CN106092680A - A kind of metal pipe material test sample preparation method - Google Patents

A kind of metal pipe material test sample preparation method Download PDF

Info

Publication number
CN106092680A
CN106092680A CN201610393500.5A CN201610393500A CN106092680A CN 106092680 A CN106092680 A CN 106092680A CN 201610393500 A CN201610393500 A CN 201610393500A CN 106092680 A CN106092680 A CN 106092680A
Authority
CN
China
Prior art keywords
tubing
cutting
cutting edge
cut
metal pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610393500.5A
Other languages
Chinese (zh)
Other versions
CN106092680B (en
Inventor
吴建军
赵伟
肖都跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING IRON & STEEL INSTITUTE Co.,Ltd.
Original Assignee
Chongqing Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Iron and Steel Group Co Ltd filed Critical Chongqing Iron and Steel Group Co Ltd
Priority to CN201610393500.5A priority Critical patent/CN106092680B/en
Publication of CN106092680A publication Critical patent/CN106092680A/en
Application granted granted Critical
Publication of CN106092680B publication Critical patent/CN106092680B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/286Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q involving mechanical work, e.g. chopping, disintegrating, compacting, homogenising
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/04Devices for withdrawing samples in the solid state, e.g. by cutting
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/286Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q involving mechanical work, e.g. chopping, disintegrating, compacting, homogenising
    • G01N2001/2873Cutting or cleaving

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses a kind of metal pipe material test sample preparation method, it is characterized in that, this method realizes by means of punch press, it is included in tube material detent mechanism in punch press and realizes the step of tubing horizontal location, also include using tubing punching mechanism to realize prepared step die-cut to tubular product sample, the tube stamping cutter of tubing punching mechanism has the cutting edge of two horizontal alignment, cutting edge spacing is consistent with specimen width, cutting edge length is more than cut pipe diameter, first adjust cutting edge direction during preparation and to be positioned tubing radially consistent, tubing section is gone out by a die cut, behind 90 degree of change cutting edge directions, die cut goes out sample again again.It is simple that the present invention has enforcement, convenient to operation, and tubing sampling efficiency is high, obtains sample deformation few, quality advantages of higher.

Description

A kind of metal pipe material test sample preparation method
Technical field
The present invention relates to metal pipe material performance test field, specifically a kind of metal pipe material test sample preparation method.
Background technology
Along with the application of metal pipe material is more and more extensive, client's quality to metal pipe material product, such as mechanical strength and resistance to The requirement of the performances such as corrosion is more and more higher, therefore before production process or tubing use, the most usually needs to enter tubing Row sampling detection, tests bio-film colonization performance etc. in its mechanical property, decay resistance and water environment.
But during tubing sampling detection, especially thin-wall metal pipe diameter pipes, if using whole tubing to carry out power Learn test and corrosion resistance test, not only reduce the efficiency of testing experiment, also result in bigger waste simultaneously.In order to improve effect Rate and minimizing waste, generally need to carry out performance survey by the sheet coupon that tubular product sample takes strip along the cutting of tubing axis direction Examination.At present, the main sample preparation using machining equipment to carry out operation and operation are as follows: first, metal thin wall pipe uses emery wheel to cut Sheet machine or band-saw machine tool cut, and tubular product sample cut into a joint tubular product sample of certain length, because of the sample under cutting End surfaces is jagged or out-of-flatness etc., then needs two facets of Vehicle Processing tubular product sample on lathe, to ensure two Cutting section is axially vertical with tubing, secondly, draws equally spaced parallel lines with marking pen in the axial direction at tubular product sample outer wall, Then, by this sample holder on planer, finally, with planer successively along the lower required sheet material examination of the parallel lines cutting finished Sample.There are following several point defects in above-mentioned existing tubing sampling technique: 1, tubular product sample clamping end face need to be got on the bus wheeled litter processed clip Holding end face, need again to clamp and position sample after Vehicle Processing one end face of a piece tubular product sample, operation is more complicated, sample preparation efficiency Relatively low.2, tubular product sample outer wall needs to draw parallel lines, clamping tube end face location, and needs examination after cutting one plies sample Sample clamps and positions sample again, and operation is more complicated, and sample preparation is inefficient.3, the processing of planer device plane carries out sheet coupon sampling Time, using the end face of tubing and the cutting position positioning tubing of ruling, the dimensional accuracy therefore taking sample processed is the highest.4, planer When device plane processing carries out sheet coupon sampling, for thin-wall pipe, often in the course of processing, sample deformation is serious, Hen Duoshi Can not direct sample under slicing, in addition it is also necessary to sheet coupon is separated by follow-up pincers worker clamp etc. with sample pipe, flattens the most again sample, Take time and effort.And sample coupon surface quality is under some influence, cause that test result is inaccurate affects sample accuracy of detection.5, should Set sample making course uses lathe kind many, and procedure of processing is loaded down with trivial details, takes time and effort.Artificial and equipment effect relatively costly.
Summary of the invention
For above-mentioned the deficiencies in the prior art, the technical problem to be solved is: how to provide a kind of structure letter Single, convenient to operation, improve the metal pipe material test sample preparation method of tubing sampling efficiency.
In order to solve above-mentioned technical problem, present invention employs following technical scheme:
A kind of metal pipe material test sample preparation method, it is characterised in that this method realizes by means of punch press, is included in punch press Tube material detent mechanism realizes the step of tubing horizontal location, also includes using tubing punching mechanism to realize die-cut to tubular product sample The step prepared, the tube stamping cutter of tubing punching mechanism has the cutting edge of two horizontal alignment, cutting edge spacing and sample Width is consistent, and cutting edge length, more than cut pipe diameter, first adjusts cutting edge direction and is positioned tubing radially during preparation Unanimously, after going out tubing section, then 90 degree of change cutting edge directions by a die cut, die cut goes out sample again.
So, use die-cut mode by punch press, to tubing clamped one time, then by adjusting cutting edge angle, carry out Twice die-cut tubular product sample that can be prepared by, simple and convenient fast, significantly reduce sample and prepare difficulty and improve sample system Standby efficiency.
As optimization, this method prepares by following metal pipe material sample die cutting device, and described metal pipe material sample is die-cut Equipment includes that punch press, punch press have the workbench being positioned at lower section, has and is positioned at punch press main shaft vertically arranged above workbench, punching Bed main shaft lower end has mounting interface, and punch press main shaft upper end is connected with punching press power set and can be controlled descending realization and rushes Pressure, also includes tubing detent mechanism and tubing punching mechanism, and tubing detent mechanism includes the base being fixed on workbench, on base It is provided with clamping position structure for realizing tubing horizontal location clamping along the longitudinal direction, and makes tubing be positioned clamping Punching press passage can be reserved above rear upper surface middle part;Described tubing punching mechanism includes that a punch press connects push rod, and punch press is even Connect push rod upper end and there is the main shaft union joint of a taper and for being connected with the docking of the mounting interface of punch press main shaft lower end, punch press Connecting push rod lower end and be provided with tube stamping cutter, the left and right sides, tube stamping cutter lower end has two rectangles straight down Block cutting part, cutting part lower end is horizontally disposed cutting edge along the longitudinal direction, and two cutting parts are just liquidating pressure passageway Arrange and both sides are smaller than punching press channel width;
Described tube stamping cutter includes the cutter body of a cuboid structure, also includes being arranged on cutter originally by fixing screw The cutting blade of the body left and right sides, cutting blade bottom downwardly extends out cutter body and constitutes the cutting part for cutting, cutting The cutting edge length cutting subordinate's end is more than cut pipe diameter, and before and after cutter body, two lateral extents are more than clamping position on base Two lateral extent before and after structure;It is additionally provided with on side, both sides before and after described cutter body for right to realize with fixing screw fit The blade fixing screw of transposition that cutting blade transposition is fixing.
So, before this equipment uses, tubing detent mechanism is to be mounted on work bench of punch press and just to punch press main shaft Position, the punch press of tubing punching mechanism connects push rod upper end and is installed on the mounting interface of punch press main shaft lower end.During tubing sampling, The tubing being truncated into segment the most along its length is installed in tubing detent mechanism along the longitudinal direction, then starts punching press power Device drives tubing punching mechanism undershoot, and tube material punching tool passes punching press passage so that it is cutting edge die-cut tubing top two Side also punches out tubular product sample.The most compared to the prior art, sample cutting is more efficient and convenient, and without to little segment pipe Two ends carry out end face processing, drastically increase sample preparation efficiency, are particularly suitable for carrying out pipe performance group contrast test Time, the batch of sample is produced.When this equipment uses simultaneously, only cutting blade need to be disassembled and again join by fixing screw Conjunction is fixed to before and after cutter body on side, both sides, it becomes possible to realize intercepting overall tubing along its length the cut-out behaviour of segment Make, after first blocking acquisition tubing segment, then cutting blade has been adjusted to about cutter body position tries with die-cut acquisition tubing Sample, the most more facilitates the preparation of tubular product sample to obtain.
As optimization, in described tubing detent mechanism, clamping position structure includes vertically being fixedly installed on above base left A pair clamping position block that right septum is oppositely arranged, clamping position block opposite side sidewall is provided with chuck installation cavity, and chuck is pacified Being provided with V-clevis in behaveing affectedly, the side of V-clevis opposite side is overall in the V-arrangement opened along the vertical direction so that two V-arrangements Form pipe clamping localization cavity between chuck opposite side, clamping position block is additionally provided with for regulating V-clevis level folder Tight clamping governor motion.
So, realizing the location to tubing by V-clevis, the tubing left and right sides is respectively arranged with the location of linear contact lay at two up and down Place so that it is position convenient and swift and improve reliability of positioning, can rely on clamping governor motion regulating guarantee locating clip during location Tight effect.
Further, described clamping governor motion includes horizontally disposed regulation bolt, and regulation bolt thread spins cooperation Being positioned at the screwed hole of chuck installation cavity position outside clamping position block, regulation bolt is inner and clamping position block abuts and coordinates And outer end is provided with regulation handle.So there is simple in construction, advantage easy to adjust.
As optimization, described regulation bolt the inner is provided with helical spring and is abutted by helical spring and clamping position block Coordinate.As such, it is possible to rely on elastic guarantee of helical spring preferably to position clamping;More importantly to can be by right simultaneously The adjustment of clamping force, change tubing location time pressure size, and then regulation tubing pressurized after its punched position from The size of body internal stress so that it is during cutting, cutting edge can preferably break tube surfaces, improves the smoothness of cutting and ensures Cut out the complete effect of sample.
As optimization, every piece of clamping position block is respectively provided with four regulation bolts, regulates bolt position correspondence clamping position Four corner location of block outer lateral side are arranged.
So, the balance of clamping force force regulation is more ensured, it is ensured that tubing is cut in the rectilinear direction of position everywhere Internal stress all compares equilibrium, it is ensured that cutting effect.
As optimization, the base between said two clamping position block is the most upwards fixedly installed a blanking cutting Support platform, blanking cutting support platform upper surface be provided with elastomeric layer for clamping position after tubing lower surface contact realization Supporting.So, when the blanking cutting support platform set up makes tubing held location, it is affected by left and right and direction, three, bottom Clamping make a concerted effort, this can make tubing upper surface be cut formation direction, position with joint efforts is the pretightning force opened above both sides, Thus making in blanking process, tubing is difficult to the deformation that is flattened, it is ensured that die-cut smooth and die-cut quality, it is ensured that obtain The quality of tubing exemplar.Further, described blanking cutting supports and leaves secondary punching between platform and two, left and right clamping position block Joint-cutting gap, the cutting edge of this secondary punch gap and tube stamping cutter is just to setting.So, tube stamping cutter is the most die-cut Time, can control to extend the stroke that tubing punching tool is descending so that it is complete under the die-cut rear continuation of sample of tubing upper face Tubing bottom is also positioned at blanking cutting and supports that the tubing above platform is the most die-cut to be opened by row, and such one-step punching can obtain up and down Left and right, for four pieces of samples, drastically increases sample preparation efficiency, and stress balance when relying on tubing to position can ensure that four The complete effect of block sample, it is to avoid the impact that coupon results is caused by sample deformation, it is ensured that the reliability of specimen test.
As optimization, in tube stamping cutter, in the space between two cutting parts, it is additionally provided with a cutting pressure Block, cutting briquetting upper end is connected on tube stamping cutter by moving back sample spring, and cutting briquetting is not downward by lower surface during external force Beyond cutting edge position, cutting part lower end.So, cutting briquetting and move back sample spring and coordinate to play and move back sample function and facilitate die-cut What rear realization was cut sample moves back sample;Additionally the more important thing is, cutting briquetting is not exceeded downwards cutting part by lower surface during external force Cutting edge position, lower end makes in blanking process, cuts briquetting and first touched pipe before the cutting edge of cutting part touches tubing Material upper surface also applies downward bigger pressure, this pressure and tubing two by moving back sample spring to cut tubing upper surface middle part Side clamp pressure jointly act on so that tubing be cut position can just be formed obliquely and cut direction substantially opposite Stress, it is possible to preferably beneficially cutting edge breaks tubing and completes cutting, improves the smoothness of cutting.Meanwhile, this pressure can support Disappear during both sides, tubing top are cut and the inside of sample both sides formation is made a concerted effort, it is to avoid in cutting process, sample is bent arch Play deformation, improve sample mass.As optimization, this cutting briquetting lower surface is for being horizontally disposed with so that it is just in sample upper end Position, portion exerts a force, it is ensured that the effect above becomes apparent from.More particularly, in the application due to cut tubing be hollow circle The special construction of shape, its inner hollow can not load, so during die cut, being easily caused tubing and be crushed and then affect cutting Smoothly and cut quality.And tubing is in all being applied with compression up and down and on the four direction of left and right before cutting in this equipment The state of power, therefore the thrust relative equilibrium being subject in tubing circumference, will not cause deformation during cutting because pressure is uneven, with Time cutting time all tubing is applied with thrust due to the tubing both sides of position of cutting, it can be cut position to tubing with joint efforts Put and form outside internal stress so that during cutting, cutting edge is easier to break tubing, therefore can complete more swimmingly to cut also Improve sample mass.
As optimization, described cutting edge is the vertical side inside cutting part and is positioned at one of lower end outside cutting part tiltedly Face is crossing to be obtained.The structure that so this cutting edge is formed so that along with cutting edge breaks tube surfaces and gos deep into tubing during cutting During, cut sample both sides will not deform because of squeezed too, improves sample mass;This structure is more favorable for simultaneously Cutter upwards withdrawing after cutting.
As optimization, also including guiding mechanism, guiding mechanism includes two pieces of guide plates, and guide plate is vertically arranged to punching press and leads to Above both sides, road and be relatively fixed on tubing detent mechanism, two pieces of guide plate medial surface and tube stamping cutter left and right sides Coordinate the guiding realized tube stamping cutter.
In such manner, it is possible to rely on guiding mechanism to realize guiding to tube stamping cutter left and right directions, it is ensured that cutting smooth and easy Carry out.
Further, described tube stamping cutter left and right sides each and also set up between corresponding guide plate medial surface There is the first guide and limit structure cooperatively formed by the first corresponding vertical direction recess and the first vertical guiding projection.So, While the cooperation relying on the first vertical guiding projection and the first vertical direction recess realizes vertically guiding tube stamping cutter, Direction and left and right directions before and after tube stamping cutter are all achieved spacing, it is ensured that the smoothness of punching press and accuracy.Enter One step ground, the first guide and limit structure is arranged at lower end for forming the cutting blade outer surface of cutting part and corresponding guiding Between plate medial surface, be additionally provided with between the cutter body left and right sides of cutting blade inner surface and tube stamping cutter by The second guide and limit structure that the second corresponding vertical direction recess and the second vertical guiding projection cooperatively form;Second guides limit The profile of bit architecture is consistent with front and back position and the first guide and limit structure, and guide plate lower end is installed solid by guide plate mounting seat Being scheduled on tubing detent mechanism upper end, guide plate mounting seat includes a vertical mounting bracket and the mounting seat of level, installs Pedestal upper end and guide plate are fixed, and lower end and mounting seat are fixed, and mounting seat is provided with strip installing hole in left-right direction And it is pressed abd fixed on tubing detent mechanism upper end, the length etc. of described strip installing hole by installing screw through strip installing hole In or more than the thickness of cutting blade left and right directions.So, disassemble also from the left and right sides of cutter body when cutting blade Adjust to install and be fixed to before and after cutter body both sides and when the cut-out realizing pipe length direction, it is possible to unclamp installation spiral shell Nail, readjusts mounting seat right position so that guide plate medial surface completes wire with cutter body left and right sides again The cooperation of position limiting structure, it is ensured that when realizing the rupturing operation in pipe length direction, it is also possible to realize guide and limit, it is ensured that cut off Smooth and easy.
In sum, it is simple that the present invention has enforcement, convenient to operation, and tubing sampling efficiency is high, obtains sample deformation Few, quality advantages of higher.
Accompanying drawing explanation
Fig. 1 is the structural representation of the metal pipe material sample die cutting device that the present invention uses when implementing.
Fig. 2 is independent tubing detent mechanism and the schematic diagram of tubing punching mechanism part-structure in Fig. 1.
Fig. 3 is the schematic diagram that Fig. 2 other direction can show device for discharging part-structure.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings.
When being embodied as: a kind of metal pipe material test sample preparation method, its feature is, this method is real by means of punch press Existing, it is included in tube material detent mechanism in punch press and realizes the step of tubing horizontal location, also include using tubing punching mechanism real Now prepared step die-cut to tubular product sample, the tube stamping cutter of tubing punching mechanism has the cutting edge of two horizontal alignment, Cutting edge spacing is consistent with specimen width, and cutting edge length, more than cut pipe diameter, first adjusts cutting edge direction during preparation Radially consistent with being positioned tubing, after going out tubing section, then 90 degree of change cutting edge directions by a die cut, punching press is cut again Cut out sample.
So, use die-cut mode by punch press, to tubing clamped one time, then by adjusting cutting edge angle, carry out Twice die-cut tubular product sample that can be prepared by, simple and convenient fast, significantly reduce sample and prepare difficulty and improve sample system Standby efficiency.
Specifically, during enforcement, this method prepares by metal pipe material sample die cutting device as Figure 1-3, described gold Belonging to tubular product sample die cutting device, including punch press 1, punch press 1 has the workbench 2 being positioned at lower section, has to be positioned at above workbench 2 and erects To the punch press main shaft 3 arranged, punch press main shaft 3 lower end has mounting interface, and punch press main shaft 3 upper end is connected with punching press power set 4 And can be controlled descending realizing punching press, also including tubing detent mechanism and tubing punching mechanism, tubing detent mechanism includes It is fixed on the base 5 of workbench 1, base 5 is provided with clamping position structure for realizing tubing level along the longitudinal direction Positioning clamping, and punching press passage can be reserved above upper surface middle part after making tubing be positioned clamping;Described tubing bicker Structure includes that punch press connects push rod, punch press connect push rod upper end have a taper main shaft union joint 6 and for and punch press The mounting interface docking of main shaft lower end is connected, and punch press connects push rod lower end and is provided with tube stamping cutter, under tube stamping cutter The end left and right sides has the cutting part of two rectangular block shape straight down, and cutting part lower end is being horizontally disposed with along the longitudinal direction Cutting edge, two cutting parts pressure passageway that just liquidating is arranged and both sides are smaller than punching press channel width.
So, before this equipment uses, tubing detent mechanism is to be mounted on work bench of punch press and just to punch press main shaft Position, the punch press of tubing punching mechanism connects push rod upper end and is installed on the mounting interface of punch press main shaft lower end.During tubing sampling, The tubing being truncated into segment the most along its length is installed in tubing detent mechanism along the longitudinal direction, then starts punching press power Device drives tubing punching mechanism undershoot, and tube material punching tool passes punching press passage so that it is cutting edge die-cut tubing top two Side also punches out tubular product sample.The most compared to the prior art, sample cutting is more efficient and convenient, and without to little segment pipe Two ends carry out end face processing, drastically increase sample preparation efficiency, are particularly suitable for carrying out pipe performance group contrast test Time, the batch of sample is produced.
Wherein, in described tubing detent mechanism, clamping position structure includes vertically being fixedly installed on above base between left and right Every a pair clamping position block 7 being oppositely arranged, clamping position block 7 opposite side sidewall being provided with chuck installation cavity, chuck is installed Intracavity is provided with V-clevis 8, and the side of V-clevis 8 opposite side is overall in the V-arrangement opened along the vertical direction so that two V-arrangements Form pipe clamping localization cavity between chuck opposite side, clamping position block is additionally provided with for regulating V-clevis level folder Tight clamping governor motion.
So, realizing the location to tubing by V-clevis, the tubing left and right sides is respectively arranged with the location of linear contact lay at two up and down Place so that it is position convenient and swift and improve reliability of positioning, can rely on clamping governor motion regulating guarantee locating clip during location Tight effect.
Wherein, described clamping governor motion includes horizontally disposed regulation bolt 9, and the cooperation that spins of regulation bolt 9 screw thread exists Being positioned at the screwed hole of chuck installation cavity position outside clamping position block, regulation bolt 9 is inner and clamping position block abuts and coordinates And outer end is provided with regulation handle.So there is simple in construction, advantage easy to adjust.
Wherein, described regulation bolt 9 the inner is provided with helical spring 23 and is supported by helical spring 23 and clamping position block 8 Connect cooperation.As such, it is possible to rely on elastic guarantee of helical spring preferably to position clamping;More importantly can be by simultaneously Adjustment to clamping force, its punched position after the size of pressure, and then regulation tubing pressurized when changing tubing location The size of self internal stress so that it is during cutting, cutting edge can preferably break tube surfaces, improves the smoothness of cutting and protects Card cuts out the complete effect of sample.
Wherein, every piece of clamping position block is respectively provided with four regulation bolts 9, outside regulation bolt position correspondence clamping position block Four, side, side corner location is arranged.
So, the balance of clamping force force regulation is more ensured, it is ensured that tubing is cut in the rectilinear direction of position everywhere Internal stress all compares equilibrium, it is ensured that cutting effect.
Wherein, the base between said two clamping position block is the most upwards fixedly installed a blanking cutting and supports platform 10, blanking cutting support platform 10 upper surface be provided with elastomeric layer for clamping position after tubing lower surface contact realization Supporting.So, when the blanking cutting support platform set up makes tubing held location, it is affected by left and right and direction, three, bottom Clamping make a concerted effort, this can make tubing upper surface be cut formation direction, position with joint efforts is the pretightning force opened above both sides, Thus making in blanking process, tubing is difficult to the deformation that is flattened, it is ensured that die-cut smooth and die-cut quality, it is ensured that obtain The quality of tubing exemplar.Can further during enforcement, described blanking cutting supports between platform and two, left and right clamping position block Leaving secondary punch gap 11, the cutting edge of this secondary punch gap 11 and tube stamping cutter is just to setting.So, tubing punching Push type broach tool downward die-cut time, can control to extend the descending stroke of tubing punching tool so that it is complete the examination of tubing upper face Continue traveling downwardly after sample is die-cut and tubing bottom is positioned at blanking cutting and support that the tubing above platform is the most die-cut to be opened, the most once rush Cut and can obtain up and down for four pieces of samples, drastically increase sample preparation efficiency, and stress when relying on tubing to position Balance can ensure that the complete effect of four pieces of samples, it is to avoid the impact that coupon results is caused by sample deformation, it is ensured that specimen test Reliability.
Wherein, in tube stamping cutter, in the space between two cutting parts, it is additionally provided with a cutting briquetting 12, Cutting briquetting 12 upper end be connected on tube stamping cutter by moving back sample spring 13, cutting briquetting 12 not by lower surface during external force to Down beyond cutting edge position, cutting part lower end.So, cutting briquetting and move back sample spring and coordinate to play and move back the convenient punching of sample function Realize cut sample after cutting moves back sample;Additionally the more important thing is, cutting briquetting is not exceeded downwards cutting by lower surface during external force Subordinate's end cutting edge position makes in blanking process, cut briquetting and first touched before the cutting edge of cutting part touches tubing Tubing upper surface also applies downward bigger pressure, this pressure and tubing by moving back sample spring to cut tubing upper surface middle part Sandwich pressure jointly act on so that tubing be cut position can just be formed obliquely and cut direction substantially opposite Stress, it is possible to preferably be beneficial to cutting edge break tubing complete cutting, improve cutting smoothness.Meanwhile, this pressure is permissible Offset inwardly making a concerted effort to the formation of sample both sides during both sides, tubing top are cut, it is to avoid in cutting process, sample is bent Arch upward deformation, improve sample mass.As optimization, this cutting briquetting lower surface is for being horizontally disposed with so that it is just to sample upper end Medium position exerts a force, it is ensured that the effect above becomes apparent from.More particularly, the application is hollow due to cut tubing Circular special construction, its inner hollow can not load, so during die cut, be easily caused tubing and be crushed and then affect and cut Smooth and the cut quality cut.And tubing is in all being applied with pressure up and down and on the four direction of left and right before cutting in this equipment The state of clamp force, therefore the thrust relative equilibrium being subject in tubing circumference, will not cause deformation because pressure is uneven during cutting, All tubing being applied with thrust due to the tubing both sides of the position of cutting during cutting, tubing can be cut by with joint efforts simultaneously Position forms outside internal stress so that during cutting, cutting edge is easier to break tubing, therefore can complete cutting more swimmingly And improve sample mass.
Wherein, described cutting edge is the vertical side inside cutting part and the inclined-plane phase being positioned at lower end outside cutting part Friendship obtains.The structure that so this cutting edge is formed so that along with cutting edge breaks tube surfaces and gos deep into tubing process during cutting In, cut sample both sides will not deform because of squeezed too, improves sample mass;This structure is more favorable for cutting simultaneously Rear cutter upwards withdrawing.
Wherein, described tube stamping cutter includes the cutter body 14 of a cuboid structure, also includes by fixing screw Be arranged on the cutting blade 15 of the cutter body left and right sides, cutting blade 15 bottom downwardly extend out cutter body and constitute for The cutting part of cutting, the cutting edge length of cutting part lower end is more than cut pipe diameter, two lateral extents before and after cutter body 14 More than two lateral extents before and after clamping position structure on base;Be additionally provided with on side, both sides before and after described cutter body 14 for Fixing screw fit is to realize the blade transposition fixing screw 16 fixing to cutting blade transposition.
So, when this equipment uses, only cutting blade need to be disassembled and again be fixed to cutter by fixing screw fit Before and after tool body on side, both sides, it becomes possible to realize overall tubing is intercepted along its length the rupturing operation of segment, first block Obtain after tubing segment, then cutting blade has been adjusted to about cutter body position with die-cut acquisition tubular product sample, thus The preparation more facilitating tubular product sample obtains.
Wherein, also including guiding mechanism, guiding mechanism includes two pieces of guide plates 17, and guide plate 17 is vertically arranged to punching press and leads to Above both sides, road and be relatively fixed on tubing detent mechanism, two pieces of guide plate medial surface and tube stamping cutter left and right sides Coordinate the guiding realized tube stamping cutter.
In such manner, it is possible to rely on guiding mechanism to realize guiding to tube stamping cutter left and right directions, it is ensured that cutting smooth and easy Carry out.
During enforcement, it is also possible to further, described tube stamping cutter left and right sides each with in corresponding guide plate The first guiding cooperatively formed by the first corresponding vertical direction recess and the first vertical guiding projection it is additionally provided with between side Position limiting structure.So, the cooperation relying on the first vertical guiding projection and the first vertical direction recess realizes tube stamping cutter Vertical guide while, direction and left and right directions before and after tube stamping cutter are all achieved spacing, it is ensured that punching press suitable Smooth property and accuracy.Further, the first guide and limit structure is arranged at lower end for being formed outside the cutting blade of cutting part Between the guide plate medial surface of surface and correspondence, the cutter body left and right sides of cutting blade inner surface and tube stamping cutter The the second guiding limit cooperatively formed by the second corresponding vertical direction recess and the second vertical guiding projection it is additionally provided with between face Bit architecture;The profile of the second guide and limit structure is consistent with front and back position and the first guide and limit structure, and guide plate 17 lower end leads to Crossing guide plate mounting seat and be fixed on tubing detent mechanism upper end, guide plate mounting seat includes a vertical mounting bracket 18 Fixing with the mounting seat 19 of level, mounting bracket 18 upper end and guide plate 17, lower end and mounting seat 19 are fixed, mounting seat It is provided with strip installing hole 20 on 19 in left-right direction and is pressed abd fixed on tubing calmly by installing screw through strip installing hole Position mechanism upper end, the length of described strip installing hole 20 is equal to or more than the thickness of cutting blade 15 left and right directions.So, when cutting Cutting blade disassembles from the left and right sides of cutter body and adjusts installation and is fixed to before and after cutter body both sides and for realizing During the cut-out in pipe length direction, it is possible to unclamp installation screw, readjust mounting seat right position so that inside guide plate Face completes the cooperation of wire restraint structure with cutter body left and right sides again, it is ensured that in the cut-out realizing pipe length direction During operation, it is also possible to realize guide and limit, it is ensured that cut off smooth and easy.It addition, it is curved to both sides foreign side in the middle part of mounting bracket 18 when implementing Bent arrange and upper end is fixedly connected on the lateral surface of guide plate, so make can to reserve between two mounting brackets in left and right bigger Locus, with facilitate realize cutting briquetting and move back sample spring maintenance handling.
During enforcement, being additionally provided with device for discharging, device for discharging includes that described cutting briquetting 12 and described blanking cutting support Platform 10, also includes just to being arranged on pipe clamping localization cavity rearward position and and pipe clamping localization cavity vertical cross-section profile The push pedal of coupling, is connected with a delivery device being fixed on work bench of punch press 21 on rear side of push pedal, described delivery device 21 energy Push pedal is enough driven to promote forward and pass pipe clamping localization cavity.So, use die-cut after, can start discharging dress Putting, drive push pedal forward the die-cut sample obtained to be released pipe clamping localization cavity by delivery device, complete discharging, raising is unloaded Material convenience.As preferably during enforcement, described delivery device 21 uses air cylinder device to obtain, and has simple in construction, easy to control, Promote the advantages such as the most reliable.As optimization during enforcement, can the punch press of adjacent position on front side of tubing detent mechanism further One receiver 22 is set on workbench, facilitates splicing, it is to avoid sample drops out workbench and breaks deformation.

Claims (10)

1. a metal pipe material test sample preparation method, it is characterised in that this method realizes by means of punch press, is included in punch press Middle tube material detent mechanism realizes the step of tubing horizontal location, also includes that using tubing punching mechanism to realize tubular product sample rushes The step that cutting obtains, the tube stamping cutter of tubing punching mechanism has the cutting edge of two horizontal alignment, cutting edge spacing and examination Sample width is consistent, and cutting edge length, more than cut pipe diameter, first adjusts cutting edge direction and is positioned tubing footpath during preparation To unanimously, after going out tubing section, then 90 degree of change cutting edge directions by a die cut, die cut goes out sample again.
2. metal pipe material test sample preparation method as claimed in claim 1, it is characterised in that by following metal pipe material examination Sample die cutting device prepares, and described metal pipe material sample die cutting device includes that punch press, punch press have the workbench being positioned at lower section, has Being positioned at punch press main shaft vertically arranged above workbench, punch press main shaft lower end has mounting interface, punch press main shaft upper end and punching press Power set are connected and can be controlled descending realizing punching press, also include tubing detent mechanism and tubing punching mechanism, tubing Detent mechanism includes the base being fixed on workbench, base is provided with clamping position structure for realizing tubing along front and back To horizontal location clamping, and punching press passage can be reserved above upper surface middle part after making tubing be positioned clamping;Described pipe Material punching mechanism includes that punch press connects push rod, punch press connect push rod upper end have a taper main shaft union joint and for Docking with the mounting interface of punch press main shaft lower end and be connected, punch press connects push rod lower end and is provided with tube stamping cutter, tube stamping The left and right sides, cutter lower end has the cutting part of two rectangular block shape straight down, and cutting part lower end is water along the longitudinal direction The flat cutting edge arranged, two cutting parts pressure passageway that just liquidating is arranged and both sides are smaller than punching press channel width;
Described tube stamping cutter includes the cutter body of a cuboid structure, also includes being arranged on cutter originally by fixing screw The cutting blade of the body left and right sides, cutting blade bottom downwardly extends out cutter body and constitutes the cutting part for cutting, cutting The cutting edge length cutting subordinate's end is more than cut pipe diameter, and before and after cutter body, two lateral extents are more than clamping position on base Two lateral extent before and after structure;It is additionally provided with on side, both sides before and after described cutter body for right to realize with fixing screw fit The blade fixing screw of transposition that cutting blade transposition is fixing.
3. metal pipe material test sample preparation method as claimed in claim 2, it is characterised in that described tubing detent mechanism In, clamping position structure includes vertically being fixedly installed on above base between left and right every a pair clamping position block being oppositely arranged, folder Hold and be provided with chuck installation cavity on locating piece opposite side sidewall, in chuck installation cavity, be provided with V-clevis, V-clevis opposite side Side overall in the V-arrangement opened along the vertical direction so that form pipe clamping location sky between two V-clevis opposite sides Chamber, clamping position block is additionally provided with the clamping governor motion for regulating V-clevis horizontal-clamping.
4. metal pipe material test sample preparation method as claimed in claim 3, it is characterised in that described clamping governor motion bag Including horizontally disposed regulation bolt, regulation bolt thread spins to coordinate and is positioned at chuck installation cavity position outside clamping position block In screwed hole, regulation bolt is inner and clamping position block abuts cooperation and outer end is provided with regulation handle.
5. metal pipe material test sample preparation method as claimed in claim 4, it is characterised in that described regulation bolt the inner sets It is equipped with helical spring and abuts cooperation by helical spring and clamping position block.
6. metal pipe material test sample preparation method as claimed in claim 4, it is characterised in that on every piece of clamping position block all Arranging four regulation bolts, regulation four corner location of bolt position correspondence clamping position block outer lateral side are arranged.
7. metal pipe material test sample preparation method as claimed in claim 3, it is characterised in that said two clamping position block Between base on be the most upwards fixedly installed blanking cutting and support platform, blanking cutting supports platform upper surface and is provided with elasticity Material layer for contacting realization supporting with the tubing lower surface after clamping position.
8. metal pipe material test sample preparation method as claimed in claim 2, it is characterised in that in tube stamping cutter, position Being additionally provided with a cutting briquetting in space between two cutting parts, cutting briquetting upper end is connected to pipe by moving back sample spring On material punching tool, cutting briquetting is not exceeded downwards cutting edge position, cutting part lower end by lower surface during external force.
9. metal pipe material test sample preparation method as claimed in claim 2, it is characterised in that described cutting edge is cutting part The vertical side of inner side is crossing with the inclined-plane being positioned at lower end outside cutting part to be obtained.
10. metal pipe material test sample preparation method as claimed in claim 2, it is characterised in that metal pipe material sample is die-cut Equipment also includes guiding mechanism, and guiding mechanism includes two pieces of guide plates, guide plate be vertically arranged to above punching press passage both sides and Being relatively fixed on tubing detent mechanism, two pieces of guide plate medial surface and tube stamping cutter left and right sides coordinate realization to pipe The guiding of material punching tool.
CN201610393500.5A 2016-06-02 2016-06-02 A kind of metal pipe material test sample preparation method Active CN106092680B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610393500.5A CN106092680B (en) 2016-06-02 2016-06-02 A kind of metal pipe material test sample preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610393500.5A CN106092680B (en) 2016-06-02 2016-06-02 A kind of metal pipe material test sample preparation method

Publications (2)

Publication Number Publication Date
CN106092680A true CN106092680A (en) 2016-11-09
CN106092680B CN106092680B (en) 2019-04-05

Family

ID=57447540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610393500.5A Active CN106092680B (en) 2016-06-02 2016-06-02 A kind of metal pipe material test sample preparation method

Country Status (1)

Country Link
CN (1) CN106092680B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108748326A (en) * 2018-05-30 2018-11-06 广州特种承压设备检测研究院 The preparation facilities of electric smelting component sample
CN114178390A (en) * 2021-12-08 2022-03-15 安徽中意机床制造有限公司 Angle steel opening equipment
CN115122407A (en) * 2022-07-04 2022-09-30 公元管道(浙江)有限公司 Stripping sample preparation machine for electric melting pipe fittings
CN115372048A (en) * 2022-08-19 2022-11-22 重庆钢铁股份有限公司 Sampling method for improving yield of medium plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001064498A1 (en) * 2000-03-02 2001-09-07 Kabushiki Kaisha Somic Ishikawa Holed cylindrical body and method of work the cylindrical body
CN1321120A (en) * 1999-01-11 2001-11-07 埃萨自动化工业公司 Method for continuous production of tubular bodies
CN202162257U (en) * 2011-05-24 2012-03-14 惠州市升华工业有限公司 Square pipe cut-off die
CN103568061A (en) * 2013-10-15 2014-02-12 上海海弋机电科技有限公司 Dual-cutter dual-angle fixed-length crank cutting device
CN105466717A (en) * 2015-11-18 2016-04-06 镇江市丹徒区建筑工程质量检测中心 A pneumatic stamping sample preparing machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1321120A (en) * 1999-01-11 2001-11-07 埃萨自动化工业公司 Method for continuous production of tubular bodies
WO2001064498A1 (en) * 2000-03-02 2001-09-07 Kabushiki Kaisha Somic Ishikawa Holed cylindrical body and method of work the cylindrical body
CN202162257U (en) * 2011-05-24 2012-03-14 惠州市升华工业有限公司 Square pipe cut-off die
CN103568061A (en) * 2013-10-15 2014-02-12 上海海弋机电科技有限公司 Dual-cutter dual-angle fixed-length crank cutting device
CN105466717A (en) * 2015-11-18 2016-04-06 镇江市丹徒区建筑工程质量检测中心 A pneumatic stamping sample preparing machine

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108748326A (en) * 2018-05-30 2018-11-06 广州特种承压设备检测研究院 The preparation facilities of electric smelting component sample
CN108748326B (en) * 2018-05-30 2023-10-31 广州特种承压设备检测研究院 Preparation device for electric melting assembly sample
CN114178390A (en) * 2021-12-08 2022-03-15 安徽中意机床制造有限公司 Angle steel opening equipment
CN114178390B (en) * 2021-12-08 2024-05-03 安徽中意机床制造有限公司 Angle steel opening equipment
CN115122407A (en) * 2022-07-04 2022-09-30 公元管道(浙江)有限公司 Stripping sample preparation machine for electric melting pipe fittings
CN115122407B (en) * 2022-07-04 2024-04-19 公元管道(浙江)有限公司 Sample making machine for stripping sample of electric melting pipe fitting
CN115372048A (en) * 2022-08-19 2022-11-22 重庆钢铁股份有限公司 Sampling method for improving yield of medium plate

Also Published As

Publication number Publication date
CN106092680B (en) 2019-04-05

Similar Documents

Publication Publication Date Title
CN106092680A (en) A kind of metal pipe material test sample preparation method
CN205660030U (en) Experimental system appearance device of tubular product
CN205660032U (en) Metal tubular product die cutting machine constructs
CN203599365U (en) Automatic punching flexer-flanger
CN105834281B (en) Tubular product sample blanking units
CN103658832B (en) Pipe installation
CN203945281U (en) A kind of micro-test sample clamping device
CN205869199U (en) Die -cut positioner of tubular product
CN205869587U (en) Remove compensation formula pole piece cutting mechanism
CN102430638B (en) Pendulum shear mould
CN105834277B (en) A kind of high efficiency tubular product sample is punched manufacture method
CN201832910U (en) Pipe end forming equipment of double clamped die
CN205660031U (en) Pipe stamping cutter structure
CN205665080U (en) Metal tubular product positioning mechanism
CN205660036U (en) Die -cut cutter guiding mechanism of tubular product sample
CN205665077U (en) Die -cut sample discharge apparatus of tubular product
CN106670723B (en) A kind of profiled metal bore work making Nano surface processing unit (plant) and its application
CN105945125B (en) A kind of metal pipe material sample die cutting device
CN207941849U (en) A kind of Pneumatic stamping device of sheet metal component hole machined
CN106017970B (en) Location structure is used in the punching of tubing high efficiency
CN218134494U (en) Integrated form expands shrinkage cavity copper pipe processing structure
CN106402502B (en) Automobile pipeline dual shock absorption structure and its metal fixing sleeve manufacturing process
CN101912998B (en) Cutting off machine
CN103447866B (en) Vehicle dormer window rail end chamfering tool
CN201079806Y (en) Cutting press

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210310

Address after: 400084 No. 2, Magnesium Bridge Road, Area A, Jianqiao Industrial Park, Dadukou District, Chongqing

Patentee after: CHONGQING IRON & STEEL INSTITUTE Co.,Ltd.

Address before: Three village 400080 Dadukou District of Chongqing weir building 1 No. 1