CN106054678A CN201610511606.0A CN201610511606A CN106054678A CN 106054678 A CN106054678 A CN 106054678A CN 201610511606 A CN201610511606 A CN 201610511606A CN 106054678 A CN106054678 A CN 106054678A
Authority
CN
China
Prior art keywords
intelligent switch
region
function
load
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610511606.0A
Other languages
Chinese (zh)
Other versions
CN106054678B (en
Inventor
张泽旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DCT SCIENCE AND TECHNOLOGY DEVELOPMENT Ltd Co
Original Assignee
DCT SCIENCE AND TECHNOLOGY DEVELOPMENT Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DCT SCIENCE AND TECHNOLOGY DEVELOPMENT Ltd Co filed Critical DCT SCIENCE AND TECHNOLOGY DEVELOPMENT Ltd Co
Priority to CN201610511606.0A priority Critical patent/CN106054678B/en
Publication of CN106054678A publication Critical patent/CN106054678A/en
Application granted granted Critical
Publication of CN106054678B publication Critical patent/CN106054678B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The invention discloses an intelligent switch comprising an operation unit, a function configuration unit, a storage unit, a control unit, and an execution unit. The operation unit is used for receiving an intelligent switching operation of a user. The function configuration unit is used for carrying out corresponding function definition and configuration on different intelligent switch operations, wherein the defined functions are configured with corresponding command information. The storage unit connected with the function configuration unit is used for storing a correspondence relation between different intelligent switch operations and all function definition information in advance. The control unit connected with the operation unit, the storage unit, and the execution unit is used for determining function definition information corresponding to the intelligent switching operation of the user by combining the pre-stored correspondence relation between different intelligent switch operations and all function definition information according to the intelligent switching operation, received by the operation unit, of the user and controlling the execution unit to execute the command information corresponding to the function definition information. The intelligent switch has a simple structure and diversified functions; the dependence on configuration and execution type equipment by the switch is reduced; and the intelligent switch can be used and operated conveniently.

Description

Intelligent switch
Technical field
The present invention relates to switching technique field, be specially a kind of intelligent switch.
Background technology
Switch is a kind of common electromechanical equipment, and there are the following problems for switch of the prior art: use one by a response Design, if controlled load is 1 tunnel, respective operations then for opening 1 loop, tunnel, if controlled load be 2,3,4 tunnel time, corresponding behaviour Making to be then unlatching 2,3,4 loop, tunnel, this construction of switch is simple, processing ease, but function singleness, it is impossible to meet people's intelligence control The demand of system;Use multi-functional operation panel, and complete to switch corresponding complex operations by the equipment such as mobile phone or remote controller, Structure is complicated, and customer consumption is relatively costly.
Summary of the invention
The technological means of the present invention is as follows:
A kind of intelligent switch, including:
For receiving the operating unit that the intelligent switch of user operates;
Functional configuration unit;For different intelligent switching manipulation being carried out function definition and the configuration of correspondence;After definition Functional configuration has corresponding command information;
Connect described functional configuration unit, for the correspondence between different intelligent switching manipulation, each function definition information Relation carries out the memory element prestored;
Connect the control unit of described operating unit, memory element and performance element;Described control unit is for according to behaviour Make the user that unit is received intelligent switch operation, in conjunction with the different intelligent switching manipulation prestored, each function definition information it Between corresponding relation, determine the intelligent switch corresponding function definition information of operation with user, and control described to perform list Unit performs the command information corresponding with function definition information;
Performance element;
Further, described intelligent switch has multiple, is separately mounted to one's respective area and other region;Described one's respective area refers to The region of the intelligent switch receiving the operation of user's intelligent switch is installed;Other region described refers to be provided with and does not receives use The region of the intelligent switch of family intelligent switch operation;Described one's respective area and other region are constituted installs the complete of each described intelligent switch Region, portion;
Further, the corresponding relation between different intelligent switching manipulation, each function definition information includes: the first intelligence The fully closed function of switching manipulation correspondence Zone Full;The corresponding command information of the fully closed function of described Zone Full will be for having installed The load stated in each region of intelligent switch is all closed;
Described control unit is after operating unit receives the first intelligent switch operation, and controlling performance element will install The load stated in each region of intelligent switch is all closed;Described performance element includes:
Module is closed in load;Described load closes module in the fully closed merit of Zone Full receiving the output of described control unit After energy control information, load each in one's respective area is closed;
The communication module communicated with the intelligent switch being arranged in other region by Web broadcast equipment;Described logical The fully closed function control information of Zone Full that control unit is exported by letter module via described Web broadcast equipment is sent to other Intelligent switch in region;Each performance element correspondence included by intelligent switch in other region controls bearing in respective regions It is loaded into row closedown;
The second fully closed function in the corresponding one's respective area of intelligent switch operation;The command information that the fully closed function in described one's respective area is corresponding For the load in one's respective area is all closed;Described control unit operating unit receive second intelligent switch operation after, Control performance element the load in one's respective area all to be closed;In the fully closed merit in one's respective area receiving the output of described control unit After energy control information, described performance element is closed module by described load and load each in one's respective area is closed;
Further, the corresponding relation between different intelligent switching manipulation, each function definition information includes: the i-th intelligence is opened Closing and operate corresponding i-th scene mode function, i=3,4 ..., M, wherein M is positive integer;Described i-th scene mode function is corresponding Command information be that the load to presumptive area carries out scene mode setting so that the load in presumptive area enters the i-th scene Pattern;
Described control unit, after operating unit receives the i-th intelligent switch operation, controls performance element to presumptive area Load carry out scene mode setting so that the load in presumptive area enters the i-th scene mode;Described performance element includes:
Load scenery control module;
The communication module communicated with the intelligent switch being arranged in other region by Web broadcast equipment;
For judging that presumptive area corresponding to the i-th scene mode function is one's respective area or other some region of scene is sentenced Disconnected module;
When scene judge module determines that presumptive area corresponding to the i-th scene mode function is one's respective area, by load field The load that scape control module controls in one's respective area enters the i-th scene mode;The i-th scene mode function is determined at scene judge module When corresponding presumptive area is other a certain region, control unit is exported by described communication module via described Web broadcast equipment The i-th scene mode function control information be sent to the intelligent switch in other region;Intelligent switch in other region is the most right Whether self intelligent switch region is that presumptive area is determined, by the intelligent switch institute in presumptive area after determining Including performance element control the load in this region and enter the i-th scene mode;
Further, the corresponding relation between different intelligent switching manipulation, each function definition information includes:
The corresponding jth call function of jth intelligent switch operation, j=M+1, M+2 ..., N, wherein N is positive integer;Described calling The corresponding command information of function is to call the intelligent switch being arranged on target area;
Described control unit, after operating unit receives the operation of jth intelligent switch, controls performance element to being arranged on mesh The intelligent switch in mark region calls;Described performance element includes:
Information extraction modules;Described information extraction modules is for extracting the intelligent switch region sending call request i.e. One's respective area information;
Calling module;
The communication module communicated with the intelligent switch being arranged in other region by Web broadcast equipment;Described logical One's respective area information is controlled information with the call function that control unit exports via described Web broadcast equipment and is sent to by letter module Intelligent switch in other region;Whether the intelligent switch in other region is all target area to self intelligent switch region Territory is determined, and the calling module being had by the performance element included by the intelligent switch in target area after determining is exhaled Cry, and point out the intelligent switch region information sending call request;
Further, described operating unit includes 1 to 4 operation button;
Further, it is defined as difference according to described operation button by the time difference between down state to lifting status Intelligent switch operates;
Further, described load is light fixture.
Owing to have employed technique scheme, the intelligent switch that the present invention provides, simple in construction, feature richness, decrease Switch configuration and the dependency of execution kind equipment, facilitate use operation.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing In having technology to describe, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is this Some bright embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to Other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is the structured flowchart of intelligent switch of the present invention;
Fig. 2 is the structured flowchart of the intelligent switch with the fully closed function of the fully closed function of Zone Full and one's respective area;
Fig. 3 is the structured flowchart of the intelligent switch with call function;
Fig. 4 is the structured flowchart of the intelligent switch with scene mode function.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The all other embodiments obtained under not making creative work premise, broadly fall into the scope of protection of the invention.
A kind of intelligent switch as shown in Figure 1, Figure 2, Figure 3 and Figure 4, including: for receiving the intelligent switch operation of user Operating unit;Functional configuration unit;For different intelligent switching manipulation being carried out function definition and the configuration of correspondence;After definition Functional configuration have corresponding command information;Connect described functional configuration unit, for different intelligent switching manipulation, each merit Corresponding relation between energy definition information carries out the memory element prestored;Connect described operating unit, memory element and execution list The control unit of unit;The intelligent switch operation of the described control unit user for being received according to operating unit, in conjunction with prestoring Different intelligent switching manipulation, corresponding relation between each function definition information, determine the intelligent switch operation phase with user Corresponding function definition information, and control the command information that the execution of described performance element is corresponding with function definition information;Perform Unit;Further, described intelligent switch has multiple, is separately mounted to one's respective area and other region;Described one's respective area refers to peace Region equipped with the intelligent switch receiving the operation of user's intelligent switch;Other region described refers to be provided with and does not receives user The region of the intelligent switch of intelligent switch operation;Described one's respective area and other region are constituted installs the whole of each described intelligent switch Region;Further, the corresponding relation between different intelligent switching manipulation, each function definition information includes: the first intelligent switch The corresponding fully closed function of Zone Full of operation;The corresponding command information of the fully closed function of described Zone Full will be for will be provided with described intelligence Load in each region that can switch all is closed;Described control unit receives the first intelligent switch operation at operating unit After, control performance element and the load in each region being provided with described intelligent switch is all closed;Described performance element bag Include: module is closed in load;Described load closes module in the Zone Full fully closed function control receiving the output of described control unit After information processed, load each in one's respective area is closed;Opened with the intelligence being arranged in other region by Web broadcast equipment Close the communication module communicated;The Zone Full that control unit is exported by described communication module via described Web broadcast equipment Fully closed function control information is sent to the intelligent switch in other region;Each execution included by intelligent switch in other region The load that unit correspondence controls in respective regions is closed;The second fully closed function in the corresponding one's respective area of intelligent switch operation;Described The corresponding command information of the fully closed function in one's respective area is the load in one's respective area all to be closed;Described control unit is in operation After unit receives the second intelligent switch operation, control performance element and the load in one's respective area is all closed;Receiving After the fully closed function control information in one's respective area of described control unit output, described performance element closes module by described load Load each in one's respective area is closed;Further, the corresponding pass between different intelligent switching manipulation, each function definition information System includes: the i-th intelligent switch operates corresponding i-th scene mode function, and i=3,4 ..., M, wherein M is positive integer;Described i-th The corresponding command information of scape mode capabilities is that the load to presumptive area carries out scene mode setting so that in presumptive area Load enters the i-th scene mode;Described control unit, after operating unit receives the i-th intelligent switch operation, controls to perform list Unit carries out scene mode setting to the load of presumptive area so that the load in presumptive area enters the i-th scene mode;Described hold Row unit includes: load scenery control module;Carried out with the intelligent switch being arranged in other region by Web broadcast equipment The communication module of communication;It is one's respective area or other a certain region for judging presumptive area corresponding to the i-th scene mode function Scene judge module;When scene judge module determines that presumptive area corresponding to the i-th scene mode function is one's respective area, pass through The load that load scenery control module controls in one's respective area enters the i-th scene mode;The i-th scene mould is determined at scene judge module When presumptive area corresponding to formula function is other a certain region, described communication module will control single via described Web broadcast equipment I-th scene mode function control information of unit's output is sent to the intelligent switch in other region;Intelligence in other region is opened Whether Guan Jun is that presumptive area is determined to self intelligent switch region, is opened by the intelligence in presumptive area after determining Performance element included by pass controls the load in this region and enters the i-th scene mode;Further, different intelligent switch behaviour Corresponding relation between work, each function definition information includes: the corresponding jth call function of jth intelligent switch operation, j=M+1, M+ 2 ..., N, wherein N is positive integer;The corresponding command information of described call function is to the intelligent switch being arranged on target area Call;Described control unit, after operating unit receives the operation of jth intelligent switch, controls performance element to being arranged on mesh The intelligent switch in mark region calls;Described performance element includes: information extraction modules;Described information extraction modules is used for carrying Take the intelligent switch region i.e. one's respective area information sending call request;Calling module;By Web broadcast equipment and installation The communication module that intelligent switch in other region communicates;Described communication module incite somebody to action this via described Web broadcast equipment Area information controls information with the call function that control unit exports and is sent to the intelligent switch in other region;In other region Intelligent switch whether be all that target area is determined, by target area after determining to self intelligent switch region The calling module that has of the performance element included by intelligent switch call, and point out the intelligent switch sending call request Region information;Further, described operating unit includes 1 to 4 operation button;Further, press according to described operation Key is defined as different intelligent switching manipulation by the time difference between down state to lifting status;Further, described load For light fixture.
Assume that Zone Full includes first area, second area and the 3rd region, i.e. first area, second area and the 3rd Region is mounted on intelligent switch of the present invention, supposes that the load in each region is light fixture, wherein in first area simultaneously Be loaded with 1 signal lamp and 2 signal lamps, be loaded with 3 signal lamps and 4 signal lamps in second area, in the 3rd region be loaded with 5 signal lamps and 6 signal lamps;Wherein first area is one's respective area, and the intelligent switch of the intelligent switch operation i.e. receiving user is arranged on the firstth district Territory, then the fully closed function of Zone Full, the fully closed function in one's respective area, call function and the field in detail below intelligent switch being had Scape mode capabilities illustrates respectively;
The fully closed function of Zone Full: the intelligent switch in being arranged on first area receives the first intelligence by operating unit Energy switching manipulation, then the performance element included by the intelligent switch in first area closes module by first area by load 1 signal lamp and 2 signal lamps close, be sent to be arranged on second by fully closed for Zone Full function control information by communication module simultaneously Intelligent switch in region and the intelligent switch being arranged in the 3rd region, further, the intelligent switch institute in second area Including performance element close module by load 3 signal lamps in second area and 4 signal lamps closed, the intelligence in the 3rd region Performance element included by switch is closed module by load and 5 signal lamps in the 3rd region and 6 signal lamps is closed;
The fully closed function in one's respective area: the intelligent switch in being arranged on first area receives the second intelligence by operating unit Switching manipulation, then the performance element included by the intelligent switch in first area closes module by first area by load 1 signal lamp and 2 signal lamps are closed;
Call function: the intelligent switch in being arranged on first area receives jth intelligent switch by operating unit and grasps Make, it is assumed that the operation of jth intelligent switch is corresponding with the call function that target area is second area, then the intelligence in first area The i.e. one's respective area information in intelligent switch region sending call request is extracted by the information extraction modules included by switch, Described one's respective area information can be here first area, or can be installation load 1 signal lamp and No. 2 when reality is applied The concrete physical location of lamp, such as room 1, after by one's respective area information retrieval, communication module controls list by same for one's respective area information The call function of unit's output controls information and is sent to the intelligent switch that is arranged in second area and is arranged in the 3rd region Intelligent switch, the intelligent switch being arranged in second area and the intelligent switch being arranged in the 3rd region are receiving the firstth district After the call function control information of the control unit output in territory, (it is all second area here to self intelligent switch region Or the 3rd region) whether it is that target area is determined, and then, the intelligent switch being arranged in second area determines second area For target area, then called by the calling module included by the intelligent switch that is arranged in second area, carry simultaneously Show that this calling is to be sent by the intelligent switch being arranged in first area;Intelligent switch in advance by intelligent switch ID with corresponding Relation between concrete physical packaging position information prestores, and such as, intelligent switch 1 is arranged on first area (or room 1), Intelligent switch 2 is arranged on second area (or room 2).
Scene mode function: the intelligent switch in being arranged on first area receives the i-th intelligence by operating unit and opens Close operation, it is assumed that the i-th intelligent switch operation is corresponding with the scene mode function that presumptive area is second area, then be arranged on the Intelligent switch in one region first passes through scene judge module and judges that presumptive area corresponding to the i-th scene mode function is local area Territory or other a certain region, and then determine that presumptive area is second area, further, the intelligence being arranged in first area Switch the i-th scene mode function control information control unit exported by communication module via described Web broadcast equipment to send out Give the intelligent switch being arranged in second area and the intelligent switch being arranged in the 3rd region, receiving by being arranged on the After the i-th scene mode function control information that intelligent switch in one region sends, the intelligent switch being arranged in second area Whether it is all that presumptive area is determined to self intelligent switch region with the intelligent switch being arranged in the 3rd region, enters And, the intelligent switch being arranged in second area determines that second area is presumptive area, the intelligence being then fitted in second area Energy switch controls the load in this region by load scenery control module and enters the i-th scene mode, the i-th scene mode here Be specifically as follows that 3 signal lamps are opened, 4 signal lamps close, or 3 signal lamps and 4 signal lamps fully closed etc., specifically, corresponding to every kind of scene mode Command information can according to switch ID+ switching-state information form prestore.
The intelligent switch that the present invention provides can have in the fully closed function in region, call function and scene mode function extremely Few a kind of function;The intelligent switch that the present invention provides, simple in construction, feature richness, decrease switch and configuration and execution class are set Standby dependency, facilitates use operation.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto, Any those familiar with the art in the technical scope that the invention discloses, according to technical scheme and Inventive concept equivalent or change in addition, all should contain within protection scope of the present invention.

Claims (8)

1. an intelligent switch, it is characterised in that described intelligent switch includes:
For receiving the operating unit that the intelligent switch of user operates;
Functional configuration unit;For different intelligent switching manipulation being carried out function definition and the configuration of correspondence;Function after definition It is configured with corresponding command information;
Connect described functional configuration unit, for the corresponding relation between different intelligent switching manipulation, each function definition information Carry out the memory element prestored;
Connect the control unit of described operating unit, memory element and performance element;Described control unit is for single according to operation The intelligent switch operation of the user that unit is received, in conjunction with between the different intelligent switching manipulation prestored, each function definition information Corresponding relation, determines the intelligent switch corresponding function definition information of operation with user, and controls described performance element and hold The command information that row is corresponding with function definition information;
Performance element.
Intelligent switch the most according to claim 1, it is characterised in that described intelligent switch has multiple, is separately mounted to local area Territory and other region;Described one's respective area refers to be provided with the region of the intelligent switch receiving the operation of user's intelligent switch;Described Other region refers to be provided with the region of the intelligent switch not receiving the operation of user's intelligent switch;Described one's respective area and other district Territory constitutes the Zone Full installing each described intelligent switch.
Intelligent switch the most according to claim 2, it is characterised in that different intelligent switching manipulation, each function definition information it Between corresponding relation include: the first intelligent switch corresponding fully closed function of Zone Full of operation;Described Zone Full fully closed function phase Corresponding command information is the load in each region being provided with described intelligent switch all to be closed;
Described control unit, after operating unit receives the first intelligent switch operation, controls performance element and will be provided with described intelligence Load in each region that can switch all is closed;Described performance element includes:
Module is closed in load;Described load closes module in the Zone Full fully closed function control receiving the output of described control unit After information processed, load each in one's respective area is closed;
The communication module communicated with the intelligent switch being arranged in other region by Web broadcast equipment;Described communication mould The fully closed function control information of Zone Full that control unit is exported by block via described Web broadcast equipment is sent to other region Interior intelligent switch;The load that each performance element correspondence included by intelligent switch in other region controls in respective regions is entered Row is closed;
The second fully closed function in the corresponding one's respective area of intelligent switch operation;The corresponding command information of the fully closed function in described one's respective area will be for will Load in one's respective area is all closed;Described control unit, after operating unit receives the second intelligent switch operation, controls Load in one's respective area is all closed by performance element;In the one's respective area fully closed function control receiving the output of described control unit After information processed, described performance element is closed module by described load and load each in one's respective area is closed.
Intelligent switch the most according to claim 2, it is characterised in that different intelligent switching manipulation, each function definition information it Between corresponding relation include: i-th intelligent switch operate corresponding i-th scene mode function, i=3,4 ..., M, wherein M is the most whole Number;The corresponding command information of described i-th scene mode function is that the load to presumptive area carries out scene mode setting so that Load in presumptive area enters the i-th scene mode;
Described control unit, after operating unit receives the i-th intelligent switch operation, controls performance element and bears presumptive area It is loaded into row scene mode to arrange so that the load in presumptive area enters the i-th scene mode;Described performance element includes:
Load scenery control module;
The communication module communicated with the intelligent switch being arranged in other region by Web broadcast equipment;
For judging that presumptive area corresponding to the i-th scene mode function is one's respective area or other some region of scene judges mould Block;
When scene judge module determines that presumptive area corresponding to the i-th scene mode function is one's respective area, by load scene control The load that molding block controls in one's respective area enters the i-th scene mode;Determine that the i-th scene mode function is corresponding at scene judge module Presumptive area when being other a certain region, described communication module via described Web broadcast equipment, control unit is exported I scene mode function control information is sent to the intelligent switch in other region;Intelligent switch in other region is all to self Whether intelligent switch region is that presumptive area is determined, by included by the intelligent switch in presumptive area after determining Performance element controls the load in this region and enters the i-th scene mode.
Intelligent switch the most according to claim 2, it is characterised in that different intelligent switching manipulation, each function definition information it Between corresponding relation include:
The corresponding jth call function of jth intelligent switch operation, j=M+1, M+2 ..., N, wherein N is positive integer;Described call function Corresponding command information is to call the intelligent switch being arranged on target area;
Described control unit, after operating unit receives the operation of jth intelligent switch, controls performance element to being arranged on target area The intelligent switch in territory calls;Described performance element includes:
Information extraction modules;Described information extraction modules sends the intelligent switch region i.e. local area of call request for extracting Domain information;
Calling module;
The communication module communicated with the intelligent switch being arranged in other region by Web broadcast equipment;Described communication mould One's respective area information is controlled information with the call function that control unit exports via described Web broadcast equipment and is sent to other by block Intelligent switch in region;Whether the intelligent switch in other region is all that target area is entered to self intelligent switch region Row determines, the calling module being had by the performance element included by the intelligent switch in target area after determining calls, And point out the intelligent switch region information sending call request.
Intelligent switch the most according to claim 1, it is characterised in that described operating unit includes 1 to 4 operation button.
Intelligent switch the most according to claim 6, it is characterised in that according to described operation button by down state to lifting Time difference between state is defined as different intelligent switching manipulation.
8. according to the intelligent switch described in claim 3,4 or 5, it is characterised in that described load is light fixture.
CN201610511606.0A 2016-07-01 2016-07-01 Intelligent switch Active CN106054678B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610511606.0A CN106054678B (en) 2016-07-01 2016-07-01 Intelligent switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610511606.0A CN106054678B (en) 2016-07-01 2016-07-01 Intelligent switch

Publications (2)

Publication Number Publication Date
CN106054678A true CN106054678A (en) 2016-10-26
CN106054678B CN106054678B (en) 2019-02-22

Family

ID=57201648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610511606.0A Active CN106054678B (en) 2016-07-01 2016-07-01 Intelligent switch

Country Status (1)

Country Link
CN (1) CN106054678B (en)

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0603936A1 (en) * 1992-12-21 1994-06-29 Koninklijke Philips Electronics N.V. Lighting system
US5459376A (en) * 1992-12-21 1995-10-17 U.S. Philips Corporation Programmable lighting system with automatic light control of ambient areas
US20060076908A1 (en) * 2004-09-10 2006-04-13 Color Kinetics Incorporated Lighting zone control methods and apparatus
CN202306291U (en) * 2011-10-26 2012-07-04 东莞市中凌电子科技有限公司 Intelligent control switch
CN103226347A (en) * 2013-03-22 2013-07-31 中感科技有限公司 Personalized switch device and control method thereof
CN203324767U (en) * 2013-05-22 2013-12-04 宁波市镇海星科智能技术有限公司 Intelligent switch system based on Zigbee network
CN103543738A (en) * 2013-11-12 2014-01-29 从兴技术有限公司 Intelligent air switch designing method, intelligent air switch and intelligent air switch system
CN103645696A (en) * 2013-11-28 2014-03-19 深圳市六合未来科技有限公司 An intelligent conference room wireless control system based on Z-Wave technology
CN103885346A (en) * 2013-11-20 2014-06-25 苏州硕穗光机电科技有限公司 Intelligent switch and control method thereof
CN103941596A (en) * 2013-01-18 2014-07-23 霍尼韦尔国际公司 A configuration method used in a controller of a family system
CN204390091U (en) * 2015-02-16 2015-06-10 大连鼎创科技开发有限公司 The light fixture of integrated humiture monitoring function or Curtain switch
CN105005203A (en) * 2015-07-27 2015-10-28 慧锐通智能科技股份有限公司 Intelligent household control system based on control panels and method thereof
CN105022362A (en) * 2014-04-29 2015-11-04 深圳市君鹏物联科技有限公司 Coordinated control system and coordinated control method of smart home equipment
CN105094086A (en) * 2014-10-26 2015-11-25 深圳市艾瑟网络技术有限公司 Intelligent household system, and condition configuration and control method for realizing many-to-many communication
CN105093991A (en) * 2015-09-02 2015-11-25 南京物联传感技术有限公司 Scenario switch capable of being flexibly provided with more buttons
CN105188235A (en) * 2015-10-30 2015-12-23 大连鼎创科技开发有限公司 Non-contact wall lamplight switch device and gesture control method thereof
CN105302008A (en) * 2015-12-03 2016-02-03 合肥联宝信息技术有限公司 Intelligent switching system and control method thereof
CN205103572U (en) * 2015-07-31 2016-03-23 莆田市涵江区新光华电子厂 Intelligent touch switch
CN105517299A (en) * 2016-01-22 2016-04-20 深圳市飞比电子科技有限公司 Intelligent switch assembly
CN105549413A (en) * 2016-02-01 2016-05-04 广西禾邦科技有限责任公司 Thing control device region management control method on the basis of internet of things
CN105700396A (en) * 2016-01-22 2016-06-22 深圳市飞比电子科技有限公司 Intelligent switch module and control method therefor
CN105703984A (en) * 2015-11-11 2016-06-22 四川长虹电器股份有限公司 Connecting method and mobile terminal

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5459376A (en) * 1992-12-21 1995-10-17 U.S. Philips Corporation Programmable lighting system with automatic light control of ambient areas
EP0603936A1 (en) * 1992-12-21 1994-06-29 Koninklijke Philips Electronics N.V. Lighting system
US20060076908A1 (en) * 2004-09-10 2006-04-13 Color Kinetics Incorporated Lighting zone control methods and apparatus
CN202306291U (en) * 2011-10-26 2012-07-04 东莞市中凌电子科技有限公司 Intelligent control switch
CN103941596A (en) * 2013-01-18 2014-07-23 霍尼韦尔国际公司 A configuration method used in a controller of a family system
CN103226347A (en) * 2013-03-22 2013-07-31 中感科技有限公司 Personalized switch device and control method thereof
CN203324767U (en) * 2013-05-22 2013-12-04 宁波市镇海星科智能技术有限公司 Intelligent switch system based on Zigbee network
CN103543738A (en) * 2013-11-12 2014-01-29 从兴技术有限公司 Intelligent air switch designing method, intelligent air switch and intelligent air switch system
CN103885346A (en) * 2013-11-20 2014-06-25 苏州硕穗光机电科技有限公司 Intelligent switch and control method thereof
CN103645696A (en) * 2013-11-28 2014-03-19 深圳市六合未来科技有限公司 An intelligent conference room wireless control system based on Z-Wave technology
CN105022362A (en) * 2014-04-29 2015-11-04 深圳市君鹏物联科技有限公司 Coordinated control system and coordinated control method of smart home equipment
CN105094086A (en) * 2014-10-26 2015-11-25 深圳市艾瑟网络技术有限公司 Intelligent household system, and condition configuration and control method for realizing many-to-many communication
CN204390091U (en) * 2015-02-16 2015-06-10 大连鼎创科技开发有限公司 The light fixture of integrated humiture monitoring function or Curtain switch
CN105005203A (en) * 2015-07-27 2015-10-28 慧锐通智能科技股份有限公司 Intelligent household control system based on control panels and method thereof
CN205103572U (en) * 2015-07-31 2016-03-23 莆田市涵江区新光华电子厂 Intelligent touch switch
CN105093991A (en) * 2015-09-02 2015-11-25 南京物联传感技术有限公司 Scenario switch capable of being flexibly provided with more buttons
CN105188235A (en) * 2015-10-30 2015-12-23 大连鼎创科技开发有限公司 Non-contact wall lamplight switch device and gesture control method thereof
CN105703984A (en) * 2015-11-11 2016-06-22 四川长虹电器股份有限公司 Connecting method and mobile terminal
CN105302008A (en) * 2015-12-03 2016-02-03 合肥联宝信息技术有限公司 Intelligent switching system and control method thereof
CN105517299A (en) * 2016-01-22 2016-04-20 深圳市飞比电子科技有限公司 Intelligent switch assembly
CN105700396A (en) * 2016-01-22 2016-06-22 深圳市飞比电子科技有限公司 Intelligent switch module and control method therefor
CN105549413A (en) * 2016-02-01 2016-05-04 广西禾邦科技有限责任公司 Thing control device region management control method on the basis of internet of things

Also Published As

Publication number Publication date
CN106054678B (en) 2019-02-22

Similar Documents

Publication Publication Date Title
CN102833389B (en) Mobile terminal and energy conservation method therefor
CN104794797A (en) Residential access control system and method based on Cloud proxy service
CN101877153B (en) With the residential communication system of entrance guard device
CN105162971B (en) A kind of mobile intelligent terminal controls the method and system of intelligent domestic system
CN102542641A (en) Door control system for building
CN106327817A (en) Projection device remote controller, and button reuse method and apparatus thereof
CN105088648A (en) Washing machine control system and washing machine
CN202267942U (en) Mobile terminal
CN106444413A (en) Smart home control method and device and router
CN202453982U (en) Network control system based on internet-of-things technology of fingerprint security burglarproof door
CN104460625A (en) Intelligent home switching system based on wireless network
CN106413230B (en) Intelligent lighting control system and lamps and lanterns
CN111246640B (en) Load control system convenient to nimble wiring, load system and guest control system
CN106054678A (en) Intelligent switch
CN101174044A (en) Backlight control circuit and luminous element control method
CN201240725Y (en) Intelligent control apparatus for elevator
CN101759069B (en) Lift using method using identity certification system as well as application and system thereof
CN101546188A (en) Intelligent building energy-saving system based on security system
CN204576649U (en) A kind of house access control system
CN105824254A (en) Controllable switching device virtualization technology and realization method thereof
CN102877736A (en) Control mode switching device of automatic door and automatic door utilizing the same
CN110636147A (en) Network distribution method and device of double-control switch, switch and intelligent switch system
CN206244212U (en) Elevator fingerprint button and elevator
CN105927947B (en) Intelligent lighting control system
KR102129516B1 (en) System for controlling entrance door

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant