CN106077518A - For wind power hub high-strength combination energy saver - Google Patents

For wind power hub high-strength combination energy saver Download PDF

Info

Publication number
CN106077518A
CN106077518A CN201610696369.XA CN201610696369A CN106077518A CN 106077518 A CN106077518 A CN 106077518A CN 201610696369 A CN201610696369 A CN 201610696369A CN 106077518 A CN106077518 A CN 106077518A
Authority
CN
China
Prior art keywords
flask
built
bar
wind power
energy saver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610696369.XA
Other languages
Chinese (zh)
Inventor
张志楷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Gangrui Precision Machinery Co Ltd
Original Assignee
Jiangsu Gangrui Precision Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Gangrui Precision Machinery Co Ltd filed Critical Jiangsu Gangrui Precision Machinery Co Ltd
Priority to CN201610696369.XA priority Critical patent/CN106077518A/en
Publication of CN106077518A publication Critical patent/CN106077518A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/22Moulds for peculiarly-shaped castings
    • B22C9/28Moulds for peculiarly-shaped castings for wheels, rolls, or rollers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Display Devices Of Pinball Game Machines (AREA)

Abstract

The invention discloses a kind of for wind power hub high-strength combination energy saver, including upper built-up flask and lower built-up flask;Wherein, upper built-up flask includes upper pillar stand, upper horizontal bar bar, upper side frame, upper longitudinal rib bar and a support of hanging oneself;Lower built-up flask include lower pillar stand, lower horizontal bar bar, lower frame, lower longitudinal rib bar and under hang a support;The bottom abutting joint of upper built-up flask is at the top of lower built-up flask, and is bolted;And upper corner baffle is corresponding with the position of lower corner baffle.This wind power hub high-strength combination energy saver structural strength height is prevented from sandbox during moulding to be occurred deforming, and can be reduced the usage amount of a large amount of resin sands at the triangle interval at turning by upper corner baffle and lower corner baffle, cost-effective, man-hour.

Description

For wind power hub high-strength combination energy saver
Technical field
The present invention relates to a kind of wind power hub processing unit (plant), especially a kind of for the energy-conservation dress of wind power hub high-strength combination Put.
Background technology
At present, add man-hour carrying out wind power hub, owing to existing processing unit (plant) structural strength is low, usually at casting process Middle there is deformation, and existing processing unit (plant) is when lower sand molding, and resin sand usage amount is big, easily causes resin sand waste.
Summary of the invention
Goal of the invention: provide a kind of structural strength high and can effectively save the wind power hub high intensity of resin sand usage amount Combination energy-saving device.
Technical scheme: of the present invention for wind power hub high-strength combination energy saver, including upper built-up flask and Lower built-up flask;
Upper built-up flask includes upper pillar stand, upper horizontal bar bar, upper side frame, upper longitudinal rib bar and a support of hanging oneself;Top Frame is two altogether, and is rectangular frame;Upper pillar stand is four altogether, is the most vertically distributed in four apex of two upper side frames; Upper horizontal bar bar is connected laterally between adjacent two root posts;Upper longitudinal rib bar vertical supporting is between two upper side frames;Hang oneself Support is arranged on the outside of upper built-up flask opposite sides, and every side is at least provided with two supports of hanging oneself;Hanging oneself propping up Frame is provided with the handle of hanging oneself of cylinder;It is provided with grid at the top of upper built-up flask;Upper grid is vertically arranged with in parallel Two blocks of cast foundary weight plates;It is provided with side shield on surrounding side in upper built-up flask;In upper built-up flask four Corner baffle all it is vertically provided with at individual drift angle;
Lower built-up flask include lower pillar stand, lower horizontal bar bar, lower frame, lower longitudinal rib bar and under hang a support;Below Frame is two altogether, and is rectangular frame;Lower pillar stand is four altogether, is the most vertically distributed in four apex of two lower frames; Lower horizontal bar bar is connected laterally between adjacent two root posts;Lower longitudinal rib bar vertical supporting is between two lower frames;Under hang Support is arranged on the outside of lower built-up flask opposite sides, and a support is hung under two in every side;Hang under propping up Frame is provided with under cylinder and hangs handle;It is provided with Under The Grille in the bottom of lower built-up flask;Surrounding side in lower built-up flask On be provided with lower side shield;Lower corner baffle all it is vertically provided with at four drift angles in lower built-up flask;
The bottom abutting joint of upper built-up flask is at the top of lower built-up flask, and is bolted;And upper turning gear Plate is corresponding with the position of lower corner baffle.
In employing, horizontal bar bar and upper longitudinal rib bar can effectively strengthen the structural strength of upper built-up flask, when preventing moulding There is deformation in upper built-up flask;The structure that the lower horizontal bar bar of employing and lower longitudinal rib bar can effectively strengthen lower built-up flask is strong Degree, prevents moulding built-up flask at present from deformation occur;Employing hang oneself handle and under hang can facilitate sand harden after by upper combination Sandbox is sling together with lower built-up flask and molding sand, is effectively increased efficiency of construction;Corner baffle and lower corner baffle in employing The usage amount of a large amount of resin sands can be reduced at the triangle interval at turning, cost-effective, man-hour;Use at upper built-up flask top Cast foundary weight plate is set and can effectively save man-hour, reduce equipment loss.
As the scheme that limits further of the present invention, upper grid edge and upper side shield and on the connection of corner baffle Place is provided with triangle gusset.In employing, triangle gusset can effectively strengthen upper grid edge and upper side shield and upper corner baffle Bonding strength.
As the scheme that limits further of the present invention, the installation place of cast foundary weight plate with upper grid is provided with foundary weight triangle Gusset.Foundary weight triangle gusset is used can effectively to strengthen the installation strength between cast foundary weight plate and upper grid.
As the scheme that limits further of the present invention, the triangle constituted with upper side shield at the back side of upper corner baffle is interval Inside it is provided with the corner supports gusset being supported on the corner baffle back side.Corner supports gusset is used can effectively to strengthen upper turning The structural strength of baffle plate.
As the scheme that limits further of the present invention, in Under The Grille edge and lower side shield and the connection of lower corner baffle Place is provided with lower triangle gusset.Lower triangle gusset is used can effectively to strengthen Under The Grille edge and lower side shield and lower corner baffle Between bonding strength.
As the scheme that limits further of the present invention, the triangle constituted with lower side shield at the back side of lower corner baffle is interval Top and bottom be mounted on set square.Set square is used can effectively to strengthen the structural strength of lower corner baffle.
Compared with prior art, it provides the benefit that the present invention: in (1) employing, horizontal bar bar and upper longitudinal rib bar can have Effect strengthens the structural strength of upper built-up flask, and when preventing moulding, deformation occurs in upper built-up flask;(2) use lower horizontal bar bar and under Longitudinal rib bar can effectively strengthen the structural strength of lower built-up flask, prevents moulding built-up flask at present from deformation occur;(3) use Hang oneself handle and under hang can facilitate sand harden after upper built-up flask is sling together with lower built-up flask and molding sand, effectively carry High efficiency of construction;(4) in employing, corner baffle and lower corner baffle can reduce a large amount of resin sands at the triangle interval at turning Usage amount, cost-effective, man-hour;(5) employing arranges cast foundary weight plate and can effectively save man-hour at upper built-up flask top, Reduce equipment loss.
Accompanying drawing explanation
Fig. 1 is the upper built-up flask top perspective view of the present invention;
Fig. 2 is the upper built-up flask elevated bottom perspective view of the present invention;
Fig. 3 is the lower built-up flask elevated bottom perspective view of the present invention;
Fig. 4 is the lower built-up flask top perspective view of the present invention.
In figure: 1, upper pillar stand, 2, upper side frame, 3, upper longitudinal rib bar, 4, upper horizontal bar bar, 5, a support of hanging oneself, 6, hang oneself , 7, upper side shield, 8, upper corner baffle, 9, upper grid, 10, cast foundary weight plate, 11, upper triangle gusset, 12, foundary weight triangle muscle Plate, 13, corner supports gusset, 14, lower pillar stand, 15, lower frame, 16, lower longitudinal rib bar, 17, lower horizontal bar bar, 18, under hang handle Support, 19, under hang handle, 20, Under The Grille, 21, set square, 22, lower corner baffle, 23, lower triangle gusset, 24, lower side shield.
Detailed description of the invention
Below in conjunction with the accompanying drawings technical solution of the present invention is described in detail, but protection scope of the present invention is not limited to Described embodiment.
Embodiment 1:
As Figure 1-4, the one that the present invention provides is for wind power hub high-strength combination energy saver, including upper combination Sandbox and lower built-up flask;
Wherein, upper built-up flask includes upper pillar stand 1, upper horizontal bar bar 4, upper side frame 2, upper longitudinal rib bar 3 and handle of hanging oneself Support 5;Upper side frame 2 is two altogether, and is rectangular frame;Upper pillar stand 1 is four altogether, is the most vertically distributed in two upper side frames 2 Four apex;Upper horizontal bar bar 4 is connected laterally between adjacent two root posts 1;Upper longitudinal rib bar 3 vertical supporting is at two Between upper side frame 2;Hang oneself and support 5 is arranged on the outside of upper built-up flask opposite sides, and hang oneself at least provided with two in every side Support 5;Hanging oneself being provided with cylindrical hanging oneself 6 on support 5;It is provided with grid 9 at the top of upper built-up flask;Upper Two blocks of cast foundary weight plates 10 vertically it are arranged with in parallel on grid 9;Upside it is provided with on surrounding side in upper built-up flask Baffle plate 7;Corner baffle 8 all it is vertically provided with at four drift angles in upper built-up flask;
Lower built-up flask include lower pillar stand 14, lower horizontal bar bar 17, lower frame 15, lower longitudinal rib bar 16 and under hang Frame 18;Lower frame 15 is two altogether, and is rectangular frame;Lower pillar stand 14 is four altogether, is the most vertically distributed in two lower frames Four apex of 15;Lower horizontal bar bar 17 is connected laterally between adjacent two root posts 14;Lower longitudinal rib bar 17 vertical supporting Between two lower frames 15;Under hang outside support 18 being arranged on lower built-up flask opposite sides, and every side at least provided with A support 18 is hung under two;Hang under and hang 19 being provided with on support 18 under cylinder;It is provided with in the bottom of lower built-up flask Under The Grille 20;Lower side shield 24 it is provided with on surrounding side in lower built-up flask;Four tops in lower built-up flask Lower corner baffle 22 all it is vertically provided with at angle;
The bottom abutting joint of upper built-up flask is at the top of lower built-up flask, and is bolted;And upper turning gear Plate 8 is corresponding with the position of lower corner baffle 22;Upper grid 9 edge and upper side shield 7 and on the junction of corner baffle 8 It is provided with triangle gusset 11;The installation place of cast foundary weight plate 10 with upper grid 9 is provided with foundary weight triangle gusset 12;At upper turning It is provided with, in the triangle interval that the back side of baffle plate 8 and upper side shield 7 are constituted, the corner supports being supported on corner baffle 8 back side Gusset 13;It is provided with lower triangle gusset 23 in the junction at Under The Grille 20 edge with lower side shield 24 and lower corner baffle 22;? Top and the bottom in the triangle interval that the back side of lower corner baffle 22 and lower side shield 24 are constituted are mounted on set square 21.
The wind power hub high-strength combination energy saver of the present invention in use, needs upper built-up flask and lower combination sand Case is placed on corresponding mould and carries out lower sand, built-up flask and molding sand is sling together after sand hardens, and moulding completes.Upper combination sand Case and lower built-up flask are all formed by square steel, round steel and Plate Welding.
The advantage of the wind power hub high-strength combination energy saver of the present invention is:
(1) hang oneself 6 and under hang safer for 19 Position Design, relieved can carry out Integral lifting;
(2) bulk strength is high, it is to avoid deform during subsequent handling (such as cast);
(3) usage amount of a large amount of resin sand can be reduced, cost-effective, man-hour;
(4) improve yield in the unit interval and reduce equipment loss and power consumption.
Although as it has been described above, represented and described the present invention with reference to specific preferred embodiment, but it must not be explained For the restriction to the present invention self.Under the spirit and scope of the present invention premise defined without departing from claims, can be right Various changes can be made in the form and details for it.

Claims (6)

1. one kind is used for wind power hub high-strength combination energy saver, it is characterised in that: include built-up flask and lower combination sand Case;
Upper built-up flask includes upper pillar stand (1), upper horizontal bar bar (4), upper side frame (2), upper longitudinal rib bar (3) and hangs oneself propping up Frame (5);Upper side frame (2) is two altogether, and is rectangular frame;Upper pillar stand (1) is four altogether, is the most vertically distributed in two tops Four apex of frame (2);Upper horizontal bar bar (4) is connected laterally between adjacent two root posts (1);Upper longitudinal rib bar (3) is erected To being supported between two upper side frames (2);A support (5) of hanging oneself is arranged on the outside of built-up flask opposite sides, and every side At least provided with two supports (5) of hanging oneself;In hang oneself (6) being provided with cylinder on a support (5) of hanging oneself;At upper built-up flask Top be provided with grid (9);Upper grid (9) is vertically arranged with in parallel two pieces of cast foundary weight plate (10);At upper combination sand Side shield (7) it is provided with on surrounding side in case;All it is vertically provided with at four drift angles in upper built-up flask Corner baffle (8);
Lower built-up flask include lower pillar stand (14), lower horizontal bar bar (17), lower frame (15), lower longitudinal rib bar (16) and under hang Support (18);Lower frame (15) is two altogether, and is rectangular frame;Lower pillar stand (14) is four altogether, is the most vertically distributed in Four apex of two lower frames (15);Lower horizontal bar bar (17) is connected laterally between adjacent two root posts (14);Lower vertical To muscle bar (17) vertical supporting between two lower frames (15);Under hang a support (18) and be arranged on lower built-up flask opposite sides Outside, and every side hangs a support (18) under two;Hang under to be provided with under cylinder on a support (18) and hang handle (19);Under The Grille (20) it is provided with in the bottom of lower built-up flask;Downside it is provided with on surrounding side in lower built-up flask Baffle plate (24);Lower corner baffle (22) all it is vertically provided with at four drift angles in lower built-up flask;
The bottom abutting joint of upper built-up flask is at the top of lower built-up flask, and is bolted;And upper corner baffle (8) Corresponding with the position of lower corner baffle (22).
It is the most according to claim 1 for wind power hub high-strength combination energy saver, it is characterised in that: at upper grid (9) edge is provided with triangle gusset (11) with the junction of upper side shield (7) and upper corner baffle (8).
It is the most according to claim 1 and 2 for wind power hub high-strength combination energy saver, it is characterised in that: in cast Foundary weight plate (10) is provided with foundary weight triangle gusset (12) with the installation place of upper grid (9).
It is the most according to claim 1 and 2 for wind power hub high-strength combination energy saver, it is characterised in that: turn upper It is provided with in the triangle interval that the back side of angle baffle plate (8) and upper side shield (7) are constituted and is supported on corner baffle (8) back side Corner supports gusset (13).
It is the most according to claim 1 and 2 for wind power hub high-strength combination energy saver, it is characterised in that: at lower lattice Grid (20) edge is provided with lower triangle gusset (23) with the junction of lower side shield (24) and lower corner baffle (22).
It is the most according to claim 1 and 2 for wind power hub high-strength combination energy saver, it is characterised in that: turn under Top and bottom that the triangle that the back side of angle baffle plate (22) and lower side shield (24) are constituted is interval are mounted on set square (21).
CN201610696369.XA 2016-08-21 2016-08-21 For wind power hub high-strength combination energy saver Pending CN106077518A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610696369.XA CN106077518A (en) 2016-08-21 2016-08-21 For wind power hub high-strength combination energy saver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610696369.XA CN106077518A (en) 2016-08-21 2016-08-21 For wind power hub high-strength combination energy saver

Publications (1)

Publication Number Publication Date
CN106077518A true CN106077518A (en) 2016-11-09

Family

ID=58069994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610696369.XA Pending CN106077518A (en) 2016-08-21 2016-08-21 For wind power hub high-strength combination energy saver

Country Status (1)

Country Link
CN (1) CN106077518A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106734987A (en) * 2017-03-17 2017-05-31 共享装备股份有限公司 Adjustable volume section formula sandbox
CN108097893A (en) * 2018-01-05 2018-06-01 江阴新长机械配件有限公司 A kind of dismountable light body structure sandbox
CN108616626A (en) * 2018-06-14 2018-10-02 深圳超多维科技有限公司 A kind of mobile phone center and its dispensing method
CN113084097A (en) * 2021-03-29 2021-07-09 阜新力达钢铁铸造有限公司 Counter weight machining tool and sand box turning method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2759640Y (en) * 2004-12-31 2006-02-22 溧阳市新力机械铸造有限公司 Modified shape casting die for diesel engine iron gear chamber cap
CN103042180A (en) * 2013-01-08 2013-04-17 河南省四达仙龙实业有限公司 Connecting structure for sand box body and box cover
CN203316685U (en) * 2013-04-28 2013-12-04 宁波永祥铸造有限公司 Torque arm sand box
CN205032650U (en) * 2015-10-10 2016-02-17 山东龙马重科有限公司 Novel lift by crane lug and use its large -scale wind -powered electricity generation foundry goods sand box
CN205217946U (en) * 2015-09-08 2016-05-11 武汉重工铸锻有限责任公司 Large -scale thin wall copper sand box for casting
CN205289673U (en) * 2016-01-14 2016-06-08 山东龙马重科有限公司 Large -scale aerogenerator base for foundry goods shaping subtract sand sand box
CN205437068U (en) * 2015-12-24 2016-08-10 惠尔信机械(泰兴)有限公司 Economize material sand box
CN205967303U (en) * 2016-08-21 2017-02-22 江苏钢锐精密机械有限公司 Be used for wind power hub high strength combination economizer

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2759640Y (en) * 2004-12-31 2006-02-22 溧阳市新力机械铸造有限公司 Modified shape casting die for diesel engine iron gear chamber cap
CN103042180A (en) * 2013-01-08 2013-04-17 河南省四达仙龙实业有限公司 Connecting structure for sand box body and box cover
CN203316685U (en) * 2013-04-28 2013-12-04 宁波永祥铸造有限公司 Torque arm sand box
CN205217946U (en) * 2015-09-08 2016-05-11 武汉重工铸锻有限责任公司 Large -scale thin wall copper sand box for casting
CN205032650U (en) * 2015-10-10 2016-02-17 山东龙马重科有限公司 Novel lift by crane lug and use its large -scale wind -powered electricity generation foundry goods sand box
CN205437068U (en) * 2015-12-24 2016-08-10 惠尔信机械(泰兴)有限公司 Economize material sand box
CN205289673U (en) * 2016-01-14 2016-06-08 山东龙马重科有限公司 Large -scale aerogenerator base for foundry goods shaping subtract sand sand box
CN205967303U (en) * 2016-08-21 2017-02-22 江苏钢锐精密机械有限公司 Be used for wind power hub high strength combination economizer

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106734987A (en) * 2017-03-17 2017-05-31 共享装备股份有限公司 Adjustable volume section formula sandbox
CN108097893A (en) * 2018-01-05 2018-06-01 江阴新长机械配件有限公司 A kind of dismountable light body structure sandbox
CN108616626A (en) * 2018-06-14 2018-10-02 深圳超多维科技有限公司 A kind of mobile phone center and its dispensing method
CN113084097A (en) * 2021-03-29 2021-07-09 阜新力达钢铁铸造有限公司 Counter weight machining tool and sand box turning method

Similar Documents

Publication Publication Date Title
CN106077518A (en) For wind power hub high-strength combination energy saver
CN104942236B (en) A kind of flaskless vertical pouring produces the moulding method of blade
CN205967303U (en) Be used for wind power hub high strength combination economizer
CN212704265U (en) Molding sand box of wind power main frame
CN205857039U (en) A kind of Collison fence for bridge Integral Steel template
CN203254299U (en) Support for rust removal and abrasive blasting of trench surface plate
CN103663160A (en) Lifting feeding device for filter cake
CN102899704A (en) Electrophoretic painting rack
CN207863305U (en) A kind of building iron concrete structure column contracture device
CN203781025U (en) C-shaped lifting appliance tilting preventing device
CN203624868U (en) Filter cake lifting feeding device
CN101898622B (en) Jig frame tooling component for longitudinal bulkhead segmented general assembling construction
CN206108705U (en) Gallows of frame isolated footing
CN205034948U (en) Rack formula hanging beam device
CN205530308U (en) Device suitable for deep water foundation construction double -walled steel cofferdam promotes and transfers
CN204139697U (en) Pole guy fastening devices
CN204737588U (en) Compensating beam for bridge crane
CN206705642U (en) A kind of inspection well cover repairs more changing device
CN204357138U (en) Simple steel structure lifting upending frame
CN204148776U (en) The assembled moulding bed of bent cap framework of steel reinforcement
CN209098016U (en) A kind of superimposed sheet shipping fixture
CN202609752U (en) Edge protection device for steel structure lifting
CN206476307U (en) A kind of frock placed for bus front bridge
CN206188193U (en) Gallows has been used in prefabricated piping lane drawing of patterns
CN205527286U (en) Heat treating gallows

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109

RJ01 Rejection of invention patent application after publication