic energy integration generating device
CN208128179U (en) A kind of new type solar energy tracking device
CN208425431U (en) A kind of wind light mutual complementing bird-scaring unit
CN105545603B (en) The dropproof safety device of magnetic suspension of vertical axis wind power generation system
CN206452349U (en) A kind of high performance solar batteries

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161116

WD01 Invention patent application deemed withdrawn after publication