CN106096926A - Event-handling method and device - Google Patents
Event-handling method and device Download PDFInfo
- Publication number
- CN106096926A CN106096926A CN201610361974.1A CN201610361974A CN106096926A CN 106096926 A CN106096926 A CN 106096926A CN 201610361974 A CN201610361974 A CN 201610361974A CN 106096926 A CN106096926 A CN 106096926A
- Authority
- CN
- China
- Prior art keywords
- event
- equipment
- resources
- account
- request
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/10—Payment architectures specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems
- G06Q20/102—Bill distribution or payments
Landscapes
- Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Development Economics (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
The invention discloses a kind of event-handling method and device.The method includes: the first equipment receives the first event-resources transfer request, and the first event-resources is transferred to target account for request by the first event-resources transfer request;The request of second event resource transfers is sent to the second equipment by the first equipment, and the request of second event resource transfers obtains the part or all of event-resources in the first event-resources for instruction second equipment the second account request on the 3rd equipment;When getting whole event-resources, the first event-resources is transferred to target account by the first equipment;When getting partial event resource, the first equipment is by the first account in partial event resource transfers to the first equipment, and shifts the first event-resources from the first account to target account.The present invention solve event handling platform in correlation technique from other accounts to target account failover events resource time there will be the technical problem of the failed situation of event-resources transfer.
Description
Technical field
The present invention relates to computer realm, in particular to a kind of event-handling method and device.
Background technology
Along with the fast development of Internet technology, event handling platform exists in processing event procedure to be needed to provide event
Source is transferred to the situation of target account from other accounts.For said circumstances, event handling platform can store other accounts
A certain amount of event-resources that family is deposited in advance, when event handling platform receive target account initiate event-resources transfer please
After asking, this event-resources transfer request can be forwarded to other accounts by this event handling platform, and uses other accounts to deposit in advance
A certain amount of event-resources put shifts its event-resources asked to target account.But, when event handling platform is deposited
During the event-resources total amount that the event-resources total amount of storage is asked less than target account, it may appear that the feelings that event-resources transfer is failed
Condition.And, the event-resources of other users is left in event handling platform in advance, also resulting in event-resources cannot repeat
Use, and then reduce event-resources utilization rate.
For above-mentioned problem, effective solution is the most not yet proposed.
Summary of the invention
Embodiments provide a kind of event-handling method and device, at least to solve event handling in correlation technique
Platform from other accounts to target account failover events resource time there will be the technology of the event-resources failed situation of transfer and ask
Topic.
An aspect according to embodiments of the present invention, it is provided that a kind of event-handling method, receives the including: the first equipment
One event-resources transfer request, wherein, the first event-resources is transferred to target for request by the first event-resources transfer request
Account;The request of second event resource transfers is sent to the second equipment by the first equipment, and wherein, the request of second event resource transfers is used
In the part or all of event money indicating second equipment the second account request on the 3rd equipment to obtain in the first event-resources
Source;And in the case of the whole event-resources got from the second account in the first event-resources, the first equipment is by
One event-resources is transferred to target account;Feelings in the partial event resource got from the second account in the first event-resources
Under condition, the first equipment is by the first account in partial event resource transfers to the first equipment, and transfer the from the first account
One event-resources is to target account.
Another aspect according to embodiments of the present invention, additionally provides a kind of event processing apparatus, including: first receives list
Unit, receives the first event-resources transfer request for the first equipment, wherein, the first event-resources transfer request for request by the
One event-resources is transferred to target account;Transmitting element, sends the request of second event resource transfers to for the first equipment
Two equipment, wherein, the request of second event resource transfers obtains for instruction second equipment the second account request on the 3rd equipment
Take the part or all of event-resources in the first event-resources;And buanch unit, for getting the from the second account
In the case of whole event-resources in one event-resources, the first event-resources is transferred to target account by the first equipment;From
In the case of getting the partial event resource in the first event-resources in second account, partial event resource is turned by the first equipment
Move on in the first account on the first equipment, and from the first account, shift the first event-resources to target account.
In embodiments of the present invention, the first equipment is when receiving the first event-resources transfer request, by setting to second
Preparation send the request of second event resource transfers to indicate second equipment the second account from the 3rd equipment to obtain the first event money
Part or all of event-resources in source, when getting whole event-resources, the first equipment can be directly by the first event-resources
It is transferred to target account, the partial event resource transfers that the first equipment can first will get when getting partial event resource
To the first account, then the first event-resources is transferred to target account from the first account, reaches the transfer of raising event-resources
The purpose of success rate, it is achieved thereby that improve the technique effect of event handling efficiency, and then solves in correlation technique at event
Platform from other accounts to target account failover events resource time there will be the technology of the event-resources failed situation of transfer
Problem.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this
Bright schematic description and description is used for explaining the present invention, is not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic diagram of the hardware environment of event-handling method according to embodiments of the present invention;
Fig. 2 is the flow chart of a kind of optional event-handling method according to embodiments of the present invention;
Fig. 3 is to synchronize the process chart that credit is redeemed soon according to embodiments of the present invention;
Fig. 4 is the process chart that the most asynchronous credit is redeemed soon;
Fig. 5 is to synchronize the process chart that credit redeems soon of providing loans according to embodiments of the present invention;
Fig. 6 is the process chart that the most asynchronous credit of providing loans is redeemed soon;
Fig. 7 is the schematic diagram of a kind of optional event processing apparatus according to embodiments of the present invention;
Fig. 8 is the schematic diagram of another kind of optional event processing apparatus according to embodiments of the present invention;
Fig. 9 is the schematic diagram of another kind of optional event processing apparatus according to embodiments of the present invention;
Figure 10 is the schematic diagram of another kind of optional event processing apparatus according to embodiments of the present invention;
Figure 11 is the schematic diagram of another kind of optional event processing apparatus according to embodiments of the present invention;
Figure 12 is the schematic diagram of another kind of optional event processing apparatus according to embodiments of the present invention;And
Figure 13 is the structured flowchart of a kind of terminal according to embodiments of the present invention.
Detailed description of the invention
In order to make those skilled in the art be more fully understood that the present invention program, below in conjunction with in the embodiment of the present invention
Accompanying drawing, is clearly and completely described the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only
The embodiment of a present invention part rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained under not making creative work premise, all should belong to the model of present invention protection
Enclose.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, "
Two " it is etc. for distinguishing similar object, without being used for describing specific order or precedence.Should be appreciated that so use
Data can exchange in the appropriate case, in order to embodiments of the invention described herein can with except here diagram or
Order beyond those described is implemented.Additionally, term " includes " and " having " and their any deformation, it is intended that cover
Cover non-exclusive comprising, such as, contain series of steps or the process of unit, method, system, product or equipment are not necessarily limited to
Those steps clearly listed or unit, but can include the most clearly listing or for these processes, method, product
Or intrinsic other step of equipment or unit.
Embodiment 1
According to embodiments of the present invention, it is provided that the embodiment of the method for a kind of event-handling method.
Alternatively, in the present embodiment, above-mentioned event-handling method can apply to as shown in Figure 1 by server 102
In the hardware environment constituted with terminal 104.As it is shown in figure 1, server 102 is attached with terminal 104 by network, above-mentioned
Network includes but not limited to: wide area network, Metropolitan Area Network (MAN) or LAN, and terminal 104 is not limited to PC, mobile phone, panel computer etc..This
The event-handling method of inventive embodiments can be performed by server 102, it is also possible to is performed by terminal 104, it is also possible to be
Jointly performed by server 102 and terminal 104.Wherein, terminal 104 perform the event-handling method of the embodiment of the present invention can also
It is to be performed by client mounted thereto.
Fig. 2 is the flow chart of a kind of optional event-handling method according to embodiments of the present invention, as in figure 2 it is shown, the party
Method may comprise steps of:
Step S202, the first equipment receives the first event-resources transfer request, and wherein, the first event-resources transfer request is used
In request, the first event-resources is transferred to target account;
Step S204, the request of second event resource transfers is sent to the second equipment by the first equipment, and wherein, second event provides
Source transfer request obtains the part in the first event-resources for instruction second equipment the second account request on the 3rd equipment
Or whole event-resources;
Step S206, in the case of the whole event-resources got from the second account in the first event-resources, the
First event-resources is transferred to target account by one equipment;In the part thing got from the second account in the first event-resources
In the case of part resource, the first equipment is by the first account in partial event resource transfers to the first equipment, and from the first account
Family is shifted the first event-resources to target account.
By above-mentioned steps S202 to step S206, the first equipment is when receiving the first event-resources transfer request, logical
Cross and send the request of second event resource transfers with the second account acquisition indicating the second equipment from the 3rd equipment to the second equipment
Part or all of event-resources in first event-resources, when getting whole event-resources, the first equipment can be directly by
One event-resources is transferred to target account, the part thing that the first equipment can first will get when getting partial event resource
First event-resources, to the first account, is then transferred to target account from the first account by part resource transfers, has reached raising thing
The purpose of part resource transfers success rate, so solve in correlation technique event handling platform from other accounts to target account
The technical problem of the failed situation of event-resources transfer is there will be, it is achieved that improve event handling efficiency during failover events resource
Technique effect.
In the technical scheme that step S202 provides, the first equipment can be a server or by multiple server structures
The server farm become, wherein, in server farm, multiple servers can be distributed, it is also possible to for centralized, the most not
It is specifically limited.First equipment can also is that a concrete equipment or platform.First event-resources transfer request can be used
First event-resources is transferred to target account, it should be noted that the embodiment of the present invention is to the first event-resources in request
Type is not specifically limited, and the first event-resources can be to need the fund resources of transfer, it is also possible to be the network needing transfer
Resource.Target account is also not specifically limited by the embodiment of the present invention, and target account can be the first event money of request transfer
The reception account in source, this target account can be personal account, it is also possible to be business account.Also, it should be noted first sets
The promoter of standby the first event-resources transfer request received can be target account, it is also possible to be other accounts.First thing
The request of part resource transfers can include the type of the first event-resources, the quantity of the first event-resources, shift the first event money
The information such as the source account in source and the target account of transfer the first event-resources.
In actual application scenarios, the first equipment, can be to the first thing after receiving the first event-resources transfer request
The request of part resource transfers resolves, obtain the type of the first event-resources that the first event-resources transfer request is asked, the
The letters such as the target account of the quantity of one event-resources, the source account shifting the first event-resources and transfer the first event-resources
Cease, and the first event-resources transfer request is responded by the information obtained according to above-mentioned parsing.
Also, it should be noted the first account can be provided with on the first equipment, this first account can store one
Quantitative event-resources.When the first equipment receives the first event-resources transfer request, the first account can store from self
A certain amount of event-resources in obtain and the event-resources of the first event-resources equivalent, and it is transferred in advance target account
Family.It should be noted that a certain amount of event-resources of storage is likely larger than the first event-resources in the first account, it is also possible to little
In the first event-resources, when in the first account, a certain amount of event-resources of storage is more than the first event-resources, the first equipment
When receiving the first event-resources transfer request, the event money with the first event-resources equivalent can be obtained from the first account
Source also transfers them to target account;When in the first account, a certain amount of event-resources of storage is less than the first event-resources,
First equipment, when receiving the first event-resources transfer request, needs to ask the first account storage from the account of other equipment
A certain amount of event-resources less than the partial event resource of the first event-resources, the partial event resource then request obtained
And first a certain amount of event-resources (both summations that is first event-resources) of storage in account be transferred to target account.
In the technical scheme that step S204 provides, the first event-resources transfer request that the first equipment interconnection receives is carried out
Response may include that and first detects on the first equipment according to resolving, from the first event-resources transfer request, the relevant information obtained
The first account in the event-resources of storage whether disclosure satisfy that the first event money that the first event-resources transfer request asked
Source, when not storing in event-resources or the first account the event-resources of storage in the first equipment Inspection to the first account less than the
During one event-resources, the first equipment can initiate second event resource request, and the request of second event resource transfers is sent extremely
Second equipment, to reach to ask whole event-resources or the mesh of partial event resource of the first event-resources from the second equipment
's.Wherein, when the first account does not stores event-resources, the request of second event resource transfers for instruction the second equipment from the
Second account of three equipment is asked whole event-resources of the first event-resources;When in the first account, the event-resources of storage is little
When the first event-resources, the request of second event resource transfers please from the second account of the 3rd equipment for instruction the second equipment
Seek the partial event resource of the first event-resources, and this partial event resource be in the first account the event-resources of storage less than the
The part of one event-resources.It should be noted that the second equipment can also be a server or by multiple server structures
The server farm become, wherein, in server farm, multiple servers can be distributed, it is also possible to for centralized, the most not
It is specifically limited.Second equipment can also is that a concrete equipment or platform.
The second event resource transfers request that first equipment sends to the second equipment can serve to indicate that the second equipment is to the
The second account request on three equipment obtains the part or all of event-resources in the first event-resources.It should be noted that the
Three equipment can also be a server or the server farm being made up of multiple servers, wherein, many in server farm
Individual server can be distributed, it is also possible to for centralized, be not specifically limited herein.3rd equipment can also is that one specifically
Equipment or platform.Account on 3rd equipment is the second account, can store event-resources, the second account in the second account
In family, the event-resources of storage enough meets the first event-resources that the first event-resources transfer request is asked.The present invention implements
Example is in order to ensure that the first event-resources by the first event-resources transfer request is asked successfully is transferred to target account, when first
When the first account in equipment does not stores the event-resources of event-resources or storage less than the first event-resources, the first equipment to
Second equipment initiates the request of second event resource transfers, and the second equipment is in order to ensure that the first event-resources is successfully transferred to target
Account, can ask whole events of the first event-resources from the second account of the 3rd equipment with q.s event-resources
Resource or partial event resource, to be further ensured that the first event-resources is successfully transferred to target account.
In the technical scheme that step S206 provides, when not storing event-resources in the first account, the first equipment is to the
The second event resource transfers request that two equipment send obtains for instruction the second equipment from the second account of the 3rd equipment
Whole event-resources of one event-resources, at the second equipment according to the request of second event resource transfers from the second account of the 3rd equipment
After obtaining whole event-resources of the first event-resources in family, the second equipment can whole by the first event-resources of getting
Event-resources is transferred in the first account of the first equipment, and then whole event-resources of the first event-resources are turned by the first equipment
Move to target account.When in the first account, the event-resources of storage is less than the first event-resources, the first equipment is to the second equipment
The second event resource transfers request sent obtains the first event for instruction the second equipment from the second account of the 3rd equipment
The partial event resource of resource, this partial event resource is that in the first account, the event-resources of storage is less than the first event-resources
Part, obtains the first event money at the second equipment according to the request of second event resource transfers from the second account of the 3rd equipment
After the partial event resource in source, the second equipment can be by the partial event resource transfers of the first event-resources that gets to first
In first account of equipment, the partial event resource of the first event-resources that then the second equipment transfer is come by the first equipment with
The event-resources of the first account storage itself is integrated, and obtains and the event-resources of the first event-resources equivalent, and by its turn
Move to target account.
It should be noted which kind of situation the most above-mentioned, the embodiment of the present invention all can guarantee that and the first event-resources turned
Move the first event-resources asked and be successfully transferred to target account.And then can solve the problem that in correlation technique, event handling is put down
Platform from other accounts to target account failover events resource time there will be the technical problem of the event-resources failed situation of transfer,
Achieve the technique effect improving event handling efficiency.
As a kind of optional embodiment, in the whole event-resources got from the second account in the first event-resources
In the case of, the first event-resources is transferred to target account and comprises the following steps by the first equipment:
Step S261, the first event-resources is transferred to the first account by the first equipment.
Step S263, the first equipment shifts the first event-resources to target account from the first account.
Step S265, the first equipment sends the first event-resources transfer request success response to target account.
It should be noted that when the first account does not stores event-resources, the first equipment send to the second equipment
Two event-resources transfer request can serve to indicate that the second equipment obtains the first event-resources from the second account of the 3rd equipment
Whole event-resources, from the second account of the 3rd equipment, obtain the at the second equipment according to the request of second event resource transfers
After whole event-resources of one event-resources, whole event-resources of the first event-resources got can be turned by the second equipment
Moving in the first account of the first equipment, then whole event-resources of the first event-resources are turned by the first equipment from the first account
Move to target account, and send the first event-resources transfer request success response to notify target account the first thing to target account
The success of part resource transfers.
This alternative embodiment can apply to fund transfer field, as a example by realizing redeeming soon in the Internet financial platform, profit
The technical scheme provided by this alternative embodiment is capable of synchronizing credit and redeems soon.Redeem soon in scheme in this synchronization credit, base
King Company and bank can consult the accrediting amount, use and please to pay the bill to the fast payment to redeem item of user by money interface, such Fund Company
Being no need for preparing ahead of time D+0 and redeem money, without estimating the fast ransom money volume of user, wherein, D refers to the date.
Fig. 3 is to synchronize the process chart that credit is redeemed soon according to embodiments of the present invention, as it is shown on figure 3, this synchronization credit is fast
The idiographic flow redeeming scheme can be described as follows:
1, user initiates D+0 and quickly redeems request, and request of quickly being redeemed by this D+0 sends to platform of managing money matters.
2, financing platform is after the D+0 receiving user's transmission quickly redeems request, sends D+0 bank to Fund Company
Request is redeemed in credit soon, and this D+0 bank credit request of redeeming soon can serve to indicate that request bank of Fund Company is to financing platform payment.
3, Fund Company is after receiving the credit of D+0 bank and redeeming request soon, first this D+0 bank credit is redeemed request soon
Carry out internal redemption to process, can include that the credit request of redeeming soon of D+0 bank carries out parsing etc. processes operation.
4, Fund Company after carrying out internal redemption and processing to the credit request of redeeming soon of D+0 bank, i.e. can send out to bank
Request instruction gives financing platform payment with request bank.
5, bank can be to the Fund Company's payment on financing platform after receiving the request instruction that Fund Company sends
Account beats money.
6, bank is after beating money to the Fund Company's Send only Account on financing platform, can notify to return to Fund Company
Payment result, Fund Company can return to financing platform after receiving the payment result that bank returns and redeem request results.
7, financing platform is after receiving the redemption successful result that Fund Company returns, and bank's fund is supplemented fund public with money
Department's Send only Account.
8, after successfully being supplemented with money in Fund Company's Send only Account by bank's fund, financing platform is paid the bill account from Fund Company
Initiate to withdraw deposit to user in family.
9, financing platform updates the single state of redemption to user after withdrawing deposit successfully, updates and redeems single " received payment ".
10, financing platform returns redemption request results to user, i.e. redeems successfully.
It should be noted that target account, financing platform in user's correspondence embodiment of the present invention in this example are corresponding
The first equipment in the embodiment of the present invention, the second equipment in Fund Company's correspondence embodiment of the present invention, the bank correspondence present invention
The 3rd equipment in embodiment, D+0 quickly redeem the first event-resources transfer request in the corresponding embodiment of the present invention of request, D+
The second event resource transfers request in the corresponding embodiment of the present invention of request, Fund Company's Send only Account pair are redeemed in the credit of 0 bank soon
Answer the first account in the embodiment of the present invention.
After using this synchronization credit to redeem scheme soon, Fund Company is without paying financing platform ahead of time;User is flat in financing
Each the redemption that platform is initiated, Fund Company please give financing platform payment after money to bank's credit.Scheme is redeemed in this synchronization credit soon
Because being real-time interface, if therefore there being a large number of users to initiate to redeem request soon, Fund Company and banking system can be caused and comparing
Big pressure.
Also, it should be noted this alternative embodiment can also be applied in other scenes, such as Internet resources transfer
In scene, the handling process that this alternative embodiment is applied in Internet resources transfer scene is similar to above-mentioned example, the most no longer
Repeat.
As a kind of optional embodiment, the first equipment the request of second event resource transfers sent to the second equipment it
Afterwards and before the first event-resources is transferred to target account by the first equipment, this alternative embodiment can also include following step
Rapid:
Step S2052, the first equipment receives the second event resource transfers request success response that the second equipment sends.
In the technical scheme that step S2052 provides, the second event money that the second equipment sends at first equipment that receives
After the transfer request of source, first can return the request success response of second event resource transfers to the first equipment, this response can be used
In indicating the second equipment to be successfully received the request of second event resource transfers, and the second event resource receiving this turns
Shifting request is responded.In this alternative embodiment the second equipment by receive second event resource transfers ask after immediately
Return the request success response of second event resource transfers to the first equipment and can increase real-time and the effectiveness of interacting message, and
And first equipment that notifies in time be successfully received second event resource transfers request, it is possible to avoid the first equipment because of repeat send out
The request of second event resource transfers is sent to cause consumption the second device network resource.
Step S2054, what the first equipment storage was corresponding with the first event-resources transfer request is in resource state to be transferred
Record, wherein, record be used for representing that to the first event-resources but the first event-resources not yet transfers to target account to successful request
Family.
In the technical scheme that step S2054 provides, the meeting after receiving the first event-resources transfer request of the first equipment
To second equipment send second event transfer request, the second equipment be successfully received second event transfer request after to this ask into
Row response, the process of its response can include whole event-resources or the part asking the first event-resources from the 3rd equipment
Event-resources.When the second equipment is successfully from whole event-resources or the partial event of the 3rd device request to the first event-resources
After resource, the request success response of second event resource transfers can be returned to the first equipment.First equipment is receiving the second equipment
After the second event resource transfers request success response returned, can record that this first event-resources transfer request asked the
One event-resources is in resource state to be transferred, and alternatively, the first equipment can store this record after recording.Need explanation
, in the first equipment storage be used for represent record for represent successful request to the first event-resources but first event money
The record of target account is not yet transferred in source can one, it is possibility to have multiple, and wherein, each record all can correspondence one
Event-resources transfer request.When the first equipment stores multiple above-mentioned record, involved by these can being recorded still
The event-resources being not transferred to target account collects, in order to the event-resources after disposably collecting is transferred to target account
Family, so can reduce the pressure that multiple events resource transfers process is brought to system.
Correspondingly, the first event-resources is transferred to target account and may include that by step S206 the first equipment
Step S2062, the first equipment sends the request success response of second event resource transfers to target account.
Step S2064, the first equipment searches record.
Step S2066, if finding record, then the 3rd event-resources transfer request transmission is set by the first equipment to second
Standby, wherein, the 3rd event-resources transfer request sends the 4th event-resources transfer for instruction the second equipment to the 3rd equipment please
Asking, the 4th event-resources transfer request obtains the first event-resources for request from the second account.
Step S2068, the first equipment gets the whole event-resources in the first event-resources from the second account, by
One event-resources transfers to the first account.
Step S2070, shifts the first event-resources to target account from the first account.
In the technical scheme that step S2062 provides, the first equipment is corresponding with the first event-resources transfer request in storage
The record being in resource state to be transferred, and after involved event-resources collects in recording these, permissible
The request success response of second event resource transfers is returned, to reach to notify that it is the most successfully initiated by target account to target account
The first event-resources transfer request responded, this response can represent that successful request is asked to target account
First event-resources, but not yet shift.In this alternative embodiment, the first equipment is by returning second event to target account
Resource transfers request success response, it is possible to reach to notify that target account successful request provides to its event asked in time
Source, and then avoid target account to cause consume the mesh of the first device network resource because repeating to initiate the first event-resources transfer request
's.
In the technical scheme that step S2064 provides, the first equipment sends second event resource transfers to target account please
After asking success response, next the first event-resources is transferred to target account, specifically, in the first equipment can be searched
What portion stored is used for representing that successful request not yet transfers to the note of target account to the first event-resources but the first event-resources
Record, in these records, involved event-resources is the event-resources to target account to be transferred.In this alternative embodiment
First equipment is used for representing that to the first event-resources but the first event-resources not yet transfers to target account to successful request by lookup
The record at family, it is possible to reach to avoid to omit the transfer of the event-resources that the event-resources initiating target account is asked
Purpose, and then achieve raising event-resources transfer accuracy.Improve the effect of event-resources transfer efficiency.
In the technical scheme that step S2066 to step S2070 provides, if the first equipment finds for representing successfully
The record of target account is not yet transferred in request to the first event-resources but the first event-resources, then explanation exist to be transferred extremely
The event-resources of target account, this event-resources to target account to be transferred is the first event-resources, the most now first sets
Standby the 3rd event-resources transfer request that can send to the second equipment, with to second device request the first event-resources.Second
Equipment receive first equipment send the 3rd event-resources request after, can according to the 3rd event-resources transfer request to
3rd equipment sends the 4th resource transfers and asks to obtain the first event-resources in the second account from the 4th equipment.Need
Bright, the 3rd event-resources can serve to indicate that the second equipment sends the 4th event-resources transfer request to the 3rd equipment, the
Four event-resources transfer request may be used for request and obtain the first event-resources from the second account.When the second equipment success is from the
After second account of three equipment gets the first event-resources, the first event-resources got can be transferred to first and set
In the first standby account, then the first event-resources is transferred to target account from the first account by the first equipment.
This alternative embodiment can also be applied to fund transfer field, as a example by realizing redeeming soon in the Internet financial platform,
The technical scheme utilizing this alternative embodiment to be provided is capable of asynchronous credit and redeems soon.Redeem soon in scheme in this asynchronous credit,
Fund Company and bank can consult the accrediting amount, use and please to pay the bill to the fast payment to redeem item of user by money interface, and such fund is public
Department is no need for preparing D+0 ahead of time and redeems money, without the fast ransom money volume estimating user.
Fig. 4 is the process chart that the most asynchronous credit is redeemed soon, and as shown in Figure 4, this asynchronous credit is fast
The idiographic flow redeeming scheme can be described as follows:
1, user initiates D+0 and quickly redeems request, and request of quickly being redeemed by this D+0 sends to platform of managing money matters.
2, financing platform is after the D+0 receiving user's transmission quickly redeems request, sends D+0 bank to Fund Company
Request is redeemed in credit soon, and this D+0 bank credit request of redeeming soon can serve to indicate that request bank of Fund Company is to financing platform payment.
3, Fund Company is after receiving the credit of D+0 bank and redeeming request soon, first this D+0 bank credit is redeemed request soon
Carry out internal redemption to process, can include that the credit request of redeeming soon of D+0 bank carries out parsing etc. processes operation.
4, Fund Company after carrying out internal redemption and processing to the credit request of redeeming soon of D+0 bank, can be to financing platform
Returning and redeem request results, this result can serve to indicate that Fund Company is successfully received the credit of D+0 bank and redeems request soon.
5, financing platform is after receiving the redemption request results that Fund Company returns, and can carry out inter-process and remember
Record is redeemed single, and is " asking successfully, pending payment " by its status indication.
6, financing platform returns redemption request results to targeted customer, and this result may be used for notifying that user is just redeeming request
In processes.
It should be noted that the follow-up flow process in Fig. 4 can be by asynchronous initiation, specifically:
7, the financing all states of platform timing scan are the redemption list of " asking successfully, pending payment ", it should be noted that reason
Wealth platform can arrange timed interval according to practical situation, such as 5 minutes.
8, financing platform is after scanning the redemption list that all of state is " asking successfully, pending payment ", can collect this
All of in the section time please the money amount of money.
9, financing platform is after the amount of money of gathering information, and can initiate request to Fund Company, gives financing platform with request
Payment.
10, Fund Company receive financing platform initiate for request give financing platform payment request after, permissible
Verification situation data, can initiate request to bank after verification situation data are errorless, to ask bank to financing platform payment.
11, bank can be to the Fund Company's Send only Account on financing platform after receiving the request that Fund Company sends
Beat money.
12, bank is after beating money to the Fund Company's Send only Account on financing platform, can notify to return to Fund Company
Returning payment result, Fund Company can return payment result to financing platform after receiving the payment result that bank returns.
13, financing platform is after receiving the successful payment result that Fund Company returns, and supplements bank's fund with money fund
Company's Send only Account.
14, after successfully being supplemented with money in Fund Company's Send only Account by bank's fund, financing platform is paid the bill from Fund Company
Account is initiated to withdraw deposit to user.
15, financing platform updates the single state of redemption to user after withdrawing deposit successfully, and updating redemption single is " received payment ".
It should be noted that target account, financing platform in user's correspondence embodiment of the present invention in this example are corresponding
The first equipment in the embodiment of the present invention, the second equipment in Fund Company's correspondence embodiment of the present invention, the bank correspondence present invention
The 3rd equipment in embodiment, D+0 quickly redeem the first event-resources transfer request in the corresponding embodiment of the present invention of request, D+
The credit of 0 bank redeems the second event resource transfers request in the corresponding embodiment of the present invention of request, financing platform soon to Fund Company
Send is used for request to the 3rd event-resources transfer request in the request correspondence embodiment of the present invention of financing platform payment, base
The 4th event money in the corresponding embodiment of the present invention of request that request is paid the bill to financing platform that King Company sends to bank
The first account in source transfer request, Fund Company's Send only Account correspondence embodiment of the present invention.
If this asynchronous credit scheme of redeeming soon has user to initiate in a large number and redeems request soon, also will not be to Fund Company and department of banking
System causes bigger pressure, does not interferes with the interface capability of Fund Company and bank.But, method pair is redeemed in this asynchronous credit soon
The money of redeeming of user has certain delay to the account time, after money will be asked in batches to become, just initiates payment to user.
Also, it should be noted this alternative embodiment can also be applied in other scenes, such as Internet resources transfer
In scene, the handling process that this alternative embodiment is applied in Internet resources transfer scene is similar to above-mentioned example, the most no longer
Repeat.
As a kind of optional embodiment, the request of second event resource transfers is sent to second by step S204 the first equipment
Equipment may include that
Step S2042, the first equipment judges that whether the first event-resources is more than the second event resource in the first account.
Step S2044, if the first event-resources exceedes second event resource, then the first equipment is by second event resource transfers
Request sends to the second equipment.
Step S2046, if the first event-resources is less than second event resource, then the first equipment shifts from the first account
First event-resources is to target account.
It should be noted that second event resource can be the event-resources of storage in the first account in the first equipment,
It should be noted that the quantity of the second event resource of storage in the first account is not specifically limited by the embodiment of the present invention, the
Two event-resources are likely larger than the first event-resources that the first event-resources transfer request is asked, it is also possible to less than the first event
Resource.First equipment, after receiving the first event-resources transfer request, can resolve in this first event-resources transfer request
Resolve and obtain its first event-resources asked.In this alternative embodiment, the first equipment is after determining the first event-resources,
Can first judge the first event-resources whether more than the second event resource in the first account, when the first event-resources asked
When exceeding second event resource, illustrate that in the first account, the second event inadequate resource of storage is to meet the first event-resources transfer
Request, the most now needs the first equipment from the 3rd equipment by the way of sending the request of second event resource transfers to the second equipment
In the second account in obtain the first event-resources and exceed the partial event resource of second event resource.When the first thing asked
When part resource is not less than second event resource, illustrate that in the first account, the second event resource of storage disclosure satisfy that the first event money
Source transfer request, the most now without the first equipment by the way of sending the request of second event resource transfers to the second equipment from the
The second account in three equipment obtains event-resources, only need to utilize the second event resource in the first account, from second event
Resource obtains the event-resources with the first event-resources equivalent and transfers them to target account.
In this alternative embodiment, the first equipment is before sending the request of second event resource transfers to the second equipment, by sentencing
Whether the first event-resources that disconnected first event-resources transfer request is asked stores more than in the first account in the first equipment
Second event resource, just send the request of second event resource transfers with the from the 3rd equipment to the second equipment when exceeding
Two accounts are asked the first event-resources;Not less than time, from the first account, directly obtain the first event-resources and by its turn
Move to target account.By this alternative embodiment, it is possible to shorten because of the event caused to other device request first event-resources
The delay of resource transfers time, and then event-resources transfer velocity can be accelerated, improve event-resources transfer efficiency.
This alternative embodiment can also be applied to fund transfer field, as a example by realizing redeeming soon in the Internet financial platform,
The technical scheme utilizing this alternative embodiment the to be provided credit that is capable of either synchronously or asynchronously providing loans is redeemed soon.
Fig. 5 is to synchronize the process chart that credit redeems soon of providing loans according to embodiments of the present invention, as it is shown in figure 5, this synchronization pad
Money credit is redeemed the idiographic flow of scheme soon and can be described as follows:
User initiates D+0 and quickly redeems request, and request of quickly being redeemed by this D+0 sends to platform of managing money matters.
Financing platform, after receiving the D+0 that user sends and quickly redeeming request, first determines whether to provide loans specified, i.e. judges
D+0 quickly redeems whether the amount of money that request asked exceedes the amount of money in the Fund Company's Send only Account in financing platform.Wherein,
Not less than time, perform the flow process that " provide loans and redeem soon " shown in dotted line frame is corresponding;When exceeding, perform the synchronization shown in dotted line frame
Flow process corresponding to " credit is redeemed soon ".
The flow process " provided loans and redeem soon " may include that financing platform is provided loans to Fund Company initiation D+0 and redeems request soon;Fund is public
Take charge of after receiving D+0 and providing loans and redeem request soon, it is carried out internal redemption and processes;And financing platform is returned redemption request knot
Really;Financing platform, after receiving the redemption request results that Fund Company returns, can be given from Fund Company's Send only Account and use
Initiate to withdraw deposit in family;Financing platform updates the single state of redemption to user after withdrawing deposit successfully, and updating redemption single is " received payment ";Financing
Platform returns redemption request results to user, i.e. redeems successfully.
The flow process of " credit is redeemed soon " that synchronize may include that financing platform sends the credit of D+0 bank to Fund Company and redeems soon
Request, this D+0 bank credit request of redeeming soon can serve to indicate that request bank of Fund Company is to financing platform payment;Fund Company
After receiving the credit of D+0 bank and redeeming request soon, first this D+0 bank credit request of redeeming soon is carried out internal redemption and processes,
Can include that the credit request of redeeming soon of D+0 bank carries out parsing etc. processes operation;Fund Company to the credit of D+0 bank soon redeem please
Ask after carrying out internal redemption process, i.e. can send out request instruction with request bank to financing platform payment to bank;Bank exists
Money can be beaten to the Fund Company's Send only Account on financing platform after receiving the request instruction that Fund Company sends;Bank is giving
After Fund Company's Send only Account on financing platform beats money, can notify to return payment result, Fund Company to Fund Company
Can return to financing platform after receiving the payment result that bank returns and redeem request results;Financing platform is receiving fund
After the redemption successful result that company returns, supplement bank's fund with money Fund Company Send only Account;Bank's fund is successfully being filled
After being worth in Fund Company's Send only Account, financing platform initiates to withdraw deposit to user from Fund Company's Send only Account;Financing platform exists
Update after withdrawing deposit successfully to user and redeem single state, update and redeem single " received payment ";Financing platform returns redemption request to user
As a result, i.e. redeem successfully.
General Fund Company of the cost of bank's credit money wants height from the cost going out money of providing loans, and uses this synchronization to provide loans credit
After redeeming scheme soon, what Fund Company's preparation was fewer provides loans the amount of money to financing platform, it is ensured that this amount of money all can be made in D day
With;While improving fund utilization rate, also can meet user redeems requirement soon.
Fig. 6 is the process chart that the most asynchronous credit of providing loans is redeemed soon, as shown in Figure 6, and this asynchronous pad
Money credit is redeemed the idiographic flow of scheme soon and can be described as follows:
User initiates D+0 and quickly redeems request, and request of quickly being redeemed by this D+0 sends to platform of managing money matters.
Financing platform, after receiving the D+0 that user sends and quickly redeeming request, first determines whether to provide loans specified, i.e. judges
D+0 quickly redeems whether the amount of money that request asked exceedes the amount of money in the Fund Company's Send only Account in financing platform.Wherein,
Not less than time, perform the flow process that " provide loans and redeem soon " shown in dotted line frame is corresponding;When exceeding, perform shown in dotted line frame is asynchronous
Flow process corresponding to " credit is redeemed soon ".
The flow process " provided loans and redeem soon " may include that financing platform is provided loans to Fund Company initiation D+0 and redeems request soon;Fund is public
Take charge of after receiving D+0 and providing loans and redeem request soon, it is carried out internal redemption and processes;And financing platform is returned redemption request knot
Really;Financing platform, after receiving the redemption request results that Fund Company returns, can be given from Fund Company's Send only Account and use
Initiate to withdraw deposit in family;Financing platform updates the single state of redemption to user after withdrawing deposit successfully, and updating redemption single is " received payment ";Financing
Platform returns redemption request results to user, i.e. redeems successfully.
The flow process of asynchronous " credit is redeemed soon " may include that financing platform sends the credit of D+0 bank to Fund Company and redeems soon
Request, this D+0 bank credit request of redeeming soon can serve to indicate that request bank of Fund Company is to financing platform payment;Fund Company
After receiving the credit of D+0 bank and redeeming request soon, first this D+0 bank credit request of redeeming soon is carried out internal redemption and processes,
Can include that the credit request of redeeming soon of D+0 bank carries out parsing etc. processes operation;Fund Company to the credit of D+0 bank soon redeem please
Asking after carrying out internal redemption process, can return to financing platform and redeem request results, this result can serve to indicate that fund
Company is successfully received the credit of D+0 bank and redeems request soon;Financing platform is receiving the redemption request results that Fund Company returns
Afterwards, inter-process can be carried out and record redemption list, and being " asking successfully, pending payment " by its status indication;Financing platform
Returning redemption request results to targeted customer, this result may be used for notifying that user redeems request present;Financing platform
The all states of timing scan are the redemption list of " asking successfully, pending payment ", it should be noted that financing platform can be according to reality
Situation arranges timed interval, such as 5 minutes;Financing platform is " asking successfully, pending payment " scanning all of state
Redeem single after, all of in this period can be collected please the money amount of money;Financing platform after the amount of money of gathering information, Ke Yixiang
Fund Company initiates request, gives financing platform payment with request;Fund Company receive financing platform initiate for asking
After giving the request of financing platform payment, can check situation data, can initiate to bank after verification situation data are errorless please
Ask, to ask bank to financing platform payment;Bank can be on financing platform after receiving the request that Fund Company sends
Fund Company's Send only Account beat money;Bank, after beating money to the Fund Company's Send only Account on financing platform, can notify
Returning payment result to Fund Company, Fund Company can return to financing platform after receiving the payment result that bank returns and pay
Money result;Financing platform, after receiving the successful payment result that Fund Company returns, supplements bank's fund with money Fund Company
Send only Account;After successfully being supplemented with money in Fund Company's Send only Account by bank's fund, financing platform is paid the bill account from Fund Company
Initiate to withdraw deposit to user in family;Financing platform updates the single state of redemption to user after withdrawing deposit successfully, and it is " paid for updating redemption single
Money ".
After using this asynchronous credit of providing loans to redeem scheme soon, the fewer amount of money of providing loans of Fund Company's preparation to financing platform,
Ensure that this amount of money all can be used in D day;While improving fund utilization rate, also can meet user redeems requirement soon.And
And, redeeming request soon if there being user to initiate in a large number, also Fund Company and banking system will not be caused bigger pressure, will not
Affect the interface capability of Fund Company and bank.But, when this asynchronous credit of providing loans redeems the scheme redemption money to user soon to account
Between have certain delay, after money will be asked in batches to become, just initiate payment to user.
It should be noted that target account, financing platform in user's correspondence embodiment of the present invention in this example are corresponding
The first equipment in the embodiment of the present invention, the second equipment in Fund Company's correspondence embodiment of the present invention, the bank correspondence present invention
The 3rd equipment in embodiment, D+0 quickly redeem the first event-resources transfer request in the corresponding embodiment of the present invention of request, D+
The credit of 0 bank redeems the second event resource transfers request in the corresponding embodiment of the present invention of request, financing platform soon to Fund Company
Send is used for request to the 3rd event-resources transfer request in the request correspondence embodiment of the present invention of financing platform payment, base
The 4th event money in the corresponding embodiment of the present invention of request that request is paid the bill to financing platform that King Company sends to bank
The first account in source transfer request, Fund Company's Send only Account correspondence embodiment of the present invention.
Also, it should be noted this alternative embodiment can also be applied in other scenes, such as Internet resources transfer
In scene, the handling process that this alternative embodiment is applied in Internet resources transfer scene is similar to above-mentioned example, the most no longer
Repeat.
As a kind of optional embodiment, before step S202 the first equipment receives the first event-resources transfer request,
This alternative embodiment can also include:
Step S201, the requirement to the resource transfers time according to current resource transfers situation and/or target account, instruction
One of execution following steps:
The request of second event resource transfers is sent to the second equipment by (1) first equipment, wherein, and second event resource transfers
Request obtains the whole events money in the first event-resources for instruction second equipment the second account request on the 3rd equipment
Source;First equipment sends the first event to the rear of target account to target account shifting the first event-resources from the first account
Resource transfers request success response;
The request of second event resource transfers is sent to the second equipment by (2) first equipment, wherein, and second event resource transfers
Request obtains the whole events money in the first event-resources for instruction second equipment the second account request on the 3rd equipment
Source;First equipment sends the first event shifting first event-resources forward direction target account to target account from the first account
Resource transfers request success response;
(3) first equipment judge that whether the first event-resources is more than the second event resource in the first account;If the first thing
Part resource exceedes second event resource, then the request of second event resource transfers is sent to the second equipment by the first equipment;
The request of second event resource transfers is sent to the second equipment by (4) first equipment, wherein, and second event resource transfers
Request obtains the partial event money in the first event-resources for instruction second equipment the second account request on the 3rd equipment
Source.
It should be noted that this alternative embodiment can be according to current resource transfers situation and/or target account to money
The requirement of source transfer time determines the concrete scheme selected by event-handling method, specifically includes above (1) to four shown in (4)
The scheme of kind, wherein, (1) is described in detail, herein to four shown in (4) kind scheme in the above embodiment of the present invention
Repeat no more.Also, it should be noted the embodiment of the present invention can also determine selected by event-handling method according to other guide
Concrete scheme, the such as first equipment and the second equipment can process in the ability of event-resources transfer request, the 3rd equipment
The quantity etc. of the event-resources that can store in the second account, illustrates the most one by one.
This alternative embodiment can also be applied to fund transfer field, as a example by realizing redeeming soon in the Internet financial platform,
Which type of scene is the technical scheme utilizing this alternative embodiment to be provided can determine under institute from the example above of the present invention
The scheme stated selects suitable scheme, concrete system of selection is exemplified below:
Big in redemption money fluctuation every day, it is impossible to estimate minimum redemption money, bank capital, or bank's cost can only be used
More cheap than Fund Company;Redeem request pressure smaller;In the case of redemption is compared concern to the account time by user, can select
Scheme is redeemed in synchronization credit as shown in Figure 3 soon.
Big in redemption money fluctuation every day, it is impossible to estimate minimum redemption money, bank capital, or bank's cost can only be used
More cheap than Fund Company;Redeem request pressure ratio relatively big, beyond Fund Company or banking system ability;User is to redeeming account
In the case of there is certain tolerance time, asynchronous credit as shown in Figure 4 can be selected to redeem scheme soon.
Little in redemption money fluctuation every day, can be easier to estimate minimum redemption money, or bank's cost is more public than fund
Department's height, to reduce Fund Company's fund cost;Redeem request pressure smaller;User compares the feelings of concern to redeeming the account time
Under condition, synchronization as shown in Figure 5 can be selected to provide loans credit line plan.
Little in redemption money fluctuation every day, can be easier to estimate minimum redemption money, or bank's cost is more public than fund
Department's height, to reduce Fund Company's fund cost;Redeem request pressure ratio relatively big, beyond Fund Company or banking system ability;
In the case of user has certain tolerance to redemption to account time, asynchronous credit line plan of providing loans as shown in Figure 6 can be selected.
Also, it should be noted this alternative embodiment can also be applied in other scenes, such as Internet resources transfer
In scene, the handling process that this alternative embodiment is applied in Internet resources transfer scene is similar to above-mentioned example, the most no longer
Repeat.
This alternative embodiment selects suitable event handling scheme according to concrete application scenarios, it is possible to reach raising event
Resource transfers success rate, the effect of raising event handling efficiency.
It should be noted that for aforesaid each method embodiment, in order to be briefly described, therefore it is all expressed as a series of
Combination of actions, but those skilled in the art should know, the present invention is not limited by described sequence of movement because
According to the present invention, some step can use other orders or carry out simultaneously.Secondly, those skilled in the art also should know
Knowing, embodiment described in this description belongs to preferred embodiment, involved action and the module not necessarily present invention
Necessary.
Through the above description of the embodiments, those skilled in the art is it can be understood that arrive according to above-mentioned enforcement
The method of example can add the mode of required general hardware platform by software and realize, naturally it is also possible to by hardware, but a lot
In the case of the former is more preferably embodiment.Based on such understanding, technical scheme is the most in other words to existing
The part that technology contributes can embody with the form of software product, and this computer software product is stored in a storage
In medium (such as ROM/RAM, magnetic disc, CD), including some instructions with so that a station terminal equipment (can be mobile phone, calculate
Machine, server, or the network equipment etc.) perform the method described in each embodiment of the present invention.
Embodiment 2
According to embodiments of the present invention, a kind of event processing apparatus for implementing above-mentioned event-handling method is additionally provided.
Fig. 7 is the schematic diagram of a kind of optional event processing apparatus according to embodiments of the present invention, as it is shown in fig. 7, this device can wrap
Include:
First receives unit 22, receives the first event-resources transfer request, wherein, the first event-resources for the first equipment
First event-resources is transferred to target account for request by transfer request;Transmitting element 24, for the first equipment by the second thing
The request of part resource transfers sends to the second equipment, and wherein, the request of second event resource transfers is for indicating the second equipment to the 3rd
The second account request on equipment obtains the part or all of event-resources in the first event-resources;And buanch unit 26, use
In in the case of the whole event-resources got from the second account in the first event-resources, the first equipment is by the first event
Resource transfers is to target account;In the case of the partial event resource got from the second account in the first event-resources,
First equipment is by the first account in partial event resource transfers to the first equipment, and shifts the first event from the first account
Resource is to target account.
It should be noted that the first reception unit 22 in this embodiment may be used for performing in the embodiment of the present application 1
Step S202, the transmitting element 24 in this embodiment may be used for performing step S204 in the embodiment of the present application 1, this embodiment
In buanch unit 26 may be used for performing step S206 in the embodiment of the present application 1.
Herein it should be noted that above-mentioned module is identical with the example that corresponding step is realized and application scenarios, but not
It is limited to above-described embodiment 1 disclosure of that.It should be noted that above-mentioned module as the part of device may operate in as
In hardware environment shown in Fig. 1, can be realized by software, it is also possible to realized by hardware.
As a kind of optional embodiment, Fig. 8 is another kind of optional event processing apparatus according to embodiments of the present invention
Schematic diagram, as shown in Figure 8, in the case of the whole event-resources got from the second account in the first event-resources,
Buanch unit 26 may include that the first shift module 261, for the first equipment, the first event-resources is transferred to the first account;
Second shift module 263, shifts the first event-resources to target account for the first equipment from the first account;First sends mould
Block 265, sends the first event-resources transfer request success response for the first equipment to target account.
It should be noted that the first shift module 261 in this embodiment may be used for performing in the embodiment of the present application 1
Step S2061, the second shift module 263 in this embodiment may be used for performing step S2063 in the embodiment of the present application 1,
The first sending module 265 in this embodiment may be used for performing step S2065 in the embodiment of the present application 1.
Herein it should be noted that above-mentioned module is identical with the example that corresponding step is realized and application scenarios, but not
It is limited to above-described embodiment 1 disclosure of that.It should be noted that above-mentioned module as the part of device may operate in as
In hardware environment shown in Fig. 1, can be realized by software, it is also possible to realized by hardware.
As a kind of optional embodiment, Fig. 9 is another kind of optional event processing apparatus according to embodiments of the present invention
Schematic diagram, as it is shown in figure 9, this alternative embodiment can also include: second receives unit 252, at the first equipment by the
After two event-resources transfer request transmissions to the second equipment and at the first equipment, the first event-resources is transferred to target account
Before, the first equipment receives the second event resource transfers request success response that the second equipment sends;Memory element 254, is used for
The record being in resource state to be transferred that first equipment storage is corresponding with the first event-resources transfer request, wherein, record is used
In representing that to the first event-resources but the first event-resources not yet transfers to target account to successful request;Buanch unit 26 is permissible
Including: sending module 262, send the request success response of second event resource transfers for the first equipment to target account;Search
Module 264, searches record for the first equipment;Second sending module 266, if for finding record, then the first equipment is by the
Three event-resources transfer request send to the second equipment, wherein, the 3rd event-resources transfer request for instruction the second equipment to
3rd equipment sends the 4th event-resources transfer request, and the 4th event-resources transfer request obtains from the second account for request
First event-resources;3rd shift module 268, for the first equipment get in the first event-resources from the second account complete
Portion's event-resources, transfers to the first account by the first event-resources;4th shift module 270, for shifting from the first account
First event-resources is to target account.
It should be noted that the second reception unit 252 in this embodiment may be used for performing in the embodiment of the present application 1
Step S2052, the memory element 254 in this embodiment may be used for performing step S2054 in the embodiment of the present application 1, and this is real
Execute the sending module 262 in example to may be used for performing step S2062 in the embodiment of the present application 1, the lookup mould in this embodiment
Block 264 may be used for performing step S2064 in the embodiment of the present application 1, and the second sending module 266 in this embodiment can be used
In step S2066 performed in the embodiment of the present application 1, the 3rd shift module 268 in this embodiment may be used for performing this Shen
Please step S2068 in embodiment 1, the 4th shift module 270 in this embodiment may be used for performing in the embodiment of the present application 1
Step S2070.
Herein it should be noted that above-mentioned module is identical with the example that corresponding step is realized and application scenarios, but not
It is limited to above-described embodiment 1 disclosure of that.It should be noted that above-mentioned module as the part of device may operate in as
In hardware environment shown in Fig. 1, can be realized by software, it is also possible to realized by hardware.
As a kind of optional embodiment, Figure 10 is another kind of optional event processing apparatus according to embodiments of the present invention
Schematic diagram, as shown in Figure 10, transmitting element 24 may include that judge module 242, for the first equipment judge first event money
Whether source is more than the second event resource in the first account;3rd sending module 244, if for the first event-resources more than second
Event-resources, then the request of second event resource transfers is sent to the second equipment by the first equipment.
It should be noted that the judge module 242 in this embodiment may be used for performing the step in the embodiment of the present application 1
S2042, the 3rd sending module 244 in this embodiment may be used for performing step S2044 in the embodiment of the present application 1.
Herein it should be noted that above-mentioned module is identical with the example that corresponding step is realized and application scenarios, but not
It is limited to above-described embodiment 1 disclosure of that.It should be noted that above-mentioned module as the part of device may operate in as
In hardware environment shown in Fig. 1, can be realized by software, it is also possible to realized by hardware.
As a kind of optional embodiment, Figure 11 is another kind of optional event processing apparatus according to embodiments of the present invention
Schematic diagram, as shown in figure 11, transmitting element 24 can also include: the 5th shift module 246, for judging the at the first equipment
After whether one event-resources is more than the second event resource in the first account, if the first event-resources provides less than second event
Source, then the first equipment shifts the first event-resources to target account from the first account.
It should be noted that the 5th shift module 246 in this embodiment may be used for performing in the embodiment of the present application 1
Step S2046.Above-mentioned module is identical with the example that corresponding step is realized and application scenarios, but is not limited to above-described embodiment 1
Disclosure of that.It should be noted that above-mentioned module may operate in hardware loop as shown in Figure 1 as the part of device
In border, can be realized by software, it is also possible to realized by hardware.
As a kind of optional embodiment, Figure 12 is another kind of optional event processing apparatus according to embodiments of the present invention
Schematic diagram, as shown in figure 12, this alternative embodiment can also include: indicating member 21, for first equipment receive first
Before event-resources transfer request, the requirement to the resource transfers time according to current resource transfers situation and/or target account,
Instruction performs one of following steps: the request of second event resource transfers is sent to the second equipment by the first equipment, wherein, and the second thing
The request of part resource transfers obtains in the first event-resources for instruction second equipment the second account request on the 3rd equipment
All event-resources;First equipment is sent out to the rear of target account to target account shifting the first event-resources from the first account
Send the first event-resources transfer request success response;The request of second event resource transfers is sent to the second equipment by the first equipment,
Wherein, the request of second event resource transfers obtains the first thing for instruction second equipment the second account request on the 3rd equipment
Whole event-resources in part resource;First equipment is shifting first event-resources forward direction to target account from the first account
Target account sends the first event-resources transfer request success response;First equipment judges that whether the first event-resources is more than first
Second event resource in account;If the first event-resources exceedes second event resource, then the first equipment is by second event resource
Transfer request sends to the second equipment;The request of second event resource transfers is sent to the second equipment, wherein, second by the first equipment
Event-resources transfer request obtains in the first event-resources for instruction second equipment the second account request on the 3rd equipment
Partial event resource.
It should be noted that the indicating member 21 in this embodiment may be used for performing the step in the embodiment of the present application 1
S201.Above-mentioned module is identical with the example that corresponding step is realized and application scenarios, but is not limited to disclosed in above-described embodiment 1
Content.It should be noted that above-mentioned module may operate in hardware environment as shown in Figure 1 as the part of device,
Can be realized by software, it is also possible to realized by hardware.
By above-mentioned module, it is possible to reach to improve event-resources and translate into the purpose of power, and then solve in correlation technique
Event handling platform from other accounts to target account failover events resource time there will be the event-resources failed situation of transfer
Technical problem, it is achieved improve event handling efficiency technique effect.
Embodiment 3
According to embodiments of the present invention, a kind of server for implementing above-mentioned event-handling method or terminal are additionally provided.
Figure 13 is the structured flowchart of a kind of terminal according to embodiments of the present invention, and as shown in figure 13, this terminal may include that
One or more (only illustrating one in figure) processor 201, memorizer 203 and transmitting device 205 are (in above-described embodiment
Dispensing device), as shown in figure 13, this terminal can also include input-output equipment 207.
Wherein, memorizer 203 can be used for storing software program and module, such as the event handling side in the embodiment of the present invention
Programmed instruction/module that method is corresponding with device, processor 201 by operation be stored in the software program in memorizer 203 and
Module, thus perform the application of various function and data process, i.e. realize above-mentioned event-handling method.Memorizer 203 can wrap
Include high speed random access memory, it is also possible to include nonvolatile memory, as one or more magnetic storage device, flash memory or
Other non-volatile solid state memories of person.In some instances, memorizer 203 can farther include remote relative to processor 201
The memorizer that journey is arranged, these remote memories can be connected to terminal by network.The example of above-mentioned network includes but does not limits
In the Internet, intranet, LAN, mobile radio communication and combinations thereof.
Above-mentioned transmitting device 205 is for receiving via a network or sending data, it is also possible to for processor with
Data transmission between memorizer.Above-mentioned network instantiation can include cable network and wireless network.In an example,
Transmitting device 205 includes a network adapter (Network Interface Controller, NIC), and it can pass through netting twine
It is connected with router with other network equipments thus communication can be carried out with the Internet or LAN.In an example, transmission dress
Putting 205 is radio frequency (Radio Frequency, RF) module, and it is for wirelessly carrying out communication with the Internet.
Wherein, specifically, memorizer 203 is used for storing application program.
Processor 201 can call the application program of memorizer 203 storage by transmitting device 205, to perform following step
Rapid: the first equipment receives the first event-resources transfer request, and wherein, the first event-resources transfer request is for asking the first thing
Part resource transfers is to target account;The request of second event resource transfers is sent to the second equipment by the first equipment, wherein, and the second thing
The request of part resource transfers obtains in the first event-resources for instruction second equipment the second account request on the 3rd equipment
Partly or entirely event-resources;And the situation in the whole event-resources got from the second account in the first event-resources
Under, the first event-resources is transferred to target account by the first equipment;Getting in the first event-resources from the second account
In the case of partial event resource, the first equipment by the first account in partial event resource transfers to the first equipment, and from
First account shifts the first event-resources to target account.
Processor 201 is additionally operable to perform following step: whole get in the first event-resources from the second account
In the case of event-resources, the first event-resources is transferred to the first account by the first equipment;First equipment is from the first account transfer
Move the first event-resources to target account;First equipment sends the first event-resources transfer request success response to target account.
Processor 201 is additionally operable to perform following step: send the request of second event resource transfers to the at the first equipment
After two equipment and before the first event-resources is transferred to target account by the first equipment, the first equipment receives the second equipment
The second event resource transfers request success response sent;The place that first equipment storage is corresponding with the first event-resources transfer request
In the record of resource state to be transferred, wherein, record is used for representing that successful request is to the first event-resources but the first event-resources
Not yet transfer to target account;First equipment sends the request success response of second event resource transfers to target account;First sets
For future reference look for record;If finding record, then the 3rd event-resources transfer request is sent to the second equipment by the first equipment, wherein,
3rd event-resources transfer request sends the 4th event-resources transfer request, the 4th thing for instruction the second equipment to the 3rd equipment
The request of part resource transfers obtains the first event-resources for request from the second account;First equipment gets from the second account
Whole event-resources in first event-resources, transfer to the first account by the first event-resources;And shift from the first account
First event-resources is to target account.
Processor 201 is additionally operable to perform following step: the first equipment judges that whether the first event-resources is more than the first account
In second event resource;If the first event-resources exceedes second event resource, then the first equipment is by second event resource transfers
Request sends to the second equipment.
Processor 201 is additionally operable to perform following step: judge that whether the first event-resources is more than the first account at the first equipment
After second event resource in family, if the first event-resources is less than second event resource, then the first equipment is from the first account
Middle transfer the first event-resources is to target account.
Processor 201 is additionally operable to perform following step: before the first equipment receives the first event-resources transfer request, root
The requirement to the resource transfers time according to current resource transfers situation and/or target account, instruction performs one of following steps: the
The request of second event resource transfers is sent to the second equipment by one equipment, and wherein, the request of second event resource transfers is used for indicating
Second equipment the second account request on the 3rd equipment obtains the whole event-resources in the first event-resources;First equipment exists
From the first account, shift the first event-resources send the first event-resources transfer request to the rear of target account to target account
Success response;The request of second event resource transfers is sent to the second equipment by the first equipment, and wherein, second event resource transfers please
Seek the whole event-resources for indicating second equipment the second account request on the 3rd equipment to obtain in the first event-resources;
First equipment shift from the first account first event-resources forward direction target account to target account send first event money
Source transfer request success response;First equipment judges that whether the first event-resources is more than the second event resource in the first account;
If the first event-resources exceedes second event resource, then the request transmission of second event resource transfers is set by the first equipment to second
Standby;The request of second event resource transfers is sent to the second equipment by the first equipment, and wherein, the request of second event resource transfers is used for
Indicate the partial event resource that second equipment the second account request on the 3rd equipment obtains in the first event-resources.
Use the embodiment of the present invention, it is provided that the scheme of a kind of event handling.First equipment is receiving the first event money
During the transfer request of source, ask by sending second event resource transfers to the second equipment to indicate the second equipment from the 3rd equipment
The second account obtain the part or all of event-resources in the first event-resources, when getting whole event-resources, first sets
Standby directly the first event-resources can be transferred to target account, when getting partial event resource the first equipment can first by
First event-resources, to the first account, is then transferred to target account from the first account by the partial event resource transfers got
Family, has reached to improve event-resources and has translated into the purpose of power, and then solves in correlation technique event handling platform from it
His account there will be the technical problem of the failed situation of event-resources transfer when target account failover events resource, it is achieved that carries
The technique effect of high event handling efficiency.
Alternatively, the concrete example in the present embodiment is referred to showing described in above-described embodiment 1 and embodiment 2
Example, the present embodiment does not repeats them here.
It will appreciated by the skilled person that the structure shown in Figure 13 is only signal, terminal can be smart mobile phone
(such as Android phone, iOS mobile phone etc.), panel computer, palm PC and mobile internet device (Mobile Internet
Devices, MID), the terminal unit such as PAD.Figure 13 its structure of above-mentioned electronic installation is not caused restriction.Such as, terminal is also
The assembly (such as network interface, display device etc.) more or more less than shown in Figure 13 can be included, or have and Figure 13 institute
Show different configurations.
One of ordinary skill in the art will appreciate that all or part of step in the various methods of above-described embodiment is can
Completing carrying out the device-dependent hardware of command terminal by program, this program can be stored in a computer-readable recording medium
In, storage medium may include that flash disk, read only memory (Read-Only Memory, ROM), random access device (Random
Access Memory, RAM), disk or CD etc..
Embodiment 4
Embodiments of the invention additionally provide a kind of storage medium.Alternatively, in the present embodiment, above-mentioned storage medium can
For the program code performing event-handling method.
Alternatively, in the present embodiment, multiple during above-mentioned storage medium may be located at the network shown in above-described embodiment
On at least one network equipment in the network equipment.
Alternatively, in the present embodiment, storage medium is arranged to storage for the program code performing following steps:
S1, the first equipment receives the first event-resources transfer request, and wherein, the first event-resources transfer request is used for asking
First event-resources is transferred to target account;
S2, the request of second event resource transfers is sent to the second equipment by the first equipment, wherein, second event resource transfers
Request for instruction second equipment the second account request on the 3rd equipment obtain in the first event-resources part or all of
Event-resources;
S3, in the case of the whole event-resources got from the second account in the first event-resources, the first equipment
First event-resources is transferred to target account;In the partial event resource got from the second account in the first event-resources
In the case of, the first equipment is by the first account in partial event resource transfers to the first equipment, and from the first account transfer
Move the first event-resources to target account.
Alternatively, storage medium is also configured to storage for the program code performing following steps: from the second account
In get the whole event-resources in the first event-resources in the case of, the first event-resources is transferred to first by the first equipment
Account;First equipment shifts the first event-resources to target account from the first account;First equipment sends the to target account
One event-resources transfer request success response.
Alternatively, storage medium is also configured to storage for the program code performing following steps: will at the first equipment
The request of second event resource transfers sends to the first event-resources being transferred to target account after the second equipment and at the first equipment
Before family, the first equipment receives the second event resource transfers request success response that the second equipment sends;First equipment storage with
The record being in resource state to be transferred that first event-resources transfer request is corresponding, wherein, record is used for representing successful request
To the first event-resources but the first event-resources not yet transfers to target account;First equipment sends the second thing to target account
The request success response of part resource transfers;First equipment searches record;If finding record, then the first equipment is by the 3rd event-resources
Transfer request sends to the second equipment, and wherein, the 3rd event-resources transfer request is sent out to the 3rd equipment for instruction the second equipment
Sending the 4th event-resources transfer request, the 4th event-resources transfer request obtains the first event money for request from the second account
Source;First equipment gets the whole event-resources in the first event-resources from the second account, by the first event-resources transfer
To the first account;And from the first account, shift the first event-resources to target account.
Alternatively, storage medium is also configured to storage for the program code performing following steps: the first equipment judges
Whether the first event-resources is more than the second event resource in the first account;If the first event-resources exceedes second event resource,
Then the request of second event resource transfers is sent to the second equipment by the first equipment.
Alternatively, storage medium is also configured to storage for the program code performing following steps: sentence at the first equipment
After whether disconnected first event-resources is more than the second event resource in the first account, if the first event-resources is less than the second thing
Part resource, then the first equipment shifts the first event-resources to target account from the first account.
Alternatively, storage medium is also configured to storage for the program code performing following steps: connect at the first equipment
Before receiving the first event-resources transfer request, according to current resource transfers situation and/or target account to the resource transfers time
Requirement, instruction performs one of following steps: the request of second event resource transfers is sent to the second equipment by the first equipment, its
In, the request of second event resource transfers obtains the first event for instruction second equipment the second account request on the 3rd equipment
Whole event-resources in resource;First equipment is shifting rear to mesh to target account of the first event-resources from the first account
Mark account sends the first event-resources transfer request success response;The request of second event resource transfers is sent to the by the first equipment
Two equipment, wherein, the request of second event resource transfers obtains for instruction second equipment the second account request on the 3rd equipment
Take the whole event-resources in the first event-resources;First equipment is shifting the first event-resources to target account from the first account
The forward direction target account at family sends the first event-resources transfer request success response;Whether first equipment judges the first event-resources
More than the second event resource in the first account;If the first event-resources exceedes second event resource, then the first equipment is by second
Event-resources transfer request sends to the second equipment;The request of second event resource transfers is sent to the second equipment by the first equipment,
Wherein, the request of second event resource transfers obtains the first thing for instruction second equipment the second account request on the 3rd equipment
Partial event resource in part resource.
Alternatively, the concrete example in the present embodiment is referred to showing described in above-described embodiment 1 and embodiment 2
Example, the present embodiment does not repeats them here.
Alternatively, in the present embodiment, above-mentioned storage medium can include but not limited to: USB flash disk, read only memory (ROM,
Read-Only Memory), random access memory (RAM, Random Access Memory), portable hard drive, magnetic disc or
The various medium that can store program code such as CD.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
If the integrated unit in above-described embodiment realizes and as independent product using the form of SFU software functional unit
When selling or use, can be stored in the storage medium that above computer can read.Based on such understanding, the skill of the present invention
Part that prior art is contributed by art scheme the most in other words or this technical scheme completely or partially can be with soft
The form of part product embodies, and this computer software product is stored in storage medium, including some instructions with so that one
Platform or multiple stage computer equipment (can be for personal computer, server or the network equipment etc.) perform each embodiment institute of the present invention
State all or part of step of method.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not has in certain embodiment
The part described in detail, may refer to the associated description of other embodiments.
In several embodiments provided herein, it should be understood that disclosed client, can be by other side
Formula realizes.Wherein, device embodiment described above is only schematically, the division of the most described unit, and the most only one
Kind of logic function divides, actual can have when realizing other dividing mode, the most multiple unit or assembly can in conjunction with or
It is desirably integrated into another system, or some features can be ignored, or do not perform.Another point, shown or discussed mutual it
Between coupling direct-coupling or communication connection can be the INDIRECT COUPLING by some interfaces, unit or module or communication link
Connect, can be being electrical or other form.
The described unit illustrated as separating component can be or may not be physically separate, shows as unit
The parts shown can be or may not be physical location, i.e. may be located at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be selected according to the actual needs to realize the mesh of the present embodiment scheme
's.
It addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it is also possible to
It is that unit is individually physically present, it is also possible to two or more unit are integrated in a unit.Above-mentioned integrated list
Unit both can realize to use the form of hardware, it would however also be possible to employ the form of SFU software functional unit realizes.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (12)
1. an event-handling method, it is characterised in that including:
First equipment receives the first event-resources transfer request, wherein, described first event-resources transfer request be used for asking by
First event-resources is transferred to target account;
The request of second event resource transfers is sent to the second equipment by described first equipment, and wherein, described second event resource turns
The request that moves obtains in described first event-resources for the second account request indicating described second equipment on the 3rd equipment
Partly or entirely event-resources;And in the whole events money got from described second account in described first event-resources
In the case of source, described first event-resources is transferred to described target account by described first equipment;From described second account
In get the partial event resource in described first event-resources in the case of, described partial event is provided by described first equipment
Source is transferred in the first account on described first equipment, and shifts described first event-resources from described first account to institute
State target account.
Method the most according to claim 1, it is characterised in that getting described first event from described second account
In the case of whole event-resources in resource, described first event-resources is transferred to described target account by described first equipment
Including:
Described first event-resources is transferred to described first account by described first equipment;
Described first equipment shifts described first event-resources to described target account from described first account;
Described first equipment sends the first event-resources transfer request success response to described target account.
Method the most according to claim 1, it is characterised in that
To after described first equipment is by second event resource transfers request transmission to the second equipment and at described first equipment
Before described first event-resources is transferred to described target account, described method also includes: described first equipment receives described the
The described second event resource transfers request success response that two equipment send;Described first equipment storage and described first event money
What source transfer request was corresponding is in the record of resource state to be transferred, and wherein, it is described that described record is used for representing that successful request arrives
First event-resources but described first event-resources not yet transfers to described target account;
Described first event-resources is transferred to described target account and includes by described first equipment: described first equipment is to described mesh
Mark account sends the request success response of second event resource transfers;Described first equipment searches described record;If finding described
Record, the 3rd event-resources transfer request is sent to described second equipment, wherein, described 3rd event by the most described first equipment
Resource transfers request is used for indicating described second equipment to send the 4th event-resources transfer request to described 3rd equipment, and described the
Four event-resources transfer request obtain described first event-resources for request from described second account;Described first equipment from
Described second account gets the whole event-resources in described first event-resources, described first event-resources is transferred to
Described first account;And from described first account, shift described first event-resources to described target account.
The most according to the method in any one of claims 1 to 3, it is characterised in that second event is provided by described first equipment
Source transfer request transmission includes to the second equipment:
Described first equipment judges whether described first event-resources exceedes the second event resource in described first account;
If described first event-resources exceedes described second event resource, described second event resource is turned by the most described first equipment
The request of shifting sends to described second equipment.
Method the most according to claim 4, it is characterised in that judge that described first event-resources is at described first equipment
After the no second event resource exceeded in described first account, also include:
If described first event-resources is less than described second event resource, the most described first equipment is from described first account transfer
Move described first event-resources to described target account.
The most according to the method in any one of claims 1 to 3, it is characterised in that receive the first thing at described first equipment
Before the request of part resource transfers, described method also includes:
The requirement to the resource transfers time according to current resource transfers situation and/or described target account, below instruction execution
One of step:
The request of described second event resource transfers is sent to described second equipment, wherein, described second thing by described first equipment
The request of part resource transfers obtains described for indicating described second equipment described second account request on described 3rd equipment
Whole event-resources in first event-resources;Described first equipment is shifting described first event money from described first account
Source sends described first event-resources transfer request success response to the rear of described target account to described target account;
The request of described second event resource transfers is sent to described second equipment, wherein, described second thing by described first equipment
The request of part resource transfers obtains described for indicating described second equipment described second account request on described 3rd equipment
Whole event-resources in first event-resources;Described first equipment is shifting described first event money from described first account
Target account described in the forward direction of source extremely described target account sends described first event-resources transfer request success response;
Described first equipment judges whether described first event-resources exceedes the second event resource in described first account;If institute
Stating the first event-resources and exceed described second event resource, the request of described second event resource transfers is sent out by the most described first equipment
Deliver to described second equipment;
The request of described second event resource transfers is sent to described second equipment, wherein, described second thing by described first equipment
The request of part resource transfers obtains described for indicating described second equipment described second account request on described 3rd equipment
Partial event resource in first event-resources.
7. an event processing apparatus, it is characterised in that including:
First receives unit, receives the first event-resources transfer request for the first equipment, and wherein, described first event-resources turns
First event-resources is transferred to target account for request by the request that moves;
Transmitting element, sends the request of second event resource transfers to the second equipment for described first equipment, wherein, and described the
Two event-resources transfer request obtain described first for indicating described second equipment the second account request on the 3rd equipment
Part or all of event-resources in event-resources;And
Buanch unit, for the feelings in the whole event-resources got from described second account in described first event-resources
Under condition, described first event-resources is transferred to described target account by described first equipment;Obtaining from described second account
In the case of partial event resource in described first event-resources, described first equipment is by described partial event resource transfers
In the first account on described first equipment, and from described first account, shift described first event-resources to described target
Account.
Device the most according to claim 7, it is characterised in that getting described first event from described second account
In the case of whole event-resources in resource, described buanch unit includes:
First shift module, transfers to described first account for described first equipment by described first event-resources;
Second shift module, shifts described first event-resources to described mesh for described first equipment from described first account
Mark account;
First sending module, sends the first event-resources transfer request for described first equipment to described target account and successfully rings
Should.
Device the most according to claim 7, it is characterised in that
Described device also includes: second receives unit, for the request of second event resource transfers being sent at described first equipment
After the second equipment and before described first event-resources is transferred to described target account by described first equipment, described
First equipment receives the described second event resource transfers request success response that described second equipment sends;Memory element, is used for
The record being in resource state to be transferred that described first equipment storage is corresponding with described first event-resources transfer request, its
In, described record is used for representing that to described first event-resources but described first event-resources not yet transfers to institute to successful request
State target account;
Described buanch unit includes: sending module, sends second event resource for described first equipment to described target account
Transfer request success response;Search module, search described record for described first equipment;Second sending module, if for looking into
Finding described record, the 3rd event-resources transfer request is sent to described second equipment by the most described first equipment, wherein, described
3rd event-resources transfer request is used for indicating described second equipment to send the 4th event-resources transfer to described 3rd equipment please
Asking, described 4th event-resources transfer request obtains described first event-resources for request from described second account;3rd
Shift module, gets the whole events money in described first event-resources from described second account for described first equipment
Source, transfers to described first account by described first event-resources;4th shift module, for shifting from described first account
Described first event-resources is to described target account.
10. according to the device according to any one of claim 7 to 9, it is characterised in that described transmitting element includes:
For described first equipment, judge module, judges whether described first event-resources exceedes second in described first account
Event-resources;
3rd sending module, if exceeding described second event resource for described first event-resources, the most described first equipment will
The request of described second event resource transfers sends to described second equipment.
11. devices according to claim 10, it is characterised in that described transmitting element also includes:
At described first equipment, 5th shift module, for judging whether described first event-resources exceedes in described first account
Second event resource after, if described first event-resources is less than described second event resource, the most described first equipment from
Described first account shifts described first event-resources to described target account.
12. according to the device according to any one of claim 7 to 9, it is characterised in that also include:
Indicating member, for before described first equipment receives the first event-resources transfer request, turns according to current resource
Condition of shifting one's love and/or the requirement to the resource transfers time of the described target account, one of instruction execution following steps:
The request of described second event resource transfers is sent to described second equipment, wherein, described second thing by described first equipment
The request of part resource transfers obtains described for indicating described second equipment described second account request on described 3rd equipment
Whole event-resources in first event-resources;Described first equipment is shifting described first event money from described first account
Source sends described first event-resources transfer request success response to the rear of described target account to described target account;
The request of described second event resource transfers is sent to described second equipment, wherein, described second thing by described first equipment
The request of part resource transfers obtains described for indicating described second equipment described second account request on described 3rd equipment
Whole event-resources in first event-resources;Described first equipment is shifting described first event money from described first account
Target account described in the forward direction of source extremely described target account sends described first event-resources transfer request success response;
Described first equipment judges whether described first event-resources exceedes the second event resource in described first account;If institute
Stating the first event-resources and exceed described second event resource, the request of described second event resource transfers is sent out by the most described first equipment
Deliver to described second equipment;
The request of described second event resource transfers is sent to described second equipment, wherein, described second thing by described first equipment
The request of part resource transfers obtains described for indicating described second equipment described second account request on described 3rd equipment
Partial event resource in first event-resources.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610361974.1A CN106096926B (en) | 2016-05-26 | 2016-05-26 | Event processing method, device, electronic device and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610361974.1A CN106096926B (en) | 2016-05-26 | 2016-05-26 | Event processing method, device, electronic device and storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106096926A true CN106096926A (en) | 2016-11-09 |
CN106096926B CN106096926B (en) | 2021-03-26 |
Family
ID=57229926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610361974.1A Active CN106096926B (en) | 2016-05-26 | 2016-05-26 | Event processing method, device, electronic device and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106096926B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107067255A (en) * | 2017-02-27 | 2017-08-18 | 腾讯科技(深圳)有限公司 | The treating method and apparatus of account in block chain |
CN109711992A (en) * | 2017-10-26 | 2019-05-03 | 财付通支付科技有限公司 | Resource transfers method, apparatus, system, electronic equipment and medium |
CN110070441A (en) * | 2018-01-22 | 2019-07-30 | 财付通支付科技有限公司 | Information processing method, device, computer equipment, storage medium and program product |
CN110533543A (en) * | 2019-08-29 | 2019-12-03 | 上海艾融软件股份有限公司 | Terminate resource value-added product, the value-added method and device of monetary fund |
WO2021208755A1 (en) * | 2020-04-14 | 2021-10-21 | 支付宝实验室(新加坡)有限公司 | Data processing and payment |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1465027A (en) * | 2001-06-11 | 2003-12-31 | 索尼公司 | Electronic money system |
CN105354745A (en) * | 2015-12-03 | 2016-02-24 | 腾讯科技(深圳)有限公司 | Processing method of data information, data information processing platform and management platform |
WO2016077225A1 (en) * | 2014-11-13 | 2016-05-19 | Alibaba Group Holding Limited | Managing warehouse information |
-
2016
- 2016-05-26 CN CN201610361974.1A patent/CN106096926B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1465027A (en) * | 2001-06-11 | 2003-12-31 | 索尼公司 | Electronic money system |
WO2016077225A1 (en) * | 2014-11-13 | 2016-05-19 | Alibaba Group Holding Limited | Managing warehouse information |
CN105354745A (en) * | 2015-12-03 | 2016-02-24 | 腾讯科技(深圳)有限公司 | Processing method of data information, data information processing platform and management platform |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107067255A (en) * | 2017-02-27 | 2017-08-18 | 腾讯科技(深圳)有限公司 | The treating method and apparatus of account in block chain |
CN107067255B (en) * | 2017-02-27 | 2019-02-26 | 腾讯科技(深圳)有限公司 | The treating method and apparatus of account in block chain |
US11095679B2 (en) | 2017-02-27 | 2021-08-17 | Tencent Technology (Shenzhen) Company Ltd | Method and apparatus for processing account in blockchain, storage medium, and computer device |
CN109711992A (en) * | 2017-10-26 | 2019-05-03 | 财付通支付科技有限公司 | Resource transfers method, apparatus, system, electronic equipment and medium |
CN109711992B (en) * | 2017-10-26 | 2023-03-14 | 财付通支付科技有限公司 | Resource transfer method, device, system, electronic device and medium |
CN110070441A (en) * | 2018-01-22 | 2019-07-30 | 财付通支付科技有限公司 | Information processing method, device, computer equipment, storage medium and program product |
CN110533543A (en) * | 2019-08-29 | 2019-12-03 | 上海艾融软件股份有限公司 | Terminate resource value-added product, the value-added method and device of monetary fund |
CN110533543B (en) * | 2019-08-29 | 2022-04-05 | 上海艾融软件股份有限公司 | Method and device for terminating value-added products and currency fund |
WO2021208755A1 (en) * | 2020-04-14 | 2021-10-21 | 支付宝实验室(新加坡)有限公司 | Data processing and payment |
Also Published As
Publication number | Publication date |
---|---|
CN106096926B (en) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106096926A (en) | Event-handling method and device | |
CN110297766A (en) | Method for testing software and software testing system based on distributed test node cluster | |
CN108985774A (en) | A kind of motivational techniques, device, equipment and the storage medium of block chain network | |
CN108510389A (en) | Intelligent contract call method, equipment and readable storage medium storing program for executing based on block chain | |
CN106131057A (en) | Certification based on virtual reality scenario and device | |
CN108197944A (en) | Resource transaction method and device based on block chain technology | |
CN108446974A (en) | Data processing equipment, method and computer readable storage medium | |
CN110363666A (en) | Information processing method, calculates equipment and storage medium at device | |
CN106651097A (en) | Data collection method, data collection device and data collection server based on crowd sourcing | |
CN105049539A (en) | Rebating method, device and system | |
CN106060676A (en) | Online interaction method and apparatus based on live streaming | |
CN106096999A (en) | The put-on method of media file and device | |
CN107340944B (en) | The display methods and device of interface | |
CN104753906A (en) | Data transfer method, device and system | |
CN106209953A (en) | The processing method of sequence information, Apparatus and system | |
CN108829868A (en) | data display method and device, storage medium and electronic device | |
CN109670847A (en) | The distribution method and device of resource | |
CN110428237A (en) | The treating method and apparatus of resource, storage medium, electronic device | |
CN106484738A (en) | A kind of page processing method and device | |
CN104917631A (en) | Prediction initiation, participation and information processing methods, device and system | |
CN107391168A (en) | Animation loading method and device and request processing method and device | |
CN106330502A (en) | Network resource processing method, device and system | |
CN106056409A (en) | Media file delivery method and device | |
CN110327625A (en) | Processing method, device, processor, terminal and the server of file | |
CN104509084A (en) | System for providing contact number information having added search function, and method for same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |