CN106014453A - 一种适用于地下隧道的约束混凝土拱架支护自动化施工方法 - Google Patents
一种适用于地下隧道的约束混凝土拱架支护自动化施工方法 Download PDFInfo
- Publication number
- CN106014453A CN106014453A CN201610539482.7A CN201610539482A CN106014453A CN 106014453 A CN106014453 A CN 106014453A CN 201610539482 A CN201610539482 A CN 201610539482A CN 106014453 A CN106014453 A CN 106014453A
- Authority
- CN
- China
- Prior art keywords
- bow member
- confined concrete
- concrete bow
- confined
- link bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 151
- 238000000034 method Methods 0.000 title abstract description 13
- 238000010276 construction Methods 0.000 claims abstract description 36
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 25
- 239000010959 steel Substances 0.000 claims abstract description 25
- 239000002131 composite material Substances 0.000 claims abstract description 5
- 239000011435 rock Substances 0.000 claims description 22
- 238000009434 installation Methods 0.000 claims description 16
- 238000003032 molecular docking Methods 0.000 claims description 16
- 210000004907 gland Anatomy 0.000 claims description 13
- 230000002787 reinforcement Effects 0.000 claims description 9
- 210000003205 muscle Anatomy 0.000 claims description 7
- 239000011378 shotcrete Substances 0.000 claims description 5
- 238000009412 basement excavation Methods 0.000 claims description 4
- 210000003141 lower extremity Anatomy 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 238000007596 consolidation process Methods 0.000 claims description 3
- 239000007921 spray Substances 0.000 claims description 2
- 230000008569 process Effects 0.000 abstract description 7
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 9
- 238000005553 drilling Methods 0.000 description 7
- 239000000523 sample Substances 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 4
- 238000009533 lab test Methods 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 4
- 239000000203 mixture Substances 0.000 description 4
- 238000001514 detection method Methods 0.000 description 3
- 230000011218 segmentation Effects 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005422 blasting Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000005489 elastic deformation Effects 0.000 description 2
- 238000004880 explosion Methods 0.000 description 2
- 239000008267 milk Substances 0.000 description 2
- 210000004080 milk Anatomy 0.000 description 2
- 235000013336 milk Nutrition 0.000 description 2
- 230000010412 perfusion Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610539482.7A CN106014453B (zh) | 2016-07-08 | 2016-07-08 | 一种适用于地下隧道的约束混凝土拱架支护自动化施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610539482.7A CN106014453B (zh) | 2016-07-08 | 2016-07-08 | 一种适用于地下隧道的约束混凝土拱架支护自动化施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106014453A true CN106014453A (zh) | 2016-10-12 |
CN106014453B CN106014453B (zh) | 2018-06-22 |
Family
ID=57109812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610539482.7A Active CN106014453B (zh) | 2016-07-08 | 2016-07-08 | 一种适用于地下隧道的约束混凝土拱架支护自动化施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106014453B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545349A (zh) * | 2016-11-23 | 2017-03-29 | 山东大学 | 一种适用于隧道拱架自动化装配的节点装置及安装方法 |
CN106644728A (zh) * | 2017-02-24 | 2017-05-10 | 中国矿业大学(北京) | 一种基于超大断面隧道围岩分级的点荷载试验分析方法 |
CN106759374A (zh) * | 2016-11-23 | 2017-05-31 | 山东大学 | 装配式地下工程支护拱架节点自动连接装置及施工方法 |
CN107905261A (zh) * | 2017-12-08 | 2018-04-13 | 山东大学 | 地下工程装配式拱架自动连接装置及施工方法 |
CN108104832A (zh) * | 2017-11-28 | 2018-06-01 | 山东大学 | 地下工程装配式约束混凝土拱架及机械化施工方法 |
CN108266204A (zh) * | 2016-12-30 | 2018-07-10 | 山东大学 | 装配式约束混凝土拱架核心混凝土灌注设备及工艺 |
CN109057821A (zh) * | 2018-09-28 | 2018-12-21 | 浙江八达隧道工程股份有限公司 | 公路软岩隧道双层拱架支护施工***及其施工方法 |
CN110295926A (zh) * | 2019-06-04 | 2019-10-01 | 中交路桥建设有限公司 | 一种隧道初支钢拱架安装垂直度控制方法 |
CN111779511A (zh) * | 2020-08-07 | 2020-10-16 | 浙江省交通规划设计研究院有限公司 | 拱架节段、拱架、拱架制作方法及拱架安装方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009138516A (ja) * | 2007-12-19 | 2009-06-25 | Sato Kogyo Co Ltd | 覆工コンクリート構造物及びその施工方法 |
CN101936170A (zh) * | 2010-09-03 | 2011-01-05 | 中国水利水电第七工程局有限公司 | 一种洞室顶拱模喷混凝土施工结构及工艺 |
CN102345463A (zh) * | 2011-10-19 | 2012-02-08 | 中交第一公路工程局有限公司 | 一种城市敏感区大跨浅埋暗挖隧道支护结构 |
CN202900283U (zh) * | 2012-11-01 | 2013-04-24 | 济南城建集团有限公司 | 钢管混凝土支护结构 |
CN103244142A (zh) * | 2013-05-23 | 2013-08-14 | 中煤科工集团武汉设计研究院 | 隧道式敷设输煤管道柔性模板混凝土条带支护装置及方法 |
CN102305091B (zh) * | 2011-08-25 | 2013-09-11 | 中铁十六局集团有限公司 | 一种硬岩大断面隧道施工的支撑结构及其施工方法 |
-
2016
- 2016-07-08 CN CN201610539482.7A patent/CN106014453B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009138516A (ja) * | 2007-12-19 | 2009-06-25 | Sato Kogyo Co Ltd | 覆工コンクリート構造物及びその施工方法 |
CN101936170A (zh) * | 2010-09-03 | 2011-01-05 | 中国水利水电第七工程局有限公司 | 一种洞室顶拱模喷混凝土施工结构及工艺 |
CN102305091B (zh) * | 2011-08-25 | 2013-09-11 | 中铁十六局集团有限公司 | 一种硬岩大断面隧道施工的支撑结构及其施工方法 |
CN102345463A (zh) * | 2011-10-19 | 2012-02-08 | 中交第一公路工程局有限公司 | 一种城市敏感区大跨浅埋暗挖隧道支护结构 |
CN202900283U (zh) * | 2012-11-01 | 2013-04-24 | 济南城建集团有限公司 | 钢管混凝土支护结构 |
CN103244142A (zh) * | 2013-05-23 | 2013-08-14 | 中煤科工集团武汉设计研究院 | 隧道式敷设输煤管道柔性模板混凝土条带支护装置及方法 |
Non-Patent Citations (1)
Title |
---|
李为腾等: "方钢约束混凝土拱架套管节点抗弯性能研究", 《中国矿业大学学报》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545349A (zh) * | 2016-11-23 | 2017-03-29 | 山东大学 | 一种适用于隧道拱架自动化装配的节点装置及安装方法 |
CN106759374A (zh) * | 2016-11-23 | 2017-05-31 | 山东大学 | 装配式地下工程支护拱架节点自动连接装置及施工方法 |
CN106759374B (zh) * | 2016-11-23 | 2019-08-20 | 山东大学 | 装配式地下工程支护拱架节点自动连接装置及施工方法 |
CN108266204A (zh) * | 2016-12-30 | 2018-07-10 | 山东大学 | 装配式约束混凝土拱架核心混凝土灌注设备及工艺 |
CN108266204B (zh) * | 2016-12-30 | 2019-12-24 | 山东大学 | 装配式约束混凝土拱架核心混凝土灌注设备及工艺 |
CN106644728A (zh) * | 2017-02-24 | 2017-05-10 | 中国矿业大学(北京) | 一种基于超大断面隧道围岩分级的点荷载试验分析方法 |
CN108104832A (zh) * | 2017-11-28 | 2018-06-01 | 山东大学 | 地下工程装配式约束混凝土拱架及机械化施工方法 |
CN108104832B (zh) * | 2017-11-28 | 2019-12-06 | 山东大学 | 地下工程装配式约束混凝土拱架及机械化施工方法 |
CN107905261A (zh) * | 2017-12-08 | 2018-04-13 | 山东大学 | 地下工程装配式拱架自动连接装置及施工方法 |
CN109057821A (zh) * | 2018-09-28 | 2018-12-21 | 浙江八达隧道工程股份有限公司 | 公路软岩隧道双层拱架支护施工***及其施工方法 |
CN110295926A (zh) * | 2019-06-04 | 2019-10-01 | 中交路桥建设有限公司 | 一种隧道初支钢拱架安装垂直度控制方法 |
CN111779511A (zh) * | 2020-08-07 | 2020-10-16 | 浙江省交通规划设计研究院有限公司 | 拱架节段、拱架、拱架制作方法及拱架安装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106014453B (zh) | 2018-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106014453A (zh) | 一种适用于地下隧道的约束混凝土拱架支护自动化施工方法 | |
CN106677811A (zh) | 一种隧道自动化施工设备及施工方法 | |
CN205977245U (zh) | 一种道路多功能机械化隧道支护台车 | |
CN204002822U (zh) | 一种顶管管幕施工装置 | |
CN105605996A (zh) | 一种使用三臂凿岩台车在ⅳ级围岩中台阶法施工的方法 | |
WO2018090962A1 (zh) | 钢索取心钻机和能代替槽井探的绿色新工法 | |
CN103306687A (zh) | 软岩隧道长悬臂水平旋喷变形控制施工方法 | |
CN208650880U (zh) | 一种用于隧道支护施工设备的拱架安装机械手 | |
CN104532842B (zh) | 一种套管回转摩擦型分断法拔桩施工方法 | |
CN205712137U (zh) | 基坑支护结构 | |
CN103075102A (zh) | 煤矿用多功能分体式履带钻机 | |
CN103195439B (zh) | 用于隧洞施工的多功能作业台车 | |
JP7257709B1 (ja) | 石炭採掘中の岩層制御のための伸縮式自己適応型掘進支持装置 | |
CN108506015A (zh) | 一种大管径分仓开挖人工顶管及应用顶管开挖的施工方法 | |
CN107023309B (zh) | 拱架安装台车 | |
CN105065037A (zh) | 公路软岩隧道双层拱架支护施工方法 | |
CN106245985A (zh) | 液压电线杆立杆车 | |
CN104989272A (zh) | 上向反井钻井工艺 | |
CN203835262U (zh) | 一种桩孔扩底施工装置 | |
CN106014427A (zh) | 一种接收顶管机的施工方法以及施工用的钢套筒 | |
CN112539066A (zh) | 一种岩溶发育长大隧道快速施工方法 | |
CN105756678A (zh) | 悬臂搭载式辅助装置及其工作方法和应用 | |
CN106013150A (zh) | 一种压桩机 | |
CN105888678A (zh) | 一种智能化挖掘顶管机 | |
RU2493367C1 (ru) | Способ строительства вертикальной выработки буровзрывным способом с тюбинговой обделкой и проходческий комплекс для осуществления способа |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Qi Inventor after: Jiang Bei Inventor after: Luan Yingcheng Inventor before: Wang Qi Inventor before: Lu Wei Inventor before: Gao Song Inventor before: Xu Hongbin Inventor before: Gao Hongke Inventor before: Jiang Bei Inventor before: Luan Yingcheng Inventor before: Li Shucai Inventor before: Qin Qian Inventor before: Sun Huibin Inventor before: Pan Rui Inventor before: Yu Hengchang Inventor before: Wang Lei |
|
GR01 | Patent grant | ||
GR01 | Patent grant |