CN106067866A - A kind of rate long-range delivery method of electricity price based on power information acquisition system - Google Patents

A kind of rate long-range delivery method of electricity price based on power information acquisition system Download PDF

Info

Publication number
CN106067866A
CN106067866A CN201610581358.7A CN201610581358A CN106067866A CN 106067866 A CN106067866 A CN 106067866A CN 201610581358 A CN201610581358 A CN 201610581358A CN 106067866 A CN106067866 A CN 106067866A
Authority
CN
China
Prior art keywords
parameter
rate
information acquisition
acquisition system
power information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610581358.7A
Other languages
Chinese (zh)
Other versions
CN106067866B (en
Inventor
张洋瑞
杨鹏
申洪涛
陶鹏
冯波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
State Grid Hebei Energy Technology Service Co Ltd
Marketing Service Center of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd
Hebei Electric Power Construction Adjustment Test Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hebei Electric Power Co Ltd, Hebei Electric Power Construction Adjustment Test Institute filed Critical State Grid Corp of China SGCC
Priority to CN201610581358.7A priority Critical patent/CN106067866B/en
Publication of CN106067866A publication Critical patent/CN106067866A/en
Application granted granted Critical
Publication of CN106067866B publication Critical patent/CN106067866B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/50Queue scheduling
    • H04L47/62Queue scheduling characterised by scheduling criteria
    • H04L47/625Queue scheduling characterised by scheduling criteria for service slots or service orders
    • H04L47/6275Queue scheduling characterised by scheduling criteria for service slots or service orders based on priority
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Hardware Design (AREA)
  • Computer Security & Cryptography (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of rate long-range delivery method of electricity price based on power information acquisition system, it includes the concentrator that the present invention is wirelessly transferred with power information acquisition system and the electric energy meter communicated to connect with concentrator by means of the power information acquisition system being arranged on server cluster;By the big data mining to power information acquisition system, it is achieved rate electricity price issues prioritization, and preferentially issues the task that channel is good;Realize clock of power meter from dynamic(al) correction;The task of realization issues time automatic decision;The present invention will be substantially reduced task and issue number of times, improve rate electricity price and issue success rate and efficiency.Meanwhile, in order to preferably meet the application demand that on-the-spot rate electricity price issues, the method support issues rate electric price parameter and issues the functions such as rate time parameter.

Description

A kind of rate long-range delivery method of electricity price based on power information acquisition system
Technical field
The present invention relates to a kind of rate long-range delivery method of electricity price based on power information acquisition system.
Background technology
Along with tou power price policy is the most gradually carried out, rate electricity price based on power information acquisition system is remote Journey issues the major way by becoming electricity price change.The existing rate electricity price of rate electricity price remotely issues flow process, is by rate electricity Valency parameter message (including rate number, rate electricity price value, switching time etc.) and the packing of authentication message issue, and take full-time Section issues pattern.As issued failure, then it is polled reissuing.
Existing issue the problem that flow process exists three aspects: one is owing to mutual message quantity is too much, at up channel or When down channel communication condition is the best, probability of failure is bigger;Two is to differ with the server cluster time part field electric energy meter time Cause, if early than current time, electricity price can be caused to issue electric energy meter after successfully and cannot switch rate electricity price;Three is such as electric price parameter Issuing time and concentrator to check meter time conflict, not only impact gathers success rate, and rate electricity price issues the most failed simultaneously.
Summary of the invention
For above-mentioned three aspect problems, remotely issuing success rate and efficiency for improve rate electric price parameter, the present invention carries For a kind of rate long-range delivery method of electricity price based on power information acquisition system.
The present invention is by the big market demand of power information acquisition system and Function Integration Mechanism, it is achieved rate electricity price issues excellent First level sequence, preferentially issues the task that channel is good;Realize clock of power meter from dynamic(al) correction, it is to avoid parameter issues rear electricity price cannot Switching;The task of realization issues time automatic decision, it is to avoid concentrator performs the multi-task simultaneously affects efficiency.
The present invention is wireless with power information acquisition system by means of the power information acquisition system being arranged on server cluster The concentrator transmitted and the electric energy meter communicated to connect with concentrator;By the big data mining to power information acquisition system, Realize rate electricity price and issue prioritization, and preferentially issue the task that channel is good;Realize clock of power meter from dynamic(al) correction;Real Current task issues time automatic decision;
Specifically comprise the following steps that
Step 1: market determines rate electric price parameter with valorizing, power information acquisition system receives user profile, and generates Rate electric price parameter issues task;
Step 2: power information acquisition system carries out descending according to channel priority parameter to the rate electric price parameter issued, Select to issue according to electric energy meter channel priority parameter order from high to low;
Step 3: issue rate electric price parameter order determine according to step 2 after, concentrator will issue time parameter with when checking meter Between parameter be transferred to power information acquisition system;Power information acquisition system judges issuing the period, when concentrator is currently at Check meter the time, then power information acquisition system carries out period automatic regular polling and again judges, until concentrator is currently at when issuing Between;When concentrator is currently at the time of issuing, and rate electric price parameter is given by power information acquisition system by downlink channel transmission Corresponding electric energy meter;
Step 4: power information acquisition system electric energy meter in step 3 sends calls survey instruction together, and the transmission collecting this electric energy meter comes Clock data, this electric energy meter is called together survey clock again judge;
If clock is abnormal, the automatic regular polling during execution pair of this electric energy meter is judged, when clock pair by power information acquisition system again Time automatic regular polling success, perform step 5;When clock pair, automatic regular polling failure, then insert clock failure queue, and skip this electricity Energy table, repeats step 2, according to descending, next electric energy meter is issued rate electric price parameter;
If clock is normal, perform step 5;
Step 5: before every time issuing rate electric price parameter, power information acquisition system carries out authentication judgement to this electric energy meter:
If authentication failure, then carry out authentication automatic regular polling and again judge, when the success of authentication automatic regular polling, hold Row step 6;When the failure of authentication automatic regular polling, authentication failure team inserted by this electric energy meter by power information acquisition system Row, and skip this electric energy meter, repeat step 2, according to descending, next electric energy meter is issued rate electric price parameter;
Step 6: the rate electric price parameter that issues is given this electric energy meter by concentrator by power information acquisition system;
Step 7: power information acquisition system electric energy meter in step 6 sends load instruction, collects what the transmission of this electric energy meter came Currently used rate electric price parameter, power information acquisition system to issue rate electric price parameter call together survey parameter judgement process: Rate electric price parameter is decomposed into and successfully issues parameter and unsuccessfully issue parameter by power information acquisition system;
Step 8 is performed to successfully issuing parameter;
Carry out parameter automatic regular polling again judge unsuccessfully issuing parameter, parameter is the most unsuccessfully issued for parameter automatic regular polling Perform step 8, issue parameter execution through the failure that parameter automatic regular polling is failed and insert failure and issue parameter queue and re-execute Step 5;
Step 8: power information acquisition system issues parameter to the success in step 7 and judges, if successfully issuing parameter set Close and the set equality issuing rate electric price parameter in step 1, then perform step 9;If successfully issue the set of parameter with The set of the rate electric price parameter issued in step 1 is unequal, then perform step 5;
Step 9: the time that power information acquisition system receives, by this electric energy meter, the rate electric price parameter that step 1 issues determines Rate time parameter.
Step 10: the rate time parameter in step 9 is judged by power information acquisition system, if rate time parameter is raw Successfully, perform step 11, if if rate time parameter failed regeneration, performing step 5;
Step 11: power information acquisition system by step 10 generates successful rate time parameter automatically generate parameter call together survey appoint Business.
Step 12: manually generated parameter calls survey task together, with step 11 automatically generate parameter and calls survey task together, manually tie Structure contrasts.
Wherein, rate electric price parameter is rate number and each rate electricity price value;Channel priority parameter is the collection of electric energy meter Success rate;According to gathering success rate descending when electric price parameter issues;The harvester of electric energy meter will gather data by concentrating Device uplink channel transmission is to power information acquisition system;When power information acquisition system issues time parameter to be that concentrator is non-checks meter Between parameter;First confirm that when electric price parameter issues whether current time belongs to concentrator and check meter the time, choose the non-period of checking meter and open Begin to perform electricity price and issue task;Rate time parameter makes again be to generate electricity after electric price parameter task all runs succeeded switching time Valency time task;Rate electric price parameter is considered as background task.
During background task performs, carry out record for performing failed rate electric price parameter, but do not affect other Issuing of electric price parameter.Electric price parameter is issued the most completely to successful background task and carry out repeatedly training in rotation automatically, only carry out down Send out failed electric price parameter.
Cause electric price parameter to issue failure for avoiding electric energy meter authentication to lose efficacy, before issuing, all carry out electric energy meter body every time Part certification.
Electric price parameter task generates electricity price time task (switching time), if this task performs into after all running succeeded Merit, is considered as whole rate parameter and issues Mission Success, the most automatically retransmits electricity price time task (number of times can configure).Period timing When poll, clock pair, the number of times of automatic regular polling, authentication automatic regular polling and parameter automatic regular polling is respectively 3-5.
Use and have the beneficial effects that produced by technique scheme:
Support of the present invention issues failure for entirety but local parameter issues successful task, only issues failure when repeatedly poll Parameter, a whole set of rate parameter (rate electric price parameter and rate time parameter) will not be re-issued, will be substantially reduced under task Send out number of times, improve rate electricity price and issue success rate and efficiency.Meanwhile, in order to preferably meet the application that on-the-spot rate electricity price issues Demand, the method support issues rate electric price parameter and issues the functions such as rate time parameter.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the schematic flow sheet of the present invention.
Detailed description of the invention
The present invention is by the big market demand of power information acquisition system and Function Integration Mechanism, it is achieved rate electricity price issues excellent First level sequence, preferentially issues the task that channel is good;Realize clock of power meter from dynamic(al) correction, it is to avoid parameter issues rear electricity price cannot Switching;The task of realization issues time automatic decision, it is to avoid concentrator performs the multi-task simultaneously affects efficiency.
The present invention is wireless with power information acquisition system by means of the power information acquisition system being arranged on server cluster The concentrator transmitted and the electric energy meter communicated to connect with concentrator;By the big data mining to power information acquisition system, Realize rate electricity price and issue prioritization, and preferentially issue the task that channel is good;Realize clock of power meter from dynamic(al) correction;Real Current task issues time automatic decision;
Specifically comprise the following steps that
Step 1: market determines rate electric price parameter with valorizing, power information acquisition system receives user profile, and generates Rate electric price parameter issues task;
Step 2: power information acquisition system carries out descending according to channel priority parameter to the rate electric price parameter issued, Select to issue according to electric energy meter channel priority parameter order from high to low;
Step 3: issue rate electric price parameter order determine according to step 2 after, concentrator will issue time parameter with when checking meter Between parameter be transferred to power information acquisition system;Power information acquisition system judges issuing the period, when concentrator is currently at Check meter the time, then power information acquisition system carries out period automatic regular polling and again judges, until concentrator is currently at when issuing Between;When concentrator is currently at the time of issuing, and rate electric price parameter is given by power information acquisition system by downlink channel transmission Corresponding electric energy meter;
Step 4: power information acquisition system electric energy meter in step 3 sends calls survey instruction together, and the transmission collecting this electric energy meter comes Clock data, this electric energy meter is called together survey clock again judge;
If clock is abnormal, the automatic regular polling during execution pair of this electric energy meter is judged, when clock pair by power information acquisition system again Time automatic regular polling success, perform step 5;When clock pair, automatic regular polling failure, then insert clock failure queue, and skip this electricity Energy table, repeats step 2, according to descending, next electric energy meter is issued rate electric price parameter;
If clock is normal, perform step 5;
Step 5: before every time issuing rate electric price parameter, power information acquisition system carries out authentication judgement to this electric energy meter:
If authentication failure, then carry out authentication automatic regular polling and again judge, when the success of authentication automatic regular polling, hold Row step 6;When the failure of authentication automatic regular polling, authentication failure team inserted by this electric energy meter by power information acquisition system Row, and skip this electric energy meter, repeat step 2, according to descending, next electric energy meter is issued rate electric price parameter;
Step 6: the rate electric price parameter that issues is given this electric energy meter by concentrator by power information acquisition system;
Step 7: power information acquisition system electric energy meter in step 6 sends load instruction, collects what the transmission of this electric energy meter came Currently used rate electric price parameter, power information acquisition system to issue rate electric price parameter call together survey parameter judgement process: Rate electric price parameter is decomposed into and successfully issues parameter and unsuccessfully issue parameter by power information acquisition system;
Step 8 is performed to successfully issuing parameter;
Carry out parameter automatic regular polling again judge unsuccessfully issuing parameter, parameter is the most unsuccessfully issued for parameter automatic regular polling Perform step 8, issue parameter execution through the failure that parameter automatic regular polling is failed and insert failure and issue parameter queue and re-execute Step 5;
Step 8: power information acquisition system issues parameter to the success in step 7 and judges, if successfully issuing parameter set Close and the set equality issuing rate electric price parameter in step 1, then perform step 9;If successfully issue the set of parameter with The set of the rate electric price parameter issued in step 1 is unequal, then perform step 5;
Step 9: the time that power information acquisition system receives, by this electric energy meter, the rate electric price parameter that step 1 issues determines Rate time parameter.
Step 10: the rate time parameter in step 9 is judged by power information acquisition system, if rate time parameter is raw Successfully, perform step 11, if if rate time parameter failed regeneration, performing step 5;
Step 11: power information acquisition system by step 10 generates successful rate time parameter automatically generate parameter call together survey appoint Business.
Step 12: manually generated parameter calls survey task together, with step 11 automatically generate parameter and calls survey task together, manually tie Structure contrasts.
Wherein, rate electric price parameter is rate number and each rate electricity price value;Channel priority parameter is the collection of electric energy meter Success rate;According to gathering success rate descending when electric price parameter issues;The harvester of electric energy meter will gather data by concentrating Device uplink channel transmission is to power information acquisition system;When power information acquisition system issues time parameter to be that concentrator is non-checks meter Between parameter;First confirm that when electric price parameter issues whether current time belongs to concentrator and check meter the time, choose the non-period of checking meter and open Begin to perform electricity price and issue task;Rate time parameter makes again be to generate electricity after electric price parameter task all runs succeeded switching time Valency time task;Rate electric price parameter is considered as background task.
During background task performs, carry out record for performing failed rate electric price parameter, but do not affect other Issuing of electric price parameter.Electric price parameter is issued the most completely to successful background task and carry out repeatedly training in rotation automatically, only carry out down Send out failed electric price parameter.
Cause electric price parameter to issue failure for avoiding electric energy meter authentication to lose efficacy, before issuing, all carry out electric energy meter body every time Part certification.
Electric price parameter task generates electricity price time task (switching time), if this task performs into after all running succeeded Merit, is considered as whole rate parameter and issues Mission Success, the most automatically retransmits electricity price time task (number of times can configure).Period timing When poll, clock pair, the number of times of automatic regular polling, authentication automatic regular polling and parameter automatic regular polling is respectively 3-5.
Support of the present invention issues failure for entirety but local parameter issues successful task, only issues when repeatedly poll Failed parameter, will not re-issue a whole set of rate parameter (rate electric price parameter and rate time parameter), will be substantially reduced and appoint Business issues number of times, improves rate electricity price and issues success rate and efficiency.Meanwhile, in order to preferably meet what on-the-spot rate electricity price issued Application demand, the method can be supported only issue rate electric price parameter and only issue the functions such as rate time parameter.
At the beginning of 2016, according to Price Control Administration of Shanxi Province's requirement, carry out resident's tou power price in the whole province's scope.According to the principle of voluntariness, weighing apparatus Jing Xin community, Shui Shi Jing County (platform district numbering 0012068489) has 371 family residents to propose electricity price amendment application.This community amounts to 524 Family, average daily collection success rate more than 99%.The method using the present invention to propose carries out electricity price and remotely issues, and successfully issues 369 families, Issue success rate 99.46%.
Last it is noted that above example is only in order to illustrate technical scheme, it is not intended to limit;Although With reference to previous embodiment, the present invention is described in detail, it will be understood by those within the art that: it still may be used So that the technical scheme described in previous embodiment to be modified, or wherein portion of techniques feature is carried out equivalent;Make It is combined being apparent to multiple technical schemes of the present invention for those skilled in the art.And these are revised or replace Change, do not make the essence of appropriate technical solution depart from the spirit and scope of embodiment of the present invention technical scheme.

Claims (4)

1. the rate long-range delivery method of electricity price based on power information acquisition system, it is characterised in that: by means of being arranged on Concentrator that the power information acquisition system of server cluster is wirelessly transferred with power information acquisition system and leading to concentrator The electric energy meter that letter connects;By the big data mining to power information acquisition system, it is achieved rate electricity price issues prioritization, And preferentially issue the task that channel is good;Realize clock of power meter from dynamic(al) correction;The task of realization issues time automatic decision;
Specifically comprise the following steps that
Step 1: market determines rate electric price parameter with valorizing, power information acquisition system receives user profile, and generates Rate electric price parameter issues task;
Step 2: power information acquisition system carries out descending according to channel priority parameter to the rate electric price parameter issued, Select to issue according to electric energy meter channel priority parameter order from high to low;
Step 3: issue rate electric price parameter order determine according to step 2 after, concentrator will issue time parameter with when checking meter Between parameter be transferred to power information acquisition system;Power information acquisition system judges issuing the period, when concentrator is currently at Check meter the time, then power information acquisition system carries out period automatic regular polling and again judges, until concentrator is currently at when issuing Between;When concentrator is currently at the time of issuing, and rate electric price parameter is given by power information acquisition system by downlink channel transmission Corresponding electric energy meter;
Step 4: power information acquisition system electric energy meter in step 3 sends calls survey instruction together, and the transmission collecting this electric energy meter comes Clock data, this electric energy meter is called together survey clock again judge;
If clock is abnormal, the automatic regular polling during execution pair of this electric energy meter is judged, when clock pair by power information acquisition system again Time automatic regular polling success, perform step 5;When clock pair, automatic regular polling failure, then insert clock failure queue, and skip this electricity Energy table, repeats step 2, according to descending, next electric energy meter is issued rate electric price parameter;
If clock is normal, perform step 5;
Step 5: before every time issuing rate electric price parameter, power information acquisition system carries out authentication judgement to this electric energy meter:
If authentication failure, then carry out authentication automatic regular polling and again judge, when the success of authentication automatic regular polling, hold Row step 6;When the failure of authentication automatic regular polling, authentication failure team inserted by this electric energy meter by power information acquisition system Row, and skip this electric energy meter, repeat step 2, according to descending, next electric energy meter is issued rate electric price parameter;
Step 6: the rate electric price parameter that issues is given this electric energy meter by concentrator by power information acquisition system;
Step 7: power information acquisition system electric energy meter in step 6 sends load instruction, collects what the transmission of this electric energy meter came Currently used rate electric price parameter, power information acquisition system to issue rate electric price parameter call together survey parameter judgement process: Rate electric price parameter is decomposed into and successfully issues parameter and unsuccessfully issue parameter by power information acquisition system;
Step 8 is performed to successfully issuing parameter;
Carry out parameter automatic regular polling again judge unsuccessfully issuing parameter, parameter is the most unsuccessfully issued for parameter automatic regular polling Perform step 8, issue parameter execution through the failure that parameter automatic regular polling is failed and insert failure and issue parameter queue and re-execute Step 5;
Step 8: power information acquisition system issues parameter to the success in step 7 and judges, if successfully issuing parameter set Close and the set equality issuing rate electric price parameter in step 1, then perform step 9;If successfully issue the set of parameter with The set of the rate electric price parameter issued in step 1 is unequal, then perform step 5;
Step 9: the time that power information acquisition system receives, by this electric energy meter, the rate electric price parameter that step 1 issues determines Rate time parameter.
The rate long-range delivery method of electricity price based on power information acquisition system the most according to claim 1, its feature exists In: also include step 10: power information acquisition system to step 9 in rate time parameter judge, if rate time parameter Generate successfully, perform step 11, if if rate time parameter failed regeneration, performing step 5;
Step 11: power information acquisition system by step 10 generates successful rate time parameter automatically generate parameter call together survey appoint Business.
The rate long-range delivery method of electricity price based on power information acquisition system the most according to claim 2, its feature exists In: also include step 12: manually generated parameter calls survey task together, automatically generate parameter and call survey task together in step 11, manually carry out Structure Comparison.
The rate long-range delivery method of electricity price based on power information acquisition system the most according to claim 3, its feature exists In: when period automatic regular polling, clock pair, the number of times of automatic regular polling, authentication automatic regular polling and parameter automatic regular polling is respectively For 3-5.
CN201610581358.7A 2016-07-22 2016-07-22 A kind of long-range delivery method of rate electricity price based on power information acquisition system Active CN106067866B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610581358.7A CN106067866B (en) 2016-07-22 2016-07-22 A kind of long-range delivery method of rate electricity price based on power information acquisition system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610581358.7A CN106067866B (en) 2016-07-22 2016-07-22 A kind of long-range delivery method of rate electricity price based on power information acquisition system

Publications (2)

Publication Number Publication Date
CN106067866A true CN106067866A (en) 2016-11-02
CN106067866B CN106067866B (en) 2019-01-25

Family

ID=57207022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610581358.7A Active CN106067866B (en) 2016-07-22 2016-07-22 A kind of long-range delivery method of rate electricity price based on power information acquisition system

Country Status (1)

Country Link
CN (1) CN106067866B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109326116A (en) * 2018-09-26 2019-02-12 国网河北省电力有限公司电力科学研究院 Ammeter parameter batch delivery method and system
CN110058126A (en) * 2019-05-29 2019-07-26 国网北京市电力公司 Distribution network failure judgment method and device
CN112382006A (en) * 2020-12-16 2021-02-19 国网宁夏电力有限公司营销服务中心(国网宁夏电力有限公司计量中心) Electricity price adjusting method, device and equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5381136A (en) * 1993-03-19 1995-01-10 Northern Illinois Gas Company Remote data collection and monitoring system for distribution line
CN105282249A (en) * 2015-10-30 2016-01-27 国网新疆电力公司电力科学研究院 Device and method for remotely issuing electric energy meter parameters and control commands based on transparent collection tasks
CN105610982A (en) * 2016-03-01 2016-05-25 积成电子股份有限公司 Method for issuing electricity price parameter to electric energy meter by electricity consumption information acquisition system
CN105759237A (en) * 2016-03-21 2016-07-13 国家电网公司 Programmable control method for electric energy meter metering device clock timing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5381136A (en) * 1993-03-19 1995-01-10 Northern Illinois Gas Company Remote data collection and monitoring system for distribution line
CN105282249A (en) * 2015-10-30 2016-01-27 国网新疆电力公司电力科学研究院 Device and method for remotely issuing electric energy meter parameters and control commands based on transparent collection tasks
CN105610982A (en) * 2016-03-01 2016-05-25 积成电子股份有限公司 Method for issuing electricity price parameter to electric energy meter by electricity consumption information acquisition system
CN105759237A (en) * 2016-03-21 2016-07-13 国家电网公司 Programmable control method for electric energy meter metering device clock timing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109326116A (en) * 2018-09-26 2019-02-12 国网河北省电力有限公司电力科学研究院 Ammeter parameter batch delivery method and system
CN110058126A (en) * 2019-05-29 2019-07-26 国网北京市电力公司 Distribution network failure judgment method and device
CN112382006A (en) * 2020-12-16 2021-02-19 国网宁夏电力有限公司营销服务中心(国网宁夏电力有限公司计量中心) Electricity price adjusting method, device and equipment

Also Published As

Publication number Publication date
CN106067866B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
CN106067866A (en) A kind of rate long-range delivery method of electricity price based on power information acquisition system
CN201383709Y (en) Remote software automatic upgrading device for intelligent electric device
CN102868552B (en) Data transmission method for uplink
CN106850271B (en) Power distribution master station and terminal communication network fault studying and judging method
CN104394020A (en) Automatic fault processing and safety control system and method for power information collection device
CN102752299B (en) Debugging-free composite communication device and method for electric vehicle charging station
CN107492040A (en) A kind of multidimensional analysis display systems and method based on power grid regulation operation monitoring
CN112688285B (en) Fault isolation and load recovery method for optimized scheduling of operators in power distribution network
CN109039881A (en) A kind of intelligent power distribution monitoring management system and information-pushing method
CN106384495A (en) Transmission method and transmission device for transparent tasks of electricity consumption information acquisition service
CN104363278A (en) Mass terminal communication access system
CN110457146A (en) The processing method and processing device of robot data
CN110336648A (en) A kind of Data Handling Equipment And Method based on NB-IOT
CN105471107A (en) Time-sharing task collection method for power grid electric energy measuring system
CN106570775A (en) Power grid fault countermeasure plan combining compilation method and device
CN109713679A (en) The urgent cutting load method of power grid based on demand response participation
CN107800786A (en) A kind of intelligent terminal remote upgrade breakpoint transmission method
CN104319779B (en) Regional power grid reactive voltage control method
CN103269121A (en) Substation secondary system dynamic reconfiguration device and reconfiguration method thereof
CN113242059B (en) Lock-free multi-coordination processing thread concurrent meter reading method based on double-ring queue
CN109548015A (en) A kind of charging equipment management method based on mobile WiFi
CN102510073B (en) Data exchanging system of large power consumption interaction system/ distribution automation master station system
CN112380732B (en) CPS (Power distribution System) evaluation method for interaction influence of electric power-traffic-information system
CN106447062B (en) A kind of on-line optimization analogue system towards Complicated Distribution Network
CN104065735A (en) Scheduling information data storage sharing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 050021 No. 238 South Sports street, Yuhua District, Hebei, Shijiazhuang

Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050021 No. 238 South Sports street, Yuhua District, Hebei, Shijiazhuang

Patentee before: ELECTRIC POWER SCIENCES RESEARCH INSTITUTE OF STATE GRID HEBEI ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Patentee before: HEBEI ELECTRIC POWER COMMISSIONING INSTITUDE

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220530

Address after: 050021 No. 238 South Sports street, Hebei, Shijiazhuang

Patentee after: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee after: Marketing service center of State Grid Hebei Electric Power Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.

Address before: 050021 No. 238 South Sports street, Yuhua District, Hebei, Shijiazhuang

Patentee before: STATE GRID HEBEI ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: STATE GRID HEBEI ENERGY TECHNOLOGY SERVICE Co.,Ltd.