CN106088337A - Large cantilever steel-frame structure with pull bar and construction method thereof - Google Patents

Large cantilever steel-frame structure with pull bar and construction method thereof Download PDF

Info

Publication number
CN106088337A
CN106088337A CN201610580087.3A CN201610580087A CN106088337A CN 106088337 A CN106088337 A CN 106088337A CN 201610580087 A CN201610580087 A CN 201610580087A CN 106088337 A CN106088337 A CN 106088337A
Authority
CN
China
Prior art keywords
steel frame
layer
steel
core walls
pull rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610580087.3A
Other languages
Chinese (zh)
Other versions
CN106088337B (en
Inventor
刘缉江
倪代俊
黄志兵
史军花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201610580087.3A priority Critical patent/CN106088337B/en
Publication of CN106088337A publication Critical patent/CN106088337A/en
Application granted granted Critical
Publication of CN106088337B publication Critical patent/CN106088337B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/34Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
    • E04B1/3404Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability supported by masts or tower-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/121Construction of stressing jacks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses large cantilever steel-frame structure and the construction method thereof of a kind of band pull bar, this steel-frame structure includes Core Walls Structure and the N shell steel frame being set up on Core Walls Structure, if the lower end, side of steel frame body is provided with the floor of encorbelmenting of dried layer, unsettled place is provided with interim steel column and supports, steel frame body is longitudinally provided with some axial planes, the steel frame of the neighbouring two-layer being positioned on axial plane is fixed by reinforcing pull rod, and reinforcing pull rod is positioned at the outside of Core Walls Structure the ramped shaped in " outside under on ".The method includes watering Core Walls Structure, installation overhang layer steel construction, setting up the support of interim steel column, erection reinforcing pull rod, construction roof and roof trusses layer steel frame and remove the step that interim steel column supports.The present invention is applicable to the lifting of the steel construction of long cantilever construction and internal large space, and overall structure is stable, and installation accuracy is high, and safety coefficient is high, and integral construction difficulty is little.

Description

Large cantilever steel-frame structure with pull bar and construction method thereof
Technical field
The present invention relates to building encorbelment technical field of construction, specifically, relate to the large cantilever steel framework of a kind of band pull bar Shelf structure and construction method thereof.
Background technology
Along with the development of technology, in modern architecture construction field, skyscraper gradually increases.And for attractive in appearance or technique Demand, skyscraper is often designed with outer cantilevered structure in the high level position, middle and upper part of its agent structure, and outer cantilevered structure is usual Outer overhanging steel structure truss is relied on to realize.
In existing constructing structure, cantilevered structure emerges in an endless stream, but being of limited application of existing cantilevered structure, Run into bigger encorbelment height and encorbelment span when, existing structure is the most inapplicable, is especially running into inner space floor The when of high, difficulty of construction is bigger.Concrete, in the Construction of Steel Structure of large space, steel structure hoisting, install impacted relatively Greatly;High-formwork construction difficulty is big, and danger coefficient is high;And in work progress, need to set up high support construct, encorbelment and high Large-spatial structures lifts, welding procedure difficulty is big.
Drawbacks described above, is worth solving.
Summary of the invention
In order to overcome the deficiency of existing technology, the present invention provides the large cantilever steel-frame structure of a kind of band pull bar and executes Work method.
Technical solution of the present invention is as described below:
With the large cantilever steel-frame structure of pull bar, including steel frame body, it is characterised in that described steel frame body includes two Vertical Core Walls Structure and the N shell steel frame being set up on described Core Walls Structure, described steel frame includes girder steel, steel column and steel bar girder Floor support plate, the lower end, side of described steel frame body is provided with the floor of encorbelmenting of M shell, described in the encorbelment unsettled place of floor be provided with removable The interim steel column unloaded supports, and M+1 layer to n-th layer is pull bar layer, and number of plies N of described steel frame meets: 7≤N≤16, described outstanding Choose number of floor levels M and be not more than 4.
Described steel frame body is longitudinally provided with some axial planes, the described steel framework of the neighbouring two-layer being positioned on described axial plane Frame is fixed by reinforcing pull rod, and described reinforcing pull rod is positioned at the outside of described Core Walls Structure the ramped shaped in " outside under on ".
Further, by the described steel frame that reinforcing pull rod is fixing, every three layers of described steel frame are one group of steel frame group, Often organizing in described steel frame group, the outer fix of bottom steel frame connects the interposition of middle level steel frame by described reinforcing pull rod Putting, the centre position of middle level steel frame connects the position of close Core Walls Structure inside top layer steel frame by described reinforcing pull rod;Upper one Organize the described top layer steel frame that described bottom steel frame is next described steel frame group of group of described steel frame group.
Further, the top of n-th layer steel frame is provided with top floor.
Further, described axial plane includes the first axial plane, the second axial plane, the 3rd axial plane and the 4th axial plane, described first Axial plane and described second axial plane are positioned at the side of described steel frame body axial line, described 3rd axial plane and described 4th axial plane pair The opposite side being distributed in described axial line claimed.
Further, in described second axial plane, inside described Core Walls Structure, it is provided with auxiliary reinforcing pull rod, described auxiliary reinforcing pull rod Symmetrical with reinforcing pull rod during the year of same layer.
Further, described interim steel column supports the concrete crossover location being located at one layer of ground.
Further, corresponding with described interim steel column Support Position underground floor is provided with support.
Further, encorbelment described in and be provided with dismountable temporary support moulding bed at the large space within floor.
The construction method of the large cantilever steel frame with pull bar, it is characterised in that comprise the following steps:
S1: water two Core Walls Structures, and install the floor the 1st steel construction to M shell of encorbelmenting;
S2: span correspondence steel column locations sets up interim steel column to support in floor encorbelments place and two Core Walls Structures, described temporarily Steel column supports and uses steel pipe buttress top to install jack;
S3: install the steel frame of M+1 layer, and pour the described of the floorslab concrete of M+1 layer, the first axial plane and the 4th axial plane Steel frame pre-arch camber 10mm, described steel frame includes girder steel, steel column, steel bar truss floor support plate;
S4: install M+2 layer and the steel frame of M+3 layer, and install the M+1 layer reinforcing pull rod to M+3 layer;
S5: retain interim steel column and support, make to encorbelment end and internal greatly across vertical deformation close to 0mm;
S6: repeat step S3-S4, install the M+4 layer steel frame to n-th layer, and install the M+4 layer reinforcing pull rod to n-th layer;
S7: construction roof and roof trusses layer steel frame;
S8: M+4 layer of the most successively constructing is to garret composite floor;
S9: add the building additional dead load such as way, curtain wall;
S10: add and use live load;
S11: remove interim steel column and support.
Further, in described step S4, the installation process of reinforcing pull rod includes:
S41: simultaneously use four set tensioning equipments to carry out the reinforcing pull rod of stretch-draw the second axial plane;
S42: simultaneously use four set tensioning equipments to carry out the reinforcing pull rod outside the Core Walls Structure of stretch-draw the 3rd axial plane, the top one of every side Root reinforcing pull rod connects M+3 layer steel frame near the position of Core Walls Structure and the centre position of M+2 layer steel frame, one, lower section steel Pull bar connects M+2 layer steel frame centre position and M+1 layer outer fix, make reinforcing pull rod outside the Core Walls Structure of every side in " on In lower outer " ramped shaped, stretch-draw apply pretightning force step by step;
S43: simultaneously use the reinforcing pull rod outside the Core Walls Structure of four set tensioning equipment stretch-draw the first axial plane and the 4th axial planes successively, often One, the top of side reinforcing pull rod connects M+3 layer steel frame near the position of Core Walls Structure and the centre position of M+2 layer steel frame, Piece reinforcing pull rod in lower section connects M+2 layer steel frame centre position and M+1 layer outer fix, makes the steel outside the Core Walls Structure of every side Pull bar, in the ramped shaped of " outside under on ", utilizes torque wrench to apply the pretightning force in step S42.
Further, in described step S41, specifically include following steps:
S411: 4 reinforcing pull rods in first Core Walls Structure centre position, simultaneous tension both sides, the reinforcing pull rod at the Core Walls Structure of every side connects M+ 3 layers of steel frame are near the position of Core Walls Structure and the centre position of M+2 layer steel frame, and connect in M+2 layer steel frame Between position and M+1 layer steel frame away from the position of Core Walls Structure;
S412: simultaneous tension Core Walls Structure both sides encorbelment end 4 reinforcing pull rods, the reinforcing pull rod at the Core Walls Structure of every side connects M+3 layer Steel frame is near the position of Core Walls Structure and the centre position of M+2 layer steel frame, and connects the interposition of M+2 layer steel frame Put with M+1 layer steel frame away from the position of Core Walls Structure;
S413: stretch-draw apply pretightning force step by step, makes steel frame disengage interim steel column and supports, the reinforcing pull rod of Core Walls Structure both sides, every side It is distributed in "eight" shape.
Further, also include the construction of large space, concrete, before setting up described large space, described tall and big The position in space first sets up temporary support moulding bed, then sets up the described steel frame above described large space, interim removing Steel column removes described temporary support moulding bed while supporting.
According to the present invention of such scheme, it has the beneficial effects that, present invention may apply to long cantilever construction and inside The lifting of the steel construction of large space, going for encorbelmenting highly reaches 10-25 rice, and span of encorbelmenting reaches the knot of encorbelmenting of 15-23 rice Structure;Lifting, fix after, interim steel column support and temporary support moulding bed dismountable, overall structure is stable, installation accuracy height, Safety coefficient is high, and integral construction difficulty is little;The present invention can also be greatly saved the engineering time simultaneously.
Accompanying drawing explanation
Fig. 1 is the integrally-built side view of the embodiment of the present invention.
Fig. 2 is that the interim steel column of embodiment of the present invention band supports and the side view of temporary support moulding bed.
Fig. 3 is the structure top view of the embodiment of the present invention.
Fig. 4-7 is the present invention the first axial plane side view to the 4th axial plane.
In the drawings, 10, steel frame body;11, Core Walls Structure;12, girder steel;13, steel bar truss floor support plate;14, steel column;20、 Reinforcing pull rod;31, interim steel column supports;32, temporary support moulding bed;41, the first axial plane;42, the second axial plane;43, the 3rd axial plane; 44, the 4th axial plane.
Detailed description of the invention
Below in conjunction with the accompanying drawings and the present invention is conducted further description by embodiment:
Embodiment one
As shown in Figure 1-2, the large cantilever steel-frame structure of band pull bar, including steel frame body 10, steel frame body 10 includes two The vertical Core Walls Structure of root 11 and the N shell steel frame being set up on Core Walls Structure 11, steel frame includes girder steel 12, steel column 14 and reinforcing bar purlin Frame floor support plate 13, the lower end, side of steel frame body 11 is provided with the floor of encorbelmenting of M shell, and the unsettled place of floor of encorbelmenting is provided with detachably Interim steel column support 31, M+1 layer to n-th layer is pull bar layer, steel frame body longitudinal direction is provided with some axial planes, be positioned on axial plane The steel frame of neighbouring two-layer fixed by reinforcing pull rod 20, reinforcing pull rod 20 is positioned at the outside of Core Walls Structure 11 and in " under on Ramped shaped outward ".
Number of plies N of steel frame meets: 7≤N≤16, in the present embodiment, N=10, M=3, and construction has on the second layer The large space of one two-layer.
By in the fixing steel frame of reinforcing pull rod 20, every compound steel framework is one group of steel frame group, often in group steel frame group, The outer fix of bottom steel frame connects the centre position of middle level steel frame, the centre position of middle level steel frame by reinforcing pull rod 20 The position of close Core Walls Structure 11 inside top layer steel frame is connected by reinforcing pull rod 20;The bottom steel frame of upper one group of steel frame group is The top layer steel frame of next group steel frame group.In the present embodiment, 4-6 layer is one group of steel frame group, the limit of the 4th layer of steel frame Edge position is connected with the centre position of the 5th layer of steel frame by reinforcing pull rod 20, and reinforcing pull rod is passed through in the centre position of the 5th layer of steel frame 20 are connected near the position of Core Walls Structure 11 with the 6th layer of steel frame;6-8 layer is second group of steel frame group, the limit of the 6th layer of steel frame Edge position is connected with the centre position of the 7th layer of steel frame by reinforcing pull rod 20, and reinforcing pull rod is passed through in the centre position of the 7th layer of steel frame 20 are connected near the position of Core Walls Structure 11 with the 8th layer of steel frame;By that analogy, until the centre position of the 9th layer of steel frame is passed through Reinforcing pull rod 20 is connected near the position of Core Walls Structure 11 with the 10th layer of steel frame.
The top of the 10th layer of steel frame is provided with top floor.
As shown in fig. 3 to 7, axial plane includes the first axial plane the 41, second axial plane the 42, the 3rd axial plane 43 and the 4th axial plane 44, the One axial plane 41 and the second axial plane 42 are positioned at dividing of the side of steel frame body axial line, the 3rd axial plane 43 and the 4th axial plane 44 symmetry It is distributed in the opposite side of axial line.In second axial plane 42, being provided with auxiliary reinforcing pull rod 20 inside Core Walls Structure 11, auxiliary reinforcing pull rod 20 is with same Layer year time reinforcing pull rod 20 symmetrical.That is, reinforcing pull rod 20 and the 5th layer of steel framework are passed through in the center of inside position of the 4th layer of steel frame Centre position within frame connects, and reinforcing pull rod 20 and the 6th layer of steel frame are passed through near core in the 5th layer of centre position within steel frame The position of heart cylinder 11 connects, by that analogy.
Interim steel column supports the 31 concrete crossover locations being located at one layer of ground.
The underground floor supporting 31 positions with interim steel column corresponding is provided with support.
Encorbelment and be provided with dismountable temporary support moulding bed 32 at the large space within floor.
Build the construction method of the large cantilever steel frame of the band pull bar of above-described embodiment, comprise the following steps:
One, two Core Walls Structures 11 of pouring, and the steel construction of floor the 1st to the 3rd layer of encorbelmenting is installed;
Two, in floor encorbelments place and two Core Walls Structures 11, span correspondence steel column locations sets up interim steel column support 31, temporarily Steel column supports 31 use steel pipe buttress tops and installs jack;
Three, the steel frame of installation the 4th layer, and pour the floorslab concrete of the 4th layer, the first axial plane 41 and steel framework of the 4th axial plane 44 Frame pre-arch camber 10mm, steel frame includes girder steel, steel column, steel bar truss floor support plate;
Four, the 5th layer and the steel frame of the 6th layer are installed, and the reinforcing pull rod 20 of the 4th layer to the 6th layer is installed.Concrete,
1, use four set tensioning equipments to carry out the reinforcing pull rod 20 of stretch-draw the second axial plane 42 simultaneously;It specifically includes step:
1. 4 reinforcing pull rods 20 in first Core Walls Structure 11 centre position, simultaneous tension both sides, the reinforcing pull rod 20 at every side Core Walls Structure 11 is even Connect the 6th layer of steel frame near the position of Core Walls Structure 11 and the centre position of the 5th layer of steel frame, and connect the 5th layer of steel frame Centre position and the 4th layer of steel frame are away from the position of Core Walls Structure 11;
2. simultaneous tension Core Walls Structure 11 both sides encorbelment end 4 reinforcing pull rods 20, the reinforcing pull rod 20 at every side Core Walls Structure 11 connects the 6th Layer steel frame is near the position of Core Walls Structure 11 and the centre position of the 5th layer of steel frame, and connects the interposition of the 5th layer of steel frame Put with the 4th layer of steel frame away from the position of Core Walls Structure 11;
3. substep stretch-draw apply 1000kN pretightning force, makes steel frame disengage interim steel column and supports 31, Core Walls Structure 11 both sides, every side Reinforcing pull rod 20 be distributed in "eight" shape.
2, use four set tensioning equipments to carry out the reinforcing pull rod 20 outside the Core Walls Structure 11 of stretch-draw the 3rd axial plane 43, every side simultaneously One, top reinforcing pull rod 20 connect the 6th layer of steel frame near the position of Core Walls Structure 11 and the centre position of the 5th layer of steel frame, under Fang Yigen reinforcing pull rod 20 connects the 5th layer of steel frame centre position and the 4th layer of outer fix, makes the steel outside every side Core Walls Structure 11 draw The bar 20 ramped shaped in " on lower outer ", step by step stretch-draw the pretightning force of 1000kN that applies;
3, use the steel outside the Core Walls Structure 11 of four set tensioning equipment stretch-draw the first axial plane 41 and the 4th axial planes 44 successively to draw simultaneously Bar 20, one, the top of every side reinforcing pull rod 20 connects the 6th layer of steel frame in the position of Core Walls Structure 11 and the 5th layer of steel frame Between position, one, lower section reinforcing pull rod 20 connects the 5th layer of steel frame centre position and the 4th layer of outer fix, makes every side Core Walls Structure 11 The reinforcing pull rod 20 in outside, in the ramped shaped of " outside under on ", utilizes torque wrench to apply initial pretightning force.
Five, retain interim steel column and support 31, make to encorbelment end and internal greatly across vertical deformation close to 0mm;
Six, repeat step 3, four, the steel frame of the 7th layer to the 10th layer is installed, and the reinforcing pull rod 20 of the 7th layer to the 10th layer is installed; During installing 7-10 layer reinforcing pull rod 20, the pretightning force that stretch-draw applies step by step is 500kN.
Seven, construction roof and roof trusses layer steel frame;
Eight, the most successively construction the 7th layer is to garret composite floor;
Nine, the building additional dead load such as way, curtain wall is added;
Ten, use live load is added;
11, remove interim steel column and support 31.
Further, in step 4, the installation process of reinforcing pull rod 20 includes:
The present embodiment also includes the construction of the large space of layer 2-3, concrete, before setting up large space, at the 2nd layer of first frame If temporary support moulding bed 32, then set up the steel frame of the 4th layer, remove temporary support tire removing while interim steel column supports 31 Frame 32.
Application Example:
Before within 2016, being positioned at Shenzhen City, Guangdong Province, the ruling by law mansion item body structure in sea realizes binding smoothly.
Ruling by law mansion project uses unique " balance " design concept, uses the band of the Core Walls Structure 11 stress Framed frame of both sides Brace steel frame structural system, simultaneously application bridge mode of construction, be aided with the high-strength E650 of φ 220mm in fact by arranging steel frame Core brace solves thing both sides 17.4m large cantilever and middle part large span, thus realizes complex Space Idea.This structure Technical approach processing technique is complicated, and installation accuracy requires high, still belongs to the first in the house construction engineering of the whole nation.
During project construction, carry out Core Walls Structure 11 steel concrete integrated construction, complete large overhanging steel structure install, complete complete State's maximum gauge reinforcing pull rod 20 is constructed and steel construction health monitoring etc. becomes several big technical barrier, is also that can construction plan suitable The key that profit is implemented.
It should be appreciated that for those of ordinary skills, can be improved according to the above description or be converted, And all these modifications and variations all should belong to the protection domain of claims of the present invention.
Above in conjunction with accompanying drawing, patent of the present invention is carried out exemplary description, it is clear that the realization of patent of the present invention is not subject to The restriction of aforesaid way, if the various improvement that the method design that have employed patent of the present invention is carried out with technical scheme, or without Improve and design and the technical scheme of patent of the present invention are directly applied to other occasion, the most within the scope of the present invention.

Claims (10)

1. the large cantilever steel-frame structure of band pull bar, including steel frame body, it is characterised in that described steel frame body includes two The vertical Core Walls Structure of root and the N shell steel frame being set up on described Core Walls Structure, described steel frame includes girder steel, steel column and reinforcing bar purlin Frame floor support plate,
The lower end, side of described steel frame body is provided with the floor of encorbelmenting of M shell, described in the encorbelment unsettled place of floor be provided with detachably Interim steel column support, described steel frame body is longitudinally provided with some axial planes, the neighbouring two-layer being positioned on described axial plane Described steel frame is fixed by reinforcing pull rod, and described reinforcing pull rod is positioned at the outside of described Core Walls Structure the slope in " outside under on " Shape.
The large cantilever steel-frame structure of band pull bar the most according to claim 1, it is characterised in that fixed by reinforcing pull rod In described steel frame, every three layers of described steel frame are one group of steel frame group, often organize in described steel frame group, outside bottom steel frame Side position connects the centre position of middle level steel frame by described reinforcing pull rod, and the centre position of middle level steel frame is drawn by described steel Bar connects the position inside top layer steel frame near Core Walls Structure.
The large cantilever steel-frame structure of band pull bar the most according to claim 1, it is characterised in that the top of n-th layer steel frame Portion is provided with top floor.
The large cantilever steel-frame structure of band pull bar the most according to claim 1, it is characterised in that described axial plane includes first Axial plane, the second axial plane, the 3rd axial plane and the 4th axial plane, described first axial plane and described second axial plane are positioned at described steel frame originally The opposite side being distributed in described axial line that the side of body axial line, described 3rd axial plane and described 4th axial plane are symmetrical.
The large cantilever steel-frame structure of band pull bar the most according to claim 4, it is characterised in that in described second axial plane, Being provided with auxiliary reinforcing pull rod inside described Core Walls Structure, when described auxiliary reinforcing pull rod and the year of same layer, reinforcing pull rod is symmetrical.
The large cantilever steel-frame structure of band pull bar the most according to claim 1, it is characterised in that described interim steel column supports It is located at the concrete crossover location on one layer of ground.
7. the construction method of the large cantilever steel frame of band pull bar, it is characterised in that comprise the following steps:
S1: water two Core Walls Structures, and install the floor the 1st steel construction to M shell of encorbelmenting;
S2: span correspondence steel column locations sets up interim steel column to support in floor encorbelments place and two Core Walls Structures;
S3: install the steel frame of M+1 layer, and pour the floorslab concrete of M+1 layer, described steel frame include girder steel, steel column, Steel bar truss floor support plate;
S4: install M+2 layer and the steel frame of M+3 layer, and install the M+1 layer reinforcing pull rod to M+3 layer;
S5: retain interim steel column and support, make to encorbelment end and internal greatly across vertical deformation close to 0mm;
S6: repeat step S3-S4, install the M+4 layer steel frame to n-th layer, and install the M+4 layer reinforcing pull rod to n-th layer;
S7: construction roof and roof trusses layer steel frame;
S8: the M+4 layer floorslab concrete to garret of the most successively constructing;
S9: remove interim steel column and support;
S10: add the building additional dead load such as way, curtain wall;
S11: add and use live load.
The construction method of the large cantilever steel frame of band pull bar the most according to claim 7, it is characterised in that described step S4 The installation process of middle reinforcing pull rod includes:
S41: simultaneously use four set tensioning equipments to carry out the reinforcing pull rod of stretch-draw the second axial plane;
S42: simultaneously use four set tensioning equipments to carry out the reinforcing pull rod outside the Core Walls Structure of stretch-draw the 3rd axial plane, the top one of every side Root reinforcing pull rod connects M+3 layer steel frame near the position of Core Walls Structure and the centre position of M+2 layer steel frame, one, lower section steel Pull bar connects M+2 layer steel frame centre position and M+1 layer outer fix, make reinforcing pull rod outside the Core Walls Structure of every side in " on In lower outer " ramped shaped, stretch-draw apply pretightning force step by step;
S43: simultaneously use the reinforcing pull rod outside the Core Walls Structure of four set tensioning equipment stretch-draw the first axial plane and the 4th axial planes successively, often One, the top of side reinforcing pull rod connects M+3 layer steel frame near the position of Core Walls Structure and the centre position of M+2 layer steel frame, Piece reinforcing pull rod in lower section connects M+2 layer steel frame centre position and M+1 layer outer fix, makes the steel outside the Core Walls Structure of every side Pull bar, in the ramped shaped of " outside under on ", utilizes torque wrench to apply the pretightning force in step S42.
The construction method of the large cantilever steel frame of band pull bar the most according to claim 8, it is characterised in that described step In S41, specifically include following steps:
S411: 4 reinforcing pull rods in first Core Walls Structure centre position, simultaneous tension both sides, the reinforcing pull rod at the Core Walls Structure of every side connects M+ 3 layers of steel frame are near the position of Core Walls Structure and the centre position of M+2 layer steel frame, and connect in M+2 layer steel frame Between position and M+1 layer steel frame away from the position of Core Walls Structure;
S412: simultaneous tension Core Walls Structure both sides encorbelment end 4 reinforcing pull rods, the reinforcing pull rod at the Core Walls Structure of every side connects M+3 layer Steel frame is near the position of Core Walls Structure and the centre position of M+2 layer steel frame, and connects the interposition of M+2 layer steel frame Put with M+1 layer steel frame away from the position of Core Walls Structure;
S413: stretch-draw apply pretightning force step by step, makes steel frame disengage interim steel column and supports, the reinforcing pull rod of Core Walls Structure both sides, every side It is distributed in "eight" shape.
The construction method of the large cantilever steel frame of band pull bar the most according to claim 7, it is characterised in that also include height The construction of large space, concrete, before setting up described large space, first set up temporary support in the position of described large space Moulding bed, then set up the described steel frame above described large space, remove remove while interim steel column supports described temporarily Support jig.
CN201610580087.3A 2016-07-22 2016-07-22 Large cantilever steel-frame structure with pull rod and its construction method Active CN106088337B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610580087.3A CN106088337B (en) 2016-07-22 2016-07-22 Large cantilever steel-frame structure with pull rod and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610580087.3A CN106088337B (en) 2016-07-22 2016-07-22 Large cantilever steel-frame structure with pull rod and its construction method

Publications (2)

Publication Number Publication Date
CN106088337A true CN106088337A (en) 2016-11-09
CN106088337B CN106088337B (en) 2018-08-21

Family

ID=57449954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610580087.3A Active CN106088337B (en) 2016-07-22 2016-07-22 Large cantilever steel-frame structure with pull rod and its construction method

Country Status (1)

Country Link
CN (1) CN106088337B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190652A (en) * 2017-06-05 2017-09-22 中建三局集团有限公司 One kind collection bundled tube intersects long cantilever class stayed-cable bridge structure system and construction method
CN107237404A (en) * 2017-08-03 2017-10-10 中国十九冶集团有限公司 A kind of overhanging steel structure and its installation method with reinforcing pull rod
CN107882328A (en) * 2017-10-23 2018-04-06 中国建筑第八工程局有限公司 The construction method of large span steel truss overhung construction
CN108222268A (en) * 2018-01-02 2018-06-29 中南林业科技大学 A kind of oblique pull high level timber buildings
CN108278001A (en) * 2018-01-23 2018-07-13 中南林业科技大学 A kind of high-rise timber buildings of overhanging
CN108775071A (en) * 2018-06-29 2018-11-09 聂超 A kind of construction method of prestressed suspension type building structure
CN109736440A (en) * 2019-02-28 2019-05-10 北京市第三建筑工程有限公司 A kind of large-span steel staggered floor closes up installation method
CN110359548A (en) * 2019-07-18 2019-10-22 合肥工业大学 A kind of steel truss suspension hybrid system and construction method
CN110952651A (en) * 2019-12-13 2020-04-03 北京建工集团山西建设有限公司 Cantilever building floor slab steel bar structure adopting steel bar truss template and reinforcement method
CN111364615A (en) * 2020-03-16 2020-07-03 山西四建集团有限公司 Mounting method of special-shaped and curved surface suspension type steel structure system
CN112012340A (en) * 2020-09-25 2020-12-01 中建一局集团第三建筑有限公司 Suspension connection node for large-span cantilever steel truss and construction method thereof
CN112709333A (en) * 2020-12-30 2021-04-27 南京大学建筑规划设计研究院有限公司 Central column-free bottom wall-free large-span elevated building and construction method
CN112814395A (en) * 2021-01-04 2021-05-18 上海市机械施工集团有限公司 Construction method of suspended steel structure
CN114263275A (en) * 2022-01-06 2022-04-01 中建五局华东建设有限公司 High-rise assembled steel structure-core tube same-layer construction method
CN114607153A (en) * 2022-03-07 2022-06-10 中建八局第三建设有限公司 Hoisting construction process for hanging multi-layer steel frame by large-span stay cable
CN115492399A (en) * 2022-09-28 2022-12-20 浙江中天恒筑钢构有限公司 Construction method for installing and adjusting hanging steel structure from bottom to top

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1988075A (en) * 1932-02-05 1935-01-15 Fiorini Guido Building construction
CN202064620U (en) * 2011-04-26 2011-12-07 北京城建五建设工程有限公司 Load-bearing frame of overhanging structure
KR20130097249A (en) * 2012-02-11 2013-09-03 김태섭 The building using principle of suspension bridges
CN103643738A (en) * 2013-11-18 2014-03-19 同济大学建筑设计研究院(集团)有限公司 Frame-core tube structure with flexible inhaul cable
CN203669326U (en) * 2013-12-30 2014-06-25 浙江国丰集团有限公司 High-strength overhanging steel platform
CN205907812U (en) * 2016-07-22 2017-01-25 中国十九冶集团有限公司 Take steel frame structure that encorbelments greatly of pull rod

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1988075A (en) * 1932-02-05 1935-01-15 Fiorini Guido Building construction
CN202064620U (en) * 2011-04-26 2011-12-07 北京城建五建设工程有限公司 Load-bearing frame of overhanging structure
KR20130097249A (en) * 2012-02-11 2013-09-03 김태섭 The building using principle of suspension bridges
CN103643738A (en) * 2013-11-18 2014-03-19 同济大学建筑设计研究院(集团)有限公司 Frame-core tube structure with flexible inhaul cable
CN203669326U (en) * 2013-12-30 2014-06-25 浙江国丰集团有限公司 High-strength overhanging steel platform
CN205907812U (en) * 2016-07-22 2017-01-25 中国十九冶集团有限公司 Take steel frame structure that encorbelments greatly of pull rod

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190652A (en) * 2017-06-05 2017-09-22 中建三局集团有限公司 One kind collection bundled tube intersects long cantilever class stayed-cable bridge structure system and construction method
CN107237404A (en) * 2017-08-03 2017-10-10 中国十九冶集团有限公司 A kind of overhanging steel structure and its installation method with reinforcing pull rod
CN107882328A (en) * 2017-10-23 2018-04-06 中国建筑第八工程局有限公司 The construction method of large span steel truss overhung construction
CN107882328B (en) * 2017-10-23 2020-03-20 中国建筑第八工程局有限公司 Construction method of large-span steel truss suspension structure
CN108222268A (en) * 2018-01-02 2018-06-29 中南林业科技大学 A kind of oblique pull high level timber buildings
CN108278001A (en) * 2018-01-23 2018-07-13 中南林业科技大学 A kind of high-rise timber buildings of overhanging
CN108775071A (en) * 2018-06-29 2018-11-09 聂超 A kind of construction method of prestressed suspension type building structure
CN109736440A (en) * 2019-02-28 2019-05-10 北京市第三建筑工程有限公司 A kind of large-span steel staggered floor closes up installation method
CN109736440B (en) * 2019-02-28 2020-07-14 北京市第三建筑工程有限公司 Staggered-layer folding installation method for large-span steel structure
CN110359548A (en) * 2019-07-18 2019-10-22 合肥工业大学 A kind of steel truss suspension hybrid system and construction method
CN110952651B (en) * 2019-12-13 2024-05-28 北京建工集团山西建设有限公司 Cantilever building floor slab reinforcing steel structure adopting reinforcing steel truss template and reinforcing steel bar arrangement method
CN110952651A (en) * 2019-12-13 2020-04-03 北京建工集团山西建设有限公司 Cantilever building floor slab steel bar structure adopting steel bar truss template and reinforcement method
CN111364615A (en) * 2020-03-16 2020-07-03 山西四建集团有限公司 Mounting method of special-shaped and curved surface suspension type steel structure system
CN112012340A (en) * 2020-09-25 2020-12-01 中建一局集团第三建筑有限公司 Suspension connection node for large-span cantilever steel truss and construction method thereof
CN112709333A (en) * 2020-12-30 2021-04-27 南京大学建筑规划设计研究院有限公司 Central column-free bottom wall-free large-span elevated building and construction method
CN112814395A (en) * 2021-01-04 2021-05-18 上海市机械施工集团有限公司 Construction method of suspended steel structure
CN114263275A (en) * 2022-01-06 2022-04-01 中建五局华东建设有限公司 High-rise assembled steel structure-core tube same-layer construction method
CN114263275B (en) * 2022-01-06 2023-06-09 中建五局华东建设有限公司 Construction method for same-layer construction of high-rise assembled steel structure-core tube
CN114607153A (en) * 2022-03-07 2022-06-10 中建八局第三建设有限公司 Hoisting construction process for hanging multi-layer steel frame by large-span stay cable
CN114607153B (en) * 2022-03-07 2023-10-10 中建八局第三建设有限公司 Hoisting construction process for large-span stay cable hanging multi-layer steel frame
CN115492399A (en) * 2022-09-28 2022-12-20 浙江中天恒筑钢构有限公司 Construction method for installing and adjusting hanging steel structure from bottom to top
CN115492399B (en) * 2022-09-28 2023-04-25 浙江中天恒筑钢构有限公司 Construction method for installing and adjusting hanging steel structure from bottom to top

Also Published As

Publication number Publication date
CN106088337B (en) 2018-08-21

Similar Documents

Publication Publication Date Title
CN106088337A (en) Large cantilever steel-frame structure with pull bar and construction method thereof
CN104975566B (en) Apply the steel pipe support in cable-stayed bridge arch tower is constructed
CN103669845A (en) High-altitude long-span overhung cornice formwork supporting system and constructing method thereof
CN101845792B (en) Method for constructing precast coping through multi-phase strain
CN205907812U (en) Take steel frame structure that encorbelments greatly of pull rod
CN103046645A (en) Large span prefabricated monolithic casting structure and construction method
CN105781142B (en) The ruggedized construction and reinforcement means of post are taken out for building structure top layer
CN104652813A (en) Tower crane construction technology used for super high-rise building steel structure
CN102418381A (en) Building structure system combined with steel beam and pre-tensioned prestressing superposed beam and construction method for building structure system
CN107009510A (en) Prefabricated case beam steel bar overall binding mold and its application method
CN107269085A (en) A kind of construction method of large-diameter concrete silo top conical shell structure
CN104790299B (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN106351245A (en) Tower crane foundation base and construction method thereof
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN110056218A (en) A kind of single-storey factory building pumping column steel-frame structure
CN202831219U (en) Large-span precast monolithic concrete structure
CN205348390U (en) Connection structure of precast concrete roof beam and cast -in -place post
CN113882507A (en) Horizontal truss system containing giant arch and construction method thereof
CN207436339U (en) Two-way cavity armoured concrete slab and its making apparatus
CN112960566B (en) Construction method of built-in tower crane of super high-rise building
CN115538678B (en) Construction method for small side surface platform of large-angle overhanging view platform
CN214089440U (en) Large-span stiff skeleton concrete arch bridge accurate assembling construction structure
US20240117625A1 (en) Building structure
CN115162534B (en) Construction method of large-span special-shaped truss ceiling
CN214531431U (en) Truss combination roof truss of opening string roof beam and encorbelmenting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant