CN106120702A - High roadbed artificial foundation's back-filling in layers layering strong rammer composite reinforcement method - Google Patents

High roadbed artificial foundation's back-filling in layers layering strong rammer composite reinforcement method Download PDF

Info

Publication number
CN106120702A
CN106120702A CN201610775625.4A CN201610775625A CN106120702A CN 106120702 A CN106120702 A CN 106120702A CN 201610775625 A CN201610775625 A CN 201610775625A CN 106120702 A CN106120702 A CN 106120702A
Authority
CN
China
Prior art keywords
strong rammer
filling
energy level
foundation
high roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610775625.4A
Other languages
Chinese (zh)
Other versions
CN106120702B (en
Inventor
杨印旺
任继荣
李锋瑞
张洁玙
郭伟林
肖华只
安明
王东杰
谢俊平
淮雪峰
任冬林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Mechanization Construction Group Co Ltd
Original Assignee
Shanxi Mechanization Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Mechanization Construction Group Co Ltd filed Critical Shanxi Mechanization Construction Group Co Ltd
Priority to CN201610775625.4A priority Critical patent/CN106120702B/en
Publication of CN106120702A publication Critical patent/CN106120702A/en
Application granted granted Critical
Publication of CN106120702B publication Critical patent/CN106120702B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention belongs to high roadbed artificial foundation back-filling in layers technical field in architectural engineering, specifically a kind of high roadbed artificial foundation's back-filling in layers layering strong rammer composite reinforcement method.Specifically comprise the following steps that 1) clear table, 2) original ground processes, and 3) excavation and filling interface digs step and processes, and 4) back-filling in layers mode, 5) layering strong rammer.The present invention uses this technique to solve, and high roadbed artificial foundation's intractability is big, long construction period and the high difficult problem of settlement after construction requirement, and have that high treating effect, speed of application be fast and the advantage such as residual settlement is little, it is that high fill foundation compares successful treatment technology means at present.

Description

High roadbed artificial foundation's back-filling in layers layering strong rammer composite reinforcement method
Technical field
The invention belongs to high roadbed artificial foundation back-filling in layers technical field in architectural engineering, specifically a kind of high roadbed people Building site base back-filling in layers layering strong rammer composite reinforcement method.
Background technology
Backfill highly fill foundation more than 20m is typically referred to as high fill foundation, traditional native stone by engineering construction industry Side's backfill reinforcement means and method for processing foundation, it is necessary to by the longer deadweight sedimentation time, exchange the whole of high fill foundation for Body is stable, it is impossible to adapt to construction period and the requirement of fund period of investment return of engineering construction at present, and, traditional approach is for high roadbed The backfill height of ground and consolidation effect aspect are all restricted.
Summary of the invention
The present invention is to solve the restriction that high fill foundation faces, it is provided that a kind of high roadbed artificial foundation's back-filling in layers layering Strong rammer composite reinforcement method.
A kind of high roadbed artificial foundation's back-filling in layers layering strong rammer composite reinforcement method, is suitable for following ground: 1, by digging The high roadbed artificial foundation that ditch earthwork balance is formed is filled out on mountain;2, the high roadbed artificial foundation of formation is backfilled by debit;
Specifically comprise the following steps that
1) clear table: before construction, carries out top layer vegetation, fertile soil etc. and is not suitable for material and carries out the original ground of high roadbed artificial foundation Cleaning, cleaning is to qualified basal plane always.
2) original ground processes;According to prospecting report and design requirement, take into account wanting of foundation bearing capacity requirement and elastic modelling quantity Ask, use the process means such as vibroroller cmpacting, impact-rolling, forced ramming reinforcing mode and composite foundation that original ground is processed, Guarantee processes groundwork bearing capacity and elastic modelling quantity reaches the high roadbed artificial foundation requirement for original place base, if high roadbed slope Outside of foot is for having free face along near slope toe or toe, it is impossible to when meeting foundation bearing capacity and stability requirement, uses antiskid Stake and barricade process.
3) excavation and filling interface digs step and processes: for original ground natural grade suddenly when the 1:5, carries out original ground and digs at stylobate Reason, excavates the table soil that original ground is loose, and making step depth-width ratio is 1:2, introversion inclined-plane 2%, and embankment can closely be engaged shape with excavation zone Integral, the width of step and height layout parameter according to filling body strong rammer and backfill thickness determines, width is strong not less than 1-2 row Ramming the distance of tamping point, height is a backfill layer thickness.
4) back-filling in layers mode: when high roadbed artificial foundation fills, if a point dried layer carries out forced ramming reinforcing;One backfill layer by Some backfill subgrades are formed, and the thickness of backfill subgrade is by every subgrade 1.0m~1.5m;Backfill face is pressed cloth planning distance by Dump truck discharging, bull-dozer flattens.
5) layering strong rammer: lift height than design strong rammer energy level effective reinforcement depth reduce 1m, with ensure each by force Ram and reinforce pier body and can extend into bottom backfill layer, form the state that is mutually twisted, fully ensure that filling body globality, every layer After strong rammer point is rammed into, carries out a full rammer on surface, carry out the reinforcing on loose top layer, reduce settlement after construction.
6) the 4th is repeated) step and the 5th) step, until completing the process work of whole high fill foundation.
Carrying out the 5th) step, strong rammer energy level during layering strong rammer is as follows with the relation of backfill thickness,
Carrying out the 5th) step, during layering strong rammer, no matter take the arrangement form of the form such as square or triangle, main tamping point Spacing is close with the effective reinforcement depth of corresponding energy level, and the main grid spacing of 4000KN.m energy level is not more than 6m, 6000KN.m energy level Main grid spacing is not more than 8m, the 8000KN.m main grid spacing of energy level, and to be not more than 8m, the 12000KN.m main grid spacing of energy level little In 11m, to stagger in upper and lower two backfill layer strong rammer main tamping point positions, in order to upper strata backfill layer forced ramming reinforcing pier body and lower floor's backfill Layer forms the most ratcheting state;The control standard that single-point ramming times and last two hits, is proposed by designing unit and through strong Rammer test determines.
Carrying out the 5th) step, during layering strong rammer, according to high level more than 8000KN.m energy level and ultra high energy level strong rammer Time, parameter designing uses square to layout, divides and complete for 2 times;Meanwhile, in the middle of main tamping point, insert a little as the 3rd time tamping point, energy The more main tamping point of level reduces 1-2 energy level.
The present invention digs step, back-filling in layers, layering heavy tamping treatment etc. by using original ground basement process, excavation and filling interface A series of reinforcement techniques, it is ensured that the stability in the large of high roadbed artificial foundation, safety, and improve constantly high roadbed artificially The filled height (current filled height is more than hundred meters) of base so that high roadbed artificial foundation is before building site growing tension Put, be conducive to using in the bare place region such as deserted mountain cheuch and remove mountain and fill out ditch mode and make ground.
Use back-filling in layers, layering strong tamping technology, by adjusting backfilling of earthwork parameter and the parameter of layering strong rammer, and carry out Change combination, effectively reinforces high fill foundation so that consolidation effect, foundation bearing capacity and settlement after construction all can meet Design requirement, and there is the features such as fast, efficient, safe and environmental protection.
By earthwork back-filling in layers and the technical combinations of strong rammer energy level, by adjusting different back-filling in layers parameters and difference Strong rammer parameter, by effective engineering measure, principle can process the high roadbed of arbitrary height under current technical status artificial Ground.
Use this technique to solve high roadbed artificial foundation's intractability is big, long construction period and settlement after construction requirement high A difficult problem, and have that high treating effect, speed of application be fast and the advantage such as residual settlement is little, be high fill foundation at present the most successfully Treatment technology means.
Accompanying drawing explanation
Fig. 1 is present invention process flow chart;
Fig. 2 is excavation and filling interface structural representation;
Fig. 3 is that schematic diagram is looked squarely in the backfill of a backfill subgrade;
Fig. 4 is the earthwork landfill top view of a backfill subgrade;
Fig. 5 is that layering strong rammer is layouted schematic diagram;
1-strong rammer tamping point in figure, 2-back-filling in layers height, 3-excavation and filling interface, 4-mound, the ground after 5-leveling, 6-backfills Asia Layer, next backfill layer strong rammer point of 7-, the upper backfill layer strong rammer point of 8-.
Detailed description of the invention
A kind of high roadbed artificial foundation's back-filling in layers layering strong rammer composite reinforcement method, is suitable for following ground: 1, by digging The high roadbed artificial foundation that ditch earthwork balance is formed is filled out on mountain;2, the high roadbed artificial foundation of formation is backfilled by debit.
Specific implementation method:
1) filling body lift height and strong rammer energy level, parameter designing are carried out.
2) vegetation and top layer according to high roadbed artificial foundation's construction area are not suitable for material thickness, use backacter Or bull-dozer clears up, after cleaning, fertile soil appointed place is left concentratedly.
3) original ground processes: is distributed according to ground requirement for bearing capacity and special geology, carries out original ground basement process.
4) excavation and filling interface digs step: uses backacter to carry out digging step and processes.
5) back-filling in layers: by each subgrade thickness planned in advance, uses dump truck muck haulage, cloth soil, and bull-dozer flattens;Respectively Subgrade is successively filled to strong rammer face absolute altitude.
6) layering strong rammer:
A. working procedure
A preparation of construction → time point rams setting-out, measurement place elevation → mono-time point rams place leveling, measurement after construction is rammed for → a time Place elevation, two times points ram setting-out → bis-time point and ram place leveling after construction is rammed for → bis-times, measure place elevation → (extrahigh energy Level strong rammer: insert for three times ram setting-out, measure place elevation → tri-time insert ram place leveling after construction is rammed for → tri-times, to measure place high Journey, completely rammer datum line setting-out → completely ram leveling measurement place, place elevation after construction → full rammer
B forced ramming construction method
1 main tamping point and reinforcing ramming construction method
1) smooth construction site is cleared up.
2) first pass tamping point setting-out, uses white lime to spill rammer position contour line.
3) setting up level gauge, level gauge is located at outside 50 meters of tamping pit limit.
4) tamping point ground elevation is measured.
5) tamping machine is in place, makes hammer ram center be directed at tamping point position, adjusts armed lever angle to 65 degree after stable car.
6) peen elevation record before rammer is measured.
7) promote detacher, demarcate away from and lock detacher rope capacity.
8) promote hammer ram to open hammer ram freely fall to predetermined altitude, detacher, and put down suspension hook.
9) peen elevation is measured.
10) step 8) 9 is repeated), by ramming times and the control standard of design requirement, complete ramming of a tamping point.
11) telephone-moving carries out subsequent point and rams, until completing this all over whole tamping points.
12) with bull-dozer, tamping pit is filled and led up, and measure place elevation, mark the position of second time tamping point.
13) again by above-mentioned steps, gradually complete all to ram pass.
14) ultra high energy level strong rammer, repeat the above steps, complete to insert tamping point construction.
2 full ramming construction methods
1) smooth location.
2) measure place elevation, release and completely ram datum line.
3) crane is in place, and hammer ram is placed in benchmark line end.
4) the principle pointwise taking 1/4 according to hammering mutually is rammed, and rams several 1-2 at every and hits.
5) ram by row, complete full rammer and construct.
6) smooth location.
3 last layer constructions
Notice during surveying setting-out staggering in the strong rammer main tamping point position with following backfill layer, in order to upper strata backfill layer forced ramming reinforcing pier body Backfill layer with lower floor and form the most ratcheting state.

Claims (4)

1. high roadbed artificial foundation's back-filling in layers layering strong rammer composite reinforcement method, it is characterised in that: applicable following ground: 1, the high roadbed artificial foundation of ditch earthwork balance formation is filled out by digging mountain;2, the high roadbed of formation is backfilled artificially by debit Base;
Specifically comprise the following steps that
1) clear table: before construction, carries out top layer vegetation, fertile soil etc. and is not suitable for material and carries out the original ground of high roadbed artificial foundation Cleaning, cleaning is to qualified basal plane always;
2) original ground processes;According to prospecting report and design requirement, take into account the requirement of foundation bearing capacity requirement and elastic modelling quantity, adopt By process means such as vibroroller cmpacting, impact-rolling, forced ramming reinforcing mode and composite foundations, original ground is processed, it is ensured that place Reason groundwork bearing capacity and elastic modelling quantity reach the high roadbed artificial foundation requirement for original place base, if outside high roadbed toe For having free face along near slope toe or toe, it is impossible to when meeting foundation bearing capacity and stability requirement, use friction pile and gear Wall processes;
3) excavation and filling interface digs step and processes: for original ground natural grade suddenly when the 1:5, carries out original ground and digs stylobate and process, Excavating the table soil that original ground is loose, making step depth-width ratio is 1:2, introversion inclined-plane 2%, and embankment can closely be engaged formation with excavation zone Integrally, the width of step and height according to filling body strong rammer layout parameter and backfill thickness determine, width not less than 1-2 arrange strong rammer The distance of tamping point, height is a backfill layer thickness;
4) back-filling in layers mode: when high roadbed artificial foundation fills, if a point dried layer carries out forced ramming reinforcing;One backfill layer is by some Backfill subgrade is formed, and the thickness of backfill subgrade is by every subgrade 1.0m~1.5m;Backfill face is pressed cloth planning distance by self-unloading Automobile discharging, bull-dozer flattens;
5) layering strong rammer: lift height reduces 1m than the effective reinforcement depth of design strong rammer energy level, to ensure that each strong rammer adds Gu pier body can extend into bottom backfill layer, form the state being mutually twisted, fully ensure that filling body globality, every layer of strong rammer After point is rammed into, carries out a full rammer on surface, carry out the reinforcing on loose top layer, reduce settlement after construction;
6) the 4th is repeated) step and the 5th) step, until completing the process work of whole high fill foundation.
High roadbed artificial foundation's back-filling in layers the most according to claim 1 layering strong rammer composite reinforcement method, its feature exists In: carrying out the 5th) step, strong rammer energy level during layering strong rammer is as follows with the relation of backfill thickness,
High roadbed artificial foundation's back-filling in layers the most according to claim 2 layering strong rammer composite reinforcement method, its feature exists In: carrying out the 5th) step, during layering strong rammer, no matter take the arrangement form of the form such as square or triangle, main tamping point Spacing is close with the effective reinforcement depth of corresponding energy level, and the main grid spacing of 4000KN.m energy level is not more than 6m, 6000KN.m energy level Main grid spacing is not more than 8m, the 8000KN.m main grid spacing of energy level, and to be not more than 8m, the 12000KN.m main grid spacing of energy level little In 11m, to stagger in upper and lower two backfill layer strong rammer main tamping point positions, in order to upper strata backfill layer forced ramming reinforcing pier body and lower floor's backfill Layer forms the most ratcheting state;The control standard that single-point ramming times and last two hits, is proposed by designing unit and through strong Rammer test determines.
High roadbed artificial foundation's back-filling in layers the most according to claim 3 layering strong rammer composite reinforcement method, its feature exists In: carrying out the 5th) step, during layering strong rammer, during according to high level more than 8000KN.m energy level and ultra high energy level strong rammer, ginseng Number is designed with square and layouts, and divides and completes for 2 times;Meanwhile, in the middle of main tamping point, inserting a little as the 3rd time tamping point, energy level is more main Tamping point reduces 1-2 energy level.
CN201610775625.4A 2016-08-31 2016-08-31 High roadbed artificial foundation back-filling in layers is layered strong rammer composite reinforcement method Active CN106120702B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610775625.4A CN106120702B (en) 2016-08-31 2016-08-31 High roadbed artificial foundation back-filling in layers is layered strong rammer composite reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610775625.4A CN106120702B (en) 2016-08-31 2016-08-31 High roadbed artificial foundation back-filling in layers is layered strong rammer composite reinforcement method

Publications (2)

Publication Number Publication Date
CN106120702A true CN106120702A (en) 2016-11-16
CN106120702B CN106120702B (en) 2018-06-22

Family

ID=57273406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610775625.4A Active CN106120702B (en) 2016-08-31 2016-08-31 High roadbed artificial foundation back-filling in layers is layered strong rammer composite reinforcement method

Country Status (1)

Country Link
CN (1) CN106120702B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884442A (en) * 2017-04-25 2017-06-23 西安理工大学 A kind of implementation of cheuch shape high fill foundation multi- scenarios method monitoring system
CN109706879A (en) * 2019-01-09 2019-05-03 武汉一冶建筑安装工程有限责任公司 Rainy season Airport in Mountain Region road base and the clear table method of highway subgrade
CN109797730A (en) * 2019-01-29 2019-05-24 中国机械设备工程股份有限公司 Ground heddle combined pressure reality dam filling construction is made in a kind of Gullied Rolling Loess Region embankment
CN109972635A (en) * 2019-02-26 2019-07-05 武汉一冶建筑安装工程有限责任公司 Side slope pastes high roadbed quality in slope and controls construction method
CN110318385A (en) * 2019-06-25 2019-10-11 青岛即城市政园林工程有限公司 A kind of weak subgrade forced ramming construction method
CN111622202A (en) * 2020-05-19 2020-09-04 民航机场规划设计研究总院有限公司 Method for filling and detecting boulder by dynamic compaction
CN113565564A (en) * 2020-04-28 2021-10-29 山西机械化建设集团有限公司 Open pit and full-collapse goaf layered backfill dynamic compaction treatment method
CN114411684A (en) * 2022-01-06 2022-04-29 西北工业大学 Dynamic compaction reinforcement optimization technology for high-fill filling and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11181751A (en) * 1997-12-17 1999-07-06 Taihei Kogyo Co Ltd Method for reinforcing soft ground using slag
JP2002105942A (en) * 2000-10-03 2002-04-10 Nippon Kaikou Kk Static compacting construction method of pile and its device
CN101349052A (en) * 2008-09-09 2009-01-21 建研地基基础工程有限责任公司 Saline soil area combined drain system and combined water drain forced ramming foundation treating method thereof
CN105160057A (en) * 2015-07-08 2015-12-16 中北大学 Method for determining optimal moisture content of filling soil in same energy level according to compaction-settlement ratio

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11181751A (en) * 1997-12-17 1999-07-06 Taihei Kogyo Co Ltd Method for reinforcing soft ground using slag
JP2002105942A (en) * 2000-10-03 2002-04-10 Nippon Kaikou Kk Static compacting construction method of pile and its device
CN101349052A (en) * 2008-09-09 2009-01-21 建研地基基础工程有限责任公司 Saline soil area combined drain system and combined water drain forced ramming foundation treating method thereof
CN105160057A (en) * 2015-07-08 2015-12-16 中北大学 Method for determining optimal moisture content of filling soil in same energy level according to compaction-settlement ratio

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨印旺: "强夯法在黄土地区某高填方工程中的应用", 《施工技术》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884442A (en) * 2017-04-25 2017-06-23 西安理工大学 A kind of implementation of cheuch shape high fill foundation multi- scenarios method monitoring system
CN106884442B (en) * 2017-04-25 2019-07-23 西安理工大学 A kind of implementation method of cheuch shape high fill foundation multi- scenarios method monitoring system
CN109706879A (en) * 2019-01-09 2019-05-03 武汉一冶建筑安装工程有限责任公司 Rainy season Airport in Mountain Region road base and the clear table method of highway subgrade
CN109797730A (en) * 2019-01-29 2019-05-24 中国机械设备工程股份有限公司 Ground heddle combined pressure reality dam filling construction is made in a kind of Gullied Rolling Loess Region embankment
CN109972635A (en) * 2019-02-26 2019-07-05 武汉一冶建筑安装工程有限责任公司 Side slope pastes high roadbed quality in slope and controls construction method
CN110318385A (en) * 2019-06-25 2019-10-11 青岛即城市政园林工程有限公司 A kind of weak subgrade forced ramming construction method
CN113565564A (en) * 2020-04-28 2021-10-29 山西机械化建设集团有限公司 Open pit and full-collapse goaf layered backfill dynamic compaction treatment method
CN111622202A (en) * 2020-05-19 2020-09-04 民航机场规划设计研究总院有限公司 Method for filling and detecting boulder by dynamic compaction
CN114411684A (en) * 2022-01-06 2022-04-29 西北工业大学 Dynamic compaction reinforcement optimization technology for high-fill filling and construction method thereof
CN114411684B (en) * 2022-01-06 2024-02-06 西北工业大学 Dynamic compaction reinforcement construction method for high-fill filling

Also Published As

Publication number Publication date
CN106120702B (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN106120702B (en) High roadbed artificial foundation back-filling in layers is layered strong rammer composite reinforcement method
CN107938676B (en) Pile foundation construction method for penetrating through full-filling karst cave
CN113445521B (en) High side slope construction method for filling
CN102392458B (en) Piling beam cofferdam construction method used for bare rock foundation construction in water
CN103321260B (en) Interval boring cuts stake inclination correction method
CN102094425A (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN108252291A (en) The construction method of the coastal backfill super thick foundation of gravelly soil of 25000KN.m heavy tamping treatments
CN108755698B (en) Construction method for steep slope loose accumulation body large inclined rock surface foundation
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN107447778A (en) The heightening and consolidation structure and method of a kind of in-service reinforced concrete retaining wall
CN106436788A (en) Foundation reinforcement and inclination correction method for friction piles of high-rise building
CN110761264A (en) Secondary dynamic compaction gravel replacement and reinforcement method for coastal sludge soft soil foundation
CN112281857A (en) Deep foundation pit excavation construction method
CN104213485A (en) Construction method used for combined dynamic compaction treatment of lake region soil-rock mixed filling roadbed
CN106522191A (en) Transformer substation foundation treatment method and application thereof
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN102817298B (en) Construction method on frozen soil
CN206385525U (en) A kind of timber structure for preventing the high backfill earthwork from sinking
CN102296591A (en) Rapid drainage solidifying treatment method of soft soil foundation
CN113846618A (en) Dynamic compaction replacement reinforcing method for foundation treatment
CN201339186Y (en) Soft rock concrete replacement pile composite foundation
CN102635044B (en) Treating method of dynamic compacter for excavation roadbed
CN207228101U (en) A kind of sand compaction pile for being used in the soft soil foundation of deep water off-lying sea reinforce vertical type shore protection
CN202925538U (en) Rammer constructed on frozen soil
CN216514911U (en) High fill roadbed structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant