CN106120690B - A kind of inverter box becomes platform and preparation method thereof - Google Patents

A kind of inverter box becomes platform and preparation method thereof Download PDF

Info

Publication number
CN106120690B
CN106120690B CN201610683741.3A CN201610683741A CN106120690B CN 106120690 B CN106120690 B CN 106120690B CN 201610683741 A CN201610683741 A CN 201610683741A CN 106120690 B CN106120690 B CN 106120690B
Authority
CN
China
Prior art keywords
platform
prestressed concrete
pipe pile
concrete pipe
landing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610683741.3A
Other languages
Chinese (zh)
Other versions
CN106120690A (en
Inventor
黄万山
王磊
吉春明
李素良
刘欣良
张源
彭秀芳
张瑞云
王泽国
陈勖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Jiangsu Power Design Institute Co Ltd filed Critical China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority to CN201610683741.3A priority Critical patent/CN106120690B/en
Publication of CN106120690A publication Critical patent/CN106120690A/en
Application granted granted Critical
Publication of CN106120690B publication Critical patent/CN106120690B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention provides a kind of inverter box and becomes platform, including based on and the prestressed concrete pipe pile 1 of post and it is arranged on the platform of the prestressed concrete pipe pile upper end, the platform is reinforced concrete beam and plate, including landing beam and landing slab 3, the landing beam is fixed on the upper end of the prestressed concrete pipe pile 1, and the landing slab 3 is fixed on the landing beam.In addition, the present invention also provides the preparation method that a kind of inverter box becomes platform, this method process is simple, difficulty of construction is small, and short time limit, quantities are small.

Description

A kind of inverter box becomes platform and preparation method thereof
Technical field
The present invention relates to a kind of inverter box to become platform and preparation method thereof, belongs to fishing light complementation photovoltaic power generation project structure Technical field.
Background technology
Photovoltaic generation is the important component of national green energy construction, and fishing light complementation photovoltaic plant is then ground light One of principal mode of overhead utility.
Traditional inverter box becomes platform and uses subsoil isolated footing or strip footing, is up steel successively from basis Reinforced concrete column and reinforced concrete platform, platform typically use beam and slab type structure.Because of fishing light complementary terms purpose inverter box Become platform and be generally arranged in fish pond adjacent edges, basis is still seated in inside fish pond.Due to having water all the year round in fish pond, cause Ground topsoil is generally silt soil, thus basic stock size is larger, buried depth is relatively deep to ensure that foundation bearing capacity and ground sink Drop meets to require simultaneously.A water is generally required during construction all to drain, while silt soil is excavated, and is excavated and is completed after-pouring Plain concrete cushion layer, then shuttering, colligation reinforcement foundation, pour base concrete;After the completion of foundation construction colligation column and Beam reinforced steel bar, finally carry out column and beam slab concreting.Traditional scheme construction technology is relatively cumbersome, difficulty of construction is inclined Greatly, especially when fish pond, bottom sludge soil is very thick, and when bearing capacity is very poor, difficulty of construction is bigger, and the construction period is longer.
The content of the invention
The present invention is in order to solve drawbacks described above present in prior art and deficiency, there is provided a kind of inverter box becomes platform And preparation method thereof, the platform can both meet the supporting that inverter box becomes, while easy for construction, quick, and simplify construction Process, greatly accelerate the duration.
In order to solve the above technical problems, the present invention, which provides a kind of inverter box, becomes platform, including based on and post it is pre- Prestressed concrete pile tube and the platform for being arranged on the prestressed concrete pipe pile upper end, the platform are armored concrete Contignation, including landing beam and landing slab, the landing beam is fixed on the upper end of the prestressed concrete pipe pile, described Landing slab is fixed on the landing beam.
Further, the landing beam includes 2 crossbeams and 2 tie-beams, and 2 crossbeams are with being arranged on the pre- of same row The top of prestressed concrete pile tube is connected, and its end is connected by 2 tie-beams.
Further, some secondary beams, the secondary beam and beam vertical and the tie-beam are provided between 2 crossbeams It is parallel.
Further, fence is provided with the platform surrounding edge.
Further, steel ladder is provided with the platform, the steel ladder extends to ground, for the upper lower platform of staff.
Further, the steel ladder is collapsible steel ladder.
The present invention also provides the preparation method that a kind of inverter box becomes platform, it is characterised in that comprises the following steps:
Step 1, the making of prestressed concrete pipe pile;
Measure, the anchor point of true fixed pile, then driven piles at anchor point to making place, that is, make and in advance should Power concrete tubular pile, the height of prestressed concrete pipe pile are more than the height of fish pond waterline;
Step 2, after prestressed concrete pipe pile completes, the welded reinforcement on the pre-buried end plate at the top of pile foundation, it is used for Connect prestressed concrete pipe pile and platform;
Step 3, template is set in stake top portion, the arrangement of template includes the arrangement of landing beam, secondary beam, platform floor;Template Arrangement carries out assembling reinforcement after completing, while built-in fitting is buried, and built-in fitting includes inverter built-in fitting, case becomes pre-buried Part, steel ladder built-in fitting;
Step 4, reinforcing bar and built-in fitting construction after the completion of carry out concreting, maintenance, prestressed concrete pipe pile it is upper End is stretched into concrete platform, and apart from platform base 0.1m;
Step 5, steel ladder installation, steel ladder are connected to platform from roadside;
Step 6, the installation that inverter, case become.
The advantageous effects that the present invention is reached:A kind of inverter box provided by the invention becomes platform, using prestressing force Concrete tubular pile replaces basis and column, does not have earth moving during making, vertical foundation forms, colligation reinforcement foundation, pours The work of base concrete, also without vertical model of the column, colligation column reinforcing bar, the work for pouring column concrete.This contracts significantly Subtract construction work amount, shorten the construction period.Meanwhile basis and column, concrete are replaced using prestressed concrete pipe pile Dosage, amount of reinforcement have declined.Present invention also offers the preparation method that inverter box becomes platform, the letter of this method process List, difficulty of construction are small, and short time limit, quantities are small.
Brief description of the drawings
The inverter box of Fig. 1 present invention becomes the overlooking the structure diagram of platform;
The inverter box of Fig. 2 present invention becomes the left view structural representation of platform.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following examples are only used for clearly illustrating the present invention Technical scheme, and can not be limited the scope of the invention with this.
As shown in Figure 1-2, the present invention provides a kind of inverter box and becomes platform, including based on and post prestressed concrete Native pile tube 1 and the platform for being arranged on the prestressed concrete pipe pile upper end, the platform are reinforced concrete girder slab knot Structure, including landing beam and landing slab 3, the landing beam are fixed on the upper end of the prestressed concrete pipe pile 1, the platform Plate 3 is fixed on the landing beam.
The platform connects using based on prestressed concrete pipe pile with post, prestressed concrete pipe pile top and platform Connect, platform uses reinforced concrete beam and plate, and inverter, box type transformer are seated on reinforced concrete platform.Using side After case, inverter box, which becomes platform, reduces earth excavation and backfilling of earthwork amount, decreases the quantities on basis, including formwork The techniques such as plate, reinforcing bar colligation, casting concrete, while the construction technology of column is simplified, only include piling technique, reduce steel The techniques such as muscle colligation, casting concrete, the quantities of platform are basically unchanged.Become platform in view of fish pond photovoltaic project inverter box The work such as fish pond side, the earthwork, the construction of foundation forms is arranged in be had a great influence by fishpond water, it is existing using that can be reduced after this programme Field difficulty of construction.Therefore, become platform for the inverter box of fishing light complementation photovoltaic project, after this programme, both saved mixed Native dosage and steel flxer journey amount are coagulated, the difficulty of site operation is in turn simplify, reduces the construction period.
The landing beam includes 2 crossbeams 2 and 2 tie-beams, 5,2 crossbeams 2 and is arranged on the prestressing force of same row The top of concrete tubular pile 1 is connected, and its end is connected by 2 tie-beams 5.Some secondary beams are provided between 2 crossbeams 2 6, the secondary beam 6 is vertical with crossbeam 2, parallel with the tie-beam 5.Fence 7 is provided with the platform surrounding edge, increases platform Security performance.Steel ladder 4 is provided with the platform, the steel ladder 4 extends to ground, for the upper lower platform of staff, institute It is collapsible steel ladder to state steel ladder 4.
Present invention also offers the preparation method that inverter box becomes platform, comprise the following steps:
Step 1, the making of prestressed concrete pipe pile;
Measure, the anchor point of true fixed pile, then driven piles at anchor point to making place, that is, make and in advance should Power concrete tubular pile, the height of prestressed concrete pipe pile are more than the height of fish pond waterline;
Step 2, after prestressed concrete pipe pile completes, the welded reinforcement on the pre-buried end plate at the top of pile foundation, it is used for Connect prestressed concrete pipe pile and platform;
Step 3, template is set in stake top portion, the arrangement of template includes the arrangement of landing beam, secondary beam, platform floor;Template Arrangement carries out assembling reinforcement after completing, while built-in fitting is buried, and built-in fitting includes inverter built-in fitting, case becomes pre-buried Part, steel ladder built-in fitting;
Step 4, reinforcing bar and built-in fitting construction after the completion of carry out concreting, maintenance, prestressed concrete pipe pile it is upper End is stretched into concrete platform, and apart from platform base 0.1m;
Step 5, steel ladder installation, steel ladder are connected to platform from roadside;
Step 6, the installation that inverter, case become.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvement and deformation can also be made, these are improved and deformation Also it should be regarded as protection scope of the present invention.

Claims (1)

1. the preparation method that a kind of inverter box becomes platform, the prestressing force that the inverter box becomes based on platform includes with post mixes Coagulate native pile tube and be arranged on the platform of the prestressed concrete pipe pile upper end, the platform is reinforced concrete girder slab knot Structure, including landing beam and landing slab, the landing beam are fixed on the upper end of the prestressed concrete pipe pile, the landing slab It is fixed on the landing beam;The landing beam includes 2 crossbeams and 2 tie-beams, and 2 crossbeams are with being arranged on same row The top of prestressed concrete pipe pile be connected, its end is connected by 2 tie-beams;It is provided between 2 crossbeams some Root secondary beam, the secondary beam with beam vertical, it is parallel with the tie-beam;Fence is provided with the platform surrounding edge;It is described flat Steel ladder is provided with platform, the steel ladder extends to ground, for the upper lower platform of staff;The steel ladder is collapsible steel ladder, Characterized in that, manufacturing process comprises the following steps:
Step 1, the making of prestressed concrete pipe pile;
Measure, the anchor point of true fixed pile, then driven piles at anchor point to making place, that is, make prestressing force and mix Native pile tube is coagulated, the height of prestressed concrete pipe pile is more than the height of fish pond waterline;
Step 2, after prestressed concrete pipe pile completes, the welded reinforcement on the pre-buried end plate at the top of pile foundation, for connecting Prestressed concrete pipe pile and platform;
Step 3, template is set in stake top portion, the arrangement of template includes the arrangement of landing beam, secondary beam, platform floor;Template is arranged After the completion of carry out assembling reinforcement, while built-in fitting is buried, built-in fitting includes inverter built-in fitting, case becomes built-in fitting, steel Terraced built-in fitting;
Concreting, maintenance, the upper end of prestressed concrete pipe pile are carried out after the completion of step 4, reinforcing bar and built-in fitting construction Stretch into concrete platform, and apart from platform base 0.1m;
Step 5, steel ladder installation, steel ladder are connected to platform from roadside;
Step 6, the installation that inverter, case become.
CN201610683741.3A 2016-08-17 2016-08-17 A kind of inverter box becomes platform and preparation method thereof Active CN106120690B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610683741.3A CN106120690B (en) 2016-08-17 2016-08-17 A kind of inverter box becomes platform and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610683741.3A CN106120690B (en) 2016-08-17 2016-08-17 A kind of inverter box becomes platform and preparation method thereof

Publications (2)

Publication Number Publication Date
CN106120690A CN106120690A (en) 2016-11-16
CN106120690B true CN106120690B (en) 2018-02-13

Family

ID=57278647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610683741.3A Active CN106120690B (en) 2016-08-17 2016-08-17 A kind of inverter box becomes platform and preparation method thereof

Country Status (1)

Country Link
CN (1) CN106120690B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930339B (en) * 2017-03-15 2019-11-22 中国能源建设集团江苏省电力设计院有限公司 It is a kind of to flatten the pile foundation reinforcement method of platform for inverter box
CN109667277A (en) * 2018-12-25 2019-04-23 中国能源建设集团广东省电力设计研究院有限公司 Cantilevered coupling beam cable termination field

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929149A (en) * 2009-06-26 2010-12-29 中国石油天然气集团公司 Shallow sea pile foundation concrete oil drilling and producing platform
CN103114567A (en) * 2013-01-31 2013-05-22 合肥聚能新能源科技有限公司 Photovoltaic power generation system combined with fish farm
CN104532813A (en) * 2014-12-16 2015-04-22 江西省城建建设集团有限公司 Overwater building construction platform and erecting method and use method thereof
CN204455845U (en) * 2015-02-10 2015-07-08 中交一航局第一工程有限公司 A kind of large-scale assembling drilling platform
CN205934891U (en) * 2016-08-17 2017-02-08 中国能源建设集团江苏省电力设计院有限公司 Dc -to -ac converter case flattens platform

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000129684A (en) * 1998-10-22 2000-05-09 Nippon Steel Corp Slope face press frame structure, framework structure, and slope face reinforcing method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929149A (en) * 2009-06-26 2010-12-29 中国石油天然气集团公司 Shallow sea pile foundation concrete oil drilling and producing platform
CN103114567A (en) * 2013-01-31 2013-05-22 合肥聚能新能源科技有限公司 Photovoltaic power generation system combined with fish farm
CN104532813A (en) * 2014-12-16 2015-04-22 江西省城建建设集团有限公司 Overwater building construction platform and erecting method and use method thereof
CN204455845U (en) * 2015-02-10 2015-07-08 中交一航局第一工程有限公司 A kind of large-scale assembling drilling platform
CN205934891U (en) * 2016-08-17 2017-02-08 中国能源建设集团江苏省电力设计院有限公司 Dc -to -ac converter case flattens platform

Also Published As

Publication number Publication date
CN106120690A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN206721894U (en) Adjustable prestress device for foundation pit support
CN108755738A (en) A kind of sea high-rise pile cap blower foundation and its construction method
CN107975059A (en) A kind of assembled pile foundation wharfs structure and its construction method
CN101092850A (en) Method and installation for rising building or historical building / cluster of historical building integrally
CN106968256A (en) Foundation ditch assembled steel trestle construction method
CN105780719B (en) Bank revetment heightening construction method is refuted in active service
CN107059773A (en) Assembled integral revetment structure and its construction method on a kind of soft soil foundation
CN108005399A (en) Add the construction method for building multi-layer underground space under a kind of existing building group
CN108277996A (en) The construction method of multi-storey basement is extended under a kind of protection groups of building
CN106436732A (en) Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations
CN103452120A (en) Pile top crown beam structure of high-strength prestress pipe pile for supporting foundation pit and construction method thereof
CN105064711B (en) Method for constructing underground garage between residential buildings
CN106120690B (en) A kind of inverter box becomes platform and preparation method thereof
CN113931166A (en) Barrel-shaped fan foundation of prefabricated sheet pile assembly type connecting structure and construction method thereof
CN103233537A (en) Heavy-load superimposed overhead terrace and construction method
CN210766861U (en) Portal formula building pile foundation underpins structure under narrow and small space
CN113417300A (en) Slope support system and construction method thereof
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
CN209339171U (en) Transmission line assembled sheet pile composite foundation
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN205934891U (en) Dc -to -ac converter case flattens platform
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN207919582U (en) A kind of assembled pile foundation wharfs structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant