CN106078071A - Frame entirety erects frock and welding method - Google Patents

Frame entirety erects frock and welding method Download PDF

Info

Publication number
CN106078071A
CN106078071A CN201610636251.8A CN201610636251A CN106078071A CN 106078071 A CN106078071 A CN 106078071A CN 201610636251 A CN201610636251 A CN 201610636251A CN 106078071 A CN106078071 A CN 106078071A
Authority
CN
China
Prior art keywords
frock
frame
side plate
jenny
erects
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610636251.8A
Other languages
Chinese (zh)
Other versions
CN106078071B (en
Inventor
卢忠华
张光伟
晏宏学
王兴涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding Industry Corp Diesel Engine Co ltd
Original Assignee
Qingdao Haixi Marine Diesel Engine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haixi Marine Diesel Engine Co Ltd filed Critical Qingdao Haixi Marine Diesel Engine Co Ltd
Priority to CN201610636251.8A priority Critical patent/CN106078071B/en
Publication of CN106078071A publication Critical patent/CN106078071A/en
Application granted granted Critical
Publication of CN106078071B publication Critical patent/CN106078071B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/047Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work moving work to adjust its position between soldering, welding or cutting steps

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The present invention provides a kind of frame entirety to erect frock and welding method, and including jenny, jenny is provided with steel wire rope, and steel wire rope, for being connected with the hanger of frame one end, is additionally provided with the setting frock for being connected with the hanger of the frame other end;In described setting frock, the top of base portion is provided with pin-and-hole, and pin-and-hole is connected with bearing pin, and bearing pin is for being connected with hanger;The center of gravity erectting frock is positioned at the bottom of base portion.Two pieces is erect frock and is connected respectively with two hangers of frame one end, and jenny is connected with two hangers of the frame other end;Jenny crawl hoists, until two are erect frock and are perpendicular to ground;Thus reduce the welding difficulty of frame.The machine frame erection of weight nearly 40 tons can be got up by the present invention, thus by PC(horizontal position welding), PF(vertical position welding), PD(fillet welding in the overhead position) be changed into be easier operation PA(downhand welding) or PB(flat fillet weld), the structure of the setting frock used, it is possible to reduce the rack construction deformation during erectting.

Description

Frame entirety erects frock and welding method
Technical field
The present invention relates to weld auxiliary mould field, the work that a kind of frame entirety for large-scale workpiece is erect Dress.
Background technology
Frame in this example, such as: large-sized low-speed two stroke diesel engine, its cylinder diameter is more than 300mm, with crosshead.Machine Frame key dimension: 7445mm × 3390mm × 3128mm, weight: 39200KG.
1. more, including PA(downhand welding due to above-mentioned frame position while welding), PB(flat fillet weld), PC(horizontal position welding), PF(stand Weldering), PD(fillet welding in the overhead position), various positions welding method is different, and frame entirety is heated uneven, easily causes welding deformation, causes Affect overall dimensions, thus affect follow-up machining dimension.
2. for PC(horizontal position welding), PF(vertical position welding), PD(fillet welding in the overhead position) weld seam of position, welder's operation easier is very big, Ask welder's level the highest;
3. frame main body weld seam needs to carry out MT(Magnetic testing) and T(ultrasound examination), PC(horizontal position welding), PF(vertical position welding), PD(faces upward Fillet welding) weld seam of position, qualification rate than relatively low, weldquality is unstable, carries out reprocessing and can cause working-day claims, has a strong impact on life Product progress.
The most traditional method is that the hanger using steel wire rope, rigging to directly utilize on side plate lifts, before lifting, Frame entirety weld seam is only by backing welding and fills one layer, and opposed configuration is more weak, erects the initial stage, unbalance stress easily occurs Even, that frame deforms situation.
5. due to weight greatly, length is longer for large-sized low-speed two stroke diesel engine frame, and structure relative stiffness is not enough, erects Journey the most easily causes malformation.
Summary of the invention
The technical problem to be solved is to provide a kind of frame entirety and erects frock, it is possible to by PC(horizontal position welding), PF (vertical position welding), PD(fillet welding in the overhead position) it is changed into the PA(downhand welding being easier operation) or PB(flat fillet weld), and setting process can be reduced In rack construction deformation.
For solving above-mentioned technical problem, the technical solution adopted in the present invention is: a kind of frame entirety erects frock, including Jenny, jenny is provided with steel wire rope, steel wire rope for being connected with the hanger of frame one end, be additionally provided with for frame The setting frock that the hanger of the other end connects;
In described setting frock, the top of base portion is provided with pin-and-hole, and pin-and-hole is connected with bearing pin, and bearing pin is for being connected with hanger;
The center of gravity erectting frock is positioned at the bottom of base portion.
Preferably in scheme, the width of described setting each side top of frock is less than the width of bottom.
Preferably in scheme, described setting frock includes that two piece of first side plate and two piece of second plate-side plate welding form, the The length of side plate is more than the length of the second side plate, and the first side plate aligns with the bottom of the second side plate, and pin-and-hole is positioned at the first side plate On.
In another optional scheme, the first described side plate and the second side plate are trapezoidal, the first side plate and the second side plate Top width less than the width of bottom.
In another optional scheme, the first described side plate is trapezoidal, and the top width of the first side plate is less than the width of bottom Degree.
Preferably in scheme, the second described side plate is trapezoidal, and the top width of the second side plate is less than the width of bottom.
A kind of use above-mentioned frame entirety to erect the method that frock carries out welding, comprise the following steps:
One, two pieces is erect frock and is connected respectively with two hangers of frame one end, and two of jenny and the frame other end are hung Ear connects;
Two, jenny crawl hoists, until two are erect frock and are perpendicular to ground;
Three, to erect frock as support, frame is to erect the bearing pin of frock as rotary shaft, along with the continuous place of jenny Moving and hoist, the process of hoisting needs jenny constantly to move to the center of gravity direction of frame, gradually rotates to suspension hook and setting frock It is in vertical state;
Four, the bearing pin erectting frock being unloaded, the jenny frame that hoists, to certain altitude, completely disengages from two pieces and erects frock, Frame is winched to operating platform overhead by jenny, and drops down onto on operating platform;
Five, after having erect, downhand welding or flat fillet weld are implemented at frame upper surface;
Six, welded this side weld, according still further to step one ~ five, frame opposite side has been erected;
By above step, reduce the welding difficulty of frame.
Preferably in scheme, in step 2, the sidepiece erectting frock is withstood, makes setting frock not sliding.
Preferably in scheme, described hanger position is arranged on the structure-reinforced portion of frame.
A kind of frame entirety that the present invention provides erects frock, by using above-mentioned structure, it is possible to use jenny Coordinate and erect frock, the machine frame erection of weight nearly 40 tons is got up, thus by PC(horizontal position welding), PF(vertical position welding), PD(fillet welding in the overhead position) It is changed into the PA(downhand welding being easier operation) or PB(flat fillet weld), the structure of the setting frock of employing, it is possible to reduce and erect Rack construction deformation in journey.
Accompanying drawing explanation
The invention will be further described with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the schematic front view of the present invention.
Fig. 2 is the schematic side view of the present invention.
Fig. 3 is the schematic top plan view erectting frock in the present invention.
Fig. 4 is the setting process schematic using the present invention.
In figure: erect frock 1, pin-and-hole 11, base portion 12, the first side plate 121, the second side plate 122, bearing pin 13, move and hang Car 2, steel wire rope 3, frame 4, hanger 41, operating platform 5.
Detailed description of the invention
Embodiment 1:
In Fig. 1 ~ 4, a kind of frame entirety erects frock, and including jenny 2, the jenny 2 in this example is to include driving, Or other boom hoistings that can lift by crane and can move, jenny 2 is provided with steel wire rope 3, and steel wire rope 3 is used for and frame The hanger 41 of 4 one end connects, and is additionally provided with the setting frock 1 for being connected with the hanger 41 of frame 4 other end;
In described setting frock 1, the top of base portion 12 is provided with pin-and-hole 11, and pin-and-hole 11 is connected with bearing pin 13, and bearing pin 13 is used for It is connected with hanger 41;
The center of gravity erectting frock 1 is positioned at the bottom of base portion 12.Thus structure, in Fig. 4, by 3 points of the steel wire rope of jenny 2 Be not connected with two hangers 41 of frame 4 one end, and two are erect the bearing pin 13 of frocks 1 respectively with two of frame 4 one end Hanger 41 connects, and wherein erects the height of bearing pin 13 to base portion 12 bottom surface of frock 1, is longer than the hanger 41 being connected with bearing pin 13 The height of the center of circle to frame 4 bottom surface.During jenny 2 lifts by crane, the weight of frame 4 is gradually undertaken by setting frock 1, and The position of hanger is generally arranged at the structure-reinforced portion of frame, thus decreases the probability of rack construction deformation.Complete setting After, remove setting frock 1 and frame 4 is placed on operating platform 5 can start welding operation, PC horizontal position welding, PF vertical position welding, PD are faced upward Fillet welding is changed into PA downhand welding or PB flat fillet weld.
Preferably in scheme, the width of described each side top of setting frock 1 is less than the width of bottom.
Preferably in scheme, described setting frock 1 includes that two piece of first side plate 121 and two piece of second side plate 122 weld Forming, the length of the first side plate 121 is more than the length of the second side plate 122, and the first side plate 121 is right with the bottom of the second side plate 122 Together, pin-and-hole 11 is positioned on the first side plate 121.Thus structure, simplify erect frock 1 structure, the only workpiece of two specifications, Each workpiece is 2, consequently facilitating processing.The sidepiece of four workpiece is welded together the setting frock i.e. constituting the present invention 1.The material of the first side plate 121 and the second side plate 122 uses Q235B steel plate.Using NC Flame Cutting blanking, assembly welding is complete Become, and coating tool paint.
Preferably in scheme, the frame length of large-sized low-speed two stroke diesel engine is close to 8m, with 12K60MC-S main frame head end As a example by, therefore the rigidity of frame own is not enough, needs serious analysis frame force structure, selects suitably upset frock stress point. During so can controlling machine frame erection indeformable, it is ensured that overall dimensions.Calculate position of centre of gravity, leading of frame two ends On rail plate, welding 4 technique hangers, postwelding carries out 100%MT inspection.
Preferably in scheme, the first described side plate 121 and the second side plate 122 are trapezoidal, the first side plate 121 and second The top width of side plate 122 is less than the width of bottom.
In another optional scheme, the first described side plate 121 is trapezoidal, and the top width of the first side plate 121 is less than the end The width in portion.
In another optional scheme, the second described side plate 122 is trapezoidal, and the top width of the second side plate 122 is less than the end The width in portion.
By above-mentioned structure, it is achieved the center of gravity erectting frock 1 is positioned at the bottom of base portion 12, thus during erectting, Erect frock 1 can participate in earlier supporting, thus reduce stand stretch.
Embodiment 2:
1. use Φ 80 bearing pin 13, erect frock 12 and link together with 2 hangers on Frame end.
2., 2 hangers of the frame other end, hang up shackle, steel wire rope.Jenny 2, uses overhead traveling crane, steel wire in this example Rope is connected with crown block hook, and overhead traveling crane crawl hoists, until 2 are erect frock and are perpendicular to ground, erects complete bottom frock and ground Face contacts.In the process, the sidepiece erectting frock is withstood, such as, the right side of figure left in Fig. 4 is withstood, make setting frock 1 Do not produce sliding.
3. using setting frock as support, frame is using bearing pin 13 as rotary shaft, along with overhead traveling crane constantly crawl hoists, rises The process of liter needs overhead traveling crane constantly to move, and gradually rotates and is in vertical state to suspension hook with erectting frock.Use to erect frock work For the scheme supported, it is to avoid the corner of frame 4 stress in switching process is concentrated, thus avoids rack construction deformation.
4. 2 joint pins being disassembled, overhead traveling crane hoists certain altitude, completely disengages from 2 and erects frocks, mobile overhead crane, Frame is winched to operating platform 5 overhead, and drops down onto on operating platform 5.
5., after having erect, the weld seam of upper surface becomes PA downhand welding, PB flat fillet weld position the most completely, operates very Simply, having welded this side weld, erected by opposite side according still further to the method, the main body weld seam of such frame just can be whole Welding completes.
The present invention is a kind of large-sized low-speed two stroke diesel engine machine frame erection scheme, and relatively difficult welding position is changed For simple, operability is high.Improve weld is accepted rate, weld appearance beautiful appearance, thus improve Product jointing quality.Reduce weldering Connect heat input, thus improve the excessive welding deformation caused of heat input and the problem of welding contraction, it is possible to ensure chi The very little tolerance meeting drawing;Reduce the labor intensity of welder, be greatly improved production efficiency, belong to welding technique model Farmland.
The present invention designs ingenious, utilizes the principle of hinge, to erect frock as hinge supporting seat, and using joint pin as Rotary shaft, hoisting and walking by overhead traveling crane, frame rotates as fulcrum to erect frock, completes the conversion of center of gravity, easily Machine frame erection is got up.Erect frock and dismount simple, convenient, can operate with 1 people;Safety improves, a sky Car just can complete the operation of machine frame erection.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as the restriction for the present invention, this Shen Embodiment in please and the feature in embodiment, can mutual combination in any in the case of not conflicting.The protection model of the present invention Enclose the technical scheme should recorded with claim, including the equivalent side of technical characteristic in the technical scheme that claim is recorded Case is protection domain.Equivalent the most in this range is improved, also within protection scope of the present invention.

Claims (9)

1. frame entirety erects a frock, and including jenny (2), jenny (2) is provided with steel wire rope (3), steel wire rope (3) for being connected with the hanger (41) of frame (4) one end, it is characterized in that: be additionally provided with for the hanger with frame (4) other end (41) the setting frock (1) connected;
In described setting frock (1), the top of base portion (12) is provided with pin-and-hole (11), and pin-and-hole (11) is connected with bearing pin (13), Bearing pin (13) is for being connected with hanger (41);
The center of gravity erectting frock (1) is positioned at the bottom of base portion (12).
A kind of frame entirety the most according to claim 1 erects frock, it is characterized in that: described setting frock (1) each The width of side top is less than the width of bottom.
A kind of frame entirety the most according to claim 1 erects frock, it is characterized in that: described setting frock (1) includes Two piece of first side plate (121) and two piece of second side plate (122) are welded, and the length of the first side plate (121) is more than the second side plate (122) length, the first side plate (121) aligns with the bottom of the second side plate (122), and pin-and-hole (11) is positioned at the first side plate (121) On.
A kind of frame entirety the most according to claim 3 erects frock, it is characterized in that: described the first side plate (121) and Second side plate (122) is trapezoidal, and the top width of the first side plate (121) and the second side plate (122) is less than the width of bottom.
A kind of frame entirety the most according to claim 3 erects frock, it is characterized in that: described the first side plate (121) is Trapezoidal, the top width of the first side plate (121) is less than the width of bottom.
A kind of frame entirety the most according to claim 3 erects frock, it is characterized in that: described the second side plate (122) is Trapezoidal, the top width of the second side plate (122) is less than the width of bottom.
7. use the frame entirety described in any one of claim 1 ~ 6 to erect the method that frock carries out welding, it is characterized in that Comprise the following steps:
One, two pieces setting frock (1) is connected respectively with two hangers (41) of frame (4) one end, jenny (2) and frame (4) two hangers (41) of the other end connect;
Two, jenny (2) crawl hoists, until two are erect frock (1) and are perpendicular to ground;
Three, to erect frock (1) as supporting, frame, to erect the bearing pin (13) of frock (1) as rotary shaft, is hung along with mobile Car (2) constantly crawl hoists, and the process of hoisting needs jenny (2) constantly to move to the center of gravity direction of frame (4), gradually revolves Go to suspension hook and be in vertical state with erectting frock;
Four, the bearing pin (13) erectting frock (1) being unloaded, jenny (2) frame (4) that hoists, to certain altitude, completely disengages from Two pieces erects frock (1), and frame is winched to operating platform (5) overhead, and drops down onto on operating platform (5) by jenny (2);
Five, after having erect, downhand welding or flat fillet weld are implemented at frame (4) upper surface;
Six, welded this side weld, according still further to step one ~ five, frame (4) opposite side has been erected;
By above step, reduce the welding difficulty of frame.
Employing frame entirety the most according to claim 7 erects the method that frock carries out welding, and it is characterized in that: in step 2 In, the sidepiece erectting frock (1) is withstood, makes setting frock (1) not sliding.
Employing frame entirety the most according to claim 7 erects the method that frock carries out welding, and it is characterized in that: described hangs Ear position is arranged on the structure-reinforced portion of frame (4).
CN201610636251.8A 2016-08-05 2016-08-05 The welding method of frock is integrally erect using frame Active CN106078071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610636251.8A CN106078071B (en) 2016-08-05 2016-08-05 The welding method of frock is integrally erect using frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610636251.8A CN106078071B (en) 2016-08-05 2016-08-05 The welding method of frock is integrally erect using frame

Publications (2)

Publication Number Publication Date
CN106078071A true CN106078071A (en) 2016-11-09
CN106078071B CN106078071B (en) 2018-02-13

Family

ID=57454230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610636251.8A Active CN106078071B (en) 2016-08-05 2016-08-05 The welding method of frock is integrally erect using frame

Country Status (1)

Country Link
CN (1) CN106078071B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60148889A (en) * 1984-01-12 1985-08-06 株式会社東芝 Method of varying attitude of article
JP2004250159A (en) * 2003-02-19 2004-09-09 Kobelco Contstruction Machinery Ltd Inverting device of discarded automobile
CN203728398U (en) * 2014-02-14 2014-07-23 上海第一机床厂有限公司 Transporting device with lifting and overturning functions
CN204079221U (en) * 2014-09-05 2015-01-07 招商局重工(深圳)有限公司 A kind of truncated cone-shaped suspension ring and piling bar Lift-on/Lift-off System
CN204173780U (en) * 2014-09-24 2015-02-25 上海振华重工(集团)股份有限公司 Steel structure equipment for supporting patient with burn and terrestrial components thereof
CN104555734A (en) * 2013-10-15 2015-04-29 烟台中集来福士海洋工程有限公司 Upper upright column turnover device and method for marine crane
CN204588505U (en) * 2015-04-15 2015-08-26 阿尔斯通水电设备(中国)有限公司 The safe overturn structure of a kind of large-scale water turbine runner
CN205834583U (en) * 2016-08-05 2016-12-28 青岛海西船舶柴油机有限公司 Frame entirety erects frock

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60148889A (en) * 1984-01-12 1985-08-06 株式会社東芝 Method of varying attitude of article
JP2004250159A (en) * 2003-02-19 2004-09-09 Kobelco Contstruction Machinery Ltd Inverting device of discarded automobile
CN104555734A (en) * 2013-10-15 2015-04-29 烟台中集来福士海洋工程有限公司 Upper upright column turnover device and method for marine crane
CN203728398U (en) * 2014-02-14 2014-07-23 上海第一机床厂有限公司 Transporting device with lifting and overturning functions
CN204079221U (en) * 2014-09-05 2015-01-07 招商局重工(深圳)有限公司 A kind of truncated cone-shaped suspension ring and piling bar Lift-on/Lift-off System
CN204173780U (en) * 2014-09-24 2015-02-25 上海振华重工(集团)股份有限公司 Steel structure equipment for supporting patient with burn and terrestrial components thereof
CN204588505U (en) * 2015-04-15 2015-08-26 阿尔斯通水电设备(中国)有限公司 The safe overturn structure of a kind of large-scale water turbine runner
CN205834583U (en) * 2016-08-05 2016-12-28 青岛海西船舶柴油机有限公司 Frame entirety erects frock

Also Published As

Publication number Publication date
CN106078071B (en) 2018-02-13

Similar Documents

Publication Publication Date Title
CN101832019B (en) Ceramic floor tile paving device
CN201791755U (en) Automatic tilter for aluminum coils
CN112758276B (en) Method for integrally building hatch circumference and torsion box of ultra-large container ship
CN207192616U (en) A kind of gantry crane for preventing that goods from rocking
CN202625600U (en) Shoulder-pole beam of double-casting bridge crane for lifting ultra-large objects
CN205834583U (en) Frame entirety erects frock
CN201901515U (en) Special lifting device for ship cabin cleaning machinery
CN205798849U (en) A kind of group is to device
CN211114737U (en) A construction operation platform in elevator well for tower crane promotes
CN106078071A (en) Frame entirety erects frock and welding method
CN205662256U (en) High rises pergola side and hangs a semi -portal bridge crane
CN210029785U (en) Novel upset hoist
CN202655839U (en) Movable pipe truss assembling clamping fixture
CN210369846U (en) Operating platform capable of being clamped on elevator shaft shear wall surface and lifted layer by layer
CN210393486U (en) Hoisting device of Z-shaped cantilever beam structure of large paper machine
CN211992810U (en) Special wheel rough machining lifting appliance placing tool
CN211249845U (en) Turning device is used in assembly of powder equipment part
CN211640410U (en) PC component offline processing procedure integrated system
CN111774803A (en) Mail steamer sheet metal upset frock
CN103231982A (en) Carrying pole bean of double-cast bridge crane for lifting super-large object
CN202539874U (en) Forming die for manufacturing sectioned medium-sized assembling poieces of ship
CN211035043U (en) Large-scale motor assembly handling device
CN207328748U (en) A kind of quick auxiliary device for realizing transverse bulkhead lifting positioning and construction safety
CN110203834A (en) The hanging apparatus and hanging method of large-scale paper machine " Z " type cantilever beam structure
CN208964369U (en) A kind of disassembling furnace machine hoisting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200327

Address after: 266520 No. 501 Lijiang East Road, Huangdao District, Shandong, Qingdao

Patentee after: CHINA SHIPBUILDING INDUSTRY CORPORATION DIESEL ENGINE Co.,Ltd.

Address before: 266520 No. 501 Lijiang East Road, Shandong, Qingdao

Patentee before: QINGDAO HAIXI MARINE DIESEL ENGINE Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 266520 No. 501 Lijiang East Road, Huangdao District, Qingdao, Shandong

Patentee after: China Shipbuilding Industry Corporation Diesel ENGINE Co.,Ltd.

Address before: 266520 No. 501 Lijiang East Road, Huangdao District, Qingdao, Shandong

Patentee before: CHINA SHIPBUILDING INDUSTRY CORPORATION DIESEL ENGINE Co.,Ltd.

CP01 Change in the name or title of a patent holder