CN106040514A - Brushing method of chemical pump body paint - Google Patents
Brushing method of chemical pump body paint Download PDFInfo
- Publication number
- CN106040514A CN106040514A CN201610478603.1A CN201610478603A CN106040514A CN 106040514 A CN106040514 A CN 106040514A CN 201610478603 A CN201610478603 A CN 201610478603A CN 106040514 A CN106040514 A CN 106040514A
- Authority
- CN
- China
- Prior art keywords
- paint
- brushing
- chemical pump
- putty
- dry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C1/00—Apparatus in which liquid or other fluent material is applied to the surface of the work by contact with a member carrying the liquid or other fluent material, e.g. a porous member loaded with a liquid to be applied as a coating
- B05C1/04—Apparatus in which liquid or other fluent material is applied to the surface of the work by contact with a member carrying the liquid or other fluent material, e.g. a porous member loaded with a liquid to be applied as a coating for applying liquid or other fluent material to work of indefinite length
- B05C1/06—Apparatus in which liquid or other fluent material is applied to the surface of the work by contact with a member carrying the liquid or other fluent material, e.g. a porous member loaded with a liquid to be applied as a coating for applying liquid or other fluent material to work of indefinite length by rubbing contact, e.g. by brushes, by pads
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C—APPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05C11/00—Component parts, details or accessories not specifically provided for in groups B05C1/00 - B05C9/00
- B05C11/10—Storage, supply or control of liquid or other fluent material; Recovery of excess liquid or other fluent material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/02—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by baking
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/04—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/04—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
- B05D3/0406—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being air
- B05D3/0413—Heating with air
Landscapes
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The invention relates to the technical field of pump valve manufacturing, in particular to a brushing method of chemical pump body paint. The brushing method comprises the following steps that through chemical pump surface pretreatment, rust removal and dirt and oil removal are carried out; then putty smearing is carried out; and after drying, three times of paint brushing are carried out, and then the paint is dried. The brushing method has the beneficial effects that the technological process is simple and convenient to operate; chemical pump paint brushing is carried out through the scientific and reasonable method; the fastness performance of the chemical pump surface paint is guaranteed, and the paint is not prone to falling off; and by means of chemical pump surface pretreatment, strong assistance of the paint is guaranteed, durability is high, and the paint is durable.
Description
Technical field
The present invention relates to pump valve preparing technical field, be specifically related to the brushing method of a kind of chemical pump pump housing paint.
Background technology
Chemical pump is the energy-saving pump of Joint National design, and pump performance, technology requirement, according to the property of international standard defined
Can be with size design, its advantage: complete series conservancy property is rationally distributed, user's range of choice width, " rear open type " structure, maintenance
Convenient, efficiency and suction are reached advanced world standards, and are widely used in industry, city water, draining, also can be used for farmland, orchard
Irrigation and drainage, other liquid being similar to clear water for conveying clear water or physics and chemical property are used, chemical pump when normally using, due to
The application of the pump housing is different, uses in touching some industries possessing corrosive nature meson, and therefore chemical pump is normally
Processing in, all can carry out paint on pump housing surface, not only ensure its corresponding aesthetic property, simultaneously can with anticorrosion,
Improve service life, but owing to chemical pump is in normal use, certain high heat fluid conveying can be related to, therefore surpass
The fluid of high heat can make the paint on chemical pump surface by great high temperature, it is easy to de-after causing certain paint to be heated
Fall, the most how to carry out the reasonable coating painted, it is to avoid it is the research topic that this area is necessary at present that paint high temperature comes off.
Summary of the invention:
The technical problem to be solved is to provide a kind of technological process simple, and effect is notable, method letter
The brushing method of single chemical pump pump housing paint.
The technical problem to be solved realizes by the following technical solutions:
The brushing method of a kind of chemical pump pump housing paint, it is characterised in that comprise the following steps:
1) chemical pump treating brushing paint carrying out surface rusty stain removing, sweep-out method uses sand paper to carry out detail sanding,
Until after surface is visible by naked eyes rusty stain, using air gun to be blown off by surface anvil cinder;
2), after using clear water hydro-peening clean on chemical pump surface after above-mentioned rust cleaning, the hot water being again with boiling carries out one
Secondary drip washing, after drip washing, uses rapidly hot-air blower, is done by surface moisture hot blow;This step is for by attachment on chemical pump surface
Major part oils and fats tentatively cleans;
3) select quick lime to be sprinkling upon chemical pump surface, after then adding water to watering can, be sprayed at chemical pump surface, the most quiet
After putting 5-7min, use clear water to rinse well, be then again with hot-air blower and dry up;
4) allotment powder of lacquer putty for use on, moves chemical pump to dust-free workshop, at one layer of powder of lacquer putty for use on of chemical pump surface brush, powder of lacquer putty for use on
THICKNESS CONTROL, between 0.5-1.5mm, then stands until powder of lacquer putty for use on forms putty layering after drying;
5) treating that the layering of above-mentioned putty is dried, using sand paper putty layering to be polished, until ensureing putty bisque
THICKNESS CONTROL is between 0.5-0.8mm;
6) chemical pump after above-mentioned steps 5 being processed moves to drying room, controls drying room temperature and is 45-48 DEG C, quiet to baking
25-28min;
7) chemical pump after above-mentioned baking is moved again to dust-free workshop, surface particles thing employing air gun is blown clean
After, carrying out painting for the first time brushing, the THICKNESS CONTROL of paint brushing is at 0.2-0.3mm;
8) after paint eighty per cant after above-mentioned brushing is dry, again carrying out second time and paint brushing, brushing paint is thick for the second time
Degree is 0.1-0.2mm;
9) after in above-mentioned steps 8 seventy percent is dry, carrying out third time and paint brushing, the thickness of third time paint brushing is 0.4-
0.5mm, after brushing terminates, after standing to sixty percent is dry, moves integrally chemical pump to drying room, and in control drying room, temperature is 38-
45 DEG C, baking until paint absolutely dry after,.
The powder of lacquer putty for use on used in above-mentioned steps 4 is oil putty;
The invention has the beneficial effects as follows: present invention process flow process is simple and convenient, carry out chemical industry by scientific and reasonable method
Pump paint brushing, it is ensured that the firm performance of chemical pump surface paint, difficult drop-off, by by chemical pump surface preparation, protect
The strength auxiliary of card paint, persistency is strong, durable in use.
Detailed description of the invention
For the technological means making the present invention realize, creation characteristic, reach purpose and be easy to understand with effect, below knot
Close specific embodiment, the present invention is expanded on further.
Embodiment 1
The brushing method of a kind of chemical pump pump housing paint, comprises the following steps:
1) chemical pump treating brushing paint carrying out surface rusty stain removing, sweep-out method uses sand paper to carry out detail sanding,
Until after surface is visible by naked eyes rusty stain, using air gun to be blown off by surface anvil cinder;
2), after using clear water hydro-peening clean on chemical pump surface after above-mentioned rust cleaning, the hot water being again with boiling carries out one
Secondary drip washing, after drip washing, uses rapidly hot-air blower, is done by surface moisture hot blow;This step is for by attachment on chemical pump surface
Major part oils and fats tentatively cleans;
3) select quick lime to be sprinkling upon chemical pump surface, after then adding water to watering can, be sprayed at chemical pump surface, the most quiet
After putting 5min, use clear water to rinse well, be then again with hot-air blower and dry up;
4) allotment powder of lacquer putty for use on, moves chemical pump to dust-free workshop, at one layer of powder of lacquer putty for use on of chemical pump surface brush, powder of lacquer putty for use on
THICKNESS CONTROL, between 0.5mm, then stands until powder of lacquer putty for use on forms putty layering after drying;
5) treating that the layering of above-mentioned putty is dried, using sand paper putty layering to be polished, until ensureing putty bisque
THICKNESS CONTROL is between 0.5mm;
6) chemical pump after above-mentioned steps 5 being processed moves to drying room, and controlling drying room temperature is 45 DEG C, quiet to baking
25min;
7) chemical pump after above-mentioned baking is moved again to dust-free workshop, surface particles thing employing air gun is blown clean
After, carrying out painting for the first time brushing, the THICKNESS CONTROL of paint brushing is at 0.2mm;
8) after paint eighty per cant after above-mentioned brushing is dry, again carrying out second time and paint brushing, brushing paint is thick for the second time
Degree is 0.1mm;
9) after in above-mentioned steps 8 seventy percent is dry, carrying out third time and paint brushing, the thickness of third time paint brushing is
0.4mm, after brushing terminates, after standing to sixty percent is dry, moves integrally chemical pump to drying room, and in control drying room, temperature is 38
DEG C, baking until paint absolutely dry after,.
Embodiment 2
The brushing method of a kind of chemical pump pump housing paint, comprises the following steps:
1) chemical pump treating brushing paint carrying out surface rusty stain removing, sweep-out method uses sand paper to carry out detail sanding,
Until after surface is visible by naked eyes rusty stain, using air gun to be blown off by surface anvil cinder;
2), after using clear water hydro-peening clean on chemical pump surface after above-mentioned rust cleaning, the hot water being again with boiling carries out one
Secondary drip washing, after drip washing, uses rapidly hot-air blower, is done by surface moisture hot blow;This step is for by attachment on chemical pump surface
Major part oils and fats tentatively cleans;
3) select quick lime to be sprinkling upon chemical pump surface, after then adding water to watering can, be sprayed at chemical pump surface, the most quiet
After putting 7min, use clear water to rinse well, be then again with hot-air blower and dry up;
4) allotment powder of lacquer putty for use on, moves chemical pump to dust-free workshop, at one layer of powder of lacquer putty for use on of chemical pump surface brush, powder of lacquer putty for use on
THICKNESS CONTROL, between 1.5mm, then stands until powder of lacquer putty for use on forms putty layering after drying;
5) treating that the layering of above-mentioned putty is dried, using sand paper putty layering to be polished, until ensureing putty bisque
THICKNESS CONTROL is between 0.8mm;
6) chemical pump after above-mentioned steps 5 being processed moves to drying room, and controlling drying room temperature is 48 DEG C, quiet to baking
28min;
7) chemical pump after above-mentioned baking is moved again to dust-free workshop, surface particles thing employing air gun is blown clean
After, carrying out painting for the first time brushing, the THICKNESS CONTROL of paint brushing is at 0.3mm;
8) after paint eighty per cant after above-mentioned brushing is dry, again carrying out second time and paint brushing, brushing paint is thick for the second time
Degree is 0.2mm;
9) after in above-mentioned steps 8 seventy percent is dry, carrying out third time and paint brushing, the thickness of third time paint brushing is
0.5mm, after brushing terminates, after standing to sixty percent is dry, moves integrally chemical pump to drying room, and in control drying room, temperature is 45
DEG C, baking until paint absolutely dry after,.
The ultimate principle of the present invention and principal character and advantages of the present invention have more than been shown and described.The technology of the industry
Personnel, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrating this described in above-described embodiment and description
The principle of invention, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, and these become
Change and improvement both falls within scope of the claimed invention.Claimed scope by appending claims and
Equivalent defines.
Claims (2)
1. the brushing method of a chemical pump pump housing paint, it is characterised in that comprise the following steps:
1) chemical pump treating brushing paint carrying out surface rusty stain removing, sweep-out method uses sand paper to carry out detail sanding, until
After surface is visible by naked eyes rusty stain, air gun is used to be blown off by surface anvil cinder;
2), after using clear water hydro-peening clean on chemical pump surface after above-mentioned rust cleaning, the hot water being again with boiling once drenches
Wash, after drip washing, use rapidly hot-air blower, surface moisture hot blow is done;
3) select quick lime to be sprinkling upon chemical pump surface, after then adding water to watering can, be sprayed at chemical pump surface, then stand 5-
After 7min, use clear water to rinse well, be then again with hot-air blower and dry up;
4) allotment powder of lacquer putty for use on, moves chemical pump to dust-free workshop, at one layer of powder of lacquer putty for use on of chemical pump surface brush, the thickness of powder of lacquer putty for use on
Control between 0.5-1.5mm, then stand until powder of lacquer putty for use on forms putty layering after drying;
5) treating that the layering of above-mentioned putty is dried, using sand paper putty layering to be polished, until ensureing the thickness of putty bisque
Control between 0.5-0.8mm;
6) chemical pump after above-mentioned steps 5 being processed moves to drying room, controls drying room temperature and is 45-48 DEG C, quiet to toasting 25-
28min;
7) chemical pump after above-mentioned baking is moved again to dust-free workshop, after surface particles thing employing air gun is blown clean, enters
Row paint brushing for the first time, the THICKNESS CONTROL of paint brushing is at 0.2-0.3mm;
8) after paint eighty per cant after above-mentioned brushing is dry, again carrying out second time and paint brushing, brushing paint thickness is for the second time
0.1-0.2mm;
9) after in above-mentioned steps 8 seventy percent is dry, carrying out third time and paint brushing, the thickness of third time paint brushing is 0.4-
0.5mm, after brushing terminates, after standing to sixty percent is dry, moves integrally chemical pump to drying room, and in control drying room, temperature is 38-
45 DEG C, baking until paint absolutely dry after,.
The brushing method of a kind of chemical pump pump housing the most according to claim 1 paint, it is characterised in that: in above-mentioned steps 4
The powder of lacquer putty for use on used is oil putty.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610478603.1A CN106040514A (en) | 2016-06-22 | 2016-06-22 | Brushing method of chemical pump body paint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610478603.1A CN106040514A (en) | 2016-06-22 | 2016-06-22 | Brushing method of chemical pump body paint |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106040514A true CN106040514A (en) | 2016-10-26 |
Family
ID=57165738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610478603.1A Pending CN106040514A (en) | 2016-06-22 | 2016-06-22 | Brushing method of chemical pump body paint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106040514A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106630774A (en) * | 2016-11-29 | 2017-05-10 | 安徽腾龙泵阀制造有限公司 | Chemical pump resistant to high temperature, abrasion and corrosion |
CN106733565A (en) * | 2016-11-29 | 2017-05-31 | 安徽腾龙泵阀制造有限公司 | A kind of method of chemical pump pump housing external coating paint |
CN107552356A (en) * | 2017-09-06 | 2018-01-09 | 安徽国泰泵科技有限公司 | Process for surface preparation before the spray painting of the chemical pump pump housing |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020069940A1 (en) * | 2000-12-07 | 2002-06-13 | Matsushita Electric Industrial Co., Ltd. | Method of manufacturing magnesium alloy molded product, painted structure thereof, method of painting the same, and casings using the same |
KR20100051955A (en) * | 2008-11-10 | 2010-05-19 | 대우조선해양 주식회사 | Painting method for preventing pre-delivery re-docking of new building ships |
JP2010139973A (en) * | 2008-12-15 | 2010-06-24 | Oi Shoji:Kk | Method for manufacturing design model, solvent-free two-liquid quick curable urethane resin liquid for spray coating material, and solvent-free two-liquid reaction curable urethane resin putty material for mounding process |
CN103537421A (en) * | 2012-09-26 | 2014-01-29 | 冯学良 | Novel long-acting coating technology of oil and gas equipment |
CN103586190A (en) * | 2013-10-09 | 2014-02-19 | 芜湖中集瑞江汽车有限公司 | Aluminum alloy refueling truck coating process |
CN103894329A (en) * | 2014-03-18 | 2014-07-02 | 甘肃农业大学 | Method for spraying surface of engineering machinery covering part |
JP5556456B2 (en) * | 2010-07-08 | 2014-07-23 | 株式会社Ihi | Method for adjusting the surface of steel in the painting process |
CN104438020A (en) * | 2013-09-25 | 2015-03-25 | 青岛市首胜实业有限公司 | Paint coating construction technology |
CN105149195A (en) * | 2015-10-20 | 2015-12-16 | 中山市凯兴达幕墙装饰工程有限公司 | Paint construction technology of novel steel structure |
CN105457875A (en) * | 2015-12-31 | 2016-04-06 | 卓达新材料科技集团有限公司 | Spraying method |
CN105618349A (en) * | 2014-11-28 | 2016-06-01 | 重庆基石机械有限公司 | Paint coating process |
-
2016
- 2016-06-22 CN CN201610478603.1A patent/CN106040514A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020069940A1 (en) * | 2000-12-07 | 2002-06-13 | Matsushita Electric Industrial Co., Ltd. | Method of manufacturing magnesium alloy molded product, painted structure thereof, method of painting the same, and casings using the same |
KR20100051955A (en) * | 2008-11-10 | 2010-05-19 | 대우조선해양 주식회사 | Painting method for preventing pre-delivery re-docking of new building ships |
JP2010139973A (en) * | 2008-12-15 | 2010-06-24 | Oi Shoji:Kk | Method for manufacturing design model, solvent-free two-liquid quick curable urethane resin liquid for spray coating material, and solvent-free two-liquid reaction curable urethane resin putty material for mounding process |
JP5556456B2 (en) * | 2010-07-08 | 2014-07-23 | 株式会社Ihi | Method for adjusting the surface of steel in the painting process |
CN103537421A (en) * | 2012-09-26 | 2014-01-29 | 冯学良 | Novel long-acting coating technology of oil and gas equipment |
CN104438020A (en) * | 2013-09-25 | 2015-03-25 | 青岛市首胜实业有限公司 | Paint coating construction technology |
CN103586190A (en) * | 2013-10-09 | 2014-02-19 | 芜湖中集瑞江汽车有限公司 | Aluminum alloy refueling truck coating process |
CN103894329A (en) * | 2014-03-18 | 2014-07-02 | 甘肃农业大学 | Method for spraying surface of engineering machinery covering part |
CN105618349A (en) * | 2014-11-28 | 2016-06-01 | 重庆基石机械有限公司 | Paint coating process |
CN105149195A (en) * | 2015-10-20 | 2015-12-16 | 中山市凯兴达幕墙装饰工程有限公司 | Paint construction technology of novel steel structure |
CN105457875A (en) * | 2015-12-31 | 2016-04-06 | 卓达新材料科技集团有限公司 | Spraying method |
Non-Patent Citations (1)
Title |
---|
吴兴敏,张兴良: "《汽车涂装修复技术》", 31 August 2014 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106630774A (en) * | 2016-11-29 | 2017-05-10 | 安徽腾龙泵阀制造有限公司 | Chemical pump resistant to high temperature, abrasion and corrosion |
CN106733565A (en) * | 2016-11-29 | 2017-05-31 | 安徽腾龙泵阀制造有限公司 | A kind of method of chemical pump pump housing external coating paint |
CN107552356A (en) * | 2017-09-06 | 2018-01-09 | 安徽国泰泵科技有限公司 | Process for surface preparation before the spray painting of the chemical pump pump housing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106040514A (en) | Brushing method of chemical pump body paint | |
CN107199168A (en) | A kind of handware baking finish process method | |
CN107791156A (en) | A kind of Shot Blasting method for steel plate derusting rust-proofing | |
CN102871529A (en) | Aluminum alloy non-stick pan with hard surface and processing technology thereof | |
CN106111485A (en) | A kind of chemical pump pump housing sprays paint front surface preprocess method | |
CN105149184A (en) | Metal spraying process and mobile phone shell | |
CN106583096A (en) | Automatic shell coating system | |
CN105131831A (en) | Stone material surface anti-fouling paint and method of applying same to marble surface for preventing fouling | |
CN104511494B (en) | A kind of processing method decorating use aluminium sheet and processing unit (plant) thereof | |
CN103660663B (en) | A kind of production method of thermal transfer steel strip with color coating | |
CN202179427U (en) | Stainless steel nonstick pot and pot body thereof | |
CN107552356A (en) | Process for surface preparation before the spray painting of the chemical pump pump housing | |
CN106694345A (en) | Metal piece paint spraying process | |
CN109590683A (en) | A kind of sliding door production technology | |
CN208230367U (en) | Pass through formula cleaning equipment for parts | |
CN109732726A (en) | A kind of surface lacquer support wax Coating technology for outdoor desk-chair | |
CN104525454A (en) | Spraying technology | |
CN205146556U (en) | Formula of spraying paint cascade cabinet | |
CN105834048B (en) | A kind of multi-functional spraying plating production line | |
CN109746171A (en) | A kind of chemical pump pump housing spray painting front surface preprocess method | |
CN109719008A (en) | A kind of chemical pump pump housing spray painting front surface preprocess method | |
CN206274207U (en) | For the hot water cyclesystem of painting operation | |
CN205712855U (en) | Self-clean type aluminum veneer | |
CN202427623U (en) | Baking device for water-based coating production line | |
CN207576763U (en) | A kind of photovoltaic circuit board marine glue spray equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161026 |