The villages and small towns sewage water treatment method of a kind of high-efficient denitrification and dephosphorization and device
Technical field
The present invention relates to a kind of sewage water treatment method and device, be specifically related at the villages and small towns sewage of a kind of high-efficient denitrification and dephosphorization
Reason method and device.
Background technology
" 12 " period, the sewage disposal in city is the most perfect, and the sewage disposal in villages and small towns is the most at the early-stage.Enter
After " 12 ", country puts into further raising to the policy guide of field of Environment Protection with strategy, and villages and small towns waste water control becomes water ring
One of emphasis that border is administered.Because life style and the difference of region, villages and small towns sewage is relative to municipal sewage, and its nitrogen, phosphorus contain
Amount fluctuating margin is relatively big, if not being effectively treated, easily causing the eutrophication of water body, particularly entering sensitive water when water outlet
When body or water outlet need reuse, the removal to nitrogen and phosphorus is the most extremely necessary.In actual motion, owing to scale and pipe network are invested
Limit, be difficult to wastewater reuse approach in rural area, the most generally use integrated buried device.Existing villages and small towns one
Changing sewage-treatment plant and mostly be AO, AAO technique, biological rotating disk technique and MBR technique etc., wherein AO, AAO technique and biology turn
The water outlet in terms of dephosphorization of dish technique is difficult to stably reach below 0.5mg/L, AO Process for Effluent total phosphorus in south generally more than 1mg/
L, is even up to more than 1.5mg/L at north water deficit area, and along with the change of temperature in season, runs and unstable;AAO technique
Although being better than AO technique with biological rotating disk technique, but also it is difficult to the most stably be down to 0.5 below mg/L;MBR Process for Effluent
Water quality is more stable, but pollutant should be removed in existing MBR technique MBR pond, realizes mud-water separation again, and operating cost is high, and film is easy
Polluting, maintenance management is complicated;Denitrogenating aspect particularly total nitrogen, above-mentioned several techniques are the most difficult to be stably reached " at town sewage
Reason factory pollutant emission standard " one-level emission standard A (hereinafter referred to as one-level A standard) in (GB18918-2002), along with sensitivity
The raising to sewage drainage standard of water body and the demand of Treated sewage reusing, the discharge standard of sewage improves constantly, recent Beijing
And some areas, Jiangsu have started to explore water outlet and perform grass root's four class water quality standard, the discharge standard of nitrogen phosphorus will be more harsh,
Therefore the research and development of high-efficient denitrification and dephosphorization system the most just become the most important thing of solution problem.
Summary of the invention
The best, the fluctuation of service and more harsh for existing villages and small towns sewerage integrated sewage disposal Nitrogen/Phosphorus Removal
The problem such as nitrogen discharge and phosphorus discharge standard, it is an object of the invention to build the villages and small towns sewage water treatment method of a kind of new and effective denitrogenation dephosphorizing
And device, it is mainly used in the domestic sewage of villages and small towns that effluent quality requirement is high, is especially suitable for the sensitive water body such as water head site, scenic spot
Region or need the villages and small towns sewage disposal of reuse.
The present invention includes sludge-tank (8) and the Prepositive denitrification pond (1) being linked in sequence, anaerobic pond (2), Aerobic Pond 1 pond
(3), the double clear water reserviors (7) of anoxic pond (4), Aerobic Pond 2 pond (5), MBR pond (6) and sterilization.
For achieving the above object, the present invention adopts the following technical scheme that, specifically includes following steps:
1), villages and small towns sewage be divided into two parts, 70% enter Prepositive denitrification pond (1), for Prepositive denitrification provide carbon source, water inlet with
The mud mixing refluxed in MBR pond (6), removes the nitrate nitrogen of 40-60%, creates favourable bar for follow-up anaerobic pond (2) dephosphorization
Part, Prepositive denitrification pond (1) time of staying is 1 hour;30% intakes into anoxic pond (4), provides carbon source for further denitrification,
Remove nitrate nitrogen further.
2), after Prepositive denitrification processes, sewage enters anaerobic pond (2), carries out anaerobic phosphorus release reaction, goes for aerobic stage
Except total phosphorus creates favorable conditions, anaerobic pond (2) is placed elastic filler (17) and can strengthen as carrier, increase elastic filler (17)
Removal to phosphorus, anaerobic pond (2) time of staying is 1 hour, forms A/O method with Aerobic Pond 1 pond (3) subsequently and processes technique, from
And reach the purpose of biological phosphate-eliminating.
3), sewage after anaerobic pond (2), enter Aerobic Pond 1 pond (3), Aerobic Pond 1 pond (3) placed elastic filler
(17), sewage is constantly mixed by aeration in pond, fully contacts with the biomembrane on filler, reaches Organic substance and degrade rapidly
Effect, carry out aerobic phosphorus absorption simultaneously, total phosphorus carried out certain removal, sewage is 2-in the response time in Aerobic Pond 1 pond (3)
3 hours;Aerobic Pond 1 pond (3), also dependent on influent quality and field condition not aeration, becomes anoxic pond and runs.
4), sewage behind Aerobic Pond 1 pond (3), enter anoxic pond (4), anoxic pond (4) is that denitrogenation processing is arranged, simultaneously
30% water inlet exists with the part mixed liquor refluxed, the nitrification liquid refluxed through sewage and Aerobic Pond 2 pond (5) in Aerobic Pond 1 pond (3)
Hybrid reaction in anoxic pond (4), in sewage, the pollutant of bio-degradable hydrolyze, the Organic substance in former water of degrading, simultaneously
Make full use of the Organic substance in 30% former water as denitrifying carbon source, anti-nitration reaction fully occurs, remove total nitrogen, after minimizing
The load of section operation, places the elastic filler (17) carrier as denitrifying bacteria in anoxic pond (4), filler is to nitrogen, phosphorus, removal
Effective, the time of staying is 2 hours, forms A/O method with Aerobic Pond 2 pond (5) in subsequent technique and processes technique, thus reaches de-
The purpose of nitrogen.
5), sewage enters Aerobic Pond 2 pond (5), the 6-8 hour time of staying, Aerobic Pond 2 pond (5) peace after anoxic pond (4)
Dress Ball-type packing (16), cuts bubble by the sponge filler in Ball-type packing (16), improves oxygen transmission efficiency, retains a large amount of outstanding
Floating microorganism, makes to be prone on filler hang biomembrane, and the growth that energy is stable, a large amount of degradation of organic substances, and by ammonium oxidation is
Nitrate nitrogen, simultaneously aerobic phosphorus absorption;Aerobic Pond 2 pond (5) effectively sludge concentration can reach 5000-6000mg/L.
6), sewage behind Aerobic Pond 2 pond (5), enter MBR pond (6), in MBR pond (6), MBR membrane module (10) is immersion
Hollow-fibre membrane, topmost function is to retain mud.The condition of negative pressure that MBR pond (6) membrane bioreactor produces in suction pump
Under, the water in mixed liquor completes solid-liquid separation through film silk, is provided with sludge bucket, it is provided that sludge reflux in pond simultaneously, and a road is back to
Prepositive denitrification pond (1), a road is back to anoxic pond (4), and a road enters sludge-tank (8), as excess sludge discharge, effectively dirty
Mud concentration can reach 6000-10000mg/L;Additionally when abnormal or fluctuation occurs in biological phosphate-eliminating, PAC can be added in MBR (6) pond
Carry out assistant chemical dephosphorization, it is ensured that stable effluent quality.
7), MBR pond (6) water outlet subsequently enter sterilization hold concurrently clear water reserviors (7), the time of staying is 1 hour, sterilization hold concurrently clear water reserviors
(7) in, disinfectant uses slow release chlorine tablets disinfection way, can constantly change chemical feeding quantity, dosing one in general 15 days according to the size of the water yield
Secondary.
Wherein said backflow is divided into sludge reflux and nitrification liquid backflow, and sludge reflux is the mud in MBR pond (6) sludge bucket
One tunnel is back to Prepositive denitrification pond (1), and reflux ratio is 40-60%, and a road is back to anoxic pond (4), and reflux ratio is 20-40%,
All using the mode that sludge reflux pump (19) refluxes, sludge reflux is interval backflow, the automatic control in switch board (9) control device
Time opening;Nitrification liquid backflow is executed Aerobic Pond 2 pond (5) and is back to anoxic pond (4), uses stripping reflux type, and reflux ratio is
100-200%, this backflow is for normally opened, by valve regulated capacity of returns.
Wherein said aerating system is divided into boring aeration pipe (15) and type micro-pore aerator (25), at Prepositive denitrification
It is provided with boring aeration pipe (15), intermittently starting at the bottom of pond (1), anoxic pond (4) pond, plays stirring immixture;In Aerobic Pond 1 pond (3)
, be provided with type micro-pore aerator (25) at the bottom of Aerobic Pond 2 pond (5) and MBR pond (6) pond, continuously open, play aeration and mixing is made
With, wherein Aerobic Pond 1 pond (3) water outlet dissolved oxygen controls at 0.5-1.5mg/L, and Aerobic Pond 2 pond (5) water outlet dissolved oxygen controls
1.5-2.5mg/L, MBR pond (6) gas-water ratio 15-10: 1;Blower fan (11) totally two the using and the reserved, are exposed by air valve and VFC
Tolerance.
Wherein said filler, Prepositive denitrification pond (1), anaerobic pond (2), Aerobic Pond 1 pond (3) and anoxic pond (4) pond
Interior installation hydrophilic elastic filler (17), upper tightly lower sparse, place Ball-type packing (16), Ball-type packing in Aerobic Pond 2 pond (5) pond
(16) internal is polyurethane sponge shape filler, and internally installed leakproof dividing plate is pushed up in pond.
Wherein said sludge-tank (8) is provided with overfall, overflow water outlet bleeder water inlet, and sludge-tank (8) can store half
The mud in year to 1 year, periodically uses fecal suction truck suction.
Wherein said switch board is provided with automaton in (9), can realize water inlet, aeration, backflow, spoil disposal and water outlet
Automatically control and remotely control.
Wherein said Prepositive denitrification pond (1), anaerobic pond (2), Aerobic Pond 1 pond (3), anoxic pond (4), Aerobic Pond 2 pond
(5), MBR pond (6) and sterilization hold concurrently clear water reserviors (7), all have manhole (18) above each pond.
Accompanying drawing explanation
Fig. 1 is villages and small towns sewage water treatment method and the device schematic diagram of a kind of high-efficient denitrification and dephosphorization of the present invention
In figure, each assembly is: 1 Prepositive denitrification pond, 2 anaerobic ponds, 3 Aerobic Pond 1 ponds, 4 anoxic pond, 5 Aerobic Pond 2 ponds, 6 MBR
Pond, the 7 double clear water reserviors of sterilization, 8 sludge-tanks, 9 switch boards, 10 MBR membrane modules, 11 blower fans, 12 suction pumps, 13 water inlet pipes,
14 outlet pipes, 15 boring aeration pipes, 16 Ball-type packings, 17 elastic fillers, 18 manholes, 19 sludge reflux pumps, 20 is dirty
Mud return duct, 21 mud valves, 22 air lines, 23 air valves, 24 nitrification liquid return ducts, 25 type micro-pore aerators.
Integrated apparatus designed according to this invention, has a following evident characteristic:
1) due to the centrifugation of film, it is not necessary to set up other solid-liquid separating equipments such as precipitation, filtration.Efficient solid-liquid separation will be useless
The microorganism species that suspended material in water, colloidal substance, biological unit run off separates with the water purified, and is not necessary at three grades
Reason the most directly can reuse.Reduced investment expense is low.
2) membrane bioreactor can filter the harmful substance such as antibacterial, virus, can save significantly on the length that dosing sterilization is brought
Phase operating cost also expands waste water recycling scope.
3) effect of efficiently damming of film, makes microorganism be completely trapped in reactor, it is achieved reactor hydraulic detention time
(HRT) and being kept completely separate of sludge age (STR), run control the most stable.
4) loss of various microorganism species, the beneficially life of speed of growth antibacterial slowly (nitrobacteria etc.) are prevented
Long, the time of staying making some macromole hardly degraded organic substances is elongated, beneficially their decomposition, thus various metabolism in system
Process is smoothed out.System impact resistance is strong, wide accommodation.
5) in membrane bioreactor, biological sludge is in operation and can reach dynamic equilibrium, almost without excess sludge discharge.
6) complete buried mode, not by landform and environmental effect, average treatment ton water takes up an area only 0.8 square metre.
7) water outlet can stably reach the discharge of " urban wastewater treatment firm pollutant emission standard " (GB18918-2002) one-level A
Standard, even up to grass root's four class water quality standard.
8) fully automatic operation, easy care, unmanned;Can combine with self-purification, it is ensured that water ecology balances.
Detailed description of the invention
Below in conjunction with embodiment, technical scheme is discussed in detail further, but protection scope of the present invention
It is not limited thereto.
Embodiment 1
The villages and small towns sewage water treatment method of a kind of high-efficient denitrification and dephosphorization and device, including sludge-tank (8) and be linked in sequence preposition
Denitrification pond (1), anaerobic pond (2), Aerobic Pond 1 pond (3), anoxic pond (4), Aerobic Pond 2 pond (5), MBR pond (6) and sterilization are held concurrently
Clear water reserviors (7), it comprises the steps:
1) villages and small towns wastewater influent is divided into two parts, and 70% enters Prepositive denitrification pond (1), and the mud refluxed with MBR pond (6) mixes
Reaction, the response time is 1 hour;30% intakes into anoxic pond (4).
2) after Prepositive denitrification processes, sewage enters anaerobic pond (2), carries out anaerobic phosphorus release reaction, goes for aerobic stage
Except total phosphorus creates favorable conditions, the time of staying is 1 hour, forms A/O method with Aerobic Pond 1 pond (3) subsequently and processes technique, thus
Reach the purpose of biological phosphate-eliminating.
3) sewage is after anaerobic pond (2), enters Aerobic Pond 1 pond (3), carries out aerobic phosphorus absorption while degradation of organic substances, dirty
Water is 2-3 hour in the response time in Aerobic Pond 1 pond (3).
4) sewage is behind Aerobic Pond 1 pond (3), enters anoxic pond (4), with 30% water inlet, the partial sludge and aerobic of backflow
The nitrification liquid that Chi2Chi (5) refluxes places elastic filler (17) in hybrid reaction, pond, and the time of staying is 2 hours, with follow-up work
Aerobic Pond 2 pond (5) in skill forms A/O method and processes technique, thus reaches the purpose of denitrogenation.
5) sewage enters Aerobic Pond 2 pond (5), the 6-8 hour time of staying after anoxic pond (4), places spherical filling out in pond
Material (16), Ball-type packing (16) is internal is that polyurethane sponge shape filler, easy to be filmed and biofilm are fast, degrades in a large number in Aerobic Pond 2 pond (5)
Organic substance, and be nitrate nitrogen, simultaneously aerobic phosphorus absorption by ammonium oxidation.
6) sewage enters MBR pond (6), the negative pressure bar that MBR pond (6) produce in suction pump (12) behind Aerobic Pond 2 pond (5)
Under part, the water in mixed liquor completes solid-liquid separation through film silk, and mud sinks to sludge bucket, by reflux pump (19) be back to preposition instead
Nitrification tank (1) and anoxic pond (4), a road enters sludge-tank (8), as excess sludge discharge;Additionally occur different when biological phosphate-eliminating
Often or during fluctuation, PAC can be added in MBR (6) pond and carry out assistant chemical dephosphorization, it is ensured that stable effluent quality.
7) MBR pond (6) water outlet subsequently enters the double clear water reserviors (7) of sterilization, and the time of staying is 1 hour, is then emitted into pipe network
Or river course.
Embodiment 2
1) villages and small towns wastewater influent is divided into two parts, and 70% enters Prepositive denitrification pond (1), and the mud refluxed with MBR pond (6) mixes
Reaction, the response time is 1 hour;30% intakes into anoxic pond (4).
2) after Prepositive denitrification processes, sewage enters anaerobic pond (2), carries out anaerobic phosphorus release reaction, goes for aerobic stage
Except total phosphorus creates favorable conditions, the time of staying is 1 hour.
3) sewage is after anaerobic pond (2), enters Aerobic Pond 1 pond (3), during Aerobic Pond 1 pond (3) not aeration, becomes anoxic pond,
Response time is 2-3 hour, with the method for operation of follow-up anoxic pond (4) composition two ends anoxic pond, the removal of strengthening nitrogen.
4) sewage is behind Aerobic Pond 1 pond (3), enters anoxic pond (4), with 30% water inlet, the partial sludge and aerobic of backflow
The nitrification liquid that Chi2Chi (5) refluxes places elastic filler (17) in hybrid reaction, pond, and the time of staying is 2 hours, with follow-up work
Aerobic Pond 2 pond (5) in skill forms A/O method and processes technique, thus reaches the purpose of denitrogenation.
5) sewage enters Aerobic Pond 2 pond (5), the 6-8 hour time of staying after anoxic pond (4), places spherical filling out in pond
Material (16), Ball-type packing (16) is internal is that polyurethane sponge shape filler, easy to be filmed and biofilm are fast, degrades in a large number in Aerobic Pond 2 pond (5)
Organic substance, and be nitrate nitrogen, simultaneously aerobic phosphorus absorption by ammonium oxidation.
6) sewage enters MBR pond (6), the negative pressure bar that MBR pond (6) produce in suction pump (12) behind Aerobic Pond 2 pond (5)
Under part, the water in mixed liquor completes solid-liquid separation through film silk, and mud sinks to sludge bucket, by reflux pump (19) be back to preposition instead
Nitrification tank (1) and anoxic pond (4), a road enters sludge-tank (8), as excess sludge discharge;Additionally occur different when biological phosphate-eliminating
Often or during fluctuation, PAC can be added in MBR (6) pond and carry out assistant chemical dephosphorization, it is ensured that stable effluent quality.
7) MBR pond (6) water outlet subsequently enters the double clear water reserviors (7) of sterilization, and the time of staying is 1 hour, is then emitted into pipe network
Or river course.
Dotted lines shown in Fig. 1 is mud return line (20) and nitrification liquid return duct (25), backflow be divided into sludge reflux and
Nitrification liquid refluxes, and sludge reflux is that mud one tunnel in MBR pond (6) sludge bucket is back to Prepositive denitrification pond (1), and reflux ratio is
40-60%, a road is back to anoxic pond (4), and reflux ratio is 20-40%, all uses the mode that sludge reflux pump (19) refluxes, mud
Backflow is interval backflow, the automatic control in switch board (9) control device time opening;Nitrification liquid backflow is Aerobic Pond 2 pond (5)
Being back to anoxic pond (4) and use stripping reflux type, reflux ratio is 100-200%, and this backflow, for normally opened, is returned by valve regulated
Flow.
Dotted line shown in Fig. 1 is air line (22), and aerating system is divided into boring aeration pipe (15) and aerating tube-type micropore
Device (25), is being provided with boring aeration pipe (15) at the bottom of Prepositive denitrification pond (1), anoxic pond (4) pond, intermittently starting, plays stirring mixing
Effect;It is being provided with type micro-pore aerator (25), continuously at the bottom of Aerobic Pond 1 pond (3), Aerobic Pond 2 pond (5) and MBR pond (6) pond
Opening, play aeration and immixture, wherein Aerobic Pond 1 pond (3) water dissolution oxygen controls at 0.5-1.5mg/L, Aerobic Pond 2 pond (5)
Water outlet dissolved oxygen controls at 1.5-2.5mg/L, MBR pond (6) gas-water ratio 15-10: 1;Blower fan (11) totally two the using and the reserved, pass through
Air valve and VFC aeration rate.
Filler shown in Fig. 1, Prepositive denitrification pond (1), anaerobic pond (2), Aerobic Pond 1 pond (3) and anoxic pond (4) pond
Interior installation hydrophilic elastic filler (17), upper tightly lower sparse, place Ball-type packing (16), Ball-type packing in Aerobic Pond 2 pond (5) pond
(16) internal is polyurethane sponge shape filler, and internally installed leakproof dividing plate is pushed up in pond.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For Yuan, on the premise of without departing from the technology of the present invention principle, it is also possible to make some improvement and modification, these improve and modification
Also should be regarded as protection scope of the present invention.