CN106049705A - Reinforced concrete and external composite thermal insulation wall integral casting molding structure and construction method - Google Patents

Reinforced concrete and external composite thermal insulation wall integral casting molding structure and construction method Download PDF

Info

Publication number
CN106049705A
CN106049705A CN201610634201.6A CN201610634201A CN106049705A CN 106049705 A CN106049705 A CN 106049705A CN 201610634201 A CN201610634201 A CN 201610634201A CN 106049705 A CN106049705 A CN 106049705A
Authority
CN
China
Prior art keywords
plate
wall
reinforcement
vertical
casting molding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610634201.6A
Other languages
Chinese (zh)
Other versions
CN106049705B (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajiang Construction Group Co ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201610634201.6A priority Critical patent/CN106049705B/en
Publication of CN106049705A publication Critical patent/CN106049705A/en
Application granted granted Critical
Publication of CN106049705B publication Critical patent/CN106049705B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention relates to a reinforced concrete and external composite thermal insulation wall integral casting molding structure. The integral casting molding structure comprises combined connecting pieces, integral vertical limit plates and horizontal limit plates, L-shaped fastening plates, vertical sliding grooves, loose bolts, embedded screws, vertical and horizontal reinforcement embedding grooves, galvanized steel plate screens, mold jacking rollers, aluminum cover plates and the like. A construction method comprises the following steps of 1 thermal insulation plate cutting; 2 interface mortar spraying; 3 reinforcement constructing; 4 thermal insulation plate installing; 5 limit plate installing; 6 formwork fastening; 7 concrete casting; 8 mold removing and curing; 9 steel plate screen installing. The reinforced concrete and external composite thermal insulation wall integral casting molding construction method has the advantages of being friendly to the environment, convenient to construct, low in cost and the like.

Description

Armored concrete and outer insulation compositing outer wall one-piece casting molding structure and construction method
Technical field
The present invention relates to a kind of armored concrete and outer insulation compositing outer wall one-piece casting molding ruggedized construction, it is adaptable to have The exterior-wall heat insulation construction of the full-situ shear wall structure that insulation, sound insulation require.
Background technology
Along with country's propelling to Building Energy-saving Work, energy-saving building technology and product develop rapidly, and extruded polystyrene board is made Being widely used to engineering for the material that a kind of thermal property is better, external wall outer insulation energy-saving building technology, with inside holding phase Ratio, has prolongation Building life cycle, elimination condensation, avoids local to produce the advantages such as " heat bridge " phenomenon.
The most traditional heat-insulation plate for external composite exterior wall one-piece casting construction, outside mainly using steel-plastic peg to connect Warming plate and reinforced mesh, although this method structure is the most firm, but compound plug-bolt belongs to patented technology, buys and needs Customized and expensive, construct the most convenient, and the method only considers the drift condition of inner side, fail to consider outside outer insulated wall plate The fixing connection of side.
In sum, although the method for existing armored concrete and outer insulation compositing outer wall one-piece casting molding exists Construction achieves good effect, but at aspects such as machine structural strengthening, cost, efficiencies of construction, still there is improvable place. In consideration of it, need badly at present invent a kind of Stability Analysis of Structures, bearing capacity is high, economic benefit is excellent armored concrete and heat-insulation plate for external Composite exterior wall one-piece casting molding construction method.Armored concrete is executed with outer insulation compositing outer wall one-piece casting molding structure Work, easy construction and cheap, major part parts are reusable, have certain economic technology benefit.
Summary of the invention
It is an object of the invention to provide a kind of armored concrete and outer insulation compositing outer wall one-piece casting molding structure, power Realistic existing good warming plate fixed effect, and there is outstanding economic benefit, reach major part parts recycling.
For realizing above-mentioned technical purpose, present invention employs techniques below scheme:
Armored concrete and outer insulation compositing outer wall one-piece casting molding structure, connect including outer insulated wall plate, combination type Part, monoblock type erect cross spacing steel plate and formwork reinforcement structure, and described combination type connector is mainly by threaded, plastic bolt Cap, horizontal reinforcement embedded groove, vertical reinforcement embedded groove, passage, connecting rod and connecting plate composition, connecting plate is provided with ventilation Hole;Combination type connector passes through horizontal reinforcement embedded groove, vertical reinforcement embedded groove by outer insulated wall plate and horizontal reinforcement, vertical steel Muscle connects fixing;Monoblock type erects cross spacing steel plate mainly by vertical spacing steel plate, cross spacing steel plate, L-type fastening plate, vertical Slippage slot, loose bolts, floor embedded nut and nut composition;Formwork reinforcement structure is by Screw arbor with nut at both-ends, side form, secondary stupefied, main stupefied Form with double nut;Colligation limited block on vertical reinforcement.
As preferably: leave sheet material tongue and groove during outer insulated wall plate cutting.
As preferably: in the screw hole of described Screw arbor with nut at both-ends, anterior filling insulation spacer block, rear portion fills thermal insulation mortar.
As preferably: deformation joint arranges Aluminum cover and steel rivet.
Armored concrete and the construction method of outer insulation compositing outer wall one-piece casting molding structure, comprise the following steps:
1) warming plate cutting: Z-shaped plate material tongue and groove should be cut out before outer insulated wall plate materials arrival between plate;
2) spray boundary mortar: boundary mortar spraying is uniform, with steel wire and polystyrol plastic foam plate adhesion-tight;
3) reinforcement construction: after setting-out snap the line, assembling reinforcement, colligation limited block on vertical reinforcement, it is desirable to two-way spacing 500mm, every piece of leisure plate arranges quantity no less than 6 pieces;Limited block is parallel with outer insulated wall plate;
4) warming plate is installed: by blocking sign, by place for the outer insulated wall plate colligation on every face wall, insert U at sheet material tongue and groove Shape dowel, is subsequently mounted combination type connector and outer insulated wall plate and horizontal reinforcement, Vertical bar connection is fixed;
5) limiting plate is installed: first install the outboard template of body of wall, then installs the inner side template of body of wall, by floor in advance The floor pre embedded bolt buried underground, fixed installation L-type fastening plate, vertical spacing steel plate is installed, cross spacing steel plate is first in vertical limit Steel plate bottom, position assembles, and subsequently by vertical slippage slot to top slide, tightens loose bolts at design attitude;
6) dies plate tap: install time stupefied, double nut stupefied, main and Screw arbor with nut at both-ends successively;
7) concrete placings: exterior wall concrete one-piece casting;
8) form removal maintenance: in complete latter 12 hours of concreting, maintenance of should sprinkling water in time, must not trickle from the top down, anti- Sealing damages outer insulated wall plate;
9) expanded metal lath is installed: first installs plastic bolt cap, afterwards by galvanized steel plain sheet net laying on exterior wall, starts to install steel spiral shell Nail nut, installs U-shaped steel plate washer when tightening, and sprays anticracking grout, finally by design requirement edge patch tapestry brick, or does coating Facing.
The present invention has following feature and a beneficial effect:
(1) combination type connector connection reinforcing bar easy to make and outer insulated wall plate are used, easy construction, cheap.
(2) monoblock type being provided with slip erects cross spacing steel plate, can firmly lock the position of outer insulated wall plate, prevention The generation of swollen mould phenomenon, and efficiency of construction is high.
(3) outer insulated wall plate that this engineering method is selected is extruded polystyrene board, and than common styrofoam, thermal property is better, There is good energy-conserving action.
Accompanying drawing explanation
Fig. 1 is armored concrete of the present invention and outer insulation compositing outer wall one-piece casting molding structure schematic diagram;
Fig. 2 is that vertical horizontal is to limiting plate connection diagram;
Fig. 3 is tongue and groove connection figure;
Fig. 4 is combination type connector schematic diagram;
Fig. 5 is expanded metal lath scheme of installation one;
Fig. 6 is expanded metal lath scheme of installation two;
Fig. 7 is permanent structure figure;
Fig. 8 is bolt hole process figure;
Fig. 9 is door and window hole Local treatment figure;
Figure 10 is movement joint process figure;
Figure 11 is present invention process flow chart;
In figure: 1-outer insulated wall plate, 2-sheet material tongue and groove, 3-combination type connector, 4-horizontal reinforcement embedded groove, 5-vertical steel Muscle embedded groove, 6-horizontal reinforcement, 7-vertical reinforcement, 8-limited block, 9-connecting rod through hole, 10-is threaded, and 11-is to drawing spiral shell Bar, 12-side form, 13-time stupefied, and 14-master is stupefied, 15-double nut, 16-galvanized steel expanded metals, 17-plastic bolt cap, 18-u type galvanized steel Pad, 19-steel screw-nut, 20-concrete exterior wall, 21-top die roller, 22-facing, 23-L type fastening plate, 24-floor pre embedded bolt, 25-nut, 26-vertical spacing steel plate, 27-cross spacing steel plate 28-screw hole, 29-thermal insulation mortar, 30-is incubated spacer block, 31- Boundary mortar, 32-dowel nail, 33-Aluminum cover, 34-passage, 35-slippage slot, 36-loose bolts, 37-connecting rod, 38-is even Fishplate bar
Detailed description of the invention
Present embodiment light plate solder technology, warming plate cutting technique, installation of embedded parts rule of operation, concreting Repeating no more Deng conventional construction technology requirement etc., emphasis illustrates that the armored concrete that the present invention relates to is whole with outer insulation compositing outer wall Body pours the embodiment of molding construction.
Referring to figs. 1 through the armored concrete shown in Figure 11 and outer insulation compositing outer wall one-piece casting molding structure, combination type Connector 3 is mainly by threaded 10, plastic bolt cap 17, horizontal reinforcement embedded groove 4, vertical reinforcement embedded groove 5, passage 34, connecting rod 37 and connecting plate 38 form, and connecting plate is provided with passage 34;Monoblock type erects cross spacing steel plate by vertically limiting Position steel plate 26, cross spacing steel plate 27, L-type fastening plate 23, vertical slippage slot 35, loose bolts 36, floor embedded nut 24, spiral shell Cap 25 grade forms.
Outer insulated wall plate 1 leaves sheet material tongue and groove 2 when cutting.
Formwork reinforcement structure by Screw arbor with nut at both-ends 11, side form 12, secondary stupefied 13, main stupefied 14, double nut 15 forms.
First filling insulation spacer block 30 in screw hole 28, then fill thermal insulation mortar 28.
Deformation joint arranges Aluminum cover 33, steel rivet 32.
As shown in figure 11, armored concrete is as follows with outer insulation compositing outer wall one-piece casting molding construction step:
1) warming plate cutting: should cut out the sheet material tongue and groove 2 such as accompanying drawing 3 before outer insulated wall plate 1 materials arrival between plate, squeezes Moulding plate gauge lattice and mostly be floor height × 600mm × thickness, should arrange tongue and groove (see Fig. 1) before materials arrival between plate, tongue and groove connects can be had Effect ground solves the quality problems such as faulting of slab ends, spillage.Should be in inner side brushing interfacial agents after materials arrival, to strengthen extruded sheet and concrete The bonding strength of body of wall.
2) spray boundary mortar: boundary mortar 31 sprays uniformly, with steel wire and polystyrol plastic foam plate adhesion-tight.
3) reinforcement construction: after setting-out snap the line, assembling reinforcement, colligation limited block 8 on vertical reinforcement, it is desirable to two-way spacing 500mm, thickness, according to design load, every piece of leisure plate arranges quantity no less than 6 pieces.Limited block is parallel with outer insulated wall plate.
4) warming plate is installed: by blocking sign, by place for the outer insulated wall plate colligation on every face wall, insert U at sheet material tongue and groove Shape dowel, being subsequently mounted combination is that outer insulated wall plate 3 and vertical horizontal are fixed by connector 3 to bar connecting, and the spacing of U-shaped dowel is not Must be more than 500mm.Reinforcing bar binding outside leisure plate steel wire (not smearing mortar side) and reinforced concrete wall, adjusts leisure plate Plan-position and perpendicularity.
5) limiting plate is installed: first install the outboard template of body of wall, then installs the inner side template of body of wall, by floor in advance The pre embedded bolt 24 buried underground, fixed installation L-type fastening plate, vertical spacing steel plate 26 is installed, cross spacing steel plate 27 is first vertically Spacing steel plate bottom assembles, and subsequently by vertical slippage slot 35 to top slide, tightens loose bolts 36 at design attitude, perpendicular The thickness of cross spacing steel plate is 20mm, and vertical spacing steel plate horizontal length is 2m, and cross spacing steel plate length is 50mm.
6) dies plate tap: installation time stupefied 13 successively, main stupefied 14, double nut 15, Screw arbor with nut at both-ends 11, secondary stupefied for 100mm* The 100mm lumps of wood, master is stupefied isDouble steel pipes, double nut is 40mm*61mm, and it is M40 that Du draws screw rod.
7) concrete placings: exterior wall concrete one-piece casting;
8) form removal maintenance: in complete latter 12 hours of concreting, maintenance of should sprinkling water in time, must not trickle from the top down, anti- Sealing damages outer insulated wall plate.
9) expanded metal lath is installed: first installs plastic bolt cap 17, is layered on exterior wall by galvanized steel expanded metals 16 afterwards, starts to install Steel screw-nut 19, installs U-shaped steel plate washer 18 when tightening, and sprays anticracking grout, finally by design requirement edge patch tapestry brick, Or do coating ornamental surface;Expanded metal lath should use galvanized steel expanded metals, Mesh distance 12mm, mesh wire diameter 0.8mm, and Mesh distance must not mistake Little, otherwise screed difficulty of construction is bigger;Expanded metal lath preferably starts to install at upper corner, should be involved in 200mm at door-window opening position, And fix with 1 cun of cement steel nail, spacing is not more than 400mm, and expanded metal lath overlapping part should be not less than 100mm, and uses iron wire colligation It is integrally forming;Door-window opening surrounding additional 400mm × 200mm galvanized steel expanded metals 16 (see Fig. 9).

Claims (5)

1. an armored concrete and outer insulation compositing outer wall one-piece casting molding structure, it is characterised in that: include external thermal insulation wall Plate (1), combination type connector (3), monoblock type erect cross spacing steel plate and formwork reinforcement structure, and described combination type connector 3 is main Will be by threaded (10), plastic bolt cap (17), horizontal reinforcement embedded groove (4), vertical reinforcement embedded groove (5), passage (34), connecting rod (37) and connecting plate (38) composition, connecting plate (38) is provided with passage (34);Combination type connector (3) By horizontal reinforcement embedded groove (4), vertical reinforcement embedded groove (5) by outer insulated wall plate (1) and horizontal reinforcement (6), vertical reinforcement (7) connection is fixing;It is mainly tight by vertical spacing steel plate (26), cross spacing steel plate (27), L-type that monoblock type erects cross spacing steel plate Gu plate (23), vertical slippage slot (35), loose bolts (36), floor embedded nut (24) and nut (25) composition;Formwork reinforcement Structure is made up of Screw arbor with nut at both-ends (11), side form (12), secondary stupefied (13), main stupefied (14) and double nut (15);Vertical reinforcement is tied up on (7) Prick limited block (8).
Armored concrete the most according to claim 1 and outer insulation compositing outer wall one-piece casting molding structure, its feature exists In: leave sheet material tongue and groove (2) during outer insulated wall plate (1) cutting.
Armored concrete the most according to claim 1 and outer insulation compositing outer wall one-piece casting molding structure, its feature exists In: in the screw hole (28) of described Screw arbor with nut at both-ends (11), anterior filling insulation spacer block (30), rear portion fills thermal insulation mortar (28).
Armored concrete the most according to claim 1 and outer insulation compositing outer wall one-piece casting molding structure, its feature exists In: deformation joint arranges Aluminum cover (33) and steel rivet (32).
5. armored concrete as claimed in claim 1 and the construction method of outer insulation compositing outer wall one-piece casting molding structure, It is characterized in that comprising the following steps:
1) warming plate cutting: Z-shaped plate material tongue and groove (2) should be cut out before outer insulated wall plate (1) materials arrival between plate;
2) spray boundary mortar: boundary mortar (31) spraying is uniform, with steel wire and polystyrol plastic foam plate adhesion-tight;
3) reinforcement construction: after setting-out snap the line, assembling reinforcement, the upper colligation limited block (8) of vertical reinforcement (7), it is desirable to two-way spacing 500mm, every piece of leisure plate arranges quantity no less than 6 pieces;Limited block (8) is parallel with outer insulated wall plate (1);
4) warming plate is installed: by blocking sign, by place for outer insulated wall plate (1) colligation on every face wall, and sheet material tongue and groove (2) place inserts U-shaped dowel, is subsequently mounted combination type connector (3) and connects solid by outer insulated wall plate (1) and horizontal reinforcement (6), vertical reinforcement (7) Fixed;
5) limiting plate is installed: first install the outboard template of body of wall, then installs the inner side template of body of wall, by pre-plugged on floor Floor pre embedded bolt (24), fixed installation L-type fastening plate (23), install vertical spacing steel plate (26), cross spacing steel plate (27) first assemble in vertical spacing steel plate (26) bottom, subsequently by vertical slippage slot (35) to top slide, to design attitude Loose bolts (36) is tightened at place;
6) dies plate tap: install time stupefied (13), main stupefied (14), double nut (15) and Screw arbor with nut at both-ends (11) successively;
7) concrete placings: exterior wall concrete one-piece casting;
8) form removal maintenance: in complete latter 12 hours of concreting, maintenance of should sprinkling water in time, must not trickle from the top down, prevent water Damage outer insulated wall plate (1);
9) expanded metal lath is installed: first installs plastic bolt cap (17), is layered on exterior wall by galvanized steel expanded metals (16) afterwards, starts to install Steel screw-nut (19), installs U-shaped steel plate washer (18) when tightening, and sprays anticracking grout, finally by design requirement edge patch decorations Face brick, or do coating ornamental surface.
CN201610634201.6A 2016-08-03 2016-08-03 The construction method of armored concrete and outer insulation compositing outer wall one-piece casting molding structure Active CN106049705B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610634201.6A CN106049705B (en) 2016-08-03 2016-08-03 The construction method of armored concrete and outer insulation compositing outer wall one-piece casting molding structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610634201.6A CN106049705B (en) 2016-08-03 2016-08-03 The construction method of armored concrete and outer insulation compositing outer wall one-piece casting molding structure

Publications (2)

Publication Number Publication Date
CN106049705A true CN106049705A (en) 2016-10-26
CN106049705B CN106049705B (en) 2018-04-06

Family

ID=57480165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610634201.6A Active CN106049705B (en) 2016-08-03 2016-08-03 The construction method of armored concrete and outer insulation compositing outer wall one-piece casting molding structure

Country Status (1)

Country Link
CN (1) CN106049705B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514073A (en) * 2017-09-28 2017-12-26 沈炜 The non-load bearing wall of convenient suspension
CN108612210A (en) * 2018-06-08 2018-10-02 河北三楷深发科技股份有限公司 A kind of passive type super low energy consumption External Thermal Insulation System construction technology
CN109577517A (en) * 2018-11-28 2019-04-05 杭州江润科技有限公司 Assembly of shear wall structure and construction method
CN110847432A (en) * 2019-10-29 2020-02-28 福建筑可丽建材科技有限公司 Light wall board using steel plate net as reinforcing rib
CN112411772A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN114000615A (en) * 2021-11-12 2022-02-01 筑友智造科技投资有限公司 External wall panel connecting piece, connecting assembly and prefabricated part connecting joint
CN117702926A (en) * 2023-12-11 2024-03-15 中国核工业华兴建设有限公司 Wall double-sided embedded part and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10229115B4 (en) * 2002-06-28 2005-07-07 Bever Gesellschaft für Befestigungsteile - Verbindungselemente mbH Connecting element for a double-shell masonry and masonry
CN101349109A (en) * 2008-09-12 2009-01-21 哈尔滨鸿盛房屋节能体系研发中心 Free connecting parts of shear wall structure wall body
CN101725185A (en) * 2009-10-30 2010-06-09 王新强 Compound heat preservation die plate and concrete one-off construction outer wall heat preservation system and construction technology thereof
CN202882116U (en) * 2012-09-28 2013-04-17 海盐孙氏建新标准件制造有限公司 Pre-buried connecting part
CN206015942U (en) * 2016-08-03 2017-03-15 上海嘉实(集团)有限公司 Armored concrete and outer insulation compositing outer wall one-piece casting molding structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10229115B4 (en) * 2002-06-28 2005-07-07 Bever Gesellschaft für Befestigungsteile - Verbindungselemente mbH Connecting element for a double-shell masonry and masonry
CN101349109A (en) * 2008-09-12 2009-01-21 哈尔滨鸿盛房屋节能体系研发中心 Free connecting parts of shear wall structure wall body
CN101725185A (en) * 2009-10-30 2010-06-09 王新强 Compound heat preservation die plate and concrete one-off construction outer wall heat preservation system and construction technology thereof
CN202882116U (en) * 2012-09-28 2013-04-17 海盐孙氏建新标准件制造有限公司 Pre-buried connecting part
CN206015942U (en) * 2016-08-03 2017-03-15 上海嘉实(集团)有限公司 Armored concrete and outer insulation compositing outer wall one-piece casting molding structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107514073A (en) * 2017-09-28 2017-12-26 沈炜 The non-load bearing wall of convenient suspension
CN108612210A (en) * 2018-06-08 2018-10-02 河北三楷深发科技股份有限公司 A kind of passive type super low energy consumption External Thermal Insulation System construction technology
CN109577517A (en) * 2018-11-28 2019-04-05 杭州江润科技有限公司 Assembly of shear wall structure and construction method
CN110847432A (en) * 2019-10-29 2020-02-28 福建筑可丽建材科技有限公司 Light wall board using steel plate net as reinforcing rib
CN112411772A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN114000615A (en) * 2021-11-12 2022-02-01 筑友智造科技投资有限公司 External wall panel connecting piece, connecting assembly and prefabricated part connecting joint
CN117702926A (en) * 2023-12-11 2024-03-15 中国核工业华兴建设有限公司 Wall double-sided embedded part and construction method

Also Published As

Publication number Publication date
CN106049705B (en) 2018-04-06

Similar Documents

Publication Publication Date Title
CN106049705A (en) Reinforced concrete and external composite thermal insulation wall integral casting molding structure and construction method
CN107100299B (en) Composite outer wall with disassembly-free formwork and construction method thereof
CN105908859A (en) Heat-preservation precast wall body and assembled house
CN104563288A (en) Reinforced concrete frame gridding slab prefabricated energy-saving house
CN101818539A (en) Assembled integral building and construction method thereof
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN108277887B (en) Assembled built-in heat preservation concrete composite wall-light steel frame connection node
CN206015942U (en) Armored concrete and outer insulation compositing outer wall one-piece casting molding structure
CN205776895U (en) Heat insulation prefabricated body of wall and prefabricated buildings
CN107288256A (en) Light composite heat insulation outer wall plate, particular manufacturing craft and preparation method thereof
CN104746639A (en) Prefabricated bay window structure installed on laminated wall board and installing method
KR101021854B1 (en) Half precast composite slab and this production technique
CN104878836A (en) Prefabricated house and construction method thereof
CN108316525B (en) Integral combined heat-insulating outer wall and construction method thereof
WO2010074550A1 (en) Assemblage formwork
CN204645253U (en) A kind of prefabricated house
CN116145856A (en) Assembled profiled steel sheet composite shear wall and construction method thereof
CN109441099B (en) Basement unilateral formwork supporting system and method for constructing basement outer wall by utilizing same
CN209799355U (en) Basement single-side formwork system
CN208168032U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN208105502U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame connecting node
CN106368445B (en) Existing building reinforces self-supporting heat-insulating integral system and construction method
CN218714288U (en) Decoration-free building structure
CN206189891U (en) Existing building reinforcement is from load -bearing and insulating integration system
CN203905223U (en) Concrete sandwich heat insulation composite wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180604

Address after: 225200 Xindu Road, Jiangdu District, Yangzhou, Jiangsu Province, No. 399

Patentee after: JIANGSU HUAJIANG CONSTRUCTION GROUP Co.,Ltd.

Address before: 310015 room 3, unit 3, Wanda Commercial Center, Hangzhou, Zhejiang, 1901.

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Construction method of integral pouring and forming structure of reinforced concrete and external thermal insulation composite exterior wall

Effective date of registration: 20230129

Granted publication date: 20180406

Pledgee: Yangzhou Branch of Bank of Jiangsu Co.,Ltd.

Pledgor: JIANGSU HUAJIANG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2023980031288